Loading...
HomeMy WebLinkAboutR-2020-027 City Authorizing Expenditure of Funds by Public Services Dept. for Svcs to be Purchased from Calvin, Giordano & Associates, Inc., to Provide Design, Permitting, & Construction Engineering RESOLUTION NO. 2020-027 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE EXPENDITURE OF FUNDS BY THE PUBLIC SERVICES DEPARTMENT FOR SERVICES TO BE PURCHASED FROM CALVIN, GIORDANO & ASSOCIATES, INC., TO PROVIDE DESIGN, PERMITTING, AND CONSTRUCTION ENGINEERING INSPECTION (CEI) SERVICES FOR THE DANIA COVE DRAINAGE IMPROVEMENT PROJECT IN THE AMOUNT OF THIRTY THREE THOUSAND TWO HUNDRED EIGHTY FIVE DOLLARS ($33,285.00); AUTHORIZING SUCH PURCHASE TO BE MADE WITHIN THE PUBLIC SERVICES DEPARTMENT'S BUDGET; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Charter of the City of Dania Beach, Part III, Article 3, Section 4, Subsection 0), authorizes the City Manager to purchase supplies, services, equipment and materials for the City government in amounts in excess of the established monetary threshold without competitive bidding and without advertisement for bids if she is authorized to do so in advance by a resolution adopted by the City Commission; and WHEREAS, in the Dania Beach Code of Ordinances, Chapter 2, Article 1, Section 2-10, "Monetary thresholds for certain purchases and payment disbursement authorizations", Subsection (a), sets the monetary threshold at Twenty-Five Thousand Dollars ($25,000.00) for a vendor each fiscal year; and WHEREAS, the Public Services Department requests approval of a Professional Services Agreement to purchase professional engineering services for design, permitting, and construction engineering inspection (CEI) services for the Dania Cove Drainage Improvement Project from Calvin, Giordano & Associates, Inc., ("CGA") in the amount of Thirty Three Thousand Two Hundred Eighty Five Dollars ($33,285.00) attached as Exhibit"A"; and WHEREAS, CGA was chosen as one of fifteen firms awarded as an approved engineering consultant for continuing contract services by the City Commission on October 25, 2016 pursuant to RFQ No. 16-004 under Resolution No. 2016-142, and it entered into an agreement with the City on November 15, 2016; and WHEREAS, the Public Services Director has determined that CGA can provide various professional engineering evaluations and services for minor drainage improvements at the north end of Southwest 251h Terrace to include an evaluation of needed drainage improvements such as a new catch basin and pipe located in Dania Cove; and WHEREAS, funding is available and appropriated in the Professional Services Engineering Account No. 403-38-01-538-31-30 for the current budget year and made in accordance with the City Purchasing Policy for such fiscal year; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above "Whereas" clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That the City Commission authorizes a Professional Services Agreement for professional engineering services and construction engineering inspection (CEI) services by Calvin, Giordano & Associates, Inc., in the amount of Thirty Three Thousand Two Hundred Eighty Five Dollars ($33,285.00). Section 3. That the Public Services Department purchase shall be subject to and made within the approved Professional Services Engineering Account No. 403-38-01-538-31-30 and in accordance with the City of Dania Beach Purchasing Policy for each fiscal year. Section 4. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 5. That this Resolution shall become effective upon its passage and adoption. PASSED and ADOPTED on March 10, 2020. ATTEST: ,A Y THOMAS SCHNEIDER, CMC LORI LE ELLEN CITY CLERK ISH�y MAYOR APPROVED AS TO F Al I CORRECTNESS: i THOMAS J. A SB CITY ATTORNEY 2 RESOLUTION#2020-027 CITY OF DANIA BEACH, FLORIDA PUBLIC SERVICES DEPARTMENT DANIA BEACH CCNA WORK ORDER SEAR LIVE IT.LOVE R. This is a work order(Work Order), dated , 20 , issued by the City of Dania Beach, Florida(the"City")to Calvin Giordano and Associates, Inc., (the "Consultant"), in connection with an Agreement dated November 15, 2016, existing between the City and the Consultant, which Agreement is incorporated by this reference. The Consultant shall perform work(the "Work") for the City as described in EXHIBIT ONE, a copy of which is attached and incorporated by this reference. The Work Order and any and all timeframes pertinent to the Work are specified in that exhibit. IN WITNESS OF THE FOREGOING, the parties have set their hands and seals the day and year first above written. CITY: ATTEST: CITY OF DANIA BEACH,FLORIDA a Florida Municipal Corporation TOM SCHNEIDER, CMC ANA GARCIA, ICMA-CM CITY CLERK CITY MANAGER APPROVED FOR FORM AND CORRECTNESS: THOMAS J.ANSBRO CITY ATTORNEY CITY OF DANIA BEACH,FLORIDA PUBLIC SERVICES DEPARTMENT %ANIA BEAM CCNA WORK ORDER(CONTINUED)-Dania Cove/SW 251 Terrace Drainage Improvements CONSULTANT: Calvin Giordano and Associates,Inc. WITNESSES: a Florida corporation(OR AS APPLIES) S URY TUBE l2atl mal +uk�' Chris Giordano PRIN NAME 1 l PRINT NAME • V Vice President SIGNATURE 1 ' TITLE L I ss e PRINT NAME STATE OF IDA COUNTY OF° The foregoing instrument was acknowledged be re me on 20?p, b �Q�S -tea as� ;srof 9 ,t' 'Florida 5,2Qr�L� L, on behalf of theC _-,x*'t¢fh6C_*3 H she is personally known to me or produced as identification and did(did not)take an oath. a"'r'o p.,, DAWN HOPKINS r° Notary Public-State of Florida a!AAL1_L-Ak_/� Commission x GG 039944 OTARY PUBLIC My Comm.Expires Feb 18,2021 State of Florida "' Bonded through Naiionai Notary Assn. My Commission Expires: a t EXHIBIT ONE Professional Services Agreement DATE: January 31, 2020 RE: Dania Cove/SW 251h Terrace Drainage Improvements CITY: City of Dania Beach 1201 Stirling Road Dania Beach, FL 33004 ATTENTION: Marjorie G. Craig,PE, Deputy Public Services Director/City Engineer CGA NO.: 19-2777.9 CITY NO.: 2017-001 CITY BID NO.: 14-047 Calvin, Giordano& Associates, Inc. (CGA) is pleased to submit this proposal for professional services on the above-referenced project to City of Dania Beach(CITY). The scope of work consists of providing design,permitting, and construction engineering inspection(CEI) services for minor drainage improvements at the north end of SW 251h Terrace to include a new catch basin and pipe that discharge into new and/or modified retention areas within the existing park. Permitting includes Broward County Surface Water Management(BCSWM)License only as no impacts to the wetlands, mangroves, or any shorelines are anticipated. The construction time is anticipated to be 4 weeks; as such,the project management and CEI services are based on this timeframe. If construction exceeds 4 weeks, CGA additional time shall be billed hourly based on the attached rates, with approval from the City or an Additional Services Agreement is required. The specific scope of services is detailed as follows: I. Engineering Design and Permitting($10,970.00) 1. Review the existing grades and provide design drawings and specifications for a new catch basin on SW 25th Terrace to outfall into the park. 2. Provide revised paving, grading and drainage plans for the park to modify the existing retention area to work around existing trees and add small retention areas on the west side of the park,where feasible, without impacting the shoreline or mangroves. 3. Meeting with City staff to confirm the design intent,review the plans, and proceed with permitting of the plans. 4. Prepare calculations required for drainage permitting. 5. Submit plans and supporting documents to BCSWM for drainage permits. 6. Respond to agency comments and resubmit plans to the permitting agencies listed above. 7. Provide final plans, specifications and permits to the City for advertising the i t project for bidding. II. Bidding Assistance and CEI Administration Services ($17,315.00) l. Attend the pre-bid meeting, assist the City in answering Requests for Information(RFI)and issuance of addenda during bid advertisement. 2. Participate in the review of the contractor's bids received by the city and provide a letter to the City with the results. Note—a full review will only be completed on the two apparent lowest bidders. If additional review is required,the time shall be billed hourly with approval from the City. 3. Schedule and conduct one (1)pre-construction meeting,prepare and distribute meeting minutes summarizing the items/issues discussed with the selected contractor(CONTRACTOR) 4. Log and review shop drawings for the proposed pipe and drainage structure (estimated 6 hours). If additional time is required to perform the reviews, CGA's time shall be billed at the hourly rate with approval from the CITY. 5. Coordinate prompt resolutions on any CONTRACTOR RFI's or of issues which may arise during the construction process 6. Overall CITY coordination to keep the CITY aware of the project's progress. 7. Review and verify quantities, coordinate revisions (if required), and provide recommendation of approval of CONTRACTOR'S monthly payment requests (estimated 3.0 hours per payment request, assuming 1 progress and 1 final pay request). 8. Provide construction inspections for compliance with plans and specifications and make field inspection reports (10.0 hours/week for estimated 4 weeks). 9. It is assumed that the City field supervisor will make daily periodic inspections and site visits to supplement CGA's construction oversight. 10. Review,negotiate, and prepare any work change directives (field change/ directives)or change orders requested by the CONTRACTOR or by the CITY. Assist with the CONTRACTOR'S requested plan deviations or material substitutions and provide the CITY with recommendation(s) 11. Review,prepare and distribute the punch list items for the substantial and final completion inspections. Upon acceptance of the work,prepare a recommendation of project acceptance and submit to the CITY. 12. Review as-builts provided by the CONTRACTOR,provide engineer's certification letter and permit close out. III. Items not included,but can be performed on an hourly basis,according to the attached rate sheet. 1. Redesign and value engineering of the construction documents after submittal to the City. 2. Environmental Resource License (ERL) or Army Corp of Engineer(ACOE) permitting relating to the shoreline or mangrove impacts. 3. Evaluate requested deviations from the approved design or specifications during the construction period/Contract Time. 4. Any other items not included above such as landscape plans, additionally survey, traffic engineering, etc. III. Miscellaneous Services Requested by the CITY. 1. This fee is for miscellaneous and unforeseen items that may come up during the scope of this proposal or additional survey that may be needed. This task is hourly and can only be utilized if approved by the CITY($5,000.00, on an hourly basis) CGA will perform the above Scope of Services for a lump sum fee of$33,285.00. The attached table provides the staff hour breakdown for these professional services. S Dania Cove-labor Matrix 1/31/2020 Jr Engineer I Project Manager Sr CADD Manager Construction Manager Sr.Inspector Clerical Total Total Rate/hour $100 00 $150 00 $115.00 $125.00 $100.00 $75 00 Hours Cost Design and Permitting 0 44 38 0 0 0 82 $10,970.00 Design 20 24 Permitting 16 12 Provide Specifications and Contract Documents B 2 PERMITTING 0 0 0 0 0 0 0 $0.00 Submit Package to Building Department Dry-Run Respond to Agency Comments BIDDING 0 12 0 0 0 0 12 $1,800.00 Pmbid 4 RFIS 4 2 Review bids 4 2 CEI 12 44 4 14 48 7 131 $15,515.00 Pre-construction meeting 2 2 2 Shop Drawing review 4 4 1 PM/General tasks during construction 10 4 Construction meetings 4 4 Contractor RFI's 4 2 4 Construction Observabon 4 40 Pay Requests 2 2 2 Review as-buI1M 6 2 Punchbst,Final Cert and dose out 4 10 4 41 2 TOTAL HOURS 12 100 42 14 48 7 225 $28,285.00 Mist. Hourly $S1000.00 TOTAL $33,28S.OD \\rtLF501\ProMd\Projects\2019\192777 Dania Beach DRC Review\Proposals\Proposal Files\Dania Cove-Labor Matrix