WHEREAS, the City Administration obtained conceptual renderings from Saltz Michelson
Architects (SMA) for the addition of office space within the City Hall Atrium and other lobby and
Commission Chamber modemization improvements (the "Project"); and
WHEREAS, on November 14, 2023, t}te Finance Department presented the conceptual
renderings to the City Commission and obtained authorization to proceed with the design of the
Project; and
WHEREAS, SMA, which has a CCNA continuing services agreement with the City,
provided a proposal for a total cost of One Hundred Fifty-Nine Thousand Six Hundred Ninety
Dollars ($ 159,690.00) for the design ofthe Project; and
WHEREAS, the City Administration recommends that the City Commission authorize the
appropriation of Administrative Impact Fees for the design proposal.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH. FLORIDA:
Section 1. That the above "Whereas" clauses are true and conect, and they are made a
part ofand incorporated into this Resolution by this reference.
Section 2. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 3. That the City Administration is authorized to appropriate Administrative
Impact Fees from General Fund Revenue Account No. 001 -00-00-324-72-01 in the amount of
Two Hundred Thousand Dollars ($200,000.00) for the design of the Project to cover the SMA
proposal and other ancillary costs, which proposal is attached as "Exhibit A," and made a part of
and incorporated into this Resolution by this reference. The funding will be transferred to the City
Hall Improvement Project Account No. 301- l8- 13-519-31- 10 in the Capital Projects Fund.
Section 4. That the current balance of Administrative Impact Fees is approximately
Six Hundred Eighty-Two Thousand Dollars ($682,000.00), and sufhcient to cover the design cost.
Section 5. That this Resolution shall become effective within ten (10) days of its
passage and adoption.
PASSED AIID ADOPTED ""DL(L,ffb6 I'1., ZOZI.
Motionby &m{n. dilftJ . secondby@.
FINAL VOTE ONADOPTION:
Commissioner Joyce L. Davis
Commissioner Tamara James
Commissioner Marco Salvino
Vice Mayor Lori Lewellen
Mayor Archibald J. Ryan IV
ss
\p5\es
.p5
.K5
APPROVEDAS TO FORM AND CORRECTNESS:
CITYCLERK MAYOR
RESoLUTToN #20 zz-152
SALTZ
MICHELSCN
ARCHITECTS
AGREEMENT FOR PROFESSIONAL 5ERV]CE5
November 29, 2023
City of Donio Beoch
100 W Doni Beoch Blvd.
Donio Beoch, FL 33004
Attn:
Phone:
Emoil:
Fronk DiPoolo
Chief Finonciol Office
954.924.5800 x36O9
f d ipo olo@do n io beoc hf l.gov
RE:Cily of Donio Beoch - Inferior Design for Lobby ond Commission Chombers
ond lnlerior Oftice Addifion
locoled of Donio Beoch City Holl, 100 W Doni Beoch Blvd., Donio Beoch. FL
sMA #P23253
Deor Fronk,
Thonk you for considering SMA os your irusted odvisor for this project. We ore pleosed to
submit the following proposol for professionol orchiiecturol services for intedor design for
the lobbv ond commission chombers ond interior office oddilion locoted ot Donio Beoch
City Holl.
I. SCOPE OF WORK:
Prepore design ond conslruciion documents for the office oddition ond inierior
design to the otrium of Donio Beoch City Holl ond Commission Chombers.
I . Design o two-story office oddition within the exisling otrium spoce. lt is obout 2,000
S.F. of new office in totol. See ottoched proposed floor plons ond renderings.
2. Modernize the lobby with new finishes ond lighiing. We will need to odjust ihe
locotion of the existing AC ducts.
3. Modernize the commission chombers with new finishes, lights, ond enhonce ihe
commissioner bockdrop ond dois.
4. Pre-Design Phose/Site Verificotion:
o. Review of the project requirements ond meet with the Owner os necessory
to fully understond the spoce requirements ond provide o concept design
- up to two (2) meetings.
5. Schemotic Design Phose:
o. Prepore schemotic design drowings of lhe improvements using best
proctices thot oddress ihe requirements of the spoce progrom.
b. Field visii ond review conditions in the existing City Holl.
c. Present schemotic design to Owner for opprovol.
THOUGIITFUL ARCHITECTURE
AR000t9/6
6. Construction Documeni Phose:
o. The construclion drowings sholl include Architecturol, Mechonicol,
Eleciricol, ond Plumbing engineering drowings required for building permit.
Upon completion of consiruction drowings, we sholl issue three (3) signed
ond seoled sets of drowings for building permit ond one (l) sei of PDFs for
the Controcior's/Client's use. This fee olso includes response to Building
Deporiment comments, including o norrotive of oll revisions.
b. Interior design selection of finishes.
/. Bidding/PermittingPhose:
o. Respond io RFI's from Sub-Controctors.
b. Porticipote in o pre-bid wolk-through with Sub-Consultonts.
c. Address questions during the bid period.
8. Construction Administrotion Phose:
o. Attend oll projecl meetings ond prepore/distribuie project meeting
minutes.
b. Address oll RFI's.
c. Address oll requests for Chonge Orders, keeping o Chonge Order Log for
review by the Owner.
d. Review oll shop drowings, keeping o Shop Drowing Log for review by the
Owner.
e. Review oll Applicotions for Poymeni prior io presenting io ihe Owner.f. Conduct Punch List octivily ot the cloim of Subsiontiol Compleiion by ihe
Coniroctor.
II. ASSUMPTIONS:
I . City sholl provide existing building plons of the building to the Architeci.
2. Finished selection is included in the proposol.
3. Adequote woter, droinoge, ond electric is existing to lhe building.
4. LEED services ore noie included.
5. There ore no sprinklers in the building ond they will not be required.
III. FEE DISTRIBUTION:
Dellverobles:Fee:
1 . Pre-Design/Site Verificoiion $ 2.000.00
2. Schemotic Design $ 32,938.00
3. 50% Construction Documents $ 45.000.00
4. 100% Conslruction Documents - Permittino $ 46,752.00
5. Bidding Assistonce $ 5,000.00
6. Construction Administrolion $ 28.000.00
Tofol s r 59.690.00
GLOBAL THINKING, LOCALLY MINDED
Poge 2 of 3
AR00099/6 | Proposol No. P23253 Initiol: SMA q:Ctieni: _
Fronk, we welcome the opportunity to ossist you with this project. If you hove ony
questions regording the obove informotion, pleose do not hesitote to coniocl our offices.
All of the terms of this ogreement ore in occordonce with our current ogreemeni wilh
the City of Donio Beoch. We look forword to working with you on this project.
Very Truly Yours,
President
Attochments: Proposed i si Level Floor Plon, Proposed 2nd Level Floor Plon, Proposed Renderings
c^M lw s \Pbpo5o&\?023 Prcrc5ol5\P23t$ Cft Of D^Nla SEACH 0niedor Oesign ror L obby ord Comn lton Chomber ond rrerror ofii.. Addirrrnl
GLOBAL TI.{INKING. LOCALLY MINDED
Poge 3 of 3
AR0009976 I Proposol No. P23253 Initiol: SMA q-Client: _
DANIA EEACH CIIY HAIT
MAIN IOBBY RENOVATIONS
MAIN LOBBY
3,363 SF
IsI IEVEL FTOOR PLAN ,(..I SALIZ
i 'iIMICI]ELSON
i". /,_! apcrl Tgcls
DANIA BEACH CIIY HATL
MAIN TOBBY RENOVATIONS
r( i.!SALIZ
I -\IMICHELSON
r . -"J APCUTIICT5
2nd LEVEI ftOOR PLAN
l*,
a,
I
i