Loading...
HomeMy WebLinkAboutR-2025-037 Craven Thompson Approval for Griffin Boat RampRESOLUTION NO. 2025-037 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA, AUTHORIZING ENVIRONMENTAL, CIVIL ENGINEERING, AND CONSTRUCTION ADMINISTRATION SERVICES FROM CRAVEN THOMPSON AND ASSOCIATES FOR THE GRIFFIN MARINE BOAT RAMP IN THE AMOUNT NOT TO EXCEED NINTY-SEVEN THOUSAND SEVEN HUNDRED AND TEN DOLLARS ($97,710.00) AND TO EXCEED THE ANNUAL SINGLE VENDOR PURCHASING POLICY OF FIFTY THOUSAND DOLLARS ($50,000.00); PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Dania Beach Code of Ordinances, Chapter 2, Article 1, Section 2-10, “Monetary thresholds for certain purchases and payment disbursement authorizations”, Subsection (a), sets the monetary threshold or limitation at Fifty Thousand Dollars ($50,000.00) for a vendor each fiscal year; and WHEREAS, the Public Services Department is requesting authorization to accept a proposal for environmental, civil engineering, and construction administration services from Craven Thompson and Associates (CTA) for the Griffin Marine Boat Ramp (the “Project”); and WHEREAS, CTA was chosen as one of fifteen firms awarded a contract as an approved engineering consultant for continuing contract services by the City Commission on January 12, 2021, pursuant to RFQ No. 20-005 under Resolution No. 2021-007; and WHEREAS, CTA will provide environmental, engineering, construction administration, bidding, and close-out services related to this Project, and which this proposal is made a part of and incorporated into this Resolution as Exhibit “A”. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF DANIA BEACH, FLORIDA: Section 1. That the above “Whereas” clauses are ratified and confirmed, and they are made a part of and incorporated into this Resolution by this reference. Section 2. That CTA is authorized to provide environmental, civil engineering, and construction management services for the Griffin Marine Boat Ramp in an amount not to exceed Ninety-Seven Thousand Seven Hundred Ten Dollars ($97,710.00). Section 3. That funding for this project will be sourced from a grant provided by the Florida Inland Navigation District (FIND), complemented by matching funds from the General Fund. These funds will be appropriated to account No. 103-72-64-575-31-10. 2 RESOLUTION #2025-037 Section 4. That the City is authorized to exceed the annual Fifty Thousand Dollars ($50,000.00) purchase threshold for a single vendor for fiscal year 2024/2025 and for all subsequent fiscal years that the agreement is in place. Section 5. That the City Manager and City Attorney are authorized to make minor revisions to the services Agreement as are deemed necessary and proper and in the best interest of the City. Section 6. That all resolutions or parts of resolutions in conflict with this Resolution are repealed to the extent of such conflict. Section 7. That this Resolution shall be effective 10 days after passage. PASSED AND ADOPTED on March 11, 2025. Motion by Vice Mayor Salvino, second by Commissioner Lewellen. FINAL VOTE ON ADOPTION: Unanimous X Yes No Commissioner Lori Lewellen ____ ____ Commissioner Luis Rimoli ____ ____ Commissioner Archibald J. Ryan IV ____ ____ Vice Mayor Marco Salvino ____ ____ Mayor Joyce L. Davis ____ ____ ATTEST: ELORA RIERA, MMC JOYCE L. DAVIS CITY CLERK MAYOR APPROVED AS TO FORM AND CORRECTNESS: EVE A. BOUTSIS CITY ATTORNEY January 22, 2025 Ms. Megan Yany Project Manager City of Dania Beach 1201 Stirling Road Dania Beach, Florida 33004 RE: GRIFFIN MARINE PARK BOAT RAMP AND DOCK ADDITIONAL SERVICES CTA PROJECT NO 23-0013 CTA PROPOSAL NO. 2025-R04.025 Dear Ms. Yany, The firm of Craven Thompson & Associates, Inc. (CTA) is pleased to provide the following proposal for professional services for the above referenced project. The specific scope tasks are as follows: I. ENVIRONMENTAL SERVICES (Provided by The Chappell Group) 1.1 Prepare Permit Application Prepare environmental resource permit applications to the U.S. Army Corps of Engineers (ACOE), the Florida Department of Environmental Protection (FDEP), and Broward County Resiliency & Environmental Department (BCRED) to replace and expand an existing boat ramp and install new floating docks for transient mooring. Structural plans of the boat ramp to be provided by MUE Engineers and the floating dock will be provided by the selected manufacturer chosen by the design team. Prepare necessary exhibits to be submitted with the applications. Lump Sum .......................................................... $5,250.00 1.2 Process Permit Application Process environmental resource permits with the ACOE, FDEP, and BCRED including responses to Requests for Additional Information (RAI), revisions to plans, benthic resource survey verification with agency staff, and coordination with Client and/or contractor. Prepare correspondence letters to U.S. Fish and Wildlife Service and Florida Fish and Wildlife Conservation Commission if necessary. Lump Sum ........................................................ $15,750.00 Ms. Megan Yany CTA Proposal No. 2025-R04.025 January 22, 2025 Page 2 1.3 Prepare SFWMD Right of Way Permit Application Prepare right of way (ROW) permit applications to South Florida Water Management District (SFWMD) for construction of the seawall, marginal dock and floating docks. Attend preapplication meeting with SFWMD staff prior to submittal of application to discuss ownership and plans. Lump Sum.................................................................................... $5,250.00 1.4 Process SFWMD Right of Way Permit Application Process SFWMD ROW permit applications including responses to Requests for Additional Information (RAIs), revisions to plans, and preparation of exhibits. Lump Sum.................................................................................. $10,500.00 1.5 FIND Grant Application Preparation of the application for Waterways Assistance Program (WAP) grant with the Florida Inland Navigation District (FIND) for the construction (Phase II) of boat ramp improvements including presentation to the commission for approval. Attend FIND board meeting in Cocoa Beach and assist City with presentation and question and answer session. Coordination with FIND staff for processing application and providing necessary documents for approval. Prepare cost estimate with city staff to develop the grant request amount that is sufficient to cover cost of construction, bidding, and construction administration. Lump Sum.................................................................................. $10,500.00 *Client to provide updated electronic AutoCAD file of survey and site plan if available. **This proposal does not include impacts to benthic resources, mangroves, mitigation, processing sovereign submerged lands lease or variances with the local municipality. If these services are required or requested by the client a proposal will be provided under separate cover. II. STRUCTURAL ENGINEERING SERVICES (Provided by MUEngineers, Inc.) 2.1 Technical Specifications (Provided by MUEngineers, Inc.) Technical specifications related to the structural design of the building structure (if requested). Lump Sum.................................................................................... $2,890.00 2.2 Bidding Assistance (Provided by MUEngineers, Inc.) Bidding Assistance (responding to bidders RFIs and attending up to one bidding phase conference call) Lump Sum.................................................................................... $1,155.00 Ms. Megan Yany CTA Proposal No. 2025-R04.025 January 22, 2025 Page 3 III. CONSTRUCTION ADMINISTRATION - STRUCTURAL ENGINEERING (Provided by MUEngineers) 3.1 Construction Administration Services Basic CA services ▪ Review and responses to RFIs related to clarifications related to the structural items indicated on the structural construction documents, structural design errors and omissions). ▪ Structural review of submittals (including up to one re-submittal per submittal) related to structural components indicated on the structural construction documents ▪ Attending virtual OAC meetings during construction on an as needed and scheduled basis. ▪ Up to 2 engineering site visits during construction. Lump Sum.................................................................................... $7,875.00 3.2 Additional Project Engineer Site Visits Additional project engineer site visits and attending meetings during construction as / if scheduled. Lump Sum (10 Visits) ................................................................... $5,250.00 3.3 Special Inspections Special Inspections and additional site visits during construction. Lump Sum.................................................................................. $10,290.00 IV. CONSTRUCTION ADMINISTRATION – CIVIL ENGINEERING 4.1 Civil Construction Phase Services (CTA Task No. 33120) ▪ Attend Pre-Construction conference meeting ▪ Prepare Meeting Minutes for Pre-Construction Meeting. ▪ Review and process shop drawings. ▪ Perform general site inspections/reviews as required to determine in general if the work is being performed in a manner that when completed will be in accordance with the contract documents. Inspections will be part-time, approximately three (3) hours per day, three (3) days per week for a Senior Supervising Engineer with an anticipated construction schedule of six (6) months to complete construction of all utilities and paving. ▪ Take photos of construction activities during site visits. ▪ Review change order request and provide professional opinion of request to City project manager (if required). ▪ Prepare Change Order on City change order format (if required). ▪ Negotiate change orders on behalf of the City (if required). ▪ Substantial and Final walkthrough with Contractor, Client, and regulatory agencies. ▪ Prepare final punch list and follow-up. Hourly, Not-to-Exceed ................................................................. $9,000.00 Ms. Megan Yany CTA Proposal No. 2025-R04.025 January 22, 2025 Page 4 4.2 Project Final Certification (CTA Task No. 31125) ▪ Review as-built information (for approval) provided by contractor’s Registered Professional Surveyor. ▪ Process as-built drawings through applicable governmental agencies based upon engineers approved as-built information provided by contractor’s Registered Professional Surveyor. This does not include field survey services. ▪ Prepare Statement of Substantial Completion of Construction and project close-out documents. Hourly, Not-to-Exceed ................................................................. $4,000.00 IV. PROJECT MANAGEMENT 5.1 Project Management (CTA Task No. 24070) Provide oversight of project to ensure timeline and direction desired by client are followed as closely as possible. Management and direction of design disciplines. Attend meetings and provide coordination between client and design team. Hourly, Not-to-Exceed ............................................................... $10,000.00 VI. MISCELLANEOUS 6.1 Reimbursables (CTA Task No. 31140) Reimbursable expenses such as courier services, FedEx charges, progress prints, permit prints, set of reproducible Mylar, etc. Estimated Budget ........................................................................ $1,000.00 SUMMARY OF FEES I. ENVIRONMENTAL SERVICES ......................................................................... $47,250.00 II. STRUCTURAL ENGINEERING SERVICES ........................................................... $4,045.00 III. CONSTRUCTION ADMINISTRATION – STRUCTURAL ENGINEERING ................ $23,415.00 IV. CONSTRUCTION ADMINISTRATION – CIVIL ENGINEERING ............................. $13,000.00 V. PROJECT MANAGEMENT ............................................................................. $10,000.00 GRAND TOTAL (NOT INCLUDING REIMBURSABLE EXPENSES) ........................ $97,710.00 ITEMS NOT INCLUDED: ▪ RFI reviews related to construction errors, deficiencies, omissions, and unforeseen field conditions. ▪ RFIs reviews not related to structural items indicated on the structural CDs. ▪ 3rd + Re-submittal reviews and submittal reviews not related to structural items indicated on the structural construction documents. ▪ Work related to owner and / or contractor requested design changes during construction. ▪ Engineer site visits exceeding the included engineering site visits in the basic CA services above. ▪ Structural Engineering Attending in person OAC meetings during construction. ▪ Civil or Landscape Design ▪ Utility Locates or test holes ▪ Planning services ▪ Surveying services Ms. Megan Yany CTA Proposal No. 2025-R04.025 January 22, 2025 Page 5 Acceptance This proposal and fee schedules are based on acceptance within 30 days of the date of preparation. If not accepted by you within that time period, we reserve the right to re-evaluate the terms and conditions contained herein. The above will be subject to the terms and conditions specified in the Contract Documents. If the proposed work and fees contained herein are agreeable with you, please provide a Purchase Order and a Notice to Proceed. Sincerely, CRAVEN THOMPSON & ASSOCIATES, INC. LEONARD (ZACH) GAMBLE, P.E. PATRICK J. GIBNEY, P.E. Senior Engineer Vice President, Engineering LZG/tg