Loading...
HomeMy WebLinkAboutR-2020-026 City Authorizing to Engage Services from A.F.L.C. Inc. in the Amount of Twenty Two Thousand Nine Hundred Twelve Dollars ($22,912.00) for Boisey Waiters Property Located at 1399 Stirling Rd RESOLUTION NO. 2020-026 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO ENGAGE SERVICES FROM A.F.L.C. INC. IN THE AMOUNT OF TWENTY TWO THOUSAND NINE HUNDRED TWELVE DOLLARS ($22,912.00) FOR THE DEMOLITION OF TWO BUILDINGS LOCATED AT THE BOISEY WAITERS PROPERTY LOCATED AT 1399 STIRLING ROAD; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, two City-owned unoccupied buildings are currently located on a 2.4 acre City property located on Stirling Road known as the Boisey Waiters parcel; and WHEREAS, these buildings are in a state of disrepair and have been used exclusively for storage over the past two decades; and WHEREAS, the buildings are no longer useful and only limit use of the land upon which the structures are located; and WHEREAS, City Administration deems it necessary and appropriate to demolish the buildings and grade the terrain so that future uses of the property include a full range of options; and WHEREAS, the Public Services Department has obtained three (3) quotes for the demolition and site work, resulting in A.F.L.C. Inc., being recommended as the lowest priced qualified respondent; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above "WHEREAS" clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That the City Commission authorizes the City Manager to purchase services from A.F.L.C. Inc. at a cost of Twenty Two Thousand Nine Hundred Twelve Dollars ($22,912.00) for the demolition of structures located at 1399 Stirling Road. Section 3. That funding for these services shall be appropriated from General Fund Unassigned Fund Balance, requiring a budget amendment that increases both revenue and expenditure accounts, as follows: Appropriated Fund Balance: 001-00-00-389-90-01 $22,912.00 Public Services R&M Buildings: 001-39-02-539-46-40 $22,912.00 Section 4. That the City Manager and City Attorney are authorized to make minor revisions to the necessary documents as are deemed necessary and proper and in the best interest of the City. Section 5. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 6. That this Resolution shall be in force and take effect immediately upon its passage and adoption. PASSED AND ADOPTED on March 10, 2020. ATTEST: THOMAS SCHNEIDER, CMC �, O LEW LEN CITY CLERK MAYOR �$tIs APPROVED AS FO AND CORRECTNESS: THOMA Y 'ANSBR CITY ATTORNEY 2 RESOLUTION#2020-026 A.FL. C INC. SUBMITTED TO: City of Dania Beach DATE:2/5/2020 ATTENTION: Carl Kallicharan JOB NAME: { ADDRESS: 1201 Stirling Road Dania Bch FL,33004 JOB ADDRESS: 1399 STIRLING ROAD OFFICE: (954)924-6808 x3745 Dania Beach Fl,33004 CELL:(954)643-8685 EMAIL: ckallicharan@daniabeachfl.com We hereby submit specifications for a complete demolition of structures at the above referenced addresses. Scope Of Work: 1-Demolition includes removing and hauling away existing two 1story CBS structures of approximately 3,036sgft g 2-Demolition includes removing and hauling away all existing foundation,footers and associated pipes. 3-Demolition includes grade disturbed area with no backfill of new material. 4-AFLC.INC. is responsible for permit processing and utilities capping(water,sewer,fpl). Exclusions: Permits Fees(City,Utilities,Derm),Property Survey, Tree Survey, Asbestos Survey&Abatement Cost, Removal Of Asphalt Driveway, Removal Of Trees, Fill Material Or Top Soil, MOT Fees, Installation Of Perimeter Fence,Installation Of Sod Cost: We hereby propose to furnish equipment and labor to complete in accordance with the above specifications,for the sum of $22,912.00 with payment to be made when job has been completed. Price is valid for 90 days after the above-mentioned screening is completed.Job is to be completed within 15 working days from job commencement. Any alteration or deviation from above specifications involving extra costs,will be executed only upon written orders, and will become an extra charge over and above the estimate. f I I I Time Of Commencement: The work to be performed under this agreement shall be commenced after a Notice of Commencement is filed and no later than a notice to proceed and all permits have been issued. All work shall be performed in an expeditious manner. General Conditions: 1. AFLC,Inc.is not responsible for any damage to existing asphalt driveway. 2. AFLC, Inc. is not responsible for inevitable damage done to walls and foundation. 3. AFLC,Inc. has all salvage rights. All existing recyclable items are included in this proposal price. There items included,but are not limited to the following: aluminum,copper, electrical panels,furniture,anything of value, etc. any items needed to be salvage by Owner or GC that is not part of AFLC's recycling proceeds counted in the given estimate is to be removed prior to commencement of demolition. 4. All items removed by AFLC, Inc. including the proceeds,if any,shall become property of AFLC, Inc.. 5. AFLC will not take responsibility for any damages that may occur to salvageable items once work has commenced. 6. If bonds are required,Owner will provide applicable bonds at no cost to AFLC, Inc. 7. AFLC, Inc.also guarantees to remove all equipment of said project location upon completion of demolition. 8. AFLC, Inc. is not responsible for unforeseen consequences or events due to failure of structures and/or building materials not seen. ACCEPTANCE OF CONTRACT The above prices, specifications and conditions are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Signature: Signature: Name: Name: Title: Title: Date: Date: AGREED AND ACCEPTED BY AFLC INC. CC#15BS00350/CC#18-D-21165-R Office:954.923.6004 TA Toll Free: .923.6004 Fax:954.923.60.8005 DECOEmail:office@decotagroup.com CONSTRUCTION Licensed&Insured coc 1516667 1502 South Federal Hwy Dania Beach,FL 33004 www.DECOTAt3ROURcom February 7th 2020 City Of Dania 100 W Dania Beach FI 33004 Estimate: SCOPE OF WORK Fee Total Demolish and hall away 2 structional building $42,000.00 $42,000.00 1399 Sterling Road Total Amount Due: $42,000.00 If you have any questions, please do not hesitate to contact me. Very truly yours, Decota Construction, Inc. 1502 South Federal Highway,Dania Beach,FL 33004,(t)954 923 6004,(f)954 923 6005 RICK HAMANN AND SONS DEMOLITION, INC. W W W.HAMANNANDSONS.C OM 4023 W. Lake Estates Dr. Office (954) 434-8937 Davie, FL 33328 Fax (954) 434-7191 License #02-10556-D Mobile (954) 325-4451 Date: 2/10/20 Name: City of Dania Beach Contact Number: Job Location:1399 Stirling rd Dania Price: $59,000 TERMS AND CONDITIONS We propose to furnish all permits,equipment, labor, insurance,materials, and all required licenses, to complete the scope of work listed below. City of dania beach to waive all permit fees and supply property survey,FPL letter and sewer cap&hose bib.Payment due upon completion. Work will commence within_ days after receipt of the properly accepted contract and will be completed within`working days after starting date, as long as permits are issued on time. SCOPE OF WORK i f 1. Demolish and remove entire structure at above address including slabs,footers, and all debris associated with the demolition. Small trees and shrubs in the right of way of demolition will be removed. Job will be left spotless when completed. € k ACCEPTANCE IF ACCEPTING PLEASE SIGN AND RETURN VIA EMAIL OR FAX#954-434-7191 THIS PROPOSAL IS EXPRESSLY SUBJECT TO THE GENERAL CONDITIONS STATED ABOVEYRICE IS GOOD FOR 90 DAYS. Richard A. Hamann, Sr. (Date) € President i 6 ACCEPTANCE (Date) i I G I I I