HomeMy WebLinkAboutR-2025-037 Craven Thompson Approval for Griffin Boat RampRESOLUTION NO. 2025-037
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING ENVIRONMENTAL, CIVIL
ENGINEERING, AND CONSTRUCTION ADMINISTRATION SERVICES
FROM CRAVEN THOMPSON AND ASSOCIATES FOR THE GRIFFIN
MARINE BOAT RAMP IN THE AMOUNT NOT TO EXCEED NINTY-SEVEN
THOUSAND SEVEN HUNDRED AND TEN DOLLARS ($97,710.00) AND TO
EXCEED THE ANNUAL SINGLE VENDOR PURCHASING POLICY OF
FIFTY THOUSAND DOLLARS ($50,000.00); PROVIDING FOR CONFLICTS;
FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the Dania Beach Code of Ordinances, Chapter 2, Article 1, Section 2-10,
“Monetary thresholds for certain purchases and payment disbursement authorizations”, Subsection
(a), sets the monetary threshold or limitation at Fifty Thousand Dollars ($50,000.00) for a vendor
each fiscal year; and
WHEREAS, the Public Services Department is requesting authorization to accept a
proposal for environmental, civil engineering, and construction administration services from
Craven Thompson and Associates (CTA) for the Griffin Marine Boat Ramp (the “Project”); and
WHEREAS, CTA was chosen as one of fifteen firms awarded a contract as an approved
engineering consultant for continuing contract services by the City Commission on January 12,
2021, pursuant to RFQ No. 20-005 under Resolution No. 2021-007; and
WHEREAS, CTA will provide environmental, engineering, construction administration,
bidding, and close-out services related to this Project, and which this proposal is made a part of and
incorporated into this Resolution as Exhibit “A”.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1. That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
Section 2. That CTA is authorized to provide environmental, civil engineering, and
construction management services for the Griffin Marine Boat Ramp in an amount not to exceed
Ninety-Seven Thousand Seven Hundred Ten Dollars ($97,710.00).
Section 3. That funding for this project will be sourced from a grant provided by the
Florida Inland Navigation District (FIND), complemented by matching funds from the General
Fund. These funds will be appropriated to account No. 103-72-64-575-31-10.
2 RESOLUTION #2025-037
Section 4. That the City is authorized to exceed the annual Fifty Thousand Dollars
($50,000.00) purchase threshold for a single vendor for fiscal year 2024/2025 and for all
subsequent fiscal years that the agreement is in place.
Section 5. That the City Manager and City Attorney are authorized to make minor
revisions to the services Agreement as are deemed necessary and proper and in the best interest of
the City.
Section 6. That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 7. That this Resolution shall be effective 10 days after passage.
PASSED AND ADOPTED on March 11, 2025.
Motion by Vice Mayor Salvino, second by Commissioner Lewellen.
FINAL VOTE ON ADOPTION: Unanimous X
Yes No
Commissioner Lori Lewellen ____ ____
Commissioner Luis Rimoli ____ ____
Commissioner Archibald J. Ryan IV ____ ____
Vice Mayor Marco Salvino ____ ____
Mayor Joyce L. Davis ____ ____
ATTEST:
ELORA RIERA, MMC JOYCE L. DAVIS
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
January 22, 2025
Ms. Megan Yany
Project Manager
City of Dania Beach
1201 Stirling Road
Dania Beach, Florida 33004
RE: GRIFFIN MARINE PARK BOAT RAMP AND DOCK
ADDITIONAL SERVICES
CTA PROJECT NO 23-0013
CTA PROPOSAL NO. 2025-R04.025
Dear Ms. Yany,
The firm of Craven Thompson & Associates, Inc. (CTA) is pleased to provide the
following proposal for professional services for the above referenced project.
The specific scope tasks are as follows:
I. ENVIRONMENTAL SERVICES (Provided by The Chappell Group)
1.1 Prepare Permit Application
Prepare environmental resource permit applications to the U.S.
Army Corps of Engineers (ACOE), the Florida Department of
Environmental Protection (FDEP), and Broward County Resiliency &
Environmental Department (BCRED) to replace and expand an
existing boat ramp and install new floating docks for transient
mooring. Structural plans of the boat ramp to be provided by MUE
Engineers and the floating dock will be provided by the selected
manufacturer chosen by the design team. Prepare necessary
exhibits to be submitted with the applications.
Lump Sum .......................................................... $5,250.00
1.2 Process Permit Application
Process environmental resource permits with the ACOE, FDEP, and
BCRED including responses to Requests for Additional Information
(RAI), revisions to plans, benthic resource survey verification with
agency staff, and coordination with Client and/or contractor.
Prepare correspondence letters to U.S. Fish and Wildlife Service and
Florida Fish and Wildlife Conservation Commission if
necessary.
Lump Sum ........................................................ $15,750.00
Ms. Megan Yany
CTA Proposal No. 2025-R04.025
January 22, 2025
Page 2
1.3 Prepare SFWMD Right of Way Permit Application
Prepare right of way (ROW) permit applications to South Florida Water Management
District (SFWMD) for construction of the seawall, marginal dock and floating docks.
Attend preapplication meeting with SFWMD staff prior to submittal of application to
discuss ownership and plans.
Lump Sum.................................................................................... $5,250.00
1.4 Process SFWMD Right of Way Permit Application
Process SFWMD ROW permit applications including responses to Requests for Additional
Information (RAIs), revisions to plans, and preparation of exhibits.
Lump Sum.................................................................................. $10,500.00
1.5 FIND Grant Application
Preparation of the application for Waterways Assistance Program (WAP) grant with the
Florida Inland Navigation District (FIND) for the construction (Phase II) of boat ramp
improvements including presentation to the commission for approval. Attend FIND board
meeting in Cocoa Beach and assist City with presentation and question and answer
session. Coordination with FIND staff for processing application and providing necessary
documents for approval. Prepare cost estimate with city staff to develop the grant request
amount that is sufficient to cover cost of construction, bidding, and construction
administration.
Lump Sum.................................................................................. $10,500.00
*Client to provide updated electronic AutoCAD file of survey and site plan if available.
**This proposal does not include impacts to benthic resources, mangroves, mitigation, processing
sovereign submerged lands lease or variances with the local municipality. If these services are required
or requested by the client a proposal will be provided under separate cover.
II. STRUCTURAL ENGINEERING SERVICES (Provided by MUEngineers, Inc.)
2.1 Technical Specifications (Provided by MUEngineers, Inc.)
Technical specifications related to the structural design of the building structure (if
requested).
Lump Sum.................................................................................... $2,890.00
2.2 Bidding Assistance (Provided by MUEngineers, Inc.)
Bidding Assistance (responding to bidders RFIs and attending up to one bidding phase
conference call)
Lump Sum.................................................................................... $1,155.00
Ms. Megan Yany
CTA Proposal No. 2025-R04.025
January 22, 2025
Page 3
III. CONSTRUCTION ADMINISTRATION - STRUCTURAL ENGINEERING (Provided by MUEngineers)
3.1 Construction Administration Services
Basic CA services
▪ Review and responses to RFIs related to clarifications related to the structural items
indicated on the structural construction documents, structural design errors and
omissions).
▪ Structural review of submittals (including up to one re-submittal per submittal)
related to structural components indicated on the structural construction documents
▪ Attending virtual OAC meetings during construction on an as needed and scheduled
basis.
▪ Up to 2 engineering site visits during construction.
Lump Sum.................................................................................... $7,875.00
3.2 Additional Project Engineer Site Visits
Additional project engineer site visits and attending meetings during construction as / if
scheduled.
Lump Sum (10 Visits) ................................................................... $5,250.00
3.3 Special Inspections
Special Inspections and additional site visits during construction.
Lump Sum.................................................................................. $10,290.00
IV. CONSTRUCTION ADMINISTRATION – CIVIL ENGINEERING
4.1 Civil Construction Phase Services (CTA Task No. 33120)
▪ Attend Pre-Construction conference meeting
▪ Prepare Meeting Minutes for Pre-Construction Meeting.
▪ Review and process shop drawings.
▪ Perform general site inspections/reviews as required to determine in general if the
work is being performed in a manner that when completed will be in accordance with
the contract documents. Inspections will be part-time, approximately three (3) hours
per day, three (3) days per week for a Senior Supervising Engineer with an anticipated
construction schedule of six (6) months to complete construction of all utilities and
paving.
▪ Take photos of construction activities during site visits.
▪ Review change order request and provide professional opinion of request to City
project manager (if required).
▪ Prepare Change Order on City change order format (if required).
▪ Negotiate change orders on behalf of the City (if required).
▪ Substantial and Final walkthrough with Contractor, Client, and regulatory agencies.
▪ Prepare final punch list and follow-up.
Hourly, Not-to-Exceed ................................................................. $9,000.00
Ms. Megan Yany
CTA Proposal No. 2025-R04.025
January 22, 2025
Page 4
4.2 Project Final Certification (CTA Task No. 31125)
▪ Review as-built information (for approval) provided by contractor’s Registered
Professional Surveyor.
▪ Process as-built drawings through applicable governmental agencies based upon
engineers approved as-built information provided by contractor’s Registered
Professional Surveyor. This does not include field survey services.
▪ Prepare Statement of Substantial Completion of Construction and project close-out
documents.
Hourly, Not-to-Exceed ................................................................. $4,000.00
IV. PROJECT MANAGEMENT
5.1 Project Management (CTA Task No. 24070)
Provide oversight of project to ensure timeline and direction desired by client are followed
as closely as possible. Management and direction of design disciplines. Attend meetings
and provide coordination between client and design team.
Hourly, Not-to-Exceed ............................................................... $10,000.00
VI. MISCELLANEOUS
6.1 Reimbursables (CTA Task No. 31140)
Reimbursable expenses such as courier services, FedEx charges, progress prints, permit
prints, set of reproducible Mylar, etc.
Estimated Budget ........................................................................ $1,000.00
SUMMARY OF FEES
I. ENVIRONMENTAL SERVICES ......................................................................... $47,250.00
II. STRUCTURAL ENGINEERING SERVICES ........................................................... $4,045.00
III. CONSTRUCTION ADMINISTRATION – STRUCTURAL ENGINEERING ................ $23,415.00
IV. CONSTRUCTION ADMINISTRATION – CIVIL ENGINEERING ............................. $13,000.00
V. PROJECT MANAGEMENT ............................................................................. $10,000.00
GRAND TOTAL (NOT INCLUDING REIMBURSABLE EXPENSES) ........................ $97,710.00
ITEMS NOT INCLUDED:
▪ RFI reviews related to construction errors, deficiencies, omissions, and unforeseen field conditions.
▪ RFIs reviews not related to structural items indicated on the structural CDs.
▪ 3rd + Re-submittal reviews and submittal reviews not related to structural items indicated on the
structural construction documents.
▪ Work related to owner and / or contractor requested design changes during construction.
▪ Engineer site visits exceeding the included engineering site visits in the basic CA services above.
▪ Structural Engineering Attending in person OAC meetings during construction.
▪ Civil or Landscape Design
▪ Utility Locates or test holes
▪ Planning services
▪ Surveying services
Ms. Megan Yany
CTA Proposal No. 2025-R04.025
January 22, 2025
Page 5
Acceptance
This proposal and fee schedules are based on acceptance within 30 days of the date of preparation. If not
accepted by you within that time period, we reserve the right to re-evaluate the terms and conditions
contained herein.
The above will be subject to the terms and conditions specified in the Contract Documents. If the
proposed work and fees contained herein are agreeable with you, please provide a Purchase Order and a