Loading...
HomeMy WebLinkAboutR-2022-147 Smith Engineering Consultants, Inc. Bid Award and Agreement for Professional Engineering Services for Backup Power to Police Substation (Reissue) (RFQ 21-034) RESOLUTION NO. 2022-147 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE AN AGREEMENT WITH SMITH ENGINEERING CONSULTANTS, INC., THE SECOND-RANKED ENGINEERING DESIGN FIRM FOR THE BACKUP POWER TO THE POLICE SUBSTATION IN THE AMOUNT OF TWENTY-EIGHT THOUSAND DOLLARS ($28,000.00); PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Dania Beach entered into an agreement with the Florida Division of Emergency Management (FDEM) for Hazard Mitigation Grant Program (HMGP) Funds, awarded by the Federal Emergency Management Agency (FEMA), to provide a backup generator for a total cost of Two Hundred Sixty-Four Thousand Dollars ($264,000.00), twenty-five percent (25%) of which will be funded by the City with a potential waiver of this requirement through the Global Match Program; and WHEREAS, in accordance with FEMA procurement guidelines, the City issued Request for Qualifications ("RFQ") No. 21-032, entitled "Professional Engineering Services for Backup Power to Police Substation" on October 25, 2021, receiving only two of the CCNA-required three responses on November 22, 2021, causing the City Selection Committee to reject the responses; and WHEREAS, the City re-issued Request for Qualifications ("RFQ") No. 21-034, entitled "Professional Engineering Services for Backup Power to Police Substation (Reissue)" on December 9, 2021; and WHEREAS, the City received three responses on January 07, 2022 and a City Selection Committee composed of the City's Deputy Director of Public Services, Fleet Manager and the CIP/Grants Administrator met on March 15, 2022 to review and evaluate the submittals and ranked the three (3) highest qualified design firms based on their qualifications as follows: 1. SGM Engineering, Inc. 280 points 2. Smith Engineering Consultants, Inc. 256 points 3. Calvin, Giordano & Associates, Inc. 255 points; and WHEREAS, on April 12, 2022, the City Commission approved the ranking of the design firms and authorized the proper City officials to negotiate a contract with the highest-ranked firm SGM Engineering, Inc.; and WHEREAS, the Selection Committee was not able to negotiate an agreement with the top- ranked firm but proceeded to successfully negotiate an agreement with the second-ranked firm, Smith Engineering Consultants for contract price of$28,000.00; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above "Whereas" clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That the City Commission of the City of Dania Beach, Florida authorizes the proper City officials to execute a contract for professional engineering services for the design of backup power for the police substation with Smith Engineering Consultants in the amount of $28,000.00. Section 3. That funding in the amount of$28,000.00 will be appropriated from BSO Hardening Grant Account No. 103-21-65-521-31-30. Section 4. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 5. That this Resolution shall be in full force and take effect immediately upon its passage and adoption. PASSED AND ADOPTED on September 14, 2022. ATTEST: y THOMAS SCHNEIDER, CMC ` • TAMARA JAM CITY CLERK e�` dr.' MAYOR geUSH'9 APPROVED AS TO FORM AND CORRECTNESS: V A. OUTSIS Y A TORNEY 2 RESOLUTION#2022-147 December 9, 2021; and WHEREAS, the City received three responses on January 07, 2022 and a City Selection Committee composed of the City's Deputy Director of Public Services, Fleet Manager and the CIP/Grants Administrator met on March 15, 2022 to review and evaluate the submittals and ranked the three (3) highest qualified design firms based on their qualifications as follows: 1. SGM Engineering, Inc. 280 points 2. Smith Engineering Consultants, Inc. 256 points 3. Calvin, Giordano & Associates, Inc. 255 points; and WHEREAS, on April 12, 2022, the City Commission approved the ranking of the design firms and authorized the proper City officials to negotiate a contract with the highest-ranked firm SGM Engineering, Inc.; and