HomeMy WebLinkAboutR-2023-150 Ranking of Firms for Construction Engineering and Inspection Services for SE Drainage ProjectRESOLUTtoN NO. 2oB-_ltu
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH" FLORIDA. AUTHORIZING THE RANKING OF CONSULTING
FIRMS THAT RESPONDED TO REQUEST FOR QUALIFICATIONS (RIQ)
NO. 23-020, "CONSTRUCTION, ENGINEERING AND INSPECTION
SERVICES FOR THE SOUTHEST DRAINAGE PROJECT", AND SELECTING
ALLY ENGINEERING SERVICES, INC. AS THE FIRST RANKED FIRM;
PROVIDING FOR CONFLICTS: FURTHER. PROVIDING FOR AN
EFFECTIVE DATE.
WHEREAS, the City of Dania Beach is engaged in design engineering for the Southeast
Drainage Project to improve the drainage in the Southeast area of tlre City by implementing
comprehensive infrastructure improvements; and
WHEREAS, the City's Public Services Deparhnent determined that since there is Federal
grant funding for the project, the City must use an engineer to provide Construction, Engineering,
and Inspection (CEI) services (the "Services") separate from the engineering firm that designed
the project; and
WHEREAS, a Ciry Selection Committee (the "Committee") was formed to develop a
scope ofwork, solicit and evaluate proposals from firms experienced in this specialized work and
the City issued Request for Quotations (RFQ) No.2023-020, on August 25, 2023; and
WHEREAS, qualified responses were received from five firms on September 25,2023,
evaluated by the Committee, and the ranking of the thee top firms were as follows:
CONSULTANT
Ally Engineering Services, Inc.
R.J. Behar and Company, Inc.
Craven, Thompson & Associates, Inc.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the above "Whereas" clauses are ratified and confirmed, and they are
made a part ofand incorporated into this Resolution by this reference.
Section 2. That the City Commission accepts the ranking of the consulting firms
responding to RFQ No. 23-020, entitled "construction, Engineering, and Inspection Services for
the Southeast Drainage Project", as provided above.
SCORE RANK
284 I
282 2
269 3
Section 3. That the proper City offrcials are authorized to negotiate and execute an
agrcement with Ally Engineering Services, Inc. If negotiations are unsuccessful, the City can
proceed with the next highest ranked respondent, until the list is exhausted or a contmct is
negotiated consistent with the terms of the RIQ.
Section 4. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conllict.
Section 5. That this Resolution shall become effective within ten (10) days of its
passage and adoption.
PASSED AND ADOPTED on
Motion by second by
FINAL VOTE ON ADOPTION:
Commissioner Joyce L. Davis
Commissioner Tamara James
Commissioner Marco Salvino
Vice Mayor Lori Lewellen
Mayor Archibald J. Ryan IV
APPROVED AS TO FORM AND CORRECTNESS;
{es#
$g-s{esF
RESOLUTT.N #2orr-]1c