Loading...
HomeMy WebLinkAboutR-2023-150 Ranking of Firms for Construction Engineering and Inspection Services for SE Drainage ProjectRESOLUTtoN NO. 2oB-_ltu A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH" FLORIDA. AUTHORIZING THE RANKING OF CONSULTING FIRMS THAT RESPONDED TO REQUEST FOR QUALIFICATIONS (RIQ) NO. 23-020, "CONSTRUCTION, ENGINEERING AND INSPECTION SERVICES FOR THE SOUTHEST DRAINAGE PROJECT", AND SELECTING ALLY ENGINEERING SERVICES, INC. AS THE FIRST RANKED FIRM; PROVIDING FOR CONFLICTS: FURTHER. PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Dania Beach is engaged in design engineering for the Southeast Drainage Project to improve the drainage in the Southeast area of tlre City by implementing comprehensive infrastructure improvements; and WHEREAS, the City's Public Services Deparhnent determined that since there is Federal grant funding for the project, the City must use an engineer to provide Construction, Engineering, and Inspection (CEI) services (the "Services") separate from the engineering firm that designed the project; and WHEREAS, a Ciry Selection Committee (the "Committee") was formed to develop a scope ofwork, solicit and evaluate proposals from firms experienced in this specialized work and the City issued Request for Quotations (RFQ) No.2023-020, on August 25, 2023; and WHEREAS, qualified responses were received from five firms on September 25,2023, evaluated by the Committee, and the ranking of the thee top firms were as follows: CONSULTANT Ally Engineering Services, Inc. R.J. Behar and Company, Inc. Craven, Thompson & Associates, Inc. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above "Whereas" clauses are ratified and confirmed, and they are made a part ofand incorporated into this Resolution by this reference. Section 2. That the City Commission accepts the ranking of the consulting firms responding to RFQ No. 23-020, entitled "construction, Engineering, and Inspection Services for the Southeast Drainage Project", as provided above. SCORE RANK 284 I 282 2 269 3 Section 3. That the proper City offrcials are authorized to negotiate and execute an agrcement with Ally Engineering Services, Inc. If negotiations are unsuccessful, the City can proceed with the next highest ranked respondent, until the list is exhausted or a contmct is negotiated consistent with the terms of the RIQ. Section 4. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conllict. Section 5. That this Resolution shall become effective within ten (10) days of its passage and adoption. PASSED AND ADOPTED on Motion by second by FINAL VOTE ON ADOPTION: Commissioner Joyce L. Davis Commissioner Tamara James Commissioner Marco Salvino Vice Mayor Lori Lewellen Mayor Archibald J. Ryan IV APPROVED AS TO FORM AND CORRECTNESS; {es# $g-s{esF RESOLUTT.N #2orr-]1c