HomeMy WebLinkAboutR-2019-118 City Authorizing the Expenditure of Funds by The City for Services to be Purchased from R.J. Behar & Company, Inc. for Construction Engineering & Inspection Services for Various Locations RESOLUTION NO. 2019-118
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE EXPENDITURE OF FUNDS BY
THE CITY OF DANIA BEACH FOR SERVICES TO BE PURCHASED FROM
R.J. BEHAR & COMPANY, INC. FOR CONSTRUCTION ENGINEERING
AND INSPECTION SERVICES FOR VARIOUS LOCATIONS FOR THE
DANIA BEACH CITYWIDE PROJECT IN THE AMOUNT OF NINETY
THOUSAND EIGHT HUNDRED EIGHTY SEVEN DOLLARS AND
TWENTY CENTS ($90,887.20), THAT EXCEEDS AN ANNUAL VENDOR
TOTAL AMOUNT OF TWENTY FIVE THOUSAND DOLLARS ($25,000.00);
AUTHORIZING SUCH AGREEMENT; PROVIDING FOR CONFLICTS;
FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the Charter of the City of Dania Beach, Part III, Article 3, Section 4,
Subsection 0), authorizes the City Manager to purchase supplies, services, equipment and
materials for the City government in amounts in excess of the established monetary threshold
without competitive bidding and without advertisement for bids if she is authorized to do so in
advance by a resolution adopted by the City Commission; and
WHEREAS, the Dania Beach Code of Ordinances, Chapter 2, Article 1, Section 2-10,
"Monetary thresholds for certain purchases and payment disbursement authorizations", subsection
(a), sets the monetary threshold at Twenty Five Thousand Dollars ($25,000.00) for a vendor for
each fiscal year; and
WHEREAS, the Public Service Department requires Construction Engineering and
Inspection services to implement the"Dania Beach Citywide—Various Locations Project"; and
WHEREAS, the City Commission appropriated funding for Construction Engineering
Inspection ("CEI") Services on December 11, 2018 by Resolution No. 2018-168, a Local Agency
Program Agreement with the Florida Department of Transportation to fund in part the "Dania
Beach Citywide—Various Locations Project"with grant funds; and
WHEREAS, the Public Services Department solicited a proposal for CEI services from R.
J. Behar & Company, Inc. in the amount of Ninety Thousand Eight Hundred Eighty Seven
Dollars and Twenty Cents ($90,887.20)to be appropriated from the approved TAP Transportation
Alternative Account No. 103-39-59-541-31-30; and
WHEREAS, the proposal from R.J. Behar & Company, Inc. will exceed the annual
Twenty Five Thousand Dollars ($25,000.00) City threshold for a single vendor and, therefore,
City Commission approval is required; and
WHEREAS, R.J. Behar & Company, Inc. was chosen as one of fifteen firms designated as
an approved engineering consultant by the City Commission on October 25, 2016 and formally
approved in connection with RFQ No. 16-004 under Resolution No. 2016-142;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the above "WHEREAS" clauses are ratified and confirmed, and they
are made a part of and incorporated into this Resolution by this reference.
Section 2. That the City Commission authorizes professional services by R.J. Behar&
Company, Inc. in the amount of Ninety Thousand Eight Hundred Eighty Seven Dollars and
Twenty Cents ($90,887.20) for construction engineering and inspection services.
Section 3. That all appropriate City officials are authorized to execute a contract with
R. J. Behar& Company.
Section 4. That funding is available and appropriated in the Grant Fund
Transportation Alternative Account#103-39-59-31-30.
Section 5. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 6. That this Resolution shall become effective upon its passage and adoption.
PASSED and ADOPTED on October 7, 2019.
ATTEST:
THOMAS SCHNEIDER, CMC LORI LEIVELLEN
CITY CLERK e�`� �0� MAYOR
�eI/SHE�'�
APPROVED AS O AND CORRECTNESS:
THOMM J. A SB O
CITY ATTO Y
2 RESOLUTION#2019-118
R.J.Behar & Company, Inc.
Engineers • P i a n n e r s
6861 SW 196th Avenue,Suite 302
Pembroke Pines, FL 33332
Consultant Project Proposal
September 26,2019
Mr. Curt A. Keyser, P.E.
Consultant Engineer
City of Dania Beach
1201 Stirling Road
Dania Beach, FL 33004
RE: Citywide Pedestrian Safety Project
CRA Multimodal Improvements
ITB No. 19-004
Financial Project ID No. 438282-1-58-01
Dear Mr. Keyser:
R.J. Behar&Company, Inc. (The Consultant) proposes to provide the services identified below for the
project entitled Citywide Pedestrian Safety Project-CRA Multimodal Improvements—ITB No. 19-004,
I. General
R.J. Behar&Company, Inc.(RJ Behar) appreciates the opportunity to submit this proposal for providing CEI
Services associated with the above-referenced project. Herein,we provide a general discussion of services
that we understand will be required for this project and present our Schedule of Fees for such services. It is
understood that this project is receiving FHWA Federal Funding via the Florida Department of Transportation
(FDOT) LAP Program. It is also understood that this project is designated as an"Off the State Highway(Off-
System) LAP Project. In addition to inspection and coordination, RJ Behar will coordinate with and provide
FDOT with all the required information to ensure compliance with all LAP requirements.
Construction contract time established for this project is 210 calendar days from the issuance of the Notice
to Proceed to Final Construction Completion. Should this project exceed the estimated time, then RJ Behar
reserves the right to seek additional fees for their CEI Services.
II. Scope of Work
RJ Behar shall provide the CEI services, on a part-time basis as requested by the City, required for contract
administration, inspection, and materials sampling and testing for the Citywide Pedestrian Safety
(CRA Multimodal Improvements) Project. RJ Behar shall perform the services necessary to coordinate the
activities of all parties involved in completing the Project, which includes maintaining complete and accurate
records of the Project;documenting all significant Project changes; assisting the City with interpreting plans,
specifications,and construction contract provisions;making recommendations to the City to resolve disputes;
and coordinating with FDOT for LAP requirement compliance.
A. Task 1 —Construction
1.1 Pre-Construction Phase — Schedule and attend, within ten (10) days after the Notice to
Proceed, a pre-construction meeting for the Project in accordance with City procedures. The
Consultant shall provide appropriate staff to attend and participate in the pre-construction
meeting,
1.2 Construction Phase—Document contractor's activities and verify quantities for payment.
a. LAP Monitoring: Request and obtain access to FDOT LAP reporting documentation systems: Local
Area Program Information Tool (LAPIT) and Equal Opportunity Compliance (EOC). Conduct and
submit labor interviews for conformance with wage rates and Commercially Useful Function
(CUF) DBE monitoring reports. Prepare and submit monthly LAP progress report(s), upload
contract documents, payment applications, change orders, and related documents into
LAPIT. Attend/Participate in all compliance/construction audits by FDOT's Oversight
Consultant; Maintaining project documents and files up to date and current, and in
accordance with the FDOT requirements and final submittals. RJ Behar will assist the City
with putting together their reimbursement package to FDOT as per the LAP agreement.
b. Project Journal: Maintain both a detailed electronic and hard copy diary with records of the
Contractor's operations, quantities, testing data, and significant events that affect the work
while the inspector is on site. Upload daily construction reports onto LAPIT.
c. Project Meetings:Administer project pre-construction,pre-paving,and progress meetings,as
needed with appropriate team members in attendance. Prepare and distribute meeting
agenda and minutes to attendees. Progress meetings will be scheduled as needed.
d. Traffic Control: Responsible for review of Work Zone traffic control plan implementation, and
inspection of maintenance of traffic schemes and devices in work zones to assure they are
in accordance with the City's requirements.
e. Environmental Control Monitoring: Monitor Contractor's work and assure that the Contractor
is conducting stormwater inspections, preparing reports, and monitoring all Stormwater
pollution prevention measures associated with the project.
f. Review and Process Contractor's Applications for Payment: Receive and review draft
application for payment prepared by the Contractor, reconcile any discrepancies between
contractor's quantities and consultant's field measured quantities. Final revised payment
application will be submitted to the City with Consultant's recommendation for payment
processing.
g. Contract Interpretations and Modifications: Receive, log, and coordinate reviews and
responses to Contractor's Requests for Information/Interpretations (RFI's) from the EOR,
following the City's approval and concurrence.
h. Administration of Changed Work:Track changes from initiation through completion. Estimate
cost and time impacts and assist with negotiation of changes in contract time and cost.
Prepare change orders to incorporate changes within Contract Documents. Evaluate the
Project on a continual basis to determine when changes are required. Review costs
presented by Contractor on Change Proposal Requests.Assist with negotiation of final pricing
as required. Assemble approved Change Proposal Requests periodically into Change
Orders. Include justification documents with each Change Order. Review as-built drawings to
verify changes in work are reflected as applicable. Provide FDOT with change order
documents for concurrent review. Review pay requests to verify Change Order items are
broken out and that payment is not made until work is complete.
1.3 Closeout Phase—
a. Substantial Completion: Receive and review Contractor's required substantial completion
submittal and schedule substantial completion inspection.
b. Conduct Substantial Completion Inspection: Coordinate, conduct, and document the
substantial completion inspection. Notify all project team members of date of substantial
completion inspection. Prepare and distribute the punch list. Review progress of corrective
action on punch list items and notify City when Substantial Completion has been achieved.
c. Final As-Built Record Drawing Review: Review as-built drawings to verify that the Contract
Drawings are properly noted to reflect actual construction;notify the Contractor of deficiencies
noted; provide follow up to verify if corrections were made and that the as-built drawings are
up to date.
d. Final Completion: Receive and review the Contractor's required final completion submittal.
Verify submittal of all required documents and review for completeness and compliance with
Contract provisions.Coordinate,attend and conduct the final inspection meeting and physical
walk-through of the Project.
e. Final Payment: Collect all payment documents required and forward to the City Project Manager for
processing along with the Contractor's Final Application and Certificate for Payment;finalize all project
costs and determine the final adjusted amounts for construction;obtain the Contractor's signature on
any required Contractor's Certification of Affidavits; process and sign Final Application for Payment;
prepare transmittal letter indicating recommendation for Final Payment.
B. Task 2—Verification Laboratory Material Sampling &Testing Services
2.1 Material Testing and Acceptance—Our CEI Team will review the Contractor's QC Plan
prior to project commencement for adequacy. It is important that all materials brought to the
project come from an FDOT approved source, be certified,and/or be on the FDOT Approved
Products List (APL). It is also very important that all manufacturing processes take place
domestically, according to the "Buy America" provisions that are required on all Federal
(LAP) Funded Projects.
Sampling and Laboratory Testing
Sample and test Proctors and LBR
Test concrete cylinders for compressive strength.
Provide Professional Engineer to sign and seal reports
III. Subconsultants
The following Subconsultants will assist in the performance of the Services under the Agreement,
(add additional pages as needed)
Subconsultant's Name Specialty of Expertise
To Be Determined Verification Laboratory Testing Services
IV. Schedule of Work—Time for Performance
Consultant will submit the deliverable and perform the Services as stated in the table below:
(add additional pages as needed)
Schedule of Deliverables
Task,Sub-Task Duration Delivery
or Activity ID# Major Task,Sub-Task Activity,or Deliverable (specify weeks or (cumulative weeks
calendar days) or calendar days)
1.1 Pre-Construction Phase 2 weeks NTP+2 weeks
1.2, 2.1 Construction Phase and VT Laboratory Testin 30 weeks NTP+32 weeks
1.3 Closeout Phase 4 weeks NTP+36 weeks
V. Compensation
Consultant shall perform the Work detailed in this Proposal for a total Not to Exceed Ninety Thousand, Eight
Hundred Eighty-Seven and Twenty Cents($90,887.20). The City shall not be liable for any fee,cost,expense
or reimbursable expense or other compensation beyond this amount unless approved in a supplemental
Work Order.
The following is a summary of the method and amount of compensation to be paid for each Task or Activity
as identified in Section IV above.
Schedule of Deliverables
Task,Sub-Task Major Task,Sub-Task Activity,or
or Activity ID# Deliverable Fee Amount Fee Basis
1.1 Pre-Construction Phase $5,524,20 fixed fee
1.2 Construction Phase $71,814.60 fixed fee
1.3 Closeout Phase $11,048.40 fixed fee
2.1 Verification Laboratory Testing Services $2,500.00 fixed fee
Subtotal—Professional Fees $90,887.20
Allowance for Reimbursable Expenses $Enter
Allowance
TOTAL $90,887.20
VI. Exclusions from Basic Services
The following services are not included in the Basic Services to be performed under this Work Order:
Surveying Services
Engineering and/or Design Services
VII. City Furnished Documents &Data
Approved Permitted Construction Plans
Contractor's Invitation to Bid Documents
Executed Contract between the Contractor and City of Dania Beach
LAP Agreement between City of Dania Beach and FDOT, including any Supplemental Agreement
Contract Specifications
Technical Special Provisions, if any
Applicable Permits
1 R.J. Behar2cQrnpawV1�1C.
Sig
David G. Romano/Director of Construction Management Services
Name/Title
9/26/2019
Date
City of Dania Beach*
Dept.Approval:
Signature Name/Title
Procurement:
Signature Procurement Manager
City Manager:
Signature City Manager
R.j.Behar & Company, Inc.
4 E n g i n e e r s - P l a n n e r s
Project Name: Citywide Pedestrian Safety Project— CRA Multimodal Improvements—(ITB Number: 19-004)
Financial Project Number: 438282-1-S8-01
Client: City of Dania Beach
CEI Start Time: TBD
I
CEI End Time: TBD
Construction Duration: 210 Calendar Days(estimated)
Calendar Months: 8 Months(estimated)
Dania Beach Multimodal Enhancements
2019
Name Position Months Man Months Man
2 3 4 5 6-T-7 8 (MM) Hours (MH) Rate Total Cost by Dollars
i
Senior PrajectEngineer 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40 70 198 $13,939.20
Resident Compliance Specialist 0.375 0.375 0.375 0.375 0375 0.375 0.375 0.375 1 3,00 528 65 $34,320.00
I
Senior Inspector 0.300 0.300 0,300 0.300 0.300 0.300 0.300 0,300 2.40 422 1 95 $40,128.00
SubTotal- 0.7 0.7 03 0.7 0.7 0.7 0.7 0.7 5.8 728 1 $88,387.20
VT Laboratory and Geotechnical Services: $2,soo.00
Total CEI Services $90,887.20
1. Verification Geotechnical Laboratory Testing Services have been added to the CEI scope of services.
2. Surveying Services are not included as part of this fee proposal; if required by the City,these services can be provided for an added cost.