Loading...
HomeMy WebLinkAboutR-2023-135 Approving Site Plan Application (SP091-22) for Starlife Group LLC at 20 SW 15th St.TITLESHEET NO. PROJECT No. 22-0715DESIGN DATE: August 2022 COVER SHEET PAVING, GRADING AND DRAINAGE PLAN WATER AND SEWER PLAN PAVEMENT MARKINGS AND SIGNAGE PLAN GENERAL NOTES CONSTRUCTION DETAILS CONSTRUCTION DETAILS CONSTRUCTION DETAILS CONSTRUCTION DETAILS CONSTRUCTION DETAILS BCTED PAVEMENT MARKINGS AND SIGNS DETAIL BCTED GROUND SIGN ASSEMBLY DETAILS BCTED STOP SIGN AND STREET IDENTIFICATION ASSEMBLY TYPICAL DETAILS STORMWATER POLLUTION PREVENTION PLAN STORMWATER POLLUTION NOTES & DETAILS STORMWATER POLLUTION NOTES & DETAILS C-0 C-1 C-1A C-1B C-2 C-3 C-4 C-5 C-6 C-7 1 OF 1 1 OF 1 1 OF 1 C-8 C-9 C-10 GGB Engineering, Inc.GGB VILLAS AT DANIA BEACH FL, 33004 NORTH 20 SW 15 ST, DANIA BEACH LEGAL DESCRIPTION: LOT 8, BLOCK 44 OF "NORTH HOLLYWOOD", ACCORDING TO THE PLAT THEREOF, AS RECORDED IN PLAT BOOK 4, PAGE ( 1 OF THE PUBLIC RECORDS OF BROWARD COUNTY, FLORIDA AS PER SURVEY DATED JULY 24, 2014 BY B & B LAND SURVEYORS, INC.) APPROVALS AGENCY APPROVAL DATE PERMIT NUMBER PA V I N G , G R A D I N G A N D DR A I N A G E P L A N 1"=10' C-1SHEET DATE:SCALE: PROJECT NO. DESIGNED BY: DRAWN BY: G.G.B. 08/31/22 GG B E n g i n e e r i n g , I n c . GGB AD - A R C H I T E C T U R E L L C VI L L A S A T D A N I A B E A C H MU L T I F A M I L Y D E V E L O P M E N T 20 S W 1 5 S T D A N I A B E A C H , F L 3 3 0 0 4 J.A. 22-0715 TOS=9.79 NAVD D C SWALE RESTORATION FOR THE LENGHT OF PROPERTY W/ 6" SODDED SWALE NEW 6" THICK SIDEWALK ACROSS DRIVEWAY SAW CUT & MATCH EX. ELEV. C C PR O P E R T Y L I N E MATCH EX. E.O.P. SW 15TH ST.8' C SWALE RESTORATION FOR THE LENGTH OF PROPERTY 7' WIDE -4" THICK CONCRETE S/W MAX. 2% CROSS SLOPE AND 6" THICK @ DRIVES 7' LANDSCAPE BUILDING TOS=9.79NAVD 8'-6" 2% MAX PR O P E R T Y L I N E MATCH EX. ELEV. 1' TYPE 'D' CURB BUILDING TOS=9.79NAVD GRADE POINT SLOPE 24' 4" 18 " 4"1-1/2" TYPE S-3 A/C 8" LIMEROCK BASE 12" COMPACTED SUBGRADE TO 98% DENSITY PER AASHTO T-180 SPECS. L LANDS- CAPE DRIVEWAY GRAPHIC SCALE NORTH C REAR YARD SWALEL L AA B B MATCH EX. ELEV. C REAR YARD SWALEL PR O P E R T Y L I N E BUILDING TOS=9.79NAVD 9" D D MATCH EX. E.O.P. BUILDING TOS=9.79NAVD 9" 4:1 MAX 9.00 8.29 4:1 MAX 4:1 MAX (SWALE) 4:1 MAX 4:1 MAX 6" S W A L E MILL & RESURFACE EX. PAVEMENT PROP. STORM DRAINAGE WELL #1 R.E.=9.00 I.E.=1.50 N&S 8" NYLOPLAST FIELD DRAIN G.E.=7.25 I.E.=1.50 N 4:1 MAX6" S W A L E 4:1 MAX SIGHT TRIANGLE (TYP.) BOSS=4.20 TOWM=3.20 TYPE "D" CURB INLET G.E.=8.00 I.E.=1.50 S&E 4"RWL TYPE "D" CURB INLET G.E.=8.35 I.E.=1.50 S&E MATCH EX. ELEV. 8.16 8.26 8.40 8.30 9.75 9.75 9.75 9.75 9.75 4" 9.60 9.75 9.60 4"4"4" 9.32 9.40 9.60 9.40 9.32 9.75 9.32 9.40 9.60 9.609.75 FL U S H FL U S H 9.60 9.75 8.90 D 9.32 9.40 8.90 D 10 LF - 8" HDPE 53 LF - 15" HDPE 5 LF - 15" HDPE 4" CONCRETE SIDEWALK 60 LF - 15" PERF. HDPE IN 4'x4' EXFIL. TRENCH EXISTING ALLEY 4' 2%MAX SLOPE 5' ACCESS EASEMENT PR O P E R T Y L I N E 5' ACCESS EASEMENT 5' ACCESS EASEMENT TYPE "D" MH G.E.=8.50 I.E.=1.50 W 1.50 S-PRB 5 LF - 15" HDPE TYPE "D" MH G.E.=8.25 I.E.=1.50 E&W 1.50 N-PRB 60 LF - 12" PERF. HDPE IN EXFIL. TRENCH 26 LF - 15" HDPE SAW-CUT AND MATCHEX. SW (TO REMAIN) 2'x12' STOP BAR SAW-CUT AND MATCH E E MATCH EXIST. ELEV. DRIVE PR O P E R T Y L I N E S.W.15TH ST 1-1/2" TYPE S-3 A/C OVER 8" MIN. LIMEROCK BASE OVER 12" COMPACTED SUBGRADE (98% DENSITY) 1%MIN 2% SLOPE GRADE POINT 7' CONCRETE S/W DRIVE 3' 1%MIN ADA RAMP PER FDOT STANDARD PLANS INDEX 522-002 STOP SIGN 8.20 8.30 (6"THICK) NOTE: EXISTING SPEED HUMP SHALL REMAIN IN PLACE UNTIL THE CONSTRUCTION OF THE DEVELOPMENT HAS BEEN COMPLETED, THEN AT THE OWNER'S EXPENSE, THE NEW SPEED HUMP SHALL BE RECONSTRUCTED AS SHOWN ON THESE PLANS. SPEED HUMP SHALL NOT ENCROACH DRIVEWAY RELOCATE EXISTING LIGHT POLE 6" THICK CONCRETE OVER 12" COMPACTED SUBGRADE (98% DENSITY) R= 5 ' 5' PROPOSED SPEED HUMP LOCATION PER FIELD MEETING WITH CITY REPRESENTATIVE. FINAL LOCATION MAY BE DETERMINE BY CITY OF DANIA BEACH. 25'25' 50' ROW C SWALEL 6' 1%MIN 2 " WA T E R A N D S E W E R P L A N 1"=10' C-1ASHEET DATE:SCALE: PROJECT NO. DESIGNED BY: DRAWN BY: G.G.B. 08/31/22 GG B E n g i n e e r i n g , I n c . GGB AD - A R C H I T E C T U R E L L C VI L L A S A T D A N I A B E A C H MU L T I F A M I L Y D E V E L O P M E N T 20 S W 1 5 S T D A N I A B E A C H , F L 3 3 0 0 4 J.A. 22-0715 TOS=9.79 NAVD P 6"x6" WYE 6"x6" WYE6" COTG I.E.=5.70 6" COTG I.E.=4.90 112 LF - 6" PVC S.S. @ 1.00% SLOPE 23 LF - 6" PVC S.S.@ 1.00% SLOPE 8"X6" WYE I.E.=4.30 PROP. 6"X4" TAPPING SLEEVE & 4" GATE VALVE PROP. (4) 2" WATER METER W/ 2" RPZ 6"x6" WYE GRAPHIC SCALE NORTH PP P P BOSS=4.20 TOWM=3.20 FH FH PROP. 6"X6" TAPPING SLEEVE & 6" GATE VALVE PROP. 6"X4" TAPPING SLEEVE & 4" GATE VALVE F.D.C. 4" DOUBLE DETECTOR CHECK VALVE ASSEMBLY FOR CONTINUATION, SEE PLUMBING PLANS EX. CONCRETE WALK TO REMAIN NEW 7' SIDEWALK The following is a typical installation of a speed hump within the unincorporated area of Broward County. 1. The speed hump shall be twenty-four (24) feet in length for the width of the roadway (typically twenty-four (24) feet), with the following characteristics: a. Height of three (3) inches b. Twelve (12) foot flat top c. Six (6) foot transitions on both the near & far sides d. Eighteen (18) inch transitions on both curb sides 2. Key cut twenty-four (24) inches on both the near & far sides with twelve (12) inches next to speed hump and twelve inches underneath, for a depth of one and a half (1 ½) inches. 3. Key cut twelve (12) inches on both curb side edges, underneath the speed hump, for a depth of one and a half (1 ½) inches. 4. Pavement markings shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) Figure 3B-30 Option “A”. a. For each direction of travel, install two (2) Chevrons, one (1) foot white pavement marking, spaced one (1) foot apart for a length of six (6) feet centered on the travel lane, placed on the transition only. b. Six (6) inch white thermoplastic edge line to be replaced along side of the speed hump, if this edge line previously existed. c. Centerline to be replaced based on BCTED Pavement Marking Policy: i. Either a six (6) inch single yellow in thermoplastic as a ten (10) / thirty (30) skip line; or ii. Six (6) inch double yellow solid line in thermoplastic. Other information: 1. All speed humps shall be installed in two (2) lifts of S3 asphalt. 2. Tack coat to be applied prior to laying the S3 asphalt. 3. An approved Maintenance of Traffic Plan shall be established for each speed hump installation. 4. Installation shall be in compliance with the FDOT Standards Specifications for Road and Bridge Construction 2010. 17'-7" 14' PAVEMENT RESTORATION PA V I N G M A R K I N G S A N D SI G N A G E P L A N 1"=10' C-1BSHEET DATE:SCALE: PROJECT NO. DESIGNED BY: DRAWN BY: G.G.B. 08/31/22 GG B E n g i n e e r i n g , I n c . GGB AD - A R C H I T E C T U R E L L C VI L L A S A T D A N I A B E A C H MU L T I F A M I L Y D E V E L O P M E N T 20 S W 1 5 S T D A N I A B E A C H , F L 3 3 0 0 4 J.A. 22-0715 GRAPHIC SCALE NORTH E I (TYP.)Z (TYP.) W K GE N E R A L N O T E S N.T.S. C-2SHEET DATE:SCALE: PROJECT NO. DESIGNED BY: DRAWN BY: G.G.B. 08/31/22 GG B E n g i n e e r i n g , I n c . GGB AD - A R C H I T E C T U R E L L C VI L L A S A T D A N I A B E A C H MU L T I F A M I L Y D E V E L O P M E N T 20 S W 1 5 S T D A N I A B E A C H , F L 3 3 0 0 4 J.A. 22-0715 CO N S T R U C T I O N D E T A I L S N.T.S. C-3SHEET DATE:SCALE: PROJECT NO. DESIGNED BY: DRAWN BY: G.G.B. 08/31/22 GG B E n g i n e e r i n g , I n c . GGB AD - A R C H I T E C T U R E L L C VI L L A S A T D A N I A B E A C H MU L T I F A M I L Y D E V E L O P M E N T 20 S W 1 5 S T D A N I A B E A C H , F L 3 3 0 0 4 J.A. 22-0715 CO N S T R U C T I O N D E T A I L S N.T.S. C-4SHEET DATE:SCALE: PROJECT NO. DESIGNED BY: DRAWN BY: G.G.B. 08/31/22 GG B E n g i n e e r i n g , I n c . GGB AD - A R C H I T E C T U R E L L C VI L L A S A T D A N I A B E A C H MU L T I F A M I L Y D E V E L O P M E N T 20 S W 1 5 S T D A N I A B E A C H , F L 3 3 0 0 4 J.A. 22-0715 CO N S T R U C T I O N D E T A I L S N.T.S. C-5SHEET DATE:SCALE: PROJECT NO. DESIGNED BY: DRAWN BY: G.G.B. 08/31/22 GG B E n g i n e e r i n g , I n c . GGB AD - A R C H I T E C T U R E L L C VI L L A S A T D A N I A B E A C H MU L T I F A M I L Y D E V E L O P M E N T 20 S W 1 5 S T D A N I A B E A C H , F L 3 3 0 0 4 J.A. 22-0715 CO N S T R U C T I O N D E T A I L S N.T.S. C-6SHEET DATE:SCALE: PROJECT NO. DESIGNED BY: DRAWN BY: G.G.B. 08/31/22 GG B E n g i n e e r i n g , I n c . GGB AD - A R C H I T E C T U R E L L C VI L L A S A T D A N I A B E A C H MU L T I F A M I L Y D E V E L O P M E N T 20 S W 1 5 S T D A N I A B E A C H , F L 3 3 0 0 4 J.A. 22-0715 CO N S T R U C T I O N D E T A I L S N.T.S. C-7SHEET DATE:SCALE: PROJECT NO. DESIGNED BY: DRAWN BY: G.G.B. 08/31/22 GG B E n g i n e e r i n g , I n c . GGB AD - A R C H I T E C T U R E L L C VI L L A S A T D A N I A B E A C H MU L T I F A M I L Y D E V E L O P M E N T 20 S W 1 5 S T D A N I A B E A C H , F L 3 3 0 0 4 J.A. 22-0715 ‚ ‚ ‚ ‰ ST O R M W A T E R P O L L U T I O N PR E V E N T I O N P L A N 1"=10' C-8SHEET DATE:SCALE: PROJECT NO. DESIGNED BY: DRAWN BY: G.G.B. 08/31/22 GG B E n g i n e e r i n g , I n c . GGB AD - A R C H I T E C T U R E L L C VI L L A S A T D A N I A B E A C H MU L T I F A M I L Y D E V E L O P M E N T 20 S W 1 5 S T D A N I A B E A C H , F L 3 3 0 0 4 J.A. 22-0715 LEGEND DENOTES WINDROW AND SILT SCREEN ALONG PROPERTY LINE DURING CONSTRUCTION OF GRADING AND DRAINAGE 20'x50'X6" ENTRY DRIVE FLORIDA #1 WASHED STONE ON TOP OF FILTER FABRIC WINDOW AND SILT SCREEN WINDOW AND SILT SCREEN WINDOW AND SILT SCREEN WINDOW AND SILT SCREEN NOTE: ALL PROPOSED AND OR EXISTING INLETS TO BE PROTECTED FROM INFLATION ST O R M W A T E R P O L L U T I O N NO T E S & D E T A I L S N.T.S. C-9SHEET DATE:SCALE: PROJECT NO. DESIGNED BY: DRAWN BY: G.G.B. 08/31/22 GG B E n g i n e e r i n g , I n c . GGB AD - A R C H I T E C T U R E L L C VI L L A S A T D A N I A B E A C H MU L T I F A M I L Y D E V E L O P M E N T 20 S W 1 5 S T D A N I A B E A C H , F L 3 3 0 0 4 J.A. 22-0715 ST O R M W A T E R P O L L U T I O N NO T E S & D E T A I L S N.T.S. C-10SHEET DATE:SCALE: PROJECT NO. DESIGNED BY: DRAWN BY: G.G.B. 08/31/22 GG B E n g i n e e r i n g , I n c . GGB AD - A R C H I T E C T U R E L L C VI L L A S A T D A N I A B E A C H MU L T I F A M I L Y D E V E L O P M E N T 20 S W 1 5 S T D A N I A B E A C H , F L 3 3 0 0 4 J.A. 22-0715 NOTES YELLOW/YELLOW RPM DETAILS MEDIAN NOSE PAINT DETAILS PAINTED MEDIAN DETAILS EDGE LINE DETAILS CHEVRON DETAILS - CROSSWALK AREAS AND IN FRONT OF CURB RAMPS STREET NAME BLADE DETAILS TYPE IV SEPARATOR DETIALS 6'-10' SKIP DETAILS 2'-4' SKIP DETAILS 1' OC, 1' MIN TO CROSSWALK DIRECTION OF TRAVEL DIRECTION OF TRAVEL 6" SOLID WHITE OR YELLOW CENTERLINE EDGE OF PAVEMENT 2" REFLECTIVE YELLOW PAINT2" YELLOW/YELLOW RPM's 6" SOLID YELLOW 6" - 12" TYPE "F"CURB AND GUTTER RAISED SEPARATOR GRASS MEDIAN GRASS MEDIAN REFLECTIVEYELLOW REFLECTIVEYELLOW REFLECTIVEYELLOW RADIUSPOINT POINT OFCURVE DIRECTION OF TRAVEL DIRECTION OF TRAVEL WHITE/RED RPM's 8" SOLID WHITE18" SOLID WHITE (SEE FDOT INDEX NO. 17346FOR SPACING OF CHEVRONS) 6' - 10' SKIPS 6" WHITE SHALL BE USED FOR THE FOLLOWING CONDITIONS: ·TRANSITIONS AT ALL LEFT AND RIGHT TURN LANES 2' - 4' SKIPS 6" WHITE SHALL BE USED FOR THE FOLLOWING CONDITIONS: ·RADIUS GUIDE LINES BETWEEN DUAL LEFTS TURN MOVEMENT (90' RADIUS PREFERRED OR AS NOTED ON PLANS) ·BUS BAY TRANSITIONS DIRECTION OF TRAVEL DIRECTION OF TRAVEL 18" SOLID YELLOW YELLOW/YELLOW RPM's 6" SOLID DOUBLE YELLOW 3 24" SOLID WHITE 4' MIN.(ONLY WHERE SINGLE RAMPS PERMITTED) 1 2 5 4'(TYP.) 9 9 DROP LANE LENGTH TABLE SPEED MIN.PREFERRED DISTANCE DISTANCE(MPH) 30-35 MPH 40-45 MPH 400'600' 600'800' "RIGHT LANE MUST TURN RIGHT" SIGN (R3-7R) TO BE PLACED AT FIRST "ONLY" MESSAGE. ADDITONAL R3-7 SIGNS SHALL BE PLACED AT ALTERNATING "ONLY" MESSAGES. 25' 15' 8" SOLID WHITE 100' MAX.SPACING 25' 25' 1 2 36' 8' 50' MIN. 8' 32' 6" SOLID WHITE 2 7 STORAGE 15'25' *ARROWS PER FDOT - CENTERED 100'-250' TRANSITION>100' DRIVEWAY 100 MAX. 8" SOLID WHITE(DUAL LEFT) 6" SOLID WHITE 6" SOLID WHITE WHITE/RED RPM'SAT 20' O.C. WHITE/RED RPM'SAT 40' O.C. VARIES 25' 6" DOUBLE YELLOW 4' MIN. - 30' MAX.NO SIDEWALK 6" SOLID YELLOW 6" WHITE 30'10'4 9 9 DEDICATED STREET 60'50' MIN.36' 32' 6" SOLID WHITE 100' TRANSITION DIRECTIONAL ARROWS REQUIRED TABLE DISTANCE ARROWS REQ'D 100' OR LESS 101'-149' 1 ARROW 150'-200' 2 ARROWS 3 ARROWS SIDEWALK 6 2 7 8 8 TWO WAY LEFT TURN LANE 6" WHITE 25' SEE FDOT INDEX NO. 711-001 FORPLACEMENT OF CROSSHATCHING. 6" SOLID WHITE 18" SOLID WHITE (R3-7R) R1-1 R1-1 D-3 6 R1-1 D-3 R1-1 R3-5R (30"x36")ORFTP-55R-06 (24"x30") 3 5 4' 6" SOLID YELLOW 6" 10' - 30'YELLOW SKIP 3 12' 8' 30' RADIUS MIN. 24" SOLID WHITE *ONE ADDITIONAL ARROW FOR EACHADDITIONAL 100' OF STORAGE TYPE "F" SEPARATOR, 4'-6' 6' - 10' SKIP6" YELLOW WHITE/RED RPM'S 15'25'150' STORAGE 200' STORAGETRANSITION LENGTHVARIES 25'15' 15' YELLOW/ YELLOWRPM'S AT 40' O. C. 50' - 6" SOLIDDOUBLE YELLOW 8" SOLID WHITE WITHWHITE/RED RPM'S 4' RADIUSPOINT RADIUSPOINT 12" SOLID WHITE 9 10' MIN. 32' MIN.36' PREFERRED VARIES SIDEWALK SIDEWALK SIDEWALK 4' 1 4 7 2 5 8 3 6 9 1' OC LEGEND 6" WHITE, 3'- 9' SKIPS 24" SOLID WHITE SPECIAL EMPHASISMARKINGS R3-5R (30"x36")ORFTP-55R-06 (24"x30") SPECIAL EMPHASIS CROSSWALK MARKINGS NOTES * DO NOT PAINT BRICK PAVERS STOP SIGN NOTE YELLOW PAINT YELLOW PAINT REFLECTIVEYELLOW SEE BCTED STOP SIGN AND STREET IDENTIFICATION ASSEMBLY TYPICAL DETAILS. WHITE 8 8 REVISIONS DATE DESCRIPTION PUBLIC WORKS DEPARTMENTTRAFFIC ENGINEERING DIVISION PAVEMENT MARKINGS AND SIGNS DETAILSDRAWN BY: STEPHON RAMOUTAR DESIGN BY: CARMELO CARATOZZOLO, P.E. CHECKED BY: CARMELO CARATOZZOLO, P.E. SHEET NO. 1 OF 1 SCALE: NTS11-24-2020 UPDATED NOTES 05-06-2022 UPDATED NOTES 04-14-2021 UPDATED NOTES 6 PVC 6 DIP UNK PVC UNK DIP 12 PVC 2 G S P 6 G S P 8 VCP 8 VCP 8 V C P 8 V C P 8 VCP 8 VCP 8 VCP 8 V C P SW 15TH ST SW 14TH ST S F E D E R A L H W Y S S T H Y 5 SW 2 N D A V E SE 15TH ST SE 14TH ST Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community, Esri, HERE, Garmin, (c) OpenStreetMap contributors -8921727 -8921727 -8921544 -8921544 30 0 3 2 9 2 30 0 3 2 9 2 30 0 3 4 7 5 30 0 3 4 7 5 Date: 7/1/2022 0 40 80 120 16020 Feet 1 inch = 37.5 feet 20 SW 15th St Dania Beach Utility Atlas Sanitary Sewer Lift Stations Sanitary Sewer Force Main Sanitary Sewer Manholes Sanitary Sewer Gravity Pipe Sanitary Sewer System Valve Sanitary Sewer Fitting Potable Water Hydrants Potable Water System Valves Potable Water Fittings Abandoned Potable Water Main Potable Water Main SWManhole DBswInlet SWPipe !( !? $K !. !!2 + G!. " 20 SW 15th St, Dania Beach µPublic Services Department City of Dania Beach Requested by: Dincer Ozaydin Public Services Deputy Director City of Dania Beach Mayra Jimenez Project Architect Architecture LLC Reviewed by: Processed by: Maria Magnolia Dominguez GIS Technician City of Dania Beach Source: 2022 Dania Beach Utility Atlas Dania Beach Darren Greene Manager Public Works & Utilities Date: 7/1/2022 MASTER PLANT LIST KEY PLANT NAME SPECIFICATION QUANTITY BAHIA PASPALUM NOTATUM ARGENTINE BAHIA GRASS SEED QTY TO BE DERTMINED BY CINTRACTOR CAS3 CRINUM ASIATICUM CRINUM LILLY, QUEEN EMMA PURPLE 36"X 30" O.A. 5 PPP MIN. HIGH DROUGHT TOLERANCE 3 CIR CHRYSOBALANUS ICACO COCtOPLUM HEDGE 24" X 24" 24" O.C. NATIVE MEDIUM DROUGHT TOLERANCE 9 FM3 FICUS MICROCARPA GREEN ISLAND FICUS 12" X 15" SPR. 16" - 18" OC. MEDIUM DROUGHT TOLERANCE 32 HP3 HAMEILIA VIRGINIANA FIRE BUSH 24"X 24" 24" OC NATIVE MEDIUM DROUGHT TOLERANCE 30 MS1 MIMOSA STRIGILLOSA SUNSHINE MIMOSA POWDERPUFF 4" X 6" 6"-8" O.C. NATIVE MEDIUM DROUGHT TOLERANCE 550 SOD ST. AUGUSTINE FLORITAM ADD AND REPLACE AS NEEDED CONTRACTOR TO VERIFY QTY FOR AREAS MISSING OR IN POOR CONDITION WF POLYPODIUM SCOLOPENDRIA WARTY FERN 8" X 8" FULL, 12" O.C. MEDIUM DROUGHT TOLERANCE 80 MASTER PLANT LIST KEY PLANT NAME SPECIFICATION QUANTITY SP3 SABAL PALMETTO CABBAGE PALM 10’-14’ CT SMOOTH TRUNKS 10” DBH. MIN. NATIVE HIGH DROUGHT TOLERANCE 4 CES14 CONOCARPUS ERECTA SERECIUS SILVER BUTTONWOOD 14'-16' X 6' SPR, 2" DBH. 5' CT NATIVE HIGH DROUGHT TOLERANCE 3 IC14 ILEX CASSINE DAHOON HOLLY 14' X 6' SPR. 5' CT. 2" DBH. MIX FEMALE/MALE NATIVE HIGH DROUGHT TOLERANCE 5 F.F.E:9.79 NAVD B.F.E :N/A F.F.E:9.79 NAVD B.F.E :N/A F.F.E:9.79 NAVD B.F.E :N/A F.F.E:9.79 NAVD B.F.E :N/A WM WM WM WM 1 2 3 4 5 6 7 8 G R G R G R G R CLCL CLCL S. W . 1 5 T H S T R E E T 18 ' A S P H A L T P A V E M E N T 135.87' 135.84' 60 . 0 0 ' xqc;LOT 9, BLOCK 44 "NORTH HOLLYWOOD" (PB.4- PG.1) xqc;LOT 7, BLOCK 44 "NORTH HOLLYWOOD" (PB.4- PG.1) 10 ' A S P H A L T P A V E M E N T EXISTING 1 STORY CBS RESIDENCE NBHD-RES xqc;1 STORY COMMERCIAL BUILDING ZONED SFED-MU 24'DRIVEWAY SB BALCONY L. 42 0 . 0 8 ' S.W 2ND AVENUE UNIT 1 UNIT 2 UNIT 3 UNIT 4 3 STORY ASPHALT 3 STORY3 STORY3 STORY BA L C O N Y SE T B A C K MULTI-TENANT MAIL & PACKAGE DROP BOXES 5' A . E . 5' A . E . DR I V E W A Y NE W D R I V E W A Y BA L C O N Y SE T B A C K DR I V E W A Y 5'A.E. PROPOSED CO N C . P A D FO R B I K E RA C K 4' PATHWAY 2% MAX. SLOPE 4' PATHWAY 2% MAX. SLOPE BA L C O N Y L . BU I L D I N G S E T B A C K BU I L D I N G S E T B A C K NE W D R I V E W A Y S T R E E T A C C E S S 5' C O N C . S W K . NE W 25'A.E. FIRST PARKING SPACE TYPE D CURB TYPE D CURB TYPE D CURB 12 6 . 3 3 ' LINE OF EXISTING COMMERCIAL BLG RE S I D E N T I A L B L G LI N E O F E X I S T I N G BU I L D I N G F R O N T A G E F A C A D E ( 5 6 % O N TH E B T L 1 S T & 2 N D L E V E L & 3 R D F L O O R TE R R A C E ) 5' C O N C . S W K . NE W NE W 3 0 " H . D E C O R A T I V E F E N C E RE D R E F L E C T I V E AC C E S S R O A D BL U E R E F L E C T I V E AC C E S S R O A D BU I L D I N G S E T B A C K FOOT PRINT:514 SQ FOOT PRINT :505 SQ FOOT PRINT :514 SQ FOOT PRINT:505 SQ 5' C O N C . S W K . EX I S T I N G NEW F.H. 8. 0 8 8. 2 9 8 . 1 8 8. 1 9 8. 1 7 8. 2 0 8. 3 7 8. 5 3 8. 5 2 8. 6 1 8. 6 4 8. 2 3 8. 0 0 1. 9 ' SI G H T T R I A N G L E SI G H T T R I A N G L E FDC 2'2'2'2' EX I S T I N G 6 " D . I . P . W A T E R M A I N EX I S T I N G 8 " V C P G R A V I T Y S E W E R EX I S T I N G 6 " D . I . P . W A T E R M A I N 1 2 PR O J E C T : REVISIONS: DATE DRAWN: 1/17/23 SHEET NO. SHEET TITLE: LANDSCAPE PLAN L-1 SEAL: SCALE: 1"=10' MLA l a n d s c a p e a r c h i t e c t u r e 10 1 6 n e 4 5 t h s t r e e t oa k l a n d p a r k , f l . 3 3 3 3 4 te l . 9 5 4 - 7 6 3 - 4 0 7 1 9 5 4 - 7 6 3 - 1 0 4 7 e - m l a g r o u p i n c @ y a h o o . c o m ml a g r o u p i n c . c o m LA - 6 6 6 6 6 9 5 I S A - 0 8 2 7 A AN D S C A P E ARC H IT E C T No. LA-6666695 STATE OF E J S LMC F OL I DR A ESEAL:A M C U R L of-3N O R T H 20 S W 1 5 S T D A N I A B E A C H , F L 3 3 0 0 4 MU L T I F A M I L Y D E V E L O P M E N T VI L L A S A T D A N I A B E A C H SUNSHINE STATE ONE CALL OF FLORIDA, INC. IT'S THE LAW! CALL 48 HOURS BEFORE YOU DIG IN FLORIDA 1-800-432-4770 DRC: 4/18/23 4/18/23 4/18/23 4/18/23 5/28/23 DRC: 5/28/23 EXISTING OVER HEAD ELECTRIC 6' HP3 30 CES14 3 (STREET TREES) SOD IC14 1 (NVUA) SP3 4 (STREET TREES) WF 80 IC14 4 (NVUA) SOD CAS3 3 SOD FM3 14 FM3 18 CIR 9 SOD MS1 550 EXISTING OVER HEAD ELECTRIC SIGHT VISIBILITY TRIANGLES TYP. BOTH SIDES MAINTAIN LANDSCAPE MATERIALS UNDER 30" AND CLEAR ZONE UP TO 8'-0" PROVIDE PEA GRAVEL 3" DEPTH FOR LENGTH OF 12" WIDE BUFFER PROP. LINE CITY OF DANIA LANDSCAPE CALCULATIONS NET LOT AREA: 8,148 SF. ZONING: SFED-MU PERVIOUS AREA REQUIRED = 1,240 SF. (15%) PERVIOUS AREA PROVIDED: 1,240 SF. INTERIOR LANDCAPE AREA FOR VUA (Sec 275-140) VUA = 4,467 SF. NON VEHICULAR OPEN SPACE = 1,240 SF. (1) TREE AND (10) SHRUBS PER 2,000 SF REQUIRED = 2 TREES 7 SHRUBS PROVIDED = 5 TREES + 7 SHRUBS CANOPY TREES REQ. = 4 (40%) 14' HT. 2" DBH. 4.5' CT PROVIDED =4 INTERMEDIATE TREES REQ. = 2 (30%) 12'HT. 2" DBH. 4' CT. PROVIDED= 2 SMALL TREES REQ. = 1 (10%) 10' HT. 1.5" DBH. 3' CT. PROVIDED = 1 NATIVES TREES/SHRUBS (Sec.275-60) 50% REQUIRED = 5 TREES (50%) / 4 SHRUBS (50%) PROVIDED = 8 TREES + 4 PALMS / SHRUBS AND GROUND COVERS = 589 STREET TREES (Sec. 307-20) SW 15th St. SOUTH: 1 TREE PER 20 L.F. (UNDER POWER LINES) 60/20 REQUIRED = 3 PROVIDED = 3 SOUTH ALLEY WAY (1) SABAL PALMS PER 15 LF. 60/15 REQUIRED = 4 PROVIDED = 4 ADJ TO ABUTTING PROPERTY EAST : 1 TREE PER 40 L.F. 136/40 REQUIRED = N/A (ACCESS EASEMENT) TOTAL TREES REQUIRED =9 TOTAL TREES PROVIDED = 12 NOTES: CONTRACTOR SHALL DO OWN MATERIAL TAKE OFF FROM FROM THE PLANS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS OF ALL UNDERGROUND UTILITIES PRIOR TO STARTING WORK. ALL TREES/PALMS SHALL MAINTAIN A MIN. 5' SEPARATION. CONTRACTOR SHALL RE-SOD/MULCH ALL AREAS IN POOR CONDITION OR DAMAGED BY CONSTRUCTION. CONTRACTOR SHALL REPLACE ANY EXISTING LANDSCAPE MATERIALS IN POOR CONDITION OR DAMAGED BY CONSTRUCTION SUBSTITUTIONS IN PLANTING MATERIALS SHALL BE APPROVED IN WRITTING BY THE DANIA BEACH CITY ARBORIST PRIOR TO USE. CONTRACTOR SHALL ADJUST,REPAIR OR REPLACE ANY IRRIGATION EQUIPMENT DAMAGED BY CONSTRUCTION. REFER TO SHEET IR-1 FOR IRRIGATION LAYOUT WITHIN LIMITS OF WORK REFER TO SHEET L-2 FOR EXISTING TREE INFORMATION REFER TO SHEET L-3 FOR PLANTING DETAILS AND SPECIFICATIONS NOTES: CONTRACTOR SHALL DO TAKE OFF FROM PLANTING PLAN . PLAN SHALL TAKE PRECEDENCE OVER PLANT LIST IF DISCREPENCIES OCCUR.2 CONTRACTOR SHALL ADHEAR TO ALL LOCAL CODES AND REQUIREMENTS. CONTRACTOR SHALL REVIEW CIVIL AND UTILITY PLANS PRIOR TO INSTALLATION OF MATERIALS. CONTRACTOR SHALL CONTACT LANDSCAPE ARCHITECT IF CONFLICTS ARISE THAT CAN NOT BE FIELD ADJUSTED. CONTRACTOR SHALL REFER TO SHEET L-3 FOR ALL PLANTING DETAILS AND SPECIFICATIONS. A PRE-CONSTRUCTION MEETING WITH THE DANIA BEACH CITY LANDSCAPE CONSULTANT IS REQUIRED PRIOR TO LANDSCAPE ACTIVITY INCLUDING THE REMOVAL OF TREES OR INSTALLATION OF PLANT MATERIAL. CONTACT DANIA BEACH COMMUNITY DEVELOPMENT DEPT. 954-624-6805 A MIN. 5 DAYS PRIOR TO DESIRED START DATE TO SCHEDULE MEETING. ZONING DATA LEGEND FLOOD ZONE SITE DESCRIPTION: BASE FLOOD ELEVATION ZONING DISTRICT GENERAL: BUILDING FOOTPRINT X N/A SFED-MU 1,950 SQ.FT (0.044 ACRES) (23%) ZONING PROPOSED USE 3 STORY MULTI-FAMILY RESIDENTIAL BUILDING ( 4 APARTMENTS UNITS ) MIXED USE RESIDENTIAL/COMMERCIAL 6 STORIES & MAX 70'BUILDING HEIGHT: ADJACENT ZONING/LAND USE SFED-MUNORTH SOUTH EAST WEST SFED-MU SFED-MU SITE CALCULATIONS: GROSS LOT AREA 10,118.40 SQ.FT (0.232 ACRES) (100%) PAVING & WALKS LANDSCAPE AREA 1,240 SQ.FT (0.028 ACRES) (15%) (MIN. REQUIRED 15%) PERVIOUS IMPERVIOUS 6,908 SQ.FT (0.1588 ACRES) (85%) DENSITY : MAX ALLOWED = PROPOSED 4 DU/0.187 AC 4 DU CONSTRUCTION TYPE III-A - PROTECTED WITH ALLOWABLE HEIGHT INCREASE OF ONE (1) FOOT PER ONE AND TWO THIRDS (1.66) FEET OF HORIZONTAL DISTANCE FRO THE ADJACENT RESIDENTIAL ZONING BOUNDARY 37' F.A.R MAX. 4.0 OPEN SPACE 6,194 SQ.FT (0.142 ACRES) (76%) 3,978 SQ.FT (0.091 ACRES) (48%)ROOF STRUCTURE COVERAGE REAR (NORTH) EAST SIDE REQ. FRONT | DOORYARD 0' SETBACKS: WEST SIDE PARKING:REQ: 2 OR MORE BEDROOM UNITS @ 1. 75 SPACES PER D.U LEVEL 2 CORNER UNITS #1 & #4 LEVEL 1 UNDER A/C - LEVEL 1 UNDER A/C-LEVEL 2 -TOTAL: -TOTAL: LEVEL 3 UNDER A/C-LEVEL 3 -TOTAL: TERRACE TOTAL UNDER A/C TOTAL: PROPOSED 8'-12' 5' 5.6' 21' PROPOSED:(4)3 BEDROOM UNITS / 2 PARKINGS MIDDLE UNITS #2 & #3 PROPOSED LEVEL 2 LEVEL 1 UNDER A/C - LEVEL 1 UNDER A/C-LEVEL 2 -TOTAL: -TOTAL: LEVEL 3 UNDER A/C-LEVEL 3 -TOTAL: TERRACE TOTAL UNDER A/C TOTAL: 0' 0' SEC. 230-40. - MINIMUM FLOOR AREAS FOR DWELLINGS MULTIFAMILY RESIDENTIAL DWELLINGS SHALL CONTAIN AT LEAST ONE THOUSAND ONE HUNDRED FIFTY (1,150) SQUARE FEET FOR THREE-BEDROOM UNITS, AND ONE HUNDRED FIFTY (150) SQUARE FEET FOR EACH ADDITIONAL BEDROOM. DENS THAT ARE SUPPLEMENTAL TO A LIVING ROOM SHALL COUNT AS BEDROOMS. MIN. REQUIRED AREA FOR 3 BEDROOMS + DEN =1,300 SQ.FT MIN. UNDER A/C AREA PROVIDED:1,899 SQ,FT 304 SQ.FT. 979 SQ.FT. 494 SQ.FT. 494 SQ.FT. 695 SQ.FT. 999 SQ.FT. 979 SQ.FT. 2,168SQ.FT. 2,472 SQ.FT. FRONTAGE 50% MIN. ON BTL LOT FRONTAGE 60'PROPOSED FRONTAGE WIDTH MIN. 50%: 30'34' NET LOT AREA 8,148 SQ.FT (0.187 ACRES) (100%) VEHICULAR AREA 4,467 SQ.FT (0.127 ACRES) 3,386 SQ.FT (0.077 ACRES) (41%) COMMON AREAS 3,454 SQ.FT (0.077 ACRES) (41%) MIN. LOT DIMENSIONS SFED-MU APARTMENT MIN. LOT SIZE W=50' X D= 100' 1,240 SQ.FT (0.0285 ACRES) (15%) (MIN. REQUIRED 15%) bldg sf / net lot sf 11,358 sf/ 8,148 sf =1.40 10,118.40sf x 25u / 43,500sf = 5.81 units 25U PER ACRE PROPOSED 503 SQ.FT. 503 SQ.FT. 703 SQ.FT. 1,050 SQ.FT. 347 SQ.FT. 2,196 SQ.FT. 2,543 SQ.FT. 990 SQ.FT. 990 SQ.FT. 332 SQ.FT.PARKING 332 SQ.FT.PARKING 9'-12' SOD TO EDGE OF ROAD F.F.E:9.79 NAVD B.F.E :N/A F.F.E:9.79 NAVD B.F.E :N/A F.F.E:9.79 NAVD B.F.E :N/A F.F.E:9.79 NAVD B.F.E :N/A 1 2 3 4 5 6 7 8 G R G R G R G R CLCL CL S. W . 1 5 T H S T R E E T 18 ' A S P H A L T P A V E M E N T ZONED SFED-MU 60 . 0 0 ' S8 8 ° 2 1 ' 2 9 " W N00°49'56"W 135.87' N00°49'56"W 135.84' N8 8 ° 2 2 ' 4 7 " E 60 . 0 0 ' N8 8 ° 2 2 ' 4 7 " E ( B A S I S O F B E A R I N G S ) LOT 9, BLOCK 44 "NORTH HOLLYWOOD" (PB.4- PG.1) LOT 7, BLOCK 44 "NORTH HOLLYWOOD" (PB.4- PG.1) 10 ' A S P H A L T P A V E M E N T EXISTING 1 STORY CBS RESIDENCE NBHD-RES 1 STORY COMMERCIAL BUILDING ZONED SFED-MU 24'DRIVEWAY FRONTAGE SETBACK SB BALCONY L. 42 0 . 0 8 ' S.W 2ND AVENUE UNIT 1 UNIT 2 UNIT 3 UNIT 4 3 STORY ASPHALT 3 STORY3 STORY3 STORY xq c ; L O T 1 3 , B L O C K 4 4 "N O R T H H O L L Y W O O D " (P B . 4 - P G . 1 ) BA L C O N Y SE T B A C K MULTI-TENANT PACKAGE DROP BOXES GARBAGE 5' U . E . 5' A . E . DR I V E W A Y NE W D R I V E W A Y BA L C O N Y SE T B A C K DR I V E W A Y PROPOSED SAND PAVERS FOR BIKE RACK 4' PATHWAY 2% MAX. SLOPE 4' PATHWAY 2% MAX. SLOPE GARBAGE GARBAGE GARBAGE BA L C O N Y L . BU I L D I N G S E T B A C K BU I L D I N G S E T B A C K BU I L D I N G S E T B A C K NE W D R I V E W A Y S T R E E T A C C E S S 5' C O N C . S W K . NE W FR O N T Y A R D FOOT PRINT:492 SQ FOOT PRINT :483 SQ5' C O N C . S W K . EX I S T I N G FOOT PRINT :483 SQ FOOT PRINT:492 SQ ~25' EASEMENT~ 5' C O N C . S W K . EX I S T I N G 8. 0 8 8. 2 9 8. 1 8 8. 1 9 8. 1 7 8. 2 0 8. 3 7 8. 5 3 8. 5 2 8. 6 1 8. 6 4 8. 2 3 8. 0 0 EX I S T I N G 6 " D . I . P . W A T E R M A I N EX I S T I N G 8 " V C P G R A V I T Y S E W E R EX I S T I N G 6 " D . I . P . W A T E R M A I N 60 . 0 0 ’ W W W W 5' 5’-0” ACCESS EASEMENT 1 TREE MITIGATION DATA NON SPECIMEN PALM REMOVED = 1 PALM PROVIDED ON SITE = 1 (SEE SHEET L-1) 1. COCONUT PALM COCOS NUCIFERA 4' CT. 10" DBH. 15'X15' GOOD REMOVE/MIT EXISTING TREE INVENTORY TREE NO. COMMON NAME BOTANICAL NAME SIZE DBH. HT. X SPR. COND DISPOSITION 6/26/23 PR O J E C T : REVISIONS: DATE DRAWN: 1/17/23 SHEET NO. SHEET TITLE: EXISTING TREE DISPOSITION PLAN L-2 SEAL: SCALE: 1"=10' MLA l a n d s c a p e a r c h i t e c t u r e 10 1 6 n e 4 5 t h s t r e e t oa k l a n d p a r k , f l . 3 3 3 3 4 te l . 9 5 4 - 7 6 3 - 4 0 7 1 9 5 4 - 7 6 3 - 1 0 4 7 e - m l a g r o u p i n c @ y a h o o . c o m ml a g r o u p i n c . c o m LA - 6 6 6 6 6 9 5 I S A - 0 8 2 7 A AN D S C A P E ARC H IT E C T No. LA-6666695 STATE OF E J S LMC F OL I DR A ESEAL:A M C U R L of-3 PLAN KEY EXISTING PALM TO REMOVE DE P A R T M E N T O F S U S T A I NA B L E D E V E L O P M E N T – UD& P TRE E P R O T E C T I O N D E T A I L Re v : 1 | Re v i s i o n Da t e : 4/10 /2 0 1 8 | I. D . N u m b e r : T PD Ap p r o v e d b y : E l l a P a r k e r , Ur b a n D e s i g n a n d P l a n n i n g M a n a g e r Unc o n t r o l l e d in ha r d co p y un l e s s ot h e r w i s e ma r k e d N O R T H 20 S W 1 5 S T D A N I A B E A C H , F L 3 3 0 0 4 MU L T I F A M I L Y D E V E L O P M E N T VI L L A S A T D A N I A B E A C H SUNSHINE STATE ONE CALL OF FLORIDA, INC. IT'S THE LAW! CALL 48 HOURS BEFORE YOU DIG IN FLORIDA 1-800-432-4770 DRC: 4/18/23 DRC: 6/21/23 18 2 5 N . E . 2 6 T H A V E N U E FT . L A U D E R D A L E , F L 3 3 3 0 5 PR O J E C T : REVISIONS: DATE DRAWN: 1/17/23 SHEET NO. SHEET TITLE: LANDSCAPE DETAILS AND SPECIFICATIONS L-3 SEAL: 3 T O W N H O M E S MLA l a n d s c a p e a r c h i t e c t u r e 10 1 6 n e 4 5 t h s t r e e t oa k l a n d p a r k , f l . 3 3 3 3 4 te l . 9 5 4 - 7 6 3 - 4 0 7 1 9 5 4 - 7 6 3 - 1 0 4 7 e - m l a g r o u p i n c @ y a h o o . c o m ml a g r o u p i n c . c o m LA - 6 6 6 6 6 9 5 I S A - 0 8 2 7 A AN D S C A P E ARC H IT E C T No. LA-6666695 STATE OF E J S LMC F OL I DR A ESEAL:A M C U RL of-3 DRC: 4/18/23 TRUNK FLARE OR TOP ROOT VISIABLE ON SURFACE ROOT BALL SLIGHTLY ABOVE GRADE 10% MAXIMUM ROOT BALL SHALL BE CLEAR OF PLANTINGS TOP SOIL COMPACTED SUBSOIL 3 TIMES ROOT BALL DIAMETER ROOT BALL DETAIL NOT TO SCALE NOTES: PLANTING DEPTH WILL BE DETERMINED BY THE TREE'S TRUNK FLARE OR THE TOP SRUFACE ROOT WILL BE VISIBLE ON THE SURFACE OF THE PLANTING. REMOVE WIRE BASKETS AND BURLAP PRIOR TO INSTALLATION COMPLLETELY REMOVE SYNTHETIC BURLAP COVERING MATERIALS TREE SUPPORT MATERIALS SHALL BE REMOVED FROM EACH TREE ONCE IT IS ETABLISHED. THIS IS TYPICALLY DONE AFTER SIX MONTHS FOR SHADE TREES AND ONE YEAR FOR PALMS TOP OF ROOTBALL SHALL BE APPROX. 1" ABOVE FINISHED GRADE TRUNK FLAIR MUST BE VISIBLE ABOVE GRADE. REMOVE TOP 1/3 OF THE NATURAL BURLAP AND WIRE BASKET COMPLETELY. IF WIRE BASKET CAN NOT BE REMOVED DUE TO ROOT BALL STABLILITY SLICE THE BASKET TO THE BOTTOM OF THE ROOT BALL ON A MIN OF 4 SIDES. NOT TO SCALE SINGLE TRUNK GUYING AND PLANTING DETAIL FINISH GRADE TREE SINGLE DOMINATE LEADER GOOD STRUCTURE FL. NO. 1 OR BETTER 3" CONT. EARTH BERM WATER BASIN 30" LONG 3/4" PVC IN HEAVY CLAY SOILS OR WHERE THERE IS A HARD PAN, AUGER AN 8" HOLE 6' DEEP OR THROUGH THE HARD PAN. PLACE ROOTBALL ON THE BOTTOM OF THE UNDISTRUBED SUB GRADE SOLID SOIL PEDESTAL PLANT PIT SHALL BE 2X AS PLACE SOIL AMENDMENTS (IE. TERRASORB, FERTILIZER TABLETS IN TOP 8" OF PLANTING SOIL WIDE AS ROOT BALL AND NO DEEPER THAN THE HEIGHT OF THE ROOT BALL 6' - 0 " 8" + 2' - 0 " 4" MI N . 3 STRANDS OF 3/4" BIODEGRADABLE ROPE TIED TO EACH TREE AND SUPPORTED IN THE GROUND WITH 3-1"X2"X1' BURIED SO TOP IS 1" BELOW GRADE. 3" OF CLEAN MULCH DEPTH IN A 5' DIA. RING KEPT 6" FROM TRUNK AND STEMS OF ALL VEGETATION THE USE OF CYPRESS OR RED MULCH IS PROHIBITED IRRIGATION HEAD AS NEEDED EXISTING UNDISTURBED SOIL TILL AND LOOSEN EXISTING SOIL TO A DEPTH OF 8" IN ALL PLANTING BEDS THEN TILL IN 4" OF PLANTING SOIL THROUGHOUT. TILL AND LOOSEN EXISTING SOIL TO A DEPTH OF 8" WITH A RADIUS OF 5' FROM TRUNK OF TREE BACKFILL W/ CLEAN 50% SAND/MUCK MIX FINISH GRADE 2X DIAMETER AT ROOT BALL BASE 3X ROOT BALL DIAMETER CT . SPR. 24" HT. MIN. VARIES 1/2" BELOW GRADE GRADE ROOT BARRIER DETAIL N.T.S. ROOT BARRIER PRODUCT: DEEPROOT UB-24-2 OR EQUAL ASSEMBLE AND INSTALL PER MANUFACTURER SPECIFICATIONS REJECTED. SOD SHALL BE WEED FREE INSTALLED OVER 2" OF TOP SOIL FREE OF DEBRIS AND ROCK. GREATER THAN 1/2" SHALL BE ANOTHER. SPACES MEASURING TIGHTLY AGAINST ONE STRIPS SHALL BE JOINED STAGGERED MANNER. SOD SOD SHALL BE LAID IN A SOD PLANTING DETAIL NOT TO SCALE PER PLAN. O.C. SPACING AS BACKFILL MIXTURE. PLANTING HOLE SHALL BE A MIN.OF 2X THE SIZE OF THE ROOT BALL. EDGE OF ROOT MASS WITH PREPARED EXISTING SUBSOIL REMOVE ENTIRE CONTAINER BEFORE PLANTING BACKFILL BETWEEN PLANTS 6" BEYOND 6" PLANTING SOIL-(PER SPECS) FINISHED GRADE MIN. 3" LAYER MULCH IN ENTIRE BED. MULCH SHALL BE KEPT 6" FROM PLANT BASE. GROUNDCOVER/ANNUALS PLANTING DETAIL NOT TO SCALE 3" MULCH RING. MULCH SHALL BE KEPT 6" FROM BASE OF PLANT TOP OF ROOT BALL SHALL BE 10% ABOVE FINISHED GRADE. FINISHED GRADE (IF CONTAINERIZED REMOVE ENTIRE CONTAINER) TOP OF ROOT BALL SHALL BE LEVEL WITH FINISHED GRADE EXISTING SUBSOIL BACKFILL MIXTURE. PLANTING HOLE SHALL BE A MIN. OF 2X THE SIZE OF THE ROOT BALL FERTILIZER TABLETS 4" TEMPORARY WATERING BASIN REMOVE BURLAP AT TOP 1/3 OF PLANT BALL. SHRUB PLANTING DETAIL NOT TO SCALE 3" MULCH RING. MULCH SHALL BE KEPT 6" FROM BASE OF PLANT 1. ALL SIZES SHOWN FOR PLANT MATERIAL ON PLAN ARE TO BE CONSIDERED AS MINIMUMS. ALL PLANT MATERIAL MUST MEET OR EXCEED THESE MINIMUM REQUIREMENTS FOR BOTH HEIGHT AND SPREAD. ANY OTHER REQUIREMENTS FOR SPECIFIC SHAPE OR EFFECT AS NOTED ON THE PLAN WILL ALSO BE REQUIRED FOR FINAL ACCEPTANCE. 2. ALL PLANT MATERIAL FURNISHED BY THE LANDSCAPE CONTRACTOR UNLESS OTHERWISE SPECIFIED SHALL BE FLORIDA NO.1 OR BETTER ACCORDING TO GRADES AND STANDARDS FOR NURSERY\ PLANTS LATEST EDITION 2001. ALL TREES DESIGNATED AS SINGLE TRUNK TREES SHALL HAVE SINGLE DOMINANT LEADER AND STRAIGHT TRUNK. THE PROPER STRUCTURE OF TREES IS MOST IMPORTANT. ALL TREES DESIGNATED AS MULTI-TRUNK TREES SHALL HAVE AT LEAST THREE (3) TRUNKS WITH EQUAL CALIPERS ORIGINATING AT THE GROUND OF THE TREES AND WITH ANGLES NO LESS THAN 45 DEGREES. TREES WITH BARK INCLUSION AND CODOMINANT TRUNKS AT ANY HEIGHT WILL NOT BE ACCEPTED. ALL TREES AND PALMS MUST BE GUYED WITH PROPER HORTICULTURAL AND ARBORICULTURAL TECHNIQUES. WE RECOMMEND THAT THE TREES BE STAKED WITH NATURAL HEMP IN LIEU OF WIRE OR OTHER SYNTHETIC MATERIAL. NAILING INTO TREES AND PALMS IS PROHIBITED. ALL STAKING SHALL BE REMOVED APPROX. TWELVE (12) MONTHS AFTER PLANTING OR AT TIME OF ESTABLISHMENT OF TREE. ALL PLANTING TO BE DONE IN ACCORDANCE WITH PROPER HORTICULTURAL PRACTICES. 3. IN ADDITION TO THESE REQUIREMENTS ALL LOCAL LANDSCAPE CODES AND REQUIREMENTS SHALL BE MET IN ORDER TO SATISFY THE REVIEW AND APPROVAL OF THE CITY OF WESTON 4. ALL PLANTING HOLES SHALL BE A MINIMUM OF 2 1/2 TIMES THE DIAMETER OF THE PLANT BALL. ALL PLANTING AREAS SHALL BE EXCAVATED TO REMOVE ALL OBJECTIONABLE MATERIALS, SUCH AS ASPHALT, SUB-BASE, CONCRETE, ROCK, CAUSTIC MATERIALS WITH AN EXCESSIVE SOIL Ph, OR SIMILAR MATERIALS NOT SUITED FOR LANDSCAPE PLANTING. ALL BURLAP /SYNTHETIC BURLAP, SYNTHETIC STRING OR CORDS OR WIRE BASKETS SHALL BE REMOVED BEFORE PLANTING. ALL SYNTHETIC TAPE SHALL BE REMOVED FROM TREES BEFORE INSPECTION. 5. ALL PLANT MATERIALS SHALL BE PLANTED IN PLANTING SOIL THAT IS DELIVERED TO THE SITE IN A CLEAN, LOOSE AND FRIABLE CONDITION. ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 6" OF PLANTING SOIL, AND ALL SODDED AREAS SHALL HAVE 2" OF PLANTING SOIL. THIS SOIL SHALL BE TILED INTO EXISTING SOIL ON SITE. ALL SOIL SHALL HAVE A WELL DRAINED CHARACTERISTIC. SOIL MUST BE FREE OF ALL ROCKS, STICKS, OBJECTIONABLE DEBRIS INCLUDING WEEDS AND WEED SEED. RECYCLED COMPOST IS ENCOURAGED AS A SOIL AMENDMENT. 6. ALL PLANT MATERIALS SHALL BE THOROUGHLY WATERED IN AT THE TIME OF PLANTING. NO DRY PLANTING SHALL BE PERMITTED. ALL PLANT MATERIALS SHALL BE PLANTED SUCH THAT THE TOP OF THE PLANT ROOT BALL IS FLUSH WITH THE SURROUNDING GRADE OR PLANTED AT 10% ABOVE THE SURROUNDING GRADE PER SPECIFICATIONS ON THE PLANTING DETAILS. 7. ALL PLANT MATERIALS SHALL BE INSTALLED WITH FERTILIZER WHICH SHALL BE STATE APPROVED AS A COMPLETE FERTILIZER CONTAINING THE REQUIRED MINIMUM OF TRACE MINOR ELEMENTS IN ADDITION TO N-P-K, OF WHICH 50% 0F THE NITROGEN SHALL BE DERIVED FROM AN ORGANIC SOURCE. 8. ALL LANDSCAPE AREAS NOT COVERED BY SHRUBS OR GROUND COVERED SHALL BE COVERED BY SOD AND ALL AREAS NOT COVERED BY SOD SHALL BE COVERED WITH NONCYPRESS ARSENIC FREE MULCH, TO A MINIMUM DEPTH OF THREE (3) INCHES OF COVER WHEN SETTLED ALL MULCH SHALL BE KEPT 2" FROM THE BASE OF ALL PLANT MATERIAL. THE WATER BASIN PARTICULARLY ON OAKS SHALL REMAIN FOR AT LEAST THREE (3) MONTHS. 9. SOD SHALL BE (AS NOTED) SOLID SOD , AND SHALL BE LAID ON A SMOOTH PLANTING BASE WHICH HAS BEEN GRADED TO MEET THE DRAINAGE CHARACTERISTICS OF THE SITE. ALL SOD SHALL BE LAID WITH CLOSELY FITTED JOINTS, AND SHALL BE IN A GREEN AND HEALTHY GROWING CONDITION AT PLANTING. 10. ALL LANDSCAPE AREA SHALL BE IRRIGATED BY A FULLY AUTOMATIC SYSTEM ADJUSTED TO PROVIDE 100% COVERAGE OF ALL LANDSCAPE AREAS WITH RAIN SENSOR. ALL HEADS SHALL BE ADJUSTED TO MIN. 100% OVERLAP. IRRIGATION SYSTEM SHALL BE RUST FREE WITH NO OVERSPRAY ONTO IMPERVIOUS AREAS. PVC RISERS SHALL BE PAINTED FLAT BLACK. 11. ANY SUBSTITUTIONS TO PLANT MATERIALS FOR AREAS AND ITEMS ADDRESSED BY LOCAL CODES SHALL BE APPROVED BY THE CITY OF WESTON PRIOR TO WORK PERFORMED. 12. ALL LANDSCAPE AREAS SHALL BE FINISH GRADED SUCH THAT THEY ARE 3.5" BELOW SURROUNDING PAVED SURFACES AS NOT TO IMPEDE THE FLOW OF DRAINAGE INTO LANDSCAPE AREAS AND TO ALLOW FOR A 3" MULCH LAYER. 13. ALL NEW LANDSCAPED AREAS SHALL BE EXCAVATED OF ALL ROCK AND DEPRIS AND BACK FILLED WITH CLEAN DEPRIS FREE 50% SAND AND 50% MUCK 14. CONTRACTOR SHALL PROVIDE SOD AND IRRIGATION TO EDGES OF OF RIGHT OF WAYS AND ALL PROPERTY LINES. 15. ALL FREE STANDING UTILITIES AND SITE EQUIPEMENT MUST BE SCREENED ON THREE (3) SIDES WITH SHRUB MATERIAL EQUAL TO THE HEIGHT OF THE ELEMENT 16. PLANTING PLAN TAKES PRECEDENT OVER PLANT LIST. 17. TREES/PALMS SHALL BE STAKED OR GUYED FOR A PERIOD OF ONE YEAR OR UNTIL ESTABLISHMENT. ALL PLANT MATERIALS SHALL BE WARRANTED FOR 1 YEAR. LANDSCAPE NOTES SCREENING SHRUB MATERIAL PLANTED ON 3 SIDES TYPICAL 6" ABOVE THE HEIGHT OF EQUIPMENT AT TIME OF PLANTING UTILITY STRUCTURE TYPICAL UTILITY EQUIPEMENT DETAIL NOT TO SCALE 5 (2"x4"x16") WOOD BATTENS NAIL 2X4 TO BATTEN 5 LAYERS OF BURLAP 1" MULCH LAYER OVER ROOT BALL. MULCH SHALL BE KEPT 6" FROM TRUNK BASE. NO PLANTS SHALL BE PLANTED OVER ROOTBAL SECURE BATTENS WITH 3/4" HIGH CARBON STEEL BAND TO HOLD BATTENS IN PLACE DURING PLANTING AND GUARANTEE PERIOD 3 (2X4) WOOD BRACES STANDARD 8' LENGTH OR OTHER 2X4 LENGTH AS DIRECTED BY THE LANDSCAPE ARCHITECT 2"X4"X24" STAKE PAD BURIED 3" BELOW GRADE FILL AROUND BALL WITH SAND. PLANTING HOLE SHALL BE A MIN. OF 2X THE SIZE OF THE ROOT BALL AND 4" DEEPER SABAL PALM PLANTING DETAIL FERTILIZE WITH OSMOCOTE AS PER MFG. RECOMMENDATIONS 12-12-12, 6 MONTH FORMULA NOT TO SCALE TOP OF ROOT BALL SHALL BE 10% ABOVE FINISHED GRADE. ALL STAKING SHALL BE REMOVED WITHIN ONE YEAR OF INSTALLATION ROOTBALL SHALL BE PLACED AT THE BOTTOM OF THE UNDISTURBED SUB GRADE SOLID SOIL PEDESTAL 6" HT. CL E A R T R U N K FP-1 GR O U N D F L O O R AN D S I T E F . P . P L A N 23 - I L BV 0 4 - 0 7 - 2 3 20 S W 1 5 T H . S T R E E T BA N I A B E A C H , F L . CO N S U L T I N G E N G I N E E R S AB T E C H E N G I N E E R I N G I N C . FA X : ( 9 5 4 ) 4 7 5 - 0 0 0 7 10 3 9 6 W E S T S T A T E R O A D 8 4 , S U I T E 1 0 8 TE L : ( 9 5 4 ) 4 7 2 - 6 0 5 0 FO R T L A U D E R D A L E , F L 3 3 3 2 4 Da t e : Ch e c k e d : Date:Issue: MU L T I - F A M I L Y D E V E L O P M E N T VI L L A S A T D A N I A B E A C H                                                                                                                                                    FP-2                                                                                                                    Digitally signed by Ismael Leon Date: 2023.04.13 12:49:03 -04'00' CO N S U L T I N G E N G I N E E R S AB T E C H E N G I N E E R I N G I N C . FA X : ( 9 5 4 ) 4 7 5 - 0 0 0 7 10 3 9 6 W E S T S T A T E R O A D 8 4 , S U I T E 1 0 8 TE L : ( 9 5 4 ) 4 7 2 - 6 0 5 0 FO R T L A U D E R D A L E , F L 3 3 3 2 4 Da t e : Ch e c k e d : Date:Issue: CAJ2085 CAJ2081 3 5 3 FP-3 FI R E P R O T E C T I O N DE T A I L S 23 - I L BV 0 4 - 0 7 - 2 3 20 S W 1 5 T H . S T R E E T BA N I A B E A C H , F L . MU L T I - F A M I L Y D E V E L O P M E N T VI L L A S A T D A N I A B E A C H