Loading...
HomeMy WebLinkAboutR-2024-049 Award to Conenginers Builders LLC - ITB 24-001 Improvements City Hall CampusRESOLUTION NO. 2024-t!:fl_ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, AUTHORIZING THE AWARD OF INVITATION TO BID NO. 24-001 "CITY HALL CAMPUS IMPROVEMENTS" TO CONENGINEERS BUILDERS LLC. IN AN AMOUNT NOT TO EXCEED NINETY SEVEN THOUSAND ONE HUNDRED EIGHTY EIGHT DOLLARS AND NINETY EIGHT CENTS ($97,188.98); PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, City Hall is frequently visited by residents , business owners and other individuals, and due to its central location also serves as a suitable place for City events; and WHEREAS, the south portion of the C ity Hall contains an aged asphalt pavement surface parking lot that is not welcoming, unsuitable for gatherings and is adjacent to a multi-story parking garage with sufficient parking capacity; and WHEREAS, the City Hall Campus Improvement Project (the "Project") consists of replacing the smface parking lot with an attractive green space that wi ll include a concrete walking path , light poles and fixtures, as well as landscape irrigation; and WHEREAS, the Public Services Department (PSD) utilized its personnel to remove the surface lot (asphalt) and install grass turf, and the remainder of the project shall be completed th.rough an Invitation to Bid (1TB) process; and WHEREAS, the City adve1tised ITB No. 24-001 "City Hall Campus Improvements" on January 5, 2024, in the Sun-Sentinel and on DemandStar, and received the fo llowing responses : • Conengineers Builders LLC • M&J General Contractors • S3S Construction, Inc. • KER Construction • TechGroupOne, Inc. • Edifica Construction $97,188 .98 $111 ,042.90 $11 7,388.00 $122,028.00 $144,10 9.50 $157,035.00; and WHEREAS, the Bid Committee, consisting of the CIP and Grants Administrator, PSD Project Managers, and a repre sentative from Kimley Hom and Associates, Inc., reviewed the bid responses, and WHEREAS, after evaluation of all factors , the Bid Committee selected the lowest-cost firm of Conengineers Builders, Inc. as the most responsive, responsible bidder. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above "Whereas " clauses are ratified and confirmed, and they are made a pait of and incorporated into this Resolution by this reference. Section 2. That the City Commission authorizes the proper City officials to execute an agreement with Conengineers Builders, Inc. for the City Hall Campus Improvements Project, in accordance with the itemized schedule of costs, a copy of which is attached as Exhibit "A " and made a part of and incorporated into this Resolution by this reference. Section 3. The funding for this installation is appropriate and available within the Capital Projects Fund/Infrastructure other than Bldgs. Account N o. 301-18-02-519-63-10. Section 4. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 5. That this Resolution shall be effective 10 days after passage. PASSED AND ADOPTED on --+-A_._,y_'<_\_,_\ _9 _.__ __ , 2024. Motion by (emmt.SStO\tY I )a.nu,,s , second bY, ~ I ce Mu.ft L-twe )Len FINAL VOTE ON ADOPTION : Unanimous ✓ Yes No Commissioner Joyce L. Davis Commissioner Tamara James Commissioner Marco Salvino Vice Mayor Lori Lewellen Mayor Archibald J. Ryan IV ~,. APPROVED AS TO FORM AND CORRECTNESS: 2 RESOLUTION #2024 -d±9