Loading...
HomeMy WebLinkAboutR-2024-116 Change Order for IMS Contracting Inc. - Pier Refurb. ProjectRESOLUTION NO. 2021. \ \\, A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH. FLORIDA. AUTHOzuZING A CHANGE ORDER FOR THE PIER RENOVATION PROJECT WITH IMS CONTRACTING, INC.. FOR THE INSTALLATION OF SUPPORT BOARDS ON THE INSIDE WOODEN PANELS OF THE PIER IN AN AMOL]NT NOT TO EXCEED FIFTY-THRTE THOI]SAND SEVEN HLI}IDRED THIRTY.SEVEN DOLLARS AND SEVEN CENTS ($53,737.07); PROVIDING FOR CONFLICTS; FURTHER. PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on December 14, 2021, the City Commission awarded ITB No. 2l-025 entitled "Pier Refurbishing Project" to Industrial Maintenance Services, lnc. D/B/A IMS Contracting lnc. ("Industrial") for a comprehensive refurbishment of the more than 25-year old pier; and WHEREAS, the refurbishment project is complete and during the final inspection, additional support was deemed necessary for the inside w-ooden panels as to maximize the structure's integrif ; and WHEREAS, Industrial has provided a change order for the additional work to install the 2- loot x 6-foot support boards lor a cost of Fifty'-Three Thousand Seven Hundred Thirty-Seven Dollars and Seven Cents ($53,737.07) and funds are available w'ithin the existing contract budget; and WHEREAS, the Public Services Department recommends the adoption of this change order with lndustrial to meet the structural needs of the Pier Refurbishing Project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section l. That the above "Whereas" clauses are ratified and confirmed, and they are made a part ofand incorporated into this Resolution by this reference. Section 2. That the City Commission authorizes the proper City officials to execute a change order with IMS Construction, Inc. for the Pier Refurbishment Project to include the installation of2' x 6' support boards on the inside wooden panels ofthe Pier as outlined in Change Order #030, w-hich has been made a part of and incorporated into this Resolution as 'Exhibit A', in an amount not to exceed Fifty-Three Thousand Seven Hundred Thirty-Seven Dollars and Seven Cents ($53,737.07). Section 3. That funding lor the change order is available in the existing contract budget in Pier Fund Account No. 415-72-15-572-63- I 0 - lnfrastructure Other Than Bldgs. Section 4. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 5. That this Resolution shall be eft'ective l0 days after passage. PASSED AND ADOPTED ON .2024. ',lrrc w{llrnMotion b1 seco FINAL VOTE ON ADOPTION: Lrnanimous "y Yes No CI TTORNEY a E ATTES ELORA CITY CL APPROVED AS TO FORM AND CORRECTNESS BO TSIS ARCHIBALD Y IV MAYOR -)RESOLUTION +:O:,T. II \-O Commissioner Joyce L. Davis Commissioner Tamara James Commissioner Marco Salvino Vice Mayor Lori Lew'ellen Mayor Archibald J. Ryan IV CONSTRUCTION ITEMIZED lndustrial Mainlenance Seryices lnc Dania Beach Piet RepairOWNER CONTRACT NUMBER PROJECT LOCATloN Danra Beach Ps 100 w Dana Beach BLVO PROJECT NUMBER lndlstral Ma.tenance Setoices l.c21035 OESCRIPIION OF WORK lnsta 2x6 supporis under each centerdeck seclon as shown on SK 5 ORSUBJECTTO CONTRACT EXTENSION OR DELAYSWRITTEN APPROVAL REOUIRED BY OAIE O' SFF AITACH€D SCHEDULE IMS CHANGE ORoER NU AER:030REAUESI FOR PROPOSALNUMBER SUBCONTRACTOR PROPOSAL SUMMARY SUBCONTRACTOR(S) PROPOSAI S 1B s 1C 5 S S 1E 5 (nes ln rEl - SUBToTAL >S S 3 lcatunhc,Ltft 2 nnus atunn 3 1,,e2)'SUBTOTAL >s PRIME CONTRACTOR FEE' Not ro Er.eed 10.01/. >10_0%s 4B oN NEXT $30,000 ! $50.000 s.o% 5 SUBCONTRACTOR TOTAL COST >$ PRIME CONTRACTOR PROPOSAL SUMMARY 5PR|ME CONTRACIOR DIRECT TABOR 's.e ar.ched /..ksheet tot detatts) S 4,665005PRIME CONTRACTOR DIRECT MATERAL rs,Ee alra.hed worksho€r fo. dera,/sl7 s 690.56s3PRIME coNTRAcToR EoUIPiTENT RENTAL rs.. arrr.ne. kortsr*r to. d,"rars) 235.a2PRIME CoNTRACTOR GENERAL CON DIIION S tsee.iached ||.tksheet tat derz s9 t5 255.08S10L,ES ' / & 3), SUBIOTAL DIRECT COST > tcatLnnc Lne s nhus c.lunn B L,,e er - TOTAI DIRECT COST >s 45,255.0610 2,000 00soN FTRST $20,000 10.oya 2!,00c0! 25,255.08 s11BoN NEXT $30,000 11C OIRECT OVERHEAD'ON BALAIICE OVER $s0,0o0 2.000.00oN FIRST $20,000 10.oy"$ 20 cca 00 29.11.r 2',s 2.',]36.19s128oN titExl 530,000 ON BALANCE OVER $50.000 s 512C s13INSURANC E AN D TAXES- $1C167sTAXES ON MATERIAI AN D EOU IPMENT"' llor Lrnes z a 3l s 53.737.07s15PRIIIIE CONTRACTOR SUBTOTAL COSTS > $ 53,737.0?PRIME CONTRACTORTOTAL COST > s ,nwlr-{EE'm Drcct ovehead and Fee catcLtaton n accardahce wth vaaR 352 236-33 lJrt 2oa2) 'Pnhe Lkntact t's Fee on Subcantacta/s Pnpasatls) and Pme Cantaclofs .wn Dtrect Orehud tt Proft ate .tt h.gotkbte .hd n is nat qo.rcntee.1 to be a||atded at the top ol the Not ta E\caed \nte.hatd indbated abale Ptapase a tat antl 'eas.nade peientaqe based d the tevet at 6trad nsta vatuo ot tabaL n.b nd .hd t se ol can lru.tiah equ ipnent requted to ac@nptish the chanse rh@lsh nesanai.n, the Co,tacl'h9 ofti*t *tu lttinatety detemthe what wit be tuhsidebd lan ah,t rcasan.ble tnh a|9atd '"Att apptcabte paynTt tares and insLhnce (vdkd's cohp., etc-) r.t bbu cast'. AME OF PRIME CONIRACTOR let:o zozr 10 10 11 t.."'*-.*t**"".* INDUSTRIAL MAINTENANCE 5ERV|CE5, rNC. t9l0 20. lv. l{, E*rn:b.. Mr 49129 POAor 369, Werlt, Mr49394 Phoh€: {eo6)73e.eorr Owner Name: City of Dania Beach x030 Oate:08t06124IMS Job No.: 21085 Chanse Req #l tnslall2x6 supports under each center deck section as shown on SK-5 Labor Material 128.00 300.00 32.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $ s $ $ $ s $ s $ $ $ $ $ s s 75.00 $ 72.88 $ 100 00 $ 72.88 $ 72 88 $ 72.88 $ 72.88 $ 72 88 $ 72.88 $ 72 88 $ 72.88 $ 72 88 $ 72.88 $ 72 88 $ 98.63 $ 98.63 $ s $ $ $ $ $ $ $ $ $ $ s s s s 5 s $ $ s $ s s $ $ $ $ S $ s s s s s s s s s $ $ $ $ $ s $ s 4.665 00 690 56 GENERAL CONDITIONS l 300 009.600 00 21.864.00 3.200.00 IMS Superinlendent IMS Tradesp€rson IMS Proiecl Manager Labot Material Other Equipment t34,664.001 $4,665.001 $5,23s.s21 $6e0.56 2SlDays of AddirionalWorh Requned to Contrcct 3 935.52