HomeMy WebLinkAboutR-2022-115 Kimley Horn and Associates Purchase of CEI Services for SW 43 Terrace Stormwater Improvements Project RESOLUTION NO. 2022-115
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE EXPENDITURE OF FUNDS BY
THE PUBLIC SERVICES DEPARTMENT FOR SERVICES TO BE
PURCHASED FROM KIMLEY HORN AND ASSOCIATES FOR
PROFESSIONAL ENGINEERING SERVICES TO PROVIDE
CONSTRUCTION ENGINEERING INSPECTION (CEI) SERVICES IN THE
AMOUNT NOT TO EXCEED NINETY-TWO THOUSAND TWO HUNDRED
DOLLARS ($92,200.00) FOR THE SOUTHWEST 43RD TERRACE
STORMWATER IMPROVEMENTS PROJECT; PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the Charter of the City of Dania Beach, Part III, Article 3, Section 4,
Subsection (j), authorizes the City Manager to purchase supplies, services, equipment, and
materials for the City government in amounts in excess of the established monetary threshold
without competitive bidding and without advertising for bids if she is authorized to do so in
advance by a resolution adopted by the City Commission; and
WHEREAS, Kimley Horn and Associates (KHA) was chosen as one of fifteen firms
approved as an engineering consultant for continuing contract services by the City Commission
on January 26, 2021,under RFQ No. 20-005 pursuant to Resolution No. 2021-007: and
WHEREAS, Broward County approved the SW 43rd Terrace Stormwater Improvements
Project as part of the Surtax Cycle 1 Capital Plan; and
WHEREAS, the Broward County Mobility Advancement Program determined that the
Surtax construction project requires a different engineer to provide post-design services other
than the engineering firm that designed the project; and
WHEREAS, KHA has provided the Public Services Department with a proposal for CEI
Services for the SW 43rd Terrace Stormwater Improvements Project in the amount not to exceed
$92,200.00.
NOW, THEREFORE,BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the above "Whereas" clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
Section 2. That the City Commission authorizes the purchases of professional
engineering services from KHA in the amount of $92,200.00 to provide limited construction
phase services for the SW 43RD Terrace Stormwater Improvements Project and that Broward
County approved Surtax Cycle 1 funding for post design engineering services for this project.
Section 3. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 4. That this Resolution shall become effective upon its passage and adoption.
PASSED AND ADOPTED on August 23, 2022.