Loading...
HomeMy WebLinkAboutR-2019-102 City Supporting Broward County Metropolitan Planning Organization's (''MPO'') Commitment 2045 Metropolitan Transportation Plan and The City of Dania Beach Projects Identified in Such Plan. RESOLUTION NO. 2019-102 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, SUPPORTING BROWARD COUNTY METROPOLITAN PLANNING ORGANIZATION'S ("MPO") COMMITMENT 2045 METROPOLITAN TRANSPORTATION PLAN AND THE CITY OF DANIA BEACH PROJECTS IDENTIFED IN SUCH PLAN; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Dania Beach ("City") has identified a roadway construction Transportation Plan Projects List within the municipality("Transportation Plan Projects List"),for which the City is requesting adoption by the Broward County Metropolitan Planning Organization ("MPO") in the Broward County MPO Long Range Transportation Plan ("LRTP") - Affordable and Unfunded Roadway Transportation Plan Projects List; and WHEREAS,the MPO approved the draft Commitment 2045 Metropolitan Transportation Plan ("MTP") Cost Feasible Plan on May 9, 2019; and WHEREAS,the transportation projects in the City have been identified as a transportation need and are currently ranked projects in the approved draft 2045 Metropolitan Transportation Plan Cost Feasible Plan, a copy of which is attached as Exhibit "A" and is incorporated into this Resolution by this reference, with other unranked projects to be included in the "needs and unfunded" portion of the MTP; and WHEREAS, the City of Dania Beach commits to work with the MPO, transportation partners and the public to prepare for project(s) for programming in the MPO Transportation Improvement Program; and WHEREAS, the City Commission deems it to be in the best interest of the citizens and residents of the City of Dania Beach to support the Broward MPO MTP; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the foregoing "WHEREAS" clauses are ratified and confirmed as being true and correct and they are made a specific part of this Resolution. Section 2. That the City supports the transportation projects identified in this Resolution for inclusion with the MPO MTP Cost Feasible Plan, as well as other projects that should be included in the "needs and unfunded" portion of the Plan. Section 3. That the City Manager is authorized to do all that is necessary and expedient in order to carry out the aims of this Resolution. Section 4. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 5. That this Resolution shall take effect immediately upon adoption. PASSED AND ADOPTED on September 10, 2019. ATTEST: THOMAS SCHNEIDER, CMC LORI LEWELLEN CITY CLERK � MAYOR q�I/SHEO�� APPROVED AS T FORM AND CO SS: W1- THO A . A BRO /CITY ATT Y 2 RESOLUTION#2019-102 i EXHIBIT `A' City of Dania Beach Commitment 2045 Metropolitan Transportation Plan (MTP) Cost Feasible Project List PROJECT NAME LOCATION PROJECT DESCRIPTION SR 822/Sheridan St Sheridan St Expand roadway from 4 lanes to From: 6 lanes • Dixie Hwy To: • US1 Old Griffin Rd Old Griffin Rd/Griffin Rd Reconfiguration of the Intersection intersection and roadway of Old From: Griffin Rd and Griffin Rd. • Bryan Rd Includes capacity improvements To: for westbound Old Griffin Rd • Griffin Rd from Bryan Rd. to Griffin Rd • Improved si nalization timing US1 / 595 Westbound US1 Improve intersection alignments on-ramp From: along US1 and add additional • 1711 Street lane to US1 /1-595 westbound To: on ramp to help reduce queuing • 1-595 on US1. West Dania Beach West Dania Beach Blvd Roadway improvements Blvd Corridor From: Intersection improvements on • US1 local roads, To: Bridge over C-10 canal, • Bryan Rd • Signalization intersection at Bryan Rd, • Improvements to railroad crossing. • Potential ROW acquisition, South Florida Rail South Florida Rail . Grade Separation for Stirling Rd I Corridor Corridor at the CSX RR From: • Stirling Rd To: • CSX RR Ravenswood Rd Ravenswood Rd • Expand roadway from 2 lanes to From: 4 lanes • SW 42"d St To: • Griffin Rd i Page 1 of 3 i I i EXHIBIT `A' { City of Dania Beach Commitment 2045 Metropolitan Transportation Plan (MTP) Needs and unfunded Project List I PROJECT NAME LOCATION PROJECT DESCRIPTION JA Ely Boulevard Ely Boulevard • Enhanced sidewalks, ADA ramps, From: paving, drainage and bike lanes • Stirling Rd. • Project has been coordinated with To: the City of Hollywood • Sheridan St. South Broward 1-95 1-95 . PD&E for 1-95 interchange Interchange PD&E From: expansion and improvements at • Griffin Rd Griffin Road, Stirling Road and To: Sheridan Street • Sheridan St • Project will be coordinated with Hollywood, Fort Lauderdale and FDOT SR 5/US 1 US-1 • Upgrades to support enhanced bus From: service along US-1 • Aventura Mall To: • Downtown Fort Lauderdale Terminal j SE 5th Ave SE 5th Ave • Reconstruct roadway to include ` From: multimodal improvement for • Dania Beach pedestrians, bicycles and transit Blvd . As an extension and in coordination To: with the NE 14'h Ave project • Sheridan St (Hollywood) k Intersections of SW SW 40 AVE . Geometric Improvements 40th Ave at Griffin . Intersection at . Expand number of turn lanes and Road and Stirling Stirling Rd storage Road • Intersection at . Signalization timing Griffin Rd Intersection of US-1 & US1 • Roadway, railroad, signal and turn Old Griffin Road Intersection at lane improvements (including US-1 Old Griffin Rd Bridge) Page 2 of 3 I 1 I EXHIBIT `A' City of Dania Beach i Commitment 2045 Metropolitan Transportation Plan (MTP) Needs and Unfunded Project List PROJECT NAME LOCATION PROJECT DESCRIPTION i Bryan Road Bryan Rd • Widen ROW and roadway expansion j From: from 2 lanes to 4 lanes i • Stirling Rd To: • Griffin Rd I I I i i i i I I i Page 3 of 3 i f