HomeMy WebLinkAbout2024-03-26 Regular City Commission Agenda Packet - Addendum No. 1
AGENDA
DANIA BEACH CITY COMMISSION
REGULAR MEETING
TUESDAY, MARCH 26, 2024 - 7:00 PM
ANY PERSON WHO DECIDES TO APPEAL ANY DECISION MADE WITH REGARD TO ANY MATTER CONSIDERED AT THIS
MEETING OR HEARING WILL NEED A RECORD OF THE PROCEEDING, AND FOR SUCH PURPOSE MAY NEED TO ENSURE
THAT A VERBATIM RECORD OF THE PROCEEDING IS MADE WHICH RECORD INCLUDES THE TESTIMONY AND EVIDENCE
UPON WHICH THE APPEAL IS TO BE BASED.
LOBBYIST REGISTRATION IS REQUIRED. PRIOR TO ENGAGING IN ANY LOBBYING ACTIVITIES, WHETHER OR NOT
COMPENSATION IS PAID OR RECEIVED IN CONNECTION WITH THOSE ACTIVITIES, EACH LOBBYIST SHALL FILE WITH THE
CITY CLERK AN ANNUAL REGISTRATION STATEMENT AND PAY AN ANNUAL TWO HUNDRED FIFTY DOLLARS ($250.00)
REGISTRATION FEE FOR EACH PRINCIPAL OR EMPLOYER. REGISTRATION FORMS ARE AVAILABLE ON THE CITY WEBSITE:
WWW.DANIABEACHFL.GOV. (ORDINANCE #2012-019; AMENDED BY ORDINANCE #2019-019)
IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT, PERSONS NEEDING ASSISTANCE TO PARTICIPATE IN
ANY OF THESE PROCEEDINGS SHOULD CONTACT THE CITY CLERK'S OFFICE, 100 W. DANIA BEACH BOULEVARD, DANIA
BEACH, FL 33004, (954) 924-6800 EXTENSION 3624, AT LEAST 48 HOURS PRIOR TO THE MEETING.
IN CONSIDERATION OF OTHERS, WE ASK THAT YOU:
A. PLEASE TURN CELL PHONES OFF, OR PLACE ON VIBRATE. IF YOU MUST MAKE A CALL, PLEASE STEP OUT INTO THE
ATRIUM, IN ORDER NOT TO INTERRUPT THE MEETING.
B. IF YOU MUST SPEAK TO SOMEONE IN THE AUDIENCE, PLEASE SPEAK SOFTLY OR GO OUT INTO THE ATRIUM, IN
ORDER NOT TO INTERRUPT THE MEETING.
DECORUM POLICY FOR MEETINGS OF THE CITY COMMISSION
OF THE CITY OF DANIA BEACH, FLORIDA:
INDIVIDUALS WHO WISH TO MAKE ANY “CITIZEN’S COMMENTS” UNDER THAT PORTION OF THE CITY COMMISSION
AGENDA, OR WHO OTHERWISE WANT TO ADDRESS THE CITY COMMISSION, MUST FIRST BE REGISTERED WITH THE CITY
CLERK (FORMS ARE AVAILABLE OUTSIDE OF THE CITY COMMISSION CHAMBERS AND MUST BE GIVEN TO THE CLERK
BEFORE THE MEETING). OTHERS WHO WANT TO ADDRESS THE COMMISSION ON ANY MATTERS MUST FIRST BE
RECOGNIZED BY THE MAYOR. ALL SUCH PERSONS MUST USE THE PODIUM IN THE COMMISSION CHAMBER. NO MORE
THAN ONE PERSON AT A TIME MAY ADDRESS THE COMMISSION FROM THE PODIUM. COMMENTS ARE ONLY TO BE MADE
TO THE CITY COMMISSION AND ARE NOT TO BE DIRECTED TO THE AUDIENCE OR CITY STAFF.
NO INDIVIDUAL SHALL MAKE ANY SLANDEROUS OR UNDULY REPETITIVE REMARKS, OR ENGAGE IN ANY OTHER
FORM OF BEHAVIOR THAT DISRUPTS OR IMPEDES THE ORDERLY CONDUCT OF THE MEETING, AS DETERMINED BY THE
MAYOR. NO INDIVIDUAL MAY SPEAK DIRECTLY TO OR ADDRESS THE MAYOR, CITY COMMISSIONER OR CITY STAFF:
COMMENTS ARE TO BE ONLY DIRECTED TO THE COMMISSION AS A WHOLE. NO CLAPPING, APPLAUDING, HECKLING OR
VERBAL OUTBURSTS IN SUPPORT OF OR OPPOSITION TO A SPEAKER OR HIS OR HER REMARKS SHALL BE PERMITTED. NO
SIGNS OR PLACARDS SHALL BE PERMITTED IN THE COMMISSION CHAMBER.
IF ANY PERSON’S CONDUCT AS DETERMINED BY THE MAYOR IS FOUND TO BE DISRUPTIVE OR INTERFERES WITH
THE ORDERLY CONDUCT OF THE MEETING, THE PERSON MAY BE ASKED BY THE MAYOR TO LEAVE THE COMMISSION
CHAMBERS; IF THE PERSON DOES NOT LEAVE AND THE CONDUCT PERSISTS, THE CITY POLICE DEPARTMENT WILL BE
REQUESTED TO ESCORT THE INDIVIDUAL FROM THE CITY COMMISSION CHAMBERS.
ALL CELLULAR TELEPHONES ARE TO BE SILENCED DURING THE MEETING. ALL PERSONS EXITING THE COMMISSION
CHAMBER SHALL DO SO QUIETLY. (RESOLUTION #2020-032)
ADDENDUM NO. 1
(Items in red are new and/or revised)
1. CALL TO ORDER/ROLL CALL
Agenda – Dania Beach City Commission
Tuesday, March 26, 2024 - 7:00 PM
Page 2 of 9
2. MOMENT OF SILENCE AND PLEDGE OF ALLEGIANCE
3. PRESENTATIONS AND SPECIAL EVENT APPROVALS
1. BCPS - School Board Member Daniel Foganholi - The Future of our Schools -
Sponsored by Commissioner James
2. Mayor Frank C. Ortis, City of Pembroke Pines - Sponsored by Vice Mayor Lewellen
3. FCCMA Honoring Dania Beach: Celebrating 75 Years of Commission-Manager
Governance - City Manager's Office
4. Stormwater Revenue Sufficiency and Discussion on Capital Funding - Finance/Raftelis
Financial Consultants
5. Special Event Application - Lauren's Kid's "Walk In My Shoes" - Parks and Recreation
6. Special Event Application - Florida Mega Market - Parks and Recreation
7. Request for Proclamation Approval - National Autism Acceptance Month - Presentation
to Dan Marino Foundation - April 7, 2024 - Sponsored by Commissioner Davis
8. Retroactive Approval of Proclamation - Expression of Sympathy for Deborah Simmons
- Sponsored by Commissioner James
4. PROCLAMATIONS
1. Government Finance and Procurement Professionals Month- March 2024 - Finance
2. Dania Beach Improvement Committee - 60th Anniversary - Sponsored by Mayor Ryan
5. ADMINISTRATIVE REPORTS
1. City Manager
2. City Attorney
3. City Clerk - Reminders:
- April 8, 2024 Budget Workshop - 4:30 p.m.
- April 9, 2024 City Commission Meeting - 7:00 p.m.
6. PUBLIC SAFETY REPORTS
7. CITIZENS' COMMENTS
Addressing the Commission: A thirty (30) minute "Citizen Comments" period shall be designated on the agenda for citizens and interested
persons to speak on matters whether or not scheduled on that day's agenda. Individuals wishing to speak on a matter not included on the
Agenda – Dania Beach City Commission
Tuesday, March 26, 2024 - 7:00 PM
Page 3 of 9
"Public Hearing" section of the agenda, which matter pertains to an item before the City Commission which requires a decision of the City
Commission, may do so by signing in and submitting a form to that effect with the City Clerk prior to the meeting. Speakers at Public
Hearings shall also submit such a form. Each speaker shall be limited to 3 minutes for his or her comments. If more than ten (10) speakers
express a desire to speak, the Commission shall determine on a meeting by meeting basis whether to (a) extend the time allotted for citizen
comments to accommodate all speakers, or (b) whether to limit the number of speakers or amount of time per speaker. A speaker's time
shall not be transferable to another speaker.
8. CONSENT AGENDA
1. Minutes: None.
2. Travel Requests: None.
3. RESOLUTION NO. 2024-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE PURCHASE OF FIVE FORD VEHICLES AND
TWO GENERATORS FOR PARKS AND RECREATION DEPARTMENT AND
STREETS, GROUNDS AND SEWER DIVISIONS IN AN AMOUNT NOT TO
EXCEED THREE HUNDRED FIFTY TWO THOUSAND FIFTY FOUR DOLLARS
AND FIFTY TWO CENTS ($352,054.52) FROM BOZARD FORD AND GENSET
SERVICES, WITHOUT COMPETITIVE BIDDING AND WITHOUT
ADVERTISEMENT FOR BIDS, BY UTILIZING THE PRICING UNDER THE
FLORIDA SHERIFFS ASSOCIATION (“FSA”) CONTRACT FSA23-VEL31.0 AND
SOURCEWELL CONTRACT NUMBER 092222GNR; PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.(Public
Sevices)
4. RESOLUTION NO. 2024-____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE CITY’S APPLICATION TO THE FLORIDA
INLAND NAVIGATION DISTRICT IN THE AMOUNT OF SEVEN HUNDRED
FIFTY THOUSAND DOLLARS ($750,000.00), TO PROVIDE FUNDING FOR THE
GRIFFIN MARINE PARK BOAT RAMP AND DOCK REPLACEMENT PROJECT;
PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE
DATE.(Public Services)
5. RESOLUTION NO. 2024-____
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE CITY MANAGER TO APPLY FOR A FEDERAL
EMERGENCY MANAGEMENT AGENCY (“FEMA”) “SAFER” GRANT TO
COVER 2023 STAFFING FOR ADEQUATE FIRE AND EMERGENCY RESPONSE
PERSONNEL COSTS; AUTHORIZING THE PROPER CITY OFFICIALS TO
EXECUTE THE APPLICATION; PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE.(Public Services & BSO Fire Department)
Agenda – Dania Beach City Commission
Tuesday, March 26, 2024 - 7:00 PM
Page 4 of 9
6. RESOLUTION NO. 2024-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE THE
49th YEAR COMMUNITY DEVELOPMENT BLOCK GRANT (“CDBG”)
AGREEMENT BETWEEN THE CITY OF DANIA BEACH AND THE BROWARD
COUNTY HOUSING FINANCE DIVISION FOR THE DIVISION TO PROVIDE
AND ADMINISTER A GRANT IN THE AMOUNT OF ONE HUNDRED SEVENTY-
SEVEN THOUSAND THREE HUNDRED SEVENTY-FOUR DOLLARS
($177,374.00), AND TO AUTHORIZE THE CITY’S PUBLIC SERVICES
DEPARTMENT TO PROCEED WITH THE BID ADVERTISEMENT FOR THE
CDBG YEAR 49, FOR THE NORTHWEST OASIS NEIGHBORHOOD
IMPROVEMENT PROGRAM PROJECT PHASE XVI; PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.(Public
Services)
9. BIDS AND REQUESTS FOR PROPOSALS
1. RESOLUTION NO. 2024-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE AWARD OF INVITATION TO BID (“ITB”) NO.
23-023 “BUILDING DEPARTMENT RENOVATION PROJECT” TO S3S
CONSTRUCTION INC. IN AN AMOUNT NOT TO EXCEED ONE MILLION TWO
HUNDRED FIFTY THOUSAND THREE HUNDRED NINETY-THREE DOLLARS
($1,250,393.00) AND TO AMEND THE BUILDING FUND AND FACILITIES
MAINTENANCE FUND TOTAL BUDGET APPROPRIATIONS; PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.(Community
Development)
2. RESOLUTION NO. 2024-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, AUTHORIZING THE AWARD OF INVITATION TO BID (“ITB”) NO.
23-010, ENTITLED “REHABILITATION OF LIFT STATIONS 1,2 AND 3 (RE-
BID)” PROJECT TO DAVID MANCINI AND SONS, INC., IN AN AMOUNT NOT
TO EXCEED NINE MILLION SEVEN HUNDRED SEVENTY-FOUR THOUSAND
FIVE HUNDRED NINETY-FIVE DOLLARS ($9,774,595.00) PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.(Public
Services)
3. RESOLUTION NO. 2024-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
Agenda – Dania Beach City Commission
Tuesday, March 26, 2024 - 7:00 PM
Page 5 of 9
AUTHORIZING THE AWARD OF INVITATION TO BID NO. 23-025 “HISTORIC
RESTORATION OF THE NYBERG-SWANSON HOUSE” TO PERSONS
SERVICES CORP. FOR HISTORIC RESTORATION AND REPAIRS; PROVIDING
FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.(Public
Services)
10. QUASI-JUDICIAL & PUBLIC HEARING ITEMS
1. RESOLUTION NO. 2024-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, APPROVING THE SITE PLAN (SP-075-23), AND VARIANCES (VA-
090-23, VA-091-23) SUBMITTED BY ABC RENTALS, INC FOR THE PROPERTY
LOCATED AT 2849 RAVENSWOOD ROAD IN THE CITY OF DANIA BEACH,
PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE
DATE. (Community Development)
2. RESOLUTION NO. 2024-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, APPROVING THE “ABC RENTALS” PLAT (PL-086-23) SUBMITTED
BY THE OWNER, ABC RENTALS, LLC FOR A PROPERTY LOCATED AT 2849
RAVENSWOOD ROAD IN THE CITY OF DANIA BEACH, PROVIDING FOR
CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE DATE. (Community
Development)
3. RESOLUTION NO. 2024-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA BEACH,
FLORIDA, APPROVING THE REQUEST FOR A WAIVER (OT-001-24) FROM
THE ONE THOUSAND (1,000) FOOT DISTANCE SEPARATION REQUIREMENT
PERTAINING TO THE SALE OF ALCOHOLIC BEVERAGES, SUBMITTED BY
THE APPLICANT, PEARL BEN YORAM AND MOR BEN YORAM OF
MAVERICK LIQUORS LLC, FOR THE PROPERTY LOCATED AT 4501
STIRLING ROAD, WITHIN THE CITY OF DANIA BEACH, FLORIDA,
PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR AN EFFECTIVE
DATE. (Community Development)
11. FIRST READING ORDINANCES
1. ORDINANCE NO. 2024-______
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AMENDING ORDINANCE 2022-010 AUTHORIZING THE
EXPENDITURE OF CITY FUNDS EXCEEDING ONE MILLION DOLLARS
Agenda – Dania Beach City Commission
Tuesday, March 26, 2024 - 7:00 PM
Page 6 of 9
($1,000,000.00), WHICH EXPENDITURE WAS PROPOSED TO NOT TO EXCEED
THE PROJECT ESTIMATE OF EIGHTEEN MILLION ONE HUNDRED
THOUSAND DOLLARS ($18,100,000.00); TO NOW REFLECT AN EXPENDITURE
EXCEEDING $18,100,000.00 DUE TO THE INFLATION OF SUPPLIES,
EQUIPMENT AND SERVICES SINCE THE ORGINAL PROJECT ESTIMATE IN
2019 WHICH EXCEEDS THE MONETARY COST ESTIMATE FROM
ORDINANCE 2022-010, TO FUND BID RFQ NO. 2021-024 “CONSTRUCTION
MANAGEMENT AT RISK SERVICES” FOR C.W. THOMAS PARK
IMPROVEMENTS; PROVIDING FOR CODIFICATION, PROVIDING FOR
CONFLICTS; PROVIDING FOR SEVERABILITY; AND FURTHER, PROVIDING
FOR AN EFFECTIVE DATE. (Parks & Recreation)
2. ORDINANCE NO. 2024-______
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AMENDING CHAPTER 28, “LAND DEVELOPMENT
REGULATIONS”, OF THE CITY CODE OF ORDINANCES, AT ARTICLE 265,
“OFFSITE PARKING REQUIREMENTS”, TO CREATE SECTIONS 265-185
THROUGH 265-189 RELATING TO ELECTRIC VEHICLE CHARGING STATION
REQUIREMENTS AND AS A PERMITTED USE; PROVIDING FOR CONFLICTS;
PROVIDING FOR SEVERABILITY; FURTHER, PROVIDING FOR AN
EFFECTIVE DATE (Community Development).
12. SECOND READING ORDINANCES
1. ORDINANCE NO. 2024-______
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE EXPENDITURE OF CITY FUNDS
EXCEEDING ONE MILLION DOLLARS ($1,000,000.00), WHICH THE ACTUAL
PROJECT COST WILL BE DETERMINED AT BID AWARD TO FUND THE
BUILDING DEPARTMENT RENOVATION PROJECT; PROVIDING FOR
SEVERABILITY; PROVIDING FOR CONFLICTS; FURTHER, PROVIDING FOR
AN EFFECTIVE DATE. (Community Development)
2. ORDINANCE NO. 2024-______
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE EXPENDITURE OF CITY FUNDS
EXCEEDING ONE MILLION DOLLARS ($1,000,000.00), TO FUND THE
HISTORIC RESTORATION OF THE NYBERG-SWANSON HOUSE PROJECT;
PROVIDING FOR CODIFICATION, PROVIDING FOR CONFLICTS; PROVIDING
FOR SEVERABILITY; AND FURTHER, PROVIDING FOR AN EFFECTIVE
DATE.(Public Services)
Agenda – Dania Beach City Commission
Tuesday, March 26, 2024 - 7:00 PM
Page 7 of 9
3. ORDINANCE NO. 2024-______
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AMENDING CHAPTER 17, ENTITLED “OFFENSES –
MISCELLANEOUS” IN ORDER TO AMEND THE CITY'S EXISTING
PROHIBITION ON CAMPING TO ENSURE THAT THE PROHIBITION AND
ENFORCEMENT MEASURES CONTAINED IN THE CODE COMPLY WITH
CONSTITUTIONAL REQUIREMENTS FOR SUCH ORDINANCES AS SET
FORTH BY THE UNITED STATES COURT OF APPEALS FOR THE ELEVENTH
CIRCUIT IN JOEL V. CITY OF ORLANDO, 232 F.3D 1353 (11TH CIR. 2000); AND
UPDATING THE CODE VIOLATIONS RELATING TO CAMPING; REPEALING
SECTIONS 17.16 “ARREST AND TRIAL,” 17.15 “VAGRANTS”, AND 17-12.1,
“SAME — PROHIBITED GENERALLY”, RELATING TO LOITERING
PROVIDING FOR CONFLICTS; PROVIDING FOR CODIFICATION; PROVIDING
FOR SEVERABILITY; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
(Sponsored by Vice Mayor Lewellen)
4. ORDINANCE NO. 2024-______
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AMENDING CHAPTER 16, “VACATION RENTALS”, AT
SECTION 16-2, ENTITLED “VACATION RENTALS”; AMENDING SECTION 105-
110, ENTITLED “PARKING AND STORAGE OF MOBILE LIVING UNITS”, AND
SECTION SEC. 105-140, ENTITLED “RESTRICTIONS ON PARKING
COMMERCIAL AND RECREATIONAL VEHICLES IN RESIDENTIAL AREAS”
TO CLARIFY THAT MOBILE HOMES OR RECREATIONAL VEHICLES
(MOBILE LIVING UNITS) CANNOT BE LEASED FOR SHORT TERM OR LONG
TERM RENTALS; PROVIDING FOR CONFLICTS; PROVIDING FOR
SEVERABILITY; CODIFICATION AND FURTHER, PROVIDING FOR AN
EFFECTIVE DATE. (Sponsored by Commissioner James)
5. ORDINANCE NO. 2024-______
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AMENDING CHAPTER 25, ENTITLED “TRAFFIC”, AT
ARTICLE III, ENTITLED “PARKING, STOPPING AND STANDING”, DIVISION 1,
ENTITLED “GENERALLY”; AT SECTION 25-48, ENTITLED “ PARKING NOT TO
OBSTRUCT TRAFFIC”; SECTION 25-66, ENTITLED “PARKING PROHIBITED
AT CERTAIN LOCATIONS”; TO CLARIFY THAT TRAILERS, MOBILE LIVING
UNITS, TRUCK OVER ONE TON IN WEIGHT, OR ANY VESSEL PARKED
IMPROPERLY SHALL BE SUBJECT TO A GREATER FINE THAN A PERSONAL
VEHICLE; AND RESERVING SECTION 25-79, CURRENTLY ENTITLED
“FINES”; PROVIDING FOR CODIFICATION, PROVIDING FOR CODIFICATION,
CONFLICTS; SEVERABILITY; AND FURTHER, PROVIDING FOR AN
EFFECTIVE DATE. (Sponsored by Vice Mayor Lewellen)
Agenda – Dania Beach City Commission
Tuesday, March 26, 2024 - 7:00 PM
Page 8 of 9
6. (WITHDRAWN from Second Reading)
ORDINANCE NO. 2024-______
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AMENDING CHAPTER 17, ENTITLED “OFFENSES –
MISCELLANEOUS” IN ORDER TO SUBSTANTIALLY MODIFY SECTION 17-11,
ENTITLED, “RESERVED TO PROVIDE FOR REGULATIONS RELATING TO
“OBSTRUCTING OF PEDESTRIAN AND VEHICULAR TRAFFIC” IN ORDER TO
PROHIBIT SAME; PROVIDING FOR CONFLICTS; PROVIDING FOR
CODIFICATION; PROVIDING FOR SEVERABILITY; FURTHER, PROVIDING
FOR AN EFFECTIVE DATE. (Sponsored by Vice Mayor Lewellen)
7. ORDINANCE NO. 2024-______
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AMENDING CHAPTER 16, “VACATION RENTALS”, AT
SECTION 16-3. REVOCATION, SUSPENSION OR TRANSFER OF VACATION
RENTAL CERTIFICATE,” TO PROVIDE AN ADDITIONAL BASIS FOR
REVOCATION OR SUSPENSION, AND TO GENERALLY PROVIDE A CLEAN
UP OF THE CODE OF ORDINANCES; PROVIDING FOR CONFLICTS;
PROVIDING FOR SEVERABILITY; CODIFICATION AND FURTHER,
PROVIDING FOR AN EFFECTIVE DATE. (Sponsored by Vice Mayor Lewellen)
8. ORDINANCE NO. 2024-______
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AMENDING CHAPTER 2, ENTITLED “ADMINISTRATION”,
ARTICLE III, ENTITLED “SUPPLEMENTAL CODE ENFORCEMENT
PROCEDURES; CODE ENFORCEMENT CITATION PROGRAM”, AT SECTION 2-
58, ENTITLED “SCHEDULE OF CODE ENFORCEMENT FINES/CIVIL
PENALTIES” TO UPDATE THE SCHEDULE OF FINES; AMENDING ARTICLE
IV, “CODE ENFORCEMENT”, AT SECTION 2-72, “APPLICABILITY” TO
UPDATE THE LIST OF CHAPTERS ENFORCED BY THE SPECIAL
MAGISTRATE; PROVIDING FOR CODIFICATION, PROVIDING FOR
CODIFICATION, CONFLICTS; SEVERABILITY; AND FURTHER, PROVIDING
FOR AN EFFECTIVE DATE. (Community Development)
9. ORDINANCE NO. 2024-______
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AMENDING CHAPTERS 5, 17, 20, 21, AND 25 IN ORDER TO
AMEND ALL CITATIONS REFERENCING CERTAIN MONETARY PENALTIES
OR IMPRISONMENT TO REFLECT SECTION 1-8 OF THE CITY’S CODE
ENTITLED “GENERAL PENALTY; CONTINUING VIOLATIONS; VIOLATION
Agenda – Dania Beach City Commission
Tuesday, March 26, 2024 - 7:00 PM
Page 9 of 9
AS PUBLIC NUISANCE”; AND DELETING OBSOLETE PROVISIONS;
PROVIDING FOR CONFLICTS; PROVIDING FOR CODIFICATION; PROVIDING
FOR SEVERABILITY; FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
(Community Development)
13. DISCUSSION AND POSSIBLE ACTION
1. Appointment of Director, Alternate and Second Alternate for Broward Leage of Cities
Board of Directors
2. 158 Federal Highway - Discussion and Possible Action to Designate the Structure
Historic with Broward County - Sponsored by Mayor Ryan
3. Request to Use City Seal on Uniform vs. City Logo
14. APPOINTMENTS: None.
15. COMMISSION COMMENTS
1. Commissioner Davis
2. Commissioner James
3. Commissioner Salvino
4. Vice-Mayor Lewellen
5. Mayor Ryan
16. ADJOURNMENT
City of Dania Beach
Parks & Recreation Memorandum
DATE: 3/26/2024
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Ashley Vlasic, Special Events Manager
SUBJECT: Special Events Application Request from Lauren’s Kids, a non-profit hosting a
state-wide, 1,500-mile “Walk In My Shoes” event on Sunday, April 7 from 8:00
AM – 2:00 PM.
Request:
Special Events Application Request from Lauren’s Kids, a non-profit hosting a state-wide,
1,500-mile “Walk In My Shoes” event during National Child Abuse and Sexual Assault
Awareness Month. They plan on hosting the event on Sunday, April 7 from 8:00 AM – 2:00
PM.
Background:
Special Events Application Request from Lauren’s Kids, a non-profit hosting a state-wide,
1,500-mile “Walk In My Shoes” event during National Child Abuse and Sexual Assault
Awareness Month. The event on Sunday, April 7 at 8:00 AM will begin at City Hall, 100 W
Dania Beach Blvd. and conclude at Holiday Park, 1150 G. Harold Martin Dr.
The applicant will pay for the necessary services recommended below.
Department Review: Comments:
BSO Fire: Fire Prevention Approved
Building Official Building permits are not required
City Attorney No issues
Code Enforcement No issues
Planning & Zoning No issues; City recommended beginning walk at City Hall
HR / Risk Mgmt- COI required
Parks & Recreation No issues
Public Services No issues
BSO Police Dept. No issues, FHP handling brief road closures
Budgetary Impact
The special events application fee for this event is $150.
Recommendation
The Parks & Recreation Department's recommendation is to approve the special event's
application, starting at City Hall, 100 W Dania Beach Blvd.
DANIA B£ACH SCAif UY[ fl LOt;: n
CITY OF DANIA BEACH
SPECIAL EVENT APPLICATION
Submit a COMPLETED APPLICATION SITE PLAN AND SITE PLAN NARRATIVE by email. Please make
sure all sections are completed and all pages are initialed by the applicant. Incomplete application will be returned to
ap�licant. After you submit the application with your fee, you will be contacted by the Special Event Coordin�tor �o
reVIew and further process your application. The Special Event Coordinator will contact you once the revtew ts complete to provide conditions or comments and the next available date for City Commission approval (ifrequired).
P.\R I' I: E\"E:\T REQl EST Event Name: Lauren's Kids "Walk In My Shoes"
Type of Event: Minor Event -Major Event less than 500 people, single day event, no road closures more than 500 people, consecutive multi-day event, road.closures(major event requires Commission approval) Wedding Is your event located in a public park or City property? � Y es ____ No ls your event located on the beach? � Yes ___ N_o Location: Starting point is now at City Hall, 100 W Dania Beach BlvdExpected maximum attendance 1 OO Expected sustained attendance _7_5 ____ _ Has this event been held in the past?_X __ Yes. ___ .No . . _ . . _ .If yes, please list the past dates, locations and attendance This Witt be the 10th state-wide (Ftonda) wafk,the last walk was held in 2018. Detailed Description: (Activities, Vendors, Entertainment, etc.) ]he flor;4 fl. JIIOYl•pvofit "olcf.s a.. 5�te-w;de, l1500n,i,}e-''\tJL//(1h
fVl -y .5Ji 0e,5 11 �ct.LI< Jurlti..5NtJiOh.tt-l ChdJA-husel,('.J1d5exwdA��ul+ 4wclre1te.CS Monf'1 (Afr·d) fr PD£ of::f he /3rowtu""d Morni� {,µ�(J< 0 tn dudeJ.
Date and Time: DATE DAY BEGIN END Attendance SETUP: April 7, 2024 Sunday 7:00 �/PM 8:00 fy.tPMEVENT DAY I: April 7, 2024 Sunday 8:00 �/PM 2:00 AM/P�EVENT DAY 2: AM/PM AM/PMEVENT DAY 3: AM/P-M AM/PM
BREAKDOWN: AM/PM AM/PM lof6 Ordinance #2021-013
City of Dania Beach
Parks & Recreation Memorandum
DATE: 3/26/2024
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Ashley Vlasic, Special Events Manager
SUBJECT: Special Events Application Request from Florida Marketplace Group is looking to
host their annual mega market in the Dania Beach Casino parking lot on April 13
from 12:00 PM – 5:00 PM.
Request:
Special Events Application Request from Florida Marketplace Group is looking to host their
annual mega market in the Dania Beach Casino parking lot on April 13 from 12:00 PM – 5:00
PM.
Background:
The requested event is proposed to be held at the Casino at Dania Beach located at 301 E. Dania
Beach Blvd, Dania Beach, FL. This event will be a marketplace (flea market) with up to 100
vendors selling merchandise/goods, including ten food trucks and a DJ/band for entertainment.
This event will be held in the VIP parking area (SW corner) of the existing casino parking lot.
The organizers will not charge admission to the event but will have food and drinks for sale, non-
alcoholic. If guests would like to purchase acholic drinks, they will be able to purchase those
inside of the Dania Beach Casino. The event will be required to have both BSPO Fire and Police
details during the event.
The applicant will pay for the necessary services recommended below.
Department Review: Comments:
BSO Fire: Fire Preventio
n
Approved with conditions
Building Official Electrical permits required
City Attorney No issues
Code Enforcement No issues
Planning & Zoning No issues, Food trucks to be 10 feet apart
HR / Risk Mgmt- No response
Parks & Recreation No issues
Public Services No issues
BSO Police Dept. No issues, BSO deputies to be scheduled
Budgetary Impact
The special events application fee for this event is $300.00.
Recommendation
The Parks & Recreation Department recommends that the City Commission approve the special
events application.
WHEREAS, the Florida Government Finance Officers Association (FGFOA) and the National Institute for
Government Procurement (NIGP) are two professional associations that cater to finance professionals such
as those employed by the City of Dania Beach; and
WHEREAS, the associations are dedicated to being a significant professional resource by providing
opportunities through education, networking, leadership, and information; and
WHEREAS, the FGFOA and NIGP, along with their member governmental organizations, acknowledge the
importance of government finance and procurement professionals and the vital services they provide to our
state, cities, and communities and further recognize, support, and practice the Public Procurement Values
and Guiding Principles of Accountability, Ethics, Impartiality, Professionalism, Service, and Transparency;
and
WHEREAS, the City Commission of the City of Dania Beach recognizes that the City Finance Department
plays a critical role in public service as stewards over citizens shared financial resources and oversight of
public funds expenditure, which make possible the services that are essential to the safety, livability, and
vitality of the Dania Beach Community.
NOW, THEREFORE, on behalf of the Dania Beach City Commission, I, Archibald J. Ryan, IV, Mayor of the
City of Dania Beach, Florida, do hereby proclaim March, 2024 as
Government Finance and Procurement
Professionals Month
in the City of Dania Beach, Florida and extend our appreciation to all government finance professionals
throughout the state and here in the city of Dania Beach, for their hard work, dedication, and leadership.
ATTEST:
ELORA RIERA, MMC ARCHIBALD J. RYAN, IV
CITY CLERK MAYOR
CO
P
Y
WHEREAS, the Dania Beach Improvement Committee (DBIC) has been beautifying Dania Beach and
is celebrating its 60th anniversary this year. Founded in 1964 as a branch of the Chamber of Commerce, it
was made up of twenty people who lived or did business in Dania Beach. The Committee started with five
members: A. J. Ryan Sr., Frank Eby, Mrs. Marie Parker, Mrs. Will La Bree, and Mrs. Genevieve Ely, and
currently has eighteen active members; and
WHEREAS, the DBIC ‘s sole mission was, and remains today, to raise money to improve the art and
cultural role in the community. Through the years, funds were raised for various projects including: in 1990
trash was removed from Dania Beach Boulevard as part of the “Adopt a Highway” County program, trees
were bought and planted around the city and at the beach, a street clock installed at City Hall, a fountain
was placed at the Nyberg-Swanson house, and benches were placed at several parks all thanks to
passionate residents and supporters dedicated to keeping the small-town charm of Dania Beach shining
bright; and
WHEREAS, yesterday and today, the Dania Beach Improvement Committee is at work looking for
ways to raise dollars for the beautification of Dania Beach while acting in the community’s best interests to
create an environment which leaves residents proud and visitors impressed; and
WHEREAS, the DBIC has pursued activities which create a more vibrant and enjoyable way of life in
Dania Beach. These efforts have not only helped beautify the community, but also sharpened its identity and
created a true sense of unity; and
WHEREAS, today, the efforts of the Dania Beach Improvement Committee continue under a new
generation of volunteers, making the city a better place to live, work, and play.
NOW, THEREFORE, on behalf of the Dania Beach City Commission, I, Archibald J. Ryan, IV, Mayor of the
City of Dania Beach, Florida, do hereby proclaim March 26, 2024 as
Dania Beach Improvement Committee
60th Anniversary Day
in the City of Dania Beach, Florida and do thank the Dania Beach Improvement Committee for the outstanding
work they continue to do in our city and do congratulate them on their 60th anniversary.
ATTEST:
ELORA RIERA, MMC ARCHIBALD J. RYAN, IV
CITY CLERK MAYOR
CO
P
Y
CITY OF DANIA BEACH
OFFICE OF THE CITY MANGER
100 West Dania Beach Blvd ∙ Dania Beach, FL 33004 ∙ (954) 924-6800 ∙ (954) 921-2604 (fax)
MEMORANDUM
Date: March 26, 2024
To: Mayor A. J. Ryan IV
Vice Mayor Lori Lewellen
Commissioner Joyce L. Davis
Commissioner Tamara James
Commissioner Marco A. Salvino, Sr.
From: Ana M. Garcia, ICMA-CM, City Manager
Subject: Manager’s Report
As requested by the commission on February 27th, we conducted research on the �meline and es�mated
expenses associated with reloca�ng and restoring to historical standards the A. C. Frost house. Provided
below is a schedule for hiring a contractor to relocate the house.
The process of selec�ng a contractor to relocate the house, including the Request For Proposal (RFP), is
expected to take approximately 49-60 days. For your reference, below is an example of an expedited
�meline:
- Bid authoriza�on: April 9
- Issuing RFP: April 16 (open for 30 days)
- Bid Opening: May 16
- Commitee Mee�ng: May 23
- City Commission Award: May 28
Once the house has been relocated to its final and permanent loca�on, we will commence the
assessment and historical restora�on phase. Please find below an es�mated outline of the steps, costs,
and �meline, these are all approxima�ons.
1. Request for Qualifica�ons (RFQ) adver�sement to select the firm for assessing the house's condi�on
and crea�ng the interior design: 3 months - $1,000
2. Condi�on Assessment and cost es�mate for design: Approximately 4-6 months - $35,000
3. If the City Commission decides to approve assessment and move forward with the design, it would
take approximately 6 months to complete design at a cost of $95,000
4. Adver�sement for construc�on, Invita�on to Bid (ITB): 2 months
5. Opening the bids, selec�ng the contractor, obtaining City Commission approval, and awarding the
contract to the contractor: 2 months minimum
6. Construc�on: Approximately 8-10 months
Es�mated reloca�on cost is $225k - $250k including concrete founda�on.
Es�mated historic restora�on $1 million (Nyberg historic restora�on cost is $1.2 million).
The complimentary Dania After Dark Blues & BBQ event, sponsored by Memorial Health, is set to take
place on Saturday, April 13th from 6:00 p.m. to 9:00 p.m. at City Hall. Attendees can look forward to the
dynamic performances of three local blues bands on the main stage. There is something for attendees of
all ages! Kids can enjoy the Kids Zone which will provide a range of engaging activities, including a little
chef class, face painting, a gaming truck, and chef hat & apron arts & crafts, and catering to the entire
family. Culinary enthusiasts can explore the Art Park Lawn, where a series of demonstrations will be
held, featuring a BBQ Competition where more than 10 vendors will offer free samples for guests to
vote on their favorite BBQ dish between the hours of 7:00 p.m. and 7:45 p.m. The winning dish will be
announced on the main stage at 8:00 p.m. To ensure convenient access, complimentary parking, and
shuttle service will be provided from Dania Beach Casino to City Hall, running continuously from 5:30
p.m. to 10:30 p.m.
The success of Dania a�er Dark has resulted in the need to explore the opportunity to look into cost/
investment to expand the parking garage to include the addi�onal two levels that the structure can
support. One hour into the Seafood Fes�val event at 5:00 p.m., the garage was full. We will explore
partnerships as well; however, the first step will be to explore the cost so we can share a full game plan
and all op�ons with you.
Lucky Fish Restaurant at Ocean Park is in full construc�on mode. All approvals from all agencies including
the city building permits were completed in February. Founda�on work is complete, and they started
going ver�cal commencing on Monday, March 18th. I would expect them to be finished within 8-9
months. This is an approximate �me frame provided no setbacks/ unforeseen circumstances per my
communica�on with Director Eleanor Norena. Ideally, we would want a TCO before the end of this
calendar year. On March 25th, Director Norena and our Team will be mee�ng with the Lucky Fish Team .
As we receive more details, we will keep you updated.
I recently received communication from the external affairs manager for the Mars Pet Care Better Cities
for Pets regarding our standing as a certified City for Pets. We are very proud of this achievement. Our
certification has been extended until 2027. Just recently we hosted a community meeting to discuss the
Olsen parks property and one of the elements of the design that was a hit was our dog friendly area.
Additionally, last week we had our take your dog to work event, and that was a big hit. We will continue
to plan and execute events and activities that ensure we are aligned with continuing to excel as a Better
City for Pets!!
Every year I work very closely with our Chief Human Resources Officer to ensure we align our words
with actions, particularly our number one goal to recruit and retain the very best! We have raised the
bar on the programs and benefits we provide our City employees including of course our elected body
that make up our legislative Team. I have been part of 7 cities in 33 plus years of Public Service and no
City that I have ever worked with or know of does what we do for our Team members, furthermore we
always seek to improve what we do and what we can offer. The aforementioned is a true commitment
to our “Culture”. Last year we created a very detailed annual report; Personalized Total Compensation
Statement (you will receive your hard copy). This document will include your Cash Compensation and
Benefits Summary as well as your Estimated Tax Savings and the value of your Total Compensation. I
hope you are as impressed with the level of detail as I was. Kudos to our HR Team.
We are ready to move forward with the next steps, with the goal to commence construction at CW
Thomas Park! We suggest $23 million all in with the current GMP of $22.7 million + $300k. Our Goal
with the support of our City Attorney, CFO and Director of Parks and Recreation is to further negotiate
the contract we have recently received. If we get them lower great, as that provides more contingency.
If we do not need to spend the contingency, then funds are returned to the City. This requires up to $1
million in additional funds from the City to preserve the project and move it forward. As I have
communicated to you, time is money as all costs of goods and services continue to increase with no
indication of future changes. We are seeking consensus to set aside an amount of $1 million to proceed.
We may or may not need it. We will keep you updated.
CITY OF DANIA BEACH
HUMAN RESOURCES DEPARTMENT
MEMORANDUM
DATE: March 18, 2024
TO: Ana M. Garcia, ICMA-CM, City Manager
VIA: Candido Sosa-Cruz, ICMA-CM, Deputy, City Manager
FROM: Linda Gonzalez, SPHR, SHRM-SCP – Chief Human Resources Officer LG
RE: Human Resources and Risk Management Report
The following is a summary of Human Resources and Risk Management activities for the last month.
Incoming Recruitment
• Recreation Leader
Open Recruitment
• Procurement Specialist
• Senior Planner
Interview/Offer Process
• Summer Camp Counselors (3)
• Summer Camp Site Supervisor
• Community Events Coordinator
• Community Events Liaison
• Division Manager, Athletics
• Park Custodian (PT)
• Recreation Assistant (OC)
• Business Attraction and Investment Manager/CRA
• Marketing and Communications Intern
• Cemetery Assistant
Background Process
• Cemetery Assistant
• Recreation Assistant (OC)
• Administrative Technician
• Human Resources Administrator
• Risk Management and Talent Acquisition Specialist
• Recreation Program Coordinator
Page 2 of 3
Recent Hires/Status Changes
• Accounting Specialist
• Recreation Assistant FT (2)
• Recreation Assistant On-call
We continue to seek ways to attract the best candidates to the City and move as swiftly as possible to make
placements as the market has remained very tight for great talent. We work closely with the hiring
departments throughout the entire recruitment cycle to make sure we adhere to the Service
Level Agreement (SLA) and RISE principles.
Training and Development
We are preparing for our next Focus group which will be held on March 21. This is an important initiative
as we encourage engaged team members to provide their ideas for efficiencies that would benefit the City.
This feedback is shared with the departments for implementation, when possible.
Our Second Health and Safety training, hosted by Paola Rojas, our representative from UHC, is scheduled
for Wednesday, March 27. There are two sessions available for our team members to attend – one at 11 am
and one at 1 pm. The topic for this training is “Fundamentals of Financial Wellbeing.”
Risk Management, Wellness and Safety
On Tuesday, February 27, we held our 1st quarterly Safety and Wellness Committee meeting for 2024. The
presenters reviewed many topics with the group, which included:
• Chief Pellecer – discussed spring break holiday safety that included replacing electrical cords every
3 years and Carbon monoxide detectors.
• BSO Lieutenant Cooper – discussed recent developments, challenges, and strategies undertaken by
the department. There has been a surge in car thefts and the use of “old school” steering wheel
locks as a deterrent for certain Hyundai model cars. Removal of registration documents from the
glove compartments of the cars.
• Paula Rojas, UHC Representative – presented on Heart Health.
• Logan Peirce, Lead Facilities – Shared Safety guidelines and best practices including if you “See
Something, Say Something.”
• Monica Terrazas, Manager, IT – presented on Cyber Security, specifically phishing attacks.
• Lisa Stewart – EAP Clinical Director – presented an overview on our Employee Assistance
Program (EAP)
Page 3 of 3
Team Member Events
On February 29 we held the Biometric Screening event for all team members. This was a great opportunity
for our team members to learn valuable biometric numbers (Total Cholesterol, HDL cholesterol, Blood
Sugar Levels, and Blood Pressure) and get started on their health and wellness goals. We had a total of 78
team members attend, a record number for this event.
On March 14, we held our third Take Your Dog to Work event in partnership with the Broward County
Animal Care group in Dania Beach. This is a quarterly event, providing an opportunity for employees to
bring their dogs to work, while participating with community adoption partners. This initiative not only
fosters a positive work environment by allowing employees to bring their pets, but also demonstrates a
broader commitment to supporting local communities and animal welfare initiatives.
We are in the preparation phase for our first Take Your Kids to Work Day Event, which is scheduled for
April 25. This event will be designed to give our team member’s children a meaningful experience with
City. Parents and kids will participate in a scheduled group of activities.
Compensation and Benefits
We submitted the annual the annual PEPIE salary survey for the City. Once we receive the results we will
review our compensation plan for salary competitiveness within the government sector in Florida.
On March 1, Total Rewards statements were distributed to all department heads. These are individualized
statements for each team member which highlight their total compensation package, which includes the
City’s cost and contributions. Department heads will meet with each team member to explain their total
salary and benefits statement by March 15.
We finalized the Memorandum of Understanding (MOU) with the union regarding offering overtime for
special events for all employees. We are currently working with the Public Services and Parks and
Recreation teams to implement the process.
Continuous Improvement Projects
We have completed our Total Rewards and Verification of Employment implementations, and are currently
working through one more project with our IT partners:
• Bulk Upload of documents into Laserfiche – Completed MSA and format is being finalized with
vendor.
1
CITY OF DANIA BEACH
PARKS AND RECREATION DEPARTMENT
MEMORANDUM
DATE: March 18, 2024
TO: Ana M. Garcia, ICMA-CM, City Manager
FROM: Cassi Waren, CPRP, Parks & Recreation Director
SUBJECT: Parks and Recreation Updates
Parks and Recreation Department Updates
Project updates:
• CW Thomas Park – City staff received the GMP from Burkhardt on March 12th. Parks and
Recreation, Finance and Legal reviewed the GMP and sent back questions/comments on
March 14th. Burkhardt is to provide their responses by end of day March 18th. Once the
details of the GMP have been ironed out, it will be brought before City Commission for
final approval and Burkhardt is ready to stage the site and begin demo.
• IT Parker – Demolition is complete. Final permit details are being submitted March 19th
and construction is set to begin the end of the week of March 18th/beginning of next
week, the week of March 25th.
• Mullikin Park – Kimley-Horn is in the final stages of the 75% design which is scheduled to
be submitted for review on April 15th.
• Mildred Jones Park – The shade structure over the north exercise equipment is complete.
• Olsen Middle School – The conceptual design was approved by City Commission on
February 13th. The community meeting was held on February 20th at 4pm. The school
board is bringing the amended agreement before their board in March/April to match the
newly approved conceptualized design. Once the amended agreement has been
approved and the city commission approves of it, the design will go out for bid.
• Chester Byrd Park – staff has submitted the FRDAP grant application for funding of
Chester Byrd Park.
• PJ Meli Park – staff are in the beginning stages of preparing the RFQ for the design services
of the PJ Meli Park project. In the meantime, staff is working with the school board to
amend the reciprocal use agreement to match the master plan design.
The revitalized Dania After Dark Wine and Seafood Festival was a huge success selling 853 tickets
to the tasting portion of the event. Attendees also enjoyed fantastic music, a variety of food
vendors, arts/craft vendors, food demonstrations, a wine demonstration and children were able
to be creative through painting and by becoming junior chefs making their own mini pizzas. We
look forward to improving the event even more next year.
Upcoming Dania After Dark events:
2
• Blues & BBQ – April 13th from 6pm – 9pm
• Taste of Dania Beach – May 11th from 6pm – 9pm
The Linear Park Renaming Ceremony took place on Tuesday, February 27th. Residents gathered
to honor and celebrate the late William “Bill” Harris as we unveiled the new park signage that
honoring the renaming of the park to William “Bill” Harris Linear Park.
Saturday, March 30th will be the Annual Spring Egg Hunt at Frost Park. The event, for ages 10
and under, kicks off at 10am with the egg hunt starting promptly at 10:30am.
The Marina is now under the new management of Oasis Marinas. Oasis Marinas took over
March 1st and has hit the ground running. The are looking forward to hosting a welcoming party
of April 11th at 5:30pm at the Marina for Marina guests and city officials.
Ocean Rescue sent two guards to attend the USLA PRWC Academy in Pompano Beach. The
weeklong class teaches rescue techniques and operating skills on a personnel watercraft. This
class is mandatory for any lifeguard in Dania Beach who operates the Rescue PWC.
The beach is starting to experience increased crowds as we encroach on Spring Break.
Ocean Rescue Report:
• Rescues – 2
• Medical – 3
• Law Enforcement Calls – 3
• Missing Persons – 1
• Wildlife or Domestic Rescues – 6
Recreation staff is preparing for Spring Break Camp. Registration opened and spaces quickly began
to fill. Frost Park is sold out, CW Thomas Park is over 50% full and PJ Meli Park has 15 spaces open.
The Teen Camp has 4 spots remaining.
The Department is excited to report that in its third year of running the Rising Stars After Care
program at all three sites, CW Thomas, Frost Park and PJ Meli Park is sold out.
Staff are preparing for the opening of Summer Camp Registration to the public. Registration will
open internally first to Rising Stars participants at the end of March and then to the general public
the first weekend in April.
Ongoing programs:
• Rising Stars at CW Thomas Park, Frost Park and PJ Meli Park
• Gracefully Aging at CW Thomas Park
• FitFusion at CW Thomas Park
• Hip Hop and Contemporary Dance at CW Thomas Park
• Youth Basketball League at CW Thomas Park
• Youth Football Skills and Drills at CW Thomas Park
• Senior Bingo at PJ Meli Park
• Adult Kickball at PJ Meli Aquatic Complex
• YAC at PJ Meli Aquatic Complex
• Youth Basketball Clinics at PJ Meli Aquatic Complex
• Karate at PJ Meli Aquatic Complex
• Swim Team at PJ Meli Park
3
• Waterpolo at PJ Meli Park
• Tarpon Soccer at Frost Park
• Kreation Station at Frost Park
• Disc Golf Putting League at Frost Park
Staff are evaluating the current and new programs to ensure we are offering the best programs
for our community for all ages. Be on the lookout for new programming rolling out in the next
couple of months.
CITY OF DANIA BEACH
PUBLIC SERVICES DEPARTMENT
MEMORANDUM
FJR/fjr
\continued…
DATE: March 26, 2024
TO: Ana M. Garcia, ICMA-CM, City Manager
VIA: Candido Sosa-Cruz, ICMA-CM, Deputy City Manager
FROM: Fernando J. Rodriguez, Public Services Director
Dincer Akin Ozaydin, P.E., Deputy Director/City Engineer
RE: PUBLIC SERVICES DEPARTMENT ACTIVITIES – February 27 through March 25, 2024
Provided below is a summary of the main PSD project activities for roughly the past eight to 10
weeks:
Stormwater System Improvements – Backflow “tidal” Valves – The valves address stormwater
storage structures to be impacted by “backflow” of water from water bodies such as lakes and
canals. This flow of water from water bodies can severely hamper storm drainage systems by
saturating them with “backflow” water. The valves help to minimize this effect. Of a total of 27
valves, 10 have been installed. The expectation is that this project will have a significant
positive impact on the City’s drainage system, particularly during high tide periods.
Water Treatment Plant Accelator Cleaning and Upgrades – The accelator is a key component
of the water treatment process, as it mixes the chemicals with the raw water supply to start the
treatment process primarily by settling out the contaminants before the filtration process. Key
components of the system such as the new valves and actuators have been installed. The new
gear boxes for the installation of the new motor arrived in March and will be installed and
tested by early April.
Stormwater Master Plan (SWMP) – Data collection by Chen Moore and Associates is in
ongoing, and includes mapping drainage basins, inventory of existing structures, and the use of
computer models to conduct the analysis. Two more public workshops are scheduled for April,
and September and, as done for the November 2023 workshop, the information and input
received will be incorporated into drainage modeling. The SWMP is expected to be substantially
complete by late Fall 2024.
SW 52nd Street Drainage Repair – This project is an important second phase of the SW 43rd
Terrace project completed roughly three months ago. Drainage pipes, inlets, and swale
regrading will be included in the work. The design is fully complete, and all required permits are
in place. The bidding process should be completed in the May/June timeframe with the
project’s substantial completion expected by the end of calendar 2024.
PUBLIC SERVICES ACTIVITIES – February 27, 2024 through March 25, 2024
Date: March 26, 2024
FJR/fjr
City Hall Exterior Improvements – This project entails the total replacement of the surface
parking lot between City Hall and the parking garage with a green area bordered by a walking
path which will include benches and lighting. The surface parking lot was removed and replaced
with sod in January. Bids for the walkway construction, lighting and drainage phase of the
project were received and evaluated, with the award to be made in early April. Estimated
completion will take between 45 to 60 days, depending on availability of the light fixtures.
Citywide Landscape Master Plan – The design for the Griffin Road median sections east of I95
has been recently completed and was presented to the Commission in November. Final
approval by the City was provided later that month. This was followed by a final review of the
plans draft by PSD staff. The procurement process has been delayed by permitting related
contractual requirements from the Florida Department of Transportation (FDOT). Depending
on the pending administrative steps and the timing of permit approval by FDOT, the work may
start in the May – June time frame, with completion expected in October or November.
Nyberg Swanson House Refurbishing Project – The bid award was presented to the
Commission for approval in late March. The buildings contents were removed in the same
month, and mobilization by the contractor is under way. The project, which is expected to take
roughly six months to complete, is projected to be finished in the September – October
timeframe.
GRANTS
Florida Inland Navigation District (FIND) – PSD is preparing a grant application to FIND for a
Waterway’s Assistance Program grant to offset the cost of the Griffin Marine Park Boat Ramp
and Dock Replacement. The City is seeking $750,000 in funding, representing 50 percent of the
Project’s estimated cost. The City Commission will be asked to approve a resolution of support
on the March 26, 2024 agenda.
Federal Emergency Management Agency (FEMA) - Chief Pellecer announced the City’s
intention to apply for a Staffing For Adequate Fire And Emergency Response (SAFER) grant. The
application’s goal is to obtain funding to hire five additional firefighters/EMTs. The grant writing
is a joint effort by the City and the Broward Sheriff’s Office. The City Commission will be asked
to approve a resolution of support on the March 26, 2024 agenda.
Community Development Block Grant (CDBG) - PSD is preparing the 50th Year CDBG
application to submit to Broward County. The application will be an Oasis Neighborhood
Improvement Project. A public hearing will be scheduled for the April 9, 2024 City Commission
Meeting.
PUBLIC SERVICES ACTIVITIES – February 27, 2024 through March 25, 2024
Date: March 26, 2024
FJR/fjr
Page 3 of 3
CITY OF DANIA BEACH
MARKETING AND COMMUNICATIONS
DIVISION MEMORANDUM
DATE: March 19, 2024
TO: Ana M. Garcia, ICMA-CM, City Manager
VIA: Candido Sosa-Cruz, ICMA-CM, Deputy City Manager
FROM: Nannette Rodriguez, Director of Marketing and Communications
SUBJECT: Marketing and Communications Division Report
______________________________________________________________________________
Ongoing Communication
The City’s website, social media, and digital signs/TV Channel 78 are continuously updated with
relevant, new, and important information. Media support is provided to all City departments
and their projects. There is a continuous effort to grow digital communications and
engagement by implementing best practices. Below are the latest social media, website, and
visual communications including special event activities in the month of February 2024:
• Executed advertising and PR campaign for Dania After Dark Wine & Seafood Festival, which
resulted in a feature in the Sun Sentinel and a featured live segment on NBC6’s South Florida
Live.
• Created the branding for DAD Blues & BBQ.
• Developed designs for internal staff events and photographed Employee Pizza Party and Take
Your Dog to Work Day.
• Finalized the design for the 120th Anniversary logo and developing concepts for other 120th
anniversary assets including banners.
• Filmed and photographed Bill Harris Linear Park renaming ceremony.
• Designed new business cards with the updated logo for Commission selection.
• Huddle newsletter was distributed to staff.
• Submitted Pioneer and Huddle to FMCA for award consideration. Note: Winners will be
announced at the FMCA conference in May 2024.
• Met with various emergency notification systems vendors.
• Developed strategies for the advertising campaign for the remaining Dania After Dark events.
• Analytics –
o Email campaigns: 6480 subscribers, email open rate 64%
o Facebook: Reach, 78K; Page visits, 3.5K; New followers, 111; Followers, 9.5K; Post
engagement rate, 5.52%; Profile Reach, 78K
o Instagram: Profile impressions, 18K; Reach, 37K; Page visits, 937; New Followers, 202;
Followers, 5.8K; Post engagement rate, 6.92%
o X: Followers, 2.7K; Post impressions, 874; Post engagement rate, 4.25%
o YouTube: Page video views, 135; Subscribers, 501
o LinkedIn: Followers, 1045; New Followers, 32; Page views, 110
CITY OF DANIA BEACH
BROWARD SHERIFF’S OFFICE (BSO)
MEMORANDUM
DATE: March 15th, 2024
TO: Ana M. Garcia, ICMA - CM, City Manager
FROM: Jason Tarala, Captain/Chief - Broward Sheriff’s Office
RE: Dania Beach Monthly Memo to City Manager – March 2024
Below are the monthly crime reports for part 1 crimes from 2/16/2024 to 3/13/2024:
Notable Increases/Decreases
When compared to the previous four weeks:
• Overall, part 1 crimes decreased by 35%, down from 138 incidents to 89 incidents.
• Auto thefts (vehicle, motorcycle, & other) decreased by 59%, reducing from 22 thefts to 9
thefts.
• Vehicle, residential, business, and structural burglaries all decreased. Overall, about 33%.
• Robberies decreased from 1 incident last period to 0 incidents this period.
• Sexual battery cases increased from 1 incident last period to 2 this period.
• In total, thefts decreased by 34%. All categories of thefts decreased except for theft of motor
vehicle parts, which increased by 1 incident.
Total Arrests
• 54 arrests made by Road Patrol
• 23 arrests made by the Crime Suppression Team
• 8 arrests made by Criminal Investigations
Notable Arrests
• A traffic stop was conducted on a stolen vehicle. The driver was taken into custody without
incident. The passenger bailed out of the car and ran into the neighborhood. While fleeing, he
burglarized another victim’s backyard, trying to hide from BSO. When the homeowner saw the
suspect, the suspect pointed a gun at him and ordered him to stay quiet. With the assistance of
the victim, BSO Aviation, BSO K9, and Dania Beach Criminal Investigations & road patrol units,
the suspect was discovered and arrested.
• An employee with a local funeral home was arrested after submitting numerous forged utility
bills to the City of Dania Beach Cemetery, to obtain a cheaper burial rate.
• A suspect used a fake driver’s license and fake cashier’s check to purchase a $7000 generator.
The suspect’s identity was learned, and he was arrested in Brevard County.
• A Dania resident was defrauded out of $7300. Through investigative means our criminal
investigations detectives identified the suspect and they were arrested and charged accordingly.
2/16/2024 – 3/13/2024
85
Proactive Enforcement Initiatives and Seizures
Throughout the past four weeks, Crime Suppression Team (CST) detectives recovered 10 firearms and
one stolen vehicle. In total, 23 arrests were made.
A narcotics investigation was conducted on a suspect believed to be selling drugs in Dania Beach. A
residential search warrant was conducted, and the following were seized:
- 153g of cocaine
- 23 g of psilocybin (magic mushrooms)
- 7 firearms
This case was adopted by the Bureau of Alcohol, Tobacco, and Firearms.
CST detectives were also notified about a suspect that punched a teacher at Dania Elementary. They
located her vehicle/residence, then conducted surveillance. She was eventually taken into custody and
provided a full confession.
CST detectives continued their collaborative efforts with BSO’s Violent Crime Unit. Various meetings
were held to discuss previous shootings and potential suspects. They are continuing with there proactive
approach to deter and apprehended any violent offenders within Dania Beach. They are also continuing
with the block party and illegal gathering operation in the NW section.
Motors/Commercial Vehicle Enforcement
• Traffic enforcement remains focused along 700 of SE 3rd Ave and 5300 SW 40th Ave.
• Multiple citations and warnings have been issued for both speeding and stop sign violations.
• Motor units assisted road patrol with various traffic accidents, including a traffic homicide
investigation.
• Two speed message boards are currently activated along 3300 Griffin Rd and 5200 SW 40th Ave.
• The speed trailer remains deployed on SE 5th Ave for northbound traffic.
Spring Break Beach Operation
We have begun our annual spring break beach operational plan to ensure a high visibility law
enforcement presence on our beach and a safe environment for all our residents and visitors. We will
have two deputies assigned to the beach on the weekends and one deputy on the weekdays through
the end of March. As we discussed last year, we will do everything in our power to deter an incident like
what occurred in the city of Hollywood the previous year on their pier. Our mobile LPR trailer will be set-
up on East Dania Beach Blvd to capture all vehicles entering and leaving the beach from Dania Beach
Blvd.
Homeless Outreach Team
• A transient population has accumulated near 4813 SW 44th Ter. A trespass affidavit has been
obtained from the property owner and efforts are underway to remove the debris and
encampment.
• A citizen complaint was made regarding the trash along the railroad tracks near SW 4th Ave.
Florida East Coast Railway was contacted. Two people were removed from the area without
incident and the FEC removed the debris.
• Someone assembled a tent at 3900 Griffin Rd. Trash and debris also spilled into the neighboring
property at 3841 Griffin Rd (FP&L’s site). Code enforcement is working with the owners to
securing the fencing and remove the debris.
• Frost Park update – the overnight park checks have been successful, and the manager reported
that no one has been caught sleeping in the park overnight.
• Code enforcement alerted deputies to a new encampment located at 605 SW 12th Ave. The
property owner has been cited. Deputies are working on obtaining a trespassing affidavit and
signage so that enforcement can begin.
• In total, 19 arrests were made relating to various trespassing violations.
Neighborhood Support Team (NST)
Follow-Up/Directives/Initiatives
Summer BreakSpot – February 20, 2024 – Phone conference with Vaughn Wilson regarding site
locations/activities for Summer BreakSpot locations within Dania Beach.
Lighthouse Church Mentor Group – March 11, 2024 – Phone conference with Terrance McElroy
regarding forming a mentorship with the youth members of Lighthouse4Students.
Meetings Zoom/In Person
• February 20, 2024 – Regional NST Meeting – 11:00am
• February 21, 2024 – Drowning Prevention Task Force Meeting – 9:30am
• February 21, 2024 – Dania Beach Woman’s Club Meeting – 12:00pm
• February 22, 2024 – Gracefully Aging Meeting – 11:00am
• February 26, 2024 – Annual Firearm Qualifications – 8:00am & 10:00am
• February 27, 2024 – Dania Beach Health & Safety Committee Meeting – 11:00am
• March 5, 2024 – Gracefully Aging Meeting – 11:00am
• March 5, 2024 – Griffin Civic Association HOA – 7:00pm
• March 12, 2024 – Estates of Fort Lauderdale Women’s Club – 11:00am
• March 13, 2024 – Dania Beach Chamber Meeting – 11:30am
BROWARD SHERIFF’S OFFICE
CITY OF DANIA BEACH
CALLS FOR SERVICE – 240 ZONE
2/16/2024 – 3/13/2024
THERE WERE A TOTAL OF 157 CALLS FOR SERVICE FOR 240 ZONE WITHIN THE LAST FOUR WEEKS.
THERE WERE A TOTAL OF 57 NOISE COMPLAINTS FOR ALL ZONES WITHIN THE LAST FOUR WEEKS.
CITY OF DANIA BEACH
BROWARD SHERIFF’S OFFICE (BSO)
EXTERNAL MEMORANDUM
DATE: March 19, 2024
TO: Ana M. Garcia, ICMA-CM, City Manager
VIA: Candido Sosa-Cruz, ICMA-CM, Deputy City Manager
FROM: Sergio Pellecer, District Fire Chief
RE: Dania Beach Memo to City Manager
____________________________________________________________________________
Please see the requested information below concerning the February 21, 2024 through March
19, 2024, of the meetings and day to day operations for the BSO Fire Rescue and Emergency
Service in Dania Beach:
• Daily morning BSO conference calls – Department Head direction for the day.
• Daily monitoring of Fire Stations and personnel safety – Review Calls and Operations.
• Coffee with the District Chief – Tabletop talk with Station 1-17 crews.
• Agenda reviews team conference calls.
• Agenda reviews with Commissioners.
• Dania Beach Commission Meeting.
• BSO Ops Conference call with District Chiefs – Daily morning operations review.
• Fire Station #1 Hardening Grant –The City Team continues to work on Roof and
Generator is at the plans review process, extensions for grants filed – This is still on
going as of 03/19/2024.
• Station 1 New Ceiling Tile replacement by City Team – This project is still ongoing as of
03/19/2024.
• Fire Truck (Quint 1) our ladder truck is still being refurbished at Ten8 service center in
Georgia continued monitoring. Final Inspection is schedule for April. Truck will be back
in service by May 1, 2024.
• Emergency Operation Center – meeting with architect, working on this project with
Deputy City Manager and City team.
• Working on SAFER Grant – 5 Personnel to add third person to Rescue Truck
• Special Magistrate Hearing
• Health and Safety Dania Beach Committee Meeting
CITY OF DANIA BEACH
BROWARD SHERIFF’S OFFICE (BSO)
EXTERNAL MEMORANDUM
• Police, Fire, Emergency Operations team meeting with BSO Emergency Management
Department
• Genasys Alert/Mass Notification Demo for City with N. Rodriguez
• Disasters EXPO with City team – Miami Beach
• City Directors meeting
• ALS License Renewal
• Received 2Quotes for Fire Station 1 Bay Floor Resurfacing. Will begin requisition, PO,
permitting process still in process as of 03/19/2024. Vendor needed to provide COI.
• New Fans for Bay area at Fire Station 1 delivered and installation will be 03/21/2024
• Firefighter Bunker Gear Lockers at Station 1 Installation scheduled for March 26, 2024
• Fire Station 17 Refrigerator Freezer Commercial Unit was be delivered and in service.
• Bunker Gear Dryer at Station 1 to be delivered March 2024.
• Thermal Imaging Cameras for Crews will be installed on all Fire Trucks and Rescues by
March 31, 2024.
• Working on quote for Fire Hose Replacement
• All Fire Station 1 and 17 taking receipt of second set of Bunker Gear (firefighting gear)
making Dania Beach a leader in the industry standard for personnel safety and health
• Continue to prepare for ISO visit in 2024.
• Preparing on taking the Delivery of New EMS Cart for Fire Rescue Details. Waiting on
Graphic installation
Training during this period – Fire Based Company Training, First Responder Health and
Wellness, Fire Truck Pump Testing, Uniform Training all station personnel, EMS Company
training, Hazardous Material Training-Primary Screener
Community Outreach –
Three (3) Day class on installation of car seats by our Life Safety Education Team
Fire Safety for 140 Children and staff, Brauser Maimonides Academy Fire Truck and Life Safety
Educators
Seniors Meeting at Casino Dania Beach – Fire Crew spoke to our Seniors
EMS Detail with 2 paramedics for Wine and Seafood Festival
TO:
FROM :
DATE:
SUBJECT:
Ana M. Garcia, City Manager, ICMA-CM
Megan Jelaso Revenue Accountant
March 4, 2024
Monthly Business Tax Licensing
Manager,
Per your request attached hereto is the Monthly Business Tax Receipt report reflecting new
businesses.
CITY OF DANIA BEACH
FINANCE DEPARTMENT
MEMORANDUM
CITY OF DANIA BEACH
FINANCE DEPARTMENT
MEMORANDUM
TO: Ana M. Garcia, ICMA-CM, City Manager.
FROM: Adam Segal, Deputy Finance Director
DATE: March 15, 2024
SUBJECT: Finance Monthly Report –February 2024
Please find attached the month Finance report. Highlights of the report include the following:
Revenues
• Building Fund Revenues
• Pier Revenue
• Beach Parking Revenue
• Marina Revenues
• Commercial Solid Waste Hauler Franchise Fees
Capital Projects
• Master Capital projects Schedule to include Grants
Information Technology
• Online Credit Card Payments
• Beach Camera Views
• Website Visits by Device
• Commission Meeting Views
• Number of Citywide Phone Calls
• Number of E-Bill Users by Month
• Kiosk collections
Business Tax Receipt Activity
• Out of Business/Inactive
• New Applications
Utility Reports
• Delinquency Report
• Meter Replacement Reports
• Aging Report
Contingency and Fund Balance Estimate
Building Fund Collections Building Fund - thru February 2024
2021/22 2022/23 2023/24
Monthly
October 1,144,624 613,610 272,140
November 107,616 183,413 742,357
December 1,142,811 1,267,607 343,469
January 146,194 193,243 141,061
February 490,813 588,953 245,535
March 281,847 202,690
April 283,429 356,512
May 226,093 153,965
June 399,287 181,738
July 132,426 212,528
August 755,979 767,780
September 1,003,182 202,415
Total 6,114,301 4,924,453 1,744,563
2021/22 2022/23 2023/24
Cumulative
October 1,144,624 613,610 272,140
November 1,252,240 797,023 1,014,498
December 2,395,051 2,064,630 1,357,967
January 2,541,246 2,257,873 1,499,028
February 3,032,058 2,846,825 1,744,563
March 3,313,906 3,049,515
April 3,597,334 3,406,027
May 3,823,427 3,559,992
June 4,222,715 3,741,730
July 4,355,140 3,954,258
August 5,111,119 4,722,038
September 6,114,301 4,924,453
Annual Goal 4,741,977 4,868,000 5,191,000
-
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
Do
l
l
a
r
s
Monthly Building Fund Collections
2021/22 2022/23 2023/24
-
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
Do
l
l
a
r
s
Building Fund
Collections -Cumulative Y-T-D
2021/22 2022/23 2023/24
Parking Fee Collections Beach Parking - thru February 2024
2021/22 2022/23 2023/24
Monthly
October 101,582 130,026 203,967
November 75,146 95,694 155,831
December 102,321 104,713 115,640
January 91,751 164,030 161,743
February 107,375 102,648 179,664
March 145,848 209,333
April 183,397 172,853
May 210,704 197,957
June 188,603 188,603
July 224,411 219,627
August 171,951 197,119
September 134,616 151,776
Total 1,737,704 1,934,380 816,845
2021/22 2022/23 2023/24
Cumulative
October 101,582 130,026 203,967
November 176,728 225,720 359,798
December 279,049 330,433 475,438
January 370,800 494,463 637,181
February 478,175 597,111 816,845
March 624,023 806,444
April 807,420 979,297
May 1,018,123 1,177,255
June 1,206,726 1,365,857
July 1,431,138 1,585,485
August 1,603,088 1,782,604
September 1,737,704 1,934,380
Annual Budget Goal 1,347,086 1,558,354 1,800,000
-
50,000
100,000
150,000
200,000
250,000
Do
l
l
a
r
s
Monthly Beach Parking Collections
2021/22 2022/23 2023/24
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
Do
l
l
a
r
s
Beach Parking Collections -Cumulative Y-T-D
2021/22 2022/23 2023/24
Pier Revenues Pier Revenues - thru February 2024
2021/22 2022/23 2023/24
Monthly
October 52,575 50,313 65,652
November 45,411 43,917 49,208
December 52,271 50,942 45,928
January 45,906 58,345 52,190
February 308,830 294,357 53,041
March 59,863 73,487
April 59,852 63,945
May 55,621 60,688
June 56,858 60,003
July 66,152 71,604
August 52,975 58,871
September 50,426 60,849
Total 906,740 947,320 266,020
Balance includes true-up for the annual rent of the Quarterdeck
based on the lease agreement.
2021/22 2022/23 2023/24
Cumulative
October 52,575 50,313 65,652
November 97,986 94,229 114,860
December 150,257 145,171 160,789
January 196,163 203,516 212,979
February 504,993 497,873 266,020
March 564,856 571,360
April 624,708 635,305
May 680,329 695,993
June 737,187 755,996
July 803,339 827,600
August 856,314 886,471
September 906,740 947,320
Annual Budget Goal 844,816 937,301 942,488
-
50,000
100,000
150,000
200,000
250,000
300,000
350,000
Do
l
l
a
r
s
Monthly Pier Collections
2021/22 2022/23 2023/24
-
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
Do
l
l
a
r
s
Pier Collections -Cumulative Y-T-D
2021/22 2022/23 2023/24
Marina Fee Collections Marina Fees - thru February 2024
2021/22 2022/23 2023/24
Monthly
October 115,264 110,239 117,540
November 117,663 116,542 121,509
December 116,830 120,621 126,034
January 106,673 124,885 123,519
February 104,605 113,849 120,277
March 111,125 117,710
April 112,170 119,728
May 102,373 124,138
June 106,001 122,027
July 104,000 126,485
August 108,096 123,889
September 106,418 124,369
Total 1,311,218 1,444,481 608,878
2021/22 2022/23 2023/24
Cumulative
October 115,264 110,239 117,540
November 232,927 226,781 239,049
December 349,758 347,402 365,082
January 456,431 472,287 488,602
February 561,036 586,135 608,878
March 672,161 703,845
April 784,330 823,574
May 886,703 947,711
June 992,704 1,069,738
July 1,096,704 1,196,223
August 1,204,800 1,320,112
September 1,311,218 1,444,481
Budget Goal 1,290,768 1,339,555 1,398,942
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
Do
l
l
a
r
s
Monthly Marina Fee
Collections
2021/22 2022/23 2023/24
-
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
1,600,000
Do
l
l
a
r
s
Marina Fee Collections -Cumulative Y-T-D
2021/22 2022/23 2023/24
Project Name Project Number Revenue Source Original Budget Grant Award Cash Match
Budget
Amendments
Total Budget
Allocation
Total Expenses
&
Encumbrances
FY 23-24
Carryforward
Amount
Project Phase/
Status
Anticipated
Completion
Date
Grant
Expiration
Stormwater Fund
SE Stormwater II PS-SW-0010
SRF Loan,
Stormwater 6,159,729 - - 844,496 7,004,225 (850,593) 6,153,632 Construction
Neighborhood Drainage Improvement
Transportation
Surtax,
Stormwater 1,170,960 - - 3,000,000 4,170,960 (2,968,928) 1,202,032 Construction
SW 37th Terrace Drainage Improvement PS-SW-0070 Stormwater 1,200,000 375,000 375,000 1,200,000 1,200,000 (1,097,830) 102,170 Completed 9/30/2026
SW 54th Court Drainage Improvement PS-SW-0050 Stormwater 1,200,000 350,000 350,000 1,200,000 1,200,000 (1,010,092) 189,908 Completed 9/30/2026
SW 43rd Terrace Stormwater Improvement PS-SW-0040
Transportation
Surtax,
Stormwater 1,568,625 1,568,625 - 508,251 2,297,467 (2,313,419) - Construction
Citywide Stormwater Master Plan/CDBG Mitigation PS-SW-0080
Stormwater,
CDBG-MIT - 795,000 265,000 16,535 1,076,535 (1,107,130) - Design
Total Stormwater Fund Projects 11,299,314 3,088,625 990,000 6,769,282 16,949,187 (9,347,991) 7,647,743
Water Fund
NW 1st Ave Water Main Stirling-City Hall N/A Water 431,730 - - - 431,730 (431,732) 0 Design
Total Water Fund Projects 431,730 - - - 431,730 (431,732) 0
Sewer Fund
Lift Rehabs 5,7,10 PS-SU-0010 Sewer 1,137,594 - - (9,607) 1,127,987 (1,007,274) 120,713 Construction
SCADA System PS-SU-0011 Sewer 257,715 - - 13,620 271,335 (248,275) - Construction
Inflow and Infiltration Mainline Repairs Project Sewer 2,041,450 - - 2,041,450 (2,041,450) - Construction
HMGP Lift Stations PS-SU-0021 HMGP 1,686,442 - - 3,634,878 5,321,320 (499,800) 4,821,520 Construction
Total Sewer Fund Projects 5,123,201 - - 3,638,891 8,762,092 (3,796,799) 4,942,233
Pier Fund
Pier Refurbishing
PS-BP-0040, PS-
BP-0041 Pier, GF Loan 500,000 - - 1,818,188 2,318,188 (2,318,188) 0 Construction
Total Pier Fund Projects 500,000 - - 1,818,188 2,318,188 (2,318,188)
Grants Fund
Solar Lighting
PS-RB-0020, PS-
RB-0043, PS-RB-
0044 CDBG 44, 46, 47 - 396,491 - - 396,491 (392,620) 3,871 Construction 4/30/2023
Fire Rescue - Station #1
PS-PB-0020, PS-
PB-0021
HMGP, City
Match - 812,850 270,150 - 1,083,000 (232,280) 850,720 Construction 7/31/2023
City Hall Wind Retrofit and Generator
PS-BP-0010, PS-
BP-0011 HMGP - 2,405,500 - - 2,405,500 (222,300) 2,183,200 Design
CDBG 48th Year Solar Lights CDBG 177,575 24,000 - 201,575 - 177,575 9/30/2023
Total Grants Fund Projects 477,575 3,987,390 294,150 433,541 5,192,656 (1,918,617) 3,250,039
Capital Projects Fund
Southeast 5th Avenue Crosswalk PS-RB-0031 Capital 200,000 - - - 200,000 (80,500) 119,500 Construction
Nyberg Swanson / Women's Club
PS-PB-0040, PS-
PB-0041 Capital - - - 647,987 647,987 (343,339) 304,648 Construction
Solar Street Lighting
PS-RB-0040, PS-
RB-0041, PS-RB-
0042, PS-RB-045
Capital, Bank
Loan - - - 1,305,462 1,305,462 (1,216,495) 88,967 Construction
Oasis XV - Capital Fund N/A Capital - - - 58,149 58,149 (11,000) 47,149 Completed
Sidewalk Masterplan Tier 1 N/A
Capital, ARPA,
GF 400,000 - - 422,604 822,604 (822,604) 0 Construction
City of Dania Beach: Master Capital Projects Summary as of 02-29-2024
Project Name Project Number Revenue Source Original Budget Grant Award Cash Match
Budget
Amendments
Total Budget
Allocation
Total Expenses
&
Encumbrances
FY 23-24
Carryforward
Amount
Project Phase/
Status
Anticipated
Completion
Date
Grant
Expiration
City of Dania Beach: Master Capital Projects Summary as of 02-29-2024
Roadway and Median Electrical N/A Capital 200,000 - - 575,000 1,475,000 (507,027) 967,973 Construction
Beach Revitalization Phase II
PS-BP-0050, PS-
BP-0052 Capital 925,000 - - 801,798 1,726,798 (1,304,438) 422,360 Construction
City Hall Restrooms PS-PB-0055 Facilities 188,654 20,500 209,154 (224,437) 212,937 Construction
IT Parker Community Center Renovations ITPCC 2023
Facilities, Flood
Insur. Proceeds,
Fund Balance 327,068 503,603 830,671 (830,671) 0 Construction
CW Thomas Park Phase I N/A
Bank Loan,
Capital 18,100,000 - - 265,505 18,449,977 (1,535,135) 16,914,842 Construction
Total Capital Projects Fund 20,340,722 - - 4,600,608 25,725,802 (6,875,645) 19,078,376
Upcoming Projects
Beachside Restroom Improvement PS-BP-0015 Capital 150,000 Planning
Bus Stop Improvements PS-RB-0110 Capital 90,000 Planning
Neighborhood Water Line Replacement PS-WU-0060 Water 203,000 Planning
Water Plant Chemical Feed Area PS-WU-0070 Water 150,000 Planning
Tiger Tail Horizontal Well/Hydraulic Modeling PS-WU-0052 Water Planning
Wells G&I Rehabilitation PS-WU-0053 Water 100,000 Planning
Dune Design Segment III Beach Nourishment PS-BP-0051 Capital 20,900 Design
Corridor Landscape Master Plan PS-RB-0090 Capital 315,000 Design
NW/SW 1st Street Water Main
PS-WU-0020, PS-
WU-0021 Water 500,000 Design
Water Plant Accelator Cleaning PS-WU-0030 Water 100,000 Design
C51 Water Supply PS-WU-0050 Water 4,600,000 Loan Approved
SW 52nd Street Drainage Improvement PS-SW-0041 Stormwater 1,200,000 Resilient FL Design
Fuel Facility Improvements PS-PB-0060 Capital 50,000 Construction
NW 1st St Streetscape PS-RB-0070 Capital 250,000 Construction
West Wing Life Safety PS-PB-0051 Capital Construction
Median/Poles Electrification PS-RB-0080 Capital 500,000 Construction
Tidal Valves - Stormwater System PS-SW-0100 Stormwater 250,000 On Hold
FPL Service Laterals to Lights PS-BP-0023 Capital On Hold
SW 34th Terrace Improvement PS-SW-0060 Stormwater 750,000 On Hold
SeaTech Parking Garage PS-BP-0053 Capital 1,200,000 On Hold
10,428,900 - - - - - -
Out of Business/Inactive # of BTRs Dollar Amount
Snack Shack Drive Thru Inc 1 818.75$ Total Out of Business/Inactive 1 818.75$
New Approved Applications # of BTRs Dollar Amount
3349 SW 44th LLC 1 236.25$
Archer Western De Moya JV III 1 850.00$
C & M America Developers LLC 1 196.50$
Ebenezer Deliverance Temple Inc 1 -$
Global Outsourcing Provider Inc 1 131.25$
James & Karen LLC 1 63.00$
Milagros Rodriguez 1 31.50$
Nahar Pinhar 1 31.50$
New BHNV Dania 2 LLC 1 31.50$
Patrick Roseberry 1 196.50$
Rajpal, Vishal 1 63.00$
Stirling In and Out LLC 1 625.00$
Twin Harbors Property Mgmt LLC 2 63.00$ Total New Applications 14 2,519.00$
BTR Status # of BTRs Total Dollar Amount
Open Renewals- Current Year 340 98,176.05$
Paid Renewals 2,843 1,001,019.74$ Total BTRs as of 02/29/2024 3,183 1,099,195.79 **
**includes license fee, fire inpsection & solid waste registration
Business Tax Receipt Activity - February 2024
Description Current 1-30 31-60 61-90 90+Total
#4652 - Eric L Wilson Reservation of Burial Plot .00 .00 .00 .00 2710.00 2,710.00
#5474 - Cokenya D West Reservation of Burial Plot .00 .00 .00 .00 250.00 250.00
#4179 - AJ Manuel Funeral Home Reservation of Burial Plot .00 .00 .00 .00 1680.00 1,680.00
#5736 - Sands, Carolyn Reservation of Burial Plot .00 .00 .00 .00 3000.00 3,000.00
#5756 - Rahming Poitier Funeral Home Reservation of Burial Plot .00 .00 .00 .00 6430.00 6,430.00
#5757 - Fuller Funeral Home Reservation of Burial Plot .00 .00 .00 .00 990.00 990.00
#5673 - Agape Funeral and Cremation Reservation of Burial Plot .00 .00 .00 .00 5040.00 5,040.00
#3946 - Eric S George Funeral Home Reservation of Burial Plot .00 .00 3990.00 .00 2380.00 6,370.00
#5909 - Freeman Funeral Home Reservation of Burial Plot .00 .00 .00 .00 1500.00 1,500.00
#5924- Garcia Gimeno Reservation of Burial Plot .00 .00 .00 .00 200.00 200.00
#5862 - Love and Grace Funeral Home Reservation of Burial Plot .00 .00 .00 .00 3360.00 3,360.00
#5976 - John Hanks Memorial Services Reservation of Burial Plot .00 .00 .00 .00 1500.00 1,500.00
#5925 - Anthony R. Manuel Funeral Home Reservation of Burial Plot .00 1680.00 .00 .00 600.00 2,280.00
#5907 - Poitier Family Funeral Home Reservation of Burial Plot .00 .00 .00 .00 1500.00 1,500.00
#6121 - Christine Smith Reservation of Burial Plot .00 .00 .00 .00 1500.00 1,500.00
#6071 - Bells Funeral Services Reservation of Burial Plot .00 .00 .00 .00 625.00 625.00
#5978 - Angels of Paradise Reservation of Burial Plot .00 .00 .00 .00 3990.00 3,990.00
#6153 - Jacqueline Andrews Reservation of Burial Plot .00 .00 .00 .00 630.00 630.00
#4410 - James C Boyd Funeral Home Reservation of Burial Plot .00 .00 .00 .00 3625.00 3,625.00
#4569 - Clark & Norris Funeral Home Reservation of Burial Plot .00 3625.00 .00 .00 .00 3,625.00
#6173 - Pax Villa FH Miami Reservation of Burial Plot .00 .00 3990.00 .00 .00 3,990.00
#4203 - McWhite's Funeral Home Reservation of Burial Plot .00 .00 1680.00 .00 .00 1,680.00
#6146 - A Mortuary Service Main LLC Reservation of Burial Plot .00 .00 .00 .00 3625.00 3,625.00
#4738 - Wright and Young Funeral Home Reservation of Burial Plot .00 3990.00 .00 .00 .00 3,990.00
#6174 - Collie, Ruth Reservation of Burial Plot .00 1500.00 .00 .00 .00 1,500.00
#4431 - Landmark Funeral Home Reservation of Burial Plot .00 625.00 .00 .00 .00 625.00
#6188 - New Beginnings Funeral Home Reservation of Burial Plot .00 3625.00 .00 .00 .00 3,625.00
#6070 - Elijah Bells Funeral Home Reservation of Burial Plot .00 3990.00 .00 .00 .00 3,990.00
#4786 - Dillard Josephine Reservaton of Burial Plot .00 .00 .00 .00 200.00 200.00
Cemetery Totals $0.00 $19,035.00 $9,660.00 $0.00 $45,335.00 $74,030.00
Bulk Trash Pickup 1920.00 .00 .00 .00 7004.00 8924.00
Bulk Trash Pk Up $1,920.00 $0.00 $0.00 $0.00 $7,004.00 $8,924.00
Miscellaneous FA Customers BSO & Fire False Alarms .00 .00 .00 .00 2,000.00 2,000.00
$0.00 $0.00 $0.00 $0.00 $2,000.00 $2,000.00
3065 - Keynorth Townhomes Annual Inspection FY 11 .00 .00 .00 .00 1,700.00 1,700.00
3072 - Atlantis Management Annual Inspection FY 11 & FY 12 .00 .00 .00 .00 7,800.00 7,800.00
1012 - Gulfstream Apts.Annual Inspection FY 11 & FY 12 .00 .00 .00 .00 2,800.00 2,800.00
#4466 - Meadowbrook Condo Annual Inspection FY 13 .00 .00 .00 .00 1,000.00 1,000.00
4644 - Oakbridge Townhomes Annual Inspection FY 14 .00 .00 .00 .00 4,000.00 4,000.00
Miscellaneous FI Customers Annual & Re-Inspections .00 .00 .00 .00 254,685.00 254,685.00
$0.00 $0.00 $0.00 $0.00 $271,985.00 $271,985.00
#6168 - Florida Dept. of Emergency 2023-00000004 .00 .00 .00 .00 120,104.00 120,104.00
#6168 - Florida Dept. of Emergency 2023-00000005 .00 .00 .00 .00 181,294.90 181,294.90
#6155 - Florida Division of Emergency 2023-00000001 .00 .00 .00 .00 56,319.60 56,319.60
$0.00 $0.00 $0.00 $0.00 $357,718.50 $357,718.50
#6170 - FL Dept. of Economic Opportunity 2023-00000002 .00 .00 .00 .00 395,504.79 395,504.79
#4051 - State of Florida Dept of 2023-00000003 .00 .00 .00 .00 332,500.00 332,500.00
#4051 - State of Florida Dept of 2023-00000004 .00 .00 .00 .00 375,000.00 375,000.00
$0.00 $0.00 $0.00 $0.00 $1,103,004.79 $1,103,004.79
Miscellaneous LM Customers Lake Maintenance .00 .00 .00 .00 275.36 275.36
$0.00 $0.00 $0.00 $0.00 $275.36 $275.36
#4647 - Palmetto Hospitality of Dania Water Impact Fees .00 .00 .00 .00 20,242.00 20,242.00
Misc. Customers Misc. Customers 12,500.00 16,206.24 .00 .00 55,179.43 83,885.67
$12,500.00 $16,206.24 $0.00 $0.00 $75,421.43 $104,127.67
$14,420.00 $35,241.24 $9,660.00 $0.00 $1,862,744.08 $1,922,065.32
Miscellaneous Billing Invoice Aging Report
Aging Date 02/29/2024
Report By Invoice Type
Fire Inspection Totals
Invoice Type FA- False Alarm
Invoice Type - CEM - Cemetery
Invoice Type GR Federal - Grant Reimb. Federal Government
False Alarm Totals
Invoice Type FI - Fire Inspection
Invoice Type - BULK Trash Pk Up - Notice of Violation
Grand Totals
Invoice Type MS - Miscellaneous
Miscellaneous Totals
Grant Federal Totals
Grant Federal Totals
Invoice Type GR State - Grant Reimb. State of Florida
Invoice Type LM - Lake Maintenance
Lake Maintenance Totals
# of
Pymts $ Value
# of
Pymts $ Value
October 12 $26,300
November 21 $41,105
December 6 $9,330
January 19 $44,995
February 9 $26,465
March
April 2023-2024
May 2024-2025
June
July 5 $9,740
August 8 $19,610
Septembe 6 $12,030
FY 2023 FY 2024
4000
9000
14000
19000
24000
29000
34000
39000
44000
49000
Credit Cards-Cemetery
FY 2023 $ Value FY 2024 $ Value
FY 2022
# of Pymts $ Value
# of
Pymts $ Value
# of
Pymts $ Value
October 112 $4,547 141 $7,334
November 46 $1,562 74 $3,333
December 36 $1,284 37 $1,503
January 23 $615 31 $1,616
February 19 $851 23 $979
March 18 $802 2022-2023
April 13 $604 2023-2024
May 0 $0 10 $267 2024-2025
June 9 $411 10 $385
July 10 $460 9 $198
August 13 $508 2 $0
Septembe 106 $4,227 115 $6,191
FY 2023 FY 2024
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
Online Credit Card Payments-Beach Parking Permits
FY 2024
# of Pymts $ Value # of Pymts $ Value # of Pymts $ Value
October 1,806 $581,381 1,756 $419,523 1,799 $631,937
November 1,626 $436,666 1607 $477,225 1698 $490,381
December 1,720 $563,383 1644 $575,861 1676 $453,598
January 1,851 $576,388 1580 $403,966 1814 $559,003
February 1,727 $529,750 1461 $393,924 1586 $466,879
March 1883 $624,708 1673 $524,878 2023-2024
April 1558 $415,006 1696 $514,951 2021-2022
May 1635 $502,840 1705 $482,818 2022-2023
June 1771 $486,384 1890 $677,359
July 2003 $522,805 1956 $509,105
August 1919 $591,853 1745 $44,810
September 1748 $475,765 1953 $648,891
FY 2022 FY 2023
$0
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
$800,000
Online Credit Card Payments -Utilities
FY 2024
# of
Pymts $ Value
# of
Pymts $ Value
# of
Pymts $ Value
October 305 $10,189 203 $9,350 293 $18,293
November 219 $10,420 126 $6,835 188 $11,802
December 218 $11,389 112 $3,952 184 $10,643
January 266 $11,741 106 $7,346 228 $13,489
February 201 $11,951 159 $12,120 215 $12,691 2020-2021
March 252 $19,322 339 $29,674 2021-2022
April 264 $48,956 229 $54,344 2022-2023
May 205 $16,068 147 $11,025
June 125 $10,999 216 $16,773
July 108 $7,008 125 $6,317
August 203 $7,805 242 $15,031
September 133 $8,115 240 $11,545
FY 2022 FY 2023
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
RecDesk
FY 2024 $ Value FY 2022 $ Value FY 2023 $ Value
FY 2024 FY2022 FY 2023
October 91,700 124,800 113,900
November 81,600 124,100 128,500
December 103,200 110,100 78,800
January 85,800 117,200 75,900
February 85,900 90,500 79,200
March 115,300 105,100
April 93,100 115,900
May 104,900 84,300
June 111,500 74,100
July 110,600 67,100
August 89,700 67,700
September 190,300 86,600
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
200000
Beach Camera Views
FY 2024 FY2022 FY 2023
FY 2024 FY 2022 FY 2023
October 369 357 396
November 444 201 238
December 475 369 270
January 719 323 494
February 632 366 424
March 377 531
April 473 471
May 342 505
June 331 508
July 202 321
August 403 501
September 422 499
YouTube Channel
0
100
200
300
400
500
600
700
800
Commission Meeting Views
FY 2024 FY 2022 FY 2023
1st Q 2021 1st Q 2022 1st Q 2023 2nd Q 2021 2nd Q 2022 2nd Q 2023 3rd Q 2021 3rd Q 2022 3rd Q 2023 4th Q 2021 4th Q 2022 4th Q 2023
Desktop 44.7%50.2%42.5%29.1%72.5%40.5%0.0%66.4%44.1%0.0%41.6%38.8%
Smartphone 53.4%44.2%55.3%36.3%25.1%57.4%0.0%32.5%54.0%0.0%56.4%47.9%
Tablet 1.8%5.0%2.2%1.3%2.2%2.1%0.0%1.2%1.6%0.0%2.0%7.3%
Other 0.0%0.6%0.0%0.0%0.0%
Website Visit by Device Type Comparison
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
1s
t
Q
2
0
2
1
1s
t
Q
2
0
2
2
1s
t
Q
2
0
2
3
2n
d
Q
2
0
2
1
2n
d
Q
2
0
2
2
2n
d
Q
2
0
2
3
3r
d
Q
2
0
2
1
3r
d
Q
2
0
2
2
3r
d
Q
2
0
2
3
4t
h
Q
2
0
2
1
4t
h
Q
2
0
2
2
4t
h
Q
2
0
2
3
Website Visit by Device Type Comparison
FY 2024 FY 2022 FY 2023
October 11,286 10,868 9,789
November 10,370 9,702 9,564
December 8,932 9,193 8,197
January 10,820 9,268 9,543
February 11,612 8,875 9,338
March 10,960 10,946
April 10,499 10,851 2023-2024
May 10,274 10,489 2021-2022
June 10,791 12,351 2022-2023
July 9,164 10,843
August 10,658 11,775
September 9,667 9,897
NUMBER OF CITY-WIDE PHONECALLS
0
2000
4000
6000
8000
10000
12000
14000
Number of e-bill users by month
FY 2024 FY 2022 FY2023
October 922 722 804
November 929 731 805
December 939 738 818
January 948 751 835
February 959 759 848
March 767 861
April 776 873
May 775
June 778 890
July 782 886
August 787 901
September 797 910
0
200
400
600
800
1000
1200
Incremental E-bill Accounts
Number of e-bill users by month FY 2024 Number of e-bill users by month FY 2022
Number of e-bill users by month FY2023
Kiosk
FY 2024 FY 2022 FY2023
October 14,452.23$ 6,940.80$ 10,067.50$
November 11,121.83$ 8,678.89$ 11,339.44$
December 11,401.43$ 7,403.30$ 12,409.30$
January 12,953.63$ 10,348.96$ 11,755.07$
February 15,069.97$ 10,992.74$ 11,856.78$
March 12,964.70$ 11,032.47$
April 10,480.52$ 7,514.64$
May 10,160.84$ 11,120.90$
June -$ 11,336.27$ 12,405.61$
July -$ 11,575.17$ 10,289.44$
August -$ 8,117.21$ 10,380.86$
Septembe -$ 7,940.87$ 11,842.84$
FY 2023
FY 2022
FY 2024
$-
$2,000.00
$4,000.00
$6,000.00
$8,000.00
$10,000.00
$12,000.00
$14,000.00
$16,000.00
$18,000.00
$20,000.00
Kiosk
FY 2024 FY 2022 FY2023
Annual Budget 900,000$
City of Dania Beach
Commercial Solid Waste Report FY 2023-2024
Payments Received
Waste Hauler
Choice Waste AKA
Waste Connections
Waste Management All Service
Refuse AKA
Republic Services
S & S National
Waste AKA Bicon,
Inc.
Panzarella Waste &
Recycling Services
Great Waste COASTAL WASTE &
RECYCLING INC
Tropical Sanitation Inc
General Fund
75.00 75.00 75.00 225.00 75.00 75.00 75.00 150.00
1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 Monthly Activity
Oct 2,506.09$ 33,232.87$ 11,277.12$ 3,777.33$ 1,165.19$ 4,666.00$ 11,433.00$ 68,057.60$
Nov 2,601.53 38,500.99 16,379.12 4,298.24 1,283.08 2,932.48 12,079.29 78,074.73
Dec 2,641.05 37,758.93 19,566.05 3,826.03 1,230.70 -9,776.60 74,799.36
Jan 2,685.42 37,936.93 11,993.95 -1,020.06 2,216.87 12,653.65 68,506.88
Feb 2,666.10 37,587.43 --1,227.76 3,091.54 -45,435.33
Mar -
Apr -
May -
Jun -
Jul -
Aug -
Sep -
13,100.19$ 185,017.15$ 59,216.24$ 11,901.60$ 5,926.79$ 12,906.89$ 45,942.54$ 334,873.90$ Total Mo. Franchise
Annual Permit Fee
Monthly Franchise
Permit Application Fee
Choice Waste AKA
Waste Connections
Waste Management All Service
Refuse AKA
Repucblic
Services
S & S National
Waste AKA Bicon,
Inc.
Panzarella Waste &
Recycling Services
Great Waste COASTAL WASTE &
RECYCLING INC Solid Waste Fund
Oct 835.36$ 11,077.62$ 3,759.04$ 1,259.11$ 388.40$ 1,555.34$ 3,811.00$ 22,685.87$
Nov 867.18$ 12,833.66$ 5,459.71$ 1,432.75$ 427.70$ 977.49$ 4,026.43$ 26,024.92$
Dec 880.35$ 12,586.31$ 6,522.02$ 1,275.34$ 410.23$ -3,258.87$ 24,933.12$
Jan 895.14$ 12,645.65$ 3,997.99$ -340.02$ 738.95$ 4,217.88$ 22,835.63$
Feb 888.70$ 12,529.14$ --409.25$ 1,030.52$ -15,145.11$
Mar -$
Apr -$
May -$
Jun -$
Jul -$
Aug -$
Sep -$
4,366.73$ 61,672.38$ 19,738.76$ 3,967.20$ 1,975.60$ 4,302.30$ 15,314.18$ 111,624.65$
18,541.92$ 247,764.53$ 80,030.00$ 17,093.80$ 8,977.39$ 18,284.19$ 62,331.72$ 453,023.55$
Monthly Franchise
Total Mo. Franchise
Total Receipts
5 Prior
Yr.
2023 2024 2023 2024 2023 2024
Oct 46,710.00 3,114.00 - 1,450.00 2,565.00 2,660.00 532.00 47 30
Nov - - - 2,540.00 2,865.00 573.00 39 35
Dec 53,717.00 6,228.00 - - 3,125.00 2,630.00 526.00 48 40
Jan 2,282.00 - - - 2,795.00 2,995.00 599.00 48 33
Feb 44,375.00 10,241.00 4,671.00 - 2,630.00 2,855.00 571.00 40 40
Mar 1,557.00 - 2,760.00 - 60
Apr 7,785.00 1,650.00 1,965.00 - 35
May 1,557.00 - 2,215.00 - 55
Jun 4,671.00 1,450.00 2,715.00 - 49
Jul - - 2,860.00 - 53
Aug 10,120.00 12,456.00 2,855.00 - 52
Sept 196,961.00 1,750.00 2,510.00 - 39
Total 369,735$ 19,583$ 21,977$ 1,450$ 31,535$ 14,005$ 2,801$ 222 521
5%# of City's 4850 account became delinquent
for this period
Water Impact Fee Water Tap Fee Delinquent # per
Month
# of Accts
Water Fund Monthly Utility Account Activity MISC
Building/ New Construction Activity Delinquent Account Activity New Accts
>120 Past Due Monthly Billings % DELQ >120 Past Due
Monthly
Billings % DELQ >120 Past Due Monthly Billings % DELQ
October 275,153 1,130,854$ 24%184,989 1,140,696$ 16%207,794 1,241,355$ 17%
November 276,502 1,145,557 24%186,463 1,205,526 15%216,614 1,267,676 17%
December 286,708 1,088,332 26%188,661 1,186,620 16%214,935 1,270,207 17%
January 309,337 1,166,202 27%188,029 1,165,000 16%220,340 1,211,794 18%
February 322,379 1,084,213 30%185,376 1,210,890 15%231,139 1,217,188 19%
March 281,908 1,112,053 25%183,535 1,267,253 14%
April 222,556 1,169,668 19%190,502 1,262,289 15%
May 211,091 1,178,959 18%189,684 1,172,418 16%
June 190,542 1,173,565 16%184,340 1,178,310 16%
July 201,407 1,194,888 17%190,677 1,288,709 15%
August 202,749 1,120,866 18%198,874 1,252,551 16%
September 183,816 1,129,966 16%203,881 1,235,287 17%
Annual Avg 247,012$ 1,141,260$ 22%189,584$ 1,213,796$ 16%218,164$ 1,241,644$ 18%
FY 2022 FY 2023 FY 2024
>120 Past Due >120 Past Due % +/->120 Past Due % +/-
October 344,685 377,040 9%388,922 3%
November 346,914 383,454 10%390,867 2%
December 347,964 385,515 10%397,662 3%
January 349,252 385,601 9%396,459 3%
February 350,890 389,237 10%395,697 2%
March 361,917 391,059 7%
April 363,125 390,781 7%
May 365,539 392,882 7%
June 376,626 394,781 5%
July 371,165 397,219 7%
August 372,990 396,674 6%
September 375,001 387,690 3%
Annual Avg 360,506$ 389,328$ 7%393,922$ 1%
Active Account Graph: Billing data indicates deliquency rate on active accounts remain constant at an average of 1% of billings per month
INACTIVE ACCOUNTS
WATER & SEWER UTILITY AGING REPORT
ACTIVE ACCOUNTS
FY 2022 FY 2023 FY 2024
0%
5%
10%
15%
20%
25%
30%
35%Active Accounts >120 days
FY 2022
FY 2023
FY 2024
310,000
320,000
330,000
340,000
350,000
360,000
370,000
380,000
390,000
400,000
410,000 Inactive Accounts > 120 days
FY 2022
FY 2023
FY 2024
City of Dania Beach
General Fund
Unassigned Fund Balance - - Contingency
----- General Fund -------
Unassigned
Contingency Fund Balance
Balance 10/1/23 (Estimated)426,700$ 30,060,196$
(Uses) / Additions:
October - (838,552)
November (6,800) (1,651,835)
December (11,122) -
January (27,950) -
February (8,483) -
March - -
April - -
May - -
June - -
July - -
August - -
September - -
Sub-Total (Uses) / Additions (54,355) (2,490,387)
Sub-Total Available 372,345 27,569,809
Other Considerations
GFOA/City Commission 25% Reserve (13,000,000)est.
Estimate of Availability at 09/30/24 372,345$ 14,569,809$
City of Dania Beach
#001-18-00-519-99-10
Contingency Account
Original Budget 325,000$
Amendment 101,700 Collins playground, veterans Park and 5k Race
Uses:
Total
Oct -
Nov (6,800) DB Press $300;DBHS $4,000;BSO Toy Drive $2,500
December (11,122) $4572 5k walk; $300 DB Press; $5,000 MLK; $1,000 Winter Camp;
$250 Committee of 100
January (27,950) $20k-Signage for Linear Park; $4k Prestge Club Etiquette Lunch
$900 Winter Camop; $2.5k State of the Region MPO; $550 DB Press
February (8,483) Lighthouse 4 Students $1500; Love our Nation $1500
MPO Ad $250;BLC Gala $5,000 ; Awards $233.22
March
April
May
June
July
August
September
Balance Remaining 372,345$
City of Dania Beach
General Fund
Analysis of
Fund Balance
Balance 10/1/23 30,060,196
Uses: #389-90-01
October (838,552) Carryovers/ P.O's etc
November (1,651,835) Purchase of 148 N Federal Highway $1,611,426
December $40,409- Surplus Carry Over for lease of modular offices
January
February
March
April
May
June
July
August
September
Total Uses (Sources)(2,490,387)
Estimated Balance Available 09/30/24 27,569,809$
Other Considerations
GFOA/City Commission 25% Reserve (13,000,000) est.
Estimate of Availability at 09/30/24 14,569,809
City of Dania Beach
Public Services Memorandum
DATE: 3/26/2024
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Fernando J. Rodriguez, Public Services Director
Dincer A. Ozaydin, P.E., Deputy Director/City Engineer
SUBJECT: APPROVAL TO PURCHASE VEHICLES AND GENERATORS UTILIZING
FLORIDA SHERIFFS ASSOCIATION AND SOURCEWELL CONTRACTS
Request:
The Public Services Department (PSD) is requesting authorization to purchase five vehicles from
awarded vendor Bozard Ford, utilizing FSA Contract FSA23-VEL31.0 and two 150kva Generators
from Genset Services utilizing the Sourcewell Contract number 092222 GNR.
Background:
The vehicle purchases for this fiscal year are required for assignment to new positions and replace
aging vehicles across several departments. The Grounds and Streets Division in PSD and the Parks
Department will require additional vehicles for these positions, and other purchases are required to
replace vehicles that have reached the end of their useful life. When this point is reached, vehicles
become increasingly unreliable due to age and mileage. The two generators, which will be assigned to
the Sewer Division, will replace two generators that are over ten (10) years old, and which have
become unreliable. All purchases were approved for the current FY24 budget.
Budgetary Impact
PSD recommends approval to purchase five vehicles and two generators in the amount of
$352,054.52, as broken down below:
Department Vehicle Type Cost GL Account
Parks Ford F-150 $38,728.00 506-39-03-539-64-20
Parks Bronco Sport $30,806.00 506-39-03-539-64-20
Grounds Ford F-150 $38,728.00 506-39-03-539-64-20
Grounds Ford F-150 $38,728.00 506-39-03-539-64-20
Streets Ford F-150 $38,728.00 506-39-03-539-64-20
Sewer MDG150DF4-STD3 $83,168.26 402-35-02-535-64-30
Sewer MDG150DF4-STD3 $83,168.26 402-35-02-535-64-30
Total $352,054.52
Recommendation
Public Services recommends City Commission approval of a resolution for the purchase of five
vehicles and two generators by utilizing awarded vendors and the pricing under the FSA Contract
FSA23-VEL31.0 and Sourcewell contract number 092222GNR.
RESOLUTION NO. 2024-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE PURCHASE OF FIVE FORD
VEHICLES AND TWO GENERATORS FOR PARKS AND RECREATION
DEPARTMENT AND STREETS, GROUNDS AND SEWER DIVISIONS IN
AN AMOUNT NOT TO EXCEED THREE HUNDRED FIFTY TWO
THOUSAND FIFTY FOUR DOLLARS AND FIFTY TWO CENTS
($352,054.52) FROM BOZARD FORD AND GENSET SERVICES, WITHOUT
COMPETITIVE BIDDING AND WITHOUT ADVERTISEMENT FOR BIDS,
BY UTILIZING THE PRICING UNDER THE FLORIDA SHERIFFS
ASSOCIATION (“FSA”) CONTRACT FSA23-VEL31.0 AND SOURCEWELL
CONTRACT NUMBER 092222GNR; PROVIDING FOR CONFLICTS;
FURTHER, PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the Charter of the City of Dania Beach, Part III, Article 3, Section 4,
Subsection (j), authorizes the City Manager to purchase supplies, services, equipment and
materials for the City government in amounts in excess of the established monetary threshold
without competitive bidding and without advertisement for bids if he/she is authorized to do so in
advance by a resolution adopted by the City Commission and if such purchases are made pursuant
to a competitive bid obtained within the last eighteen (18) months by other government agencies
such as the federal government, state of Florida or a Florida municipality or county; and
WHEREAS, the Dania Beach Code of Ordinances, Chapter 2, Article 1, Section 2-10,
“Monetary thresholds for certain purchases and payment disbursement authorizations”, Subsection
(a), sets the monetary threshold or limitation at $50,000.00; and
WHEREAS, the Public Services Department (“PSD”) has determined that vehicles and
equipment needed by the City can be purchased at the least cost to the City from Bozard Ford
utilizing the pricing under the FSA Contract FSA23-VEL31.0, and Genset Services utilizing
pricing under the Sourcewell Contract number 092222GNR, attached as composite Exhibit “A,”
copies of which are made a part of and are incorporated into this Resolution by this reference; and
WHEREAS, the approved FY24 budget provides for the purchase of vehicles and
equipment to support existing and new staff in Parks and Recreation and Public Services
Departments, as well as replacing units that have reached the end of their useful lives.
2 RESOLUTION #2024-______
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA:
Section 1.That the foregoing “Whereas” clauses are ratified and confirmed as being
true and correct and they are made a specific part of and incorporated into this Resolution by this
reference.
Section 2.That City Commission authorizes the purchase of (5) five Ford vehicles for
Parks and Recreation Department and Public Services Department by utilizing the pricing under
the FSA Contract FSA23-VEL31.0 valid through September 30, 2024 and (2)two generators for
the Sewer Division utilizing the pricing under the Sourcewell Contract #092222GNR.
Section 3. That funding for this purchase is available and appropriated in the FY 24
budget from the following sources:
Section 4.That the City Commission authorized the purchase of vehicles from
Bachrodt FT (dba Palmetto Ford as stipulated above, authorizes the proper City officials to execute
such documents as are necessary for the purchase of such vehicles.
Section 5.That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 6.That this Resolution shall be effective 10 days after passage.
SPACE INTENTIONALLY LEFT BLANK
Position/Department Vehicle Type Procurement cost GL Account
Parks Ford F-150 $38,728.00 506-39-03-539-64-20
Parks Bronco Sport $30,806.00 506-39-03-539-64-20
Grounds Ford F-150 $38,728.00 506-39-03-539-64-20
Grounds Ford F-150 $38,728.00 506-39-03-539-64-20
Streets Ford F-150 $38,728.00 506-39-03-539-64-20
Sewer MDG150DF4-
STD3
$83,168.26 402-35-02-535-64-30
Sewer MDG150DF4-
STD3
$83,168.26 402-35-02-535-64-30
Total $352,054.52
3 RESOLUTION #2024-______
PASSED AND ADOPTED on __________________, 2024.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Joyce L. Davis ____ ____
Commissioner Tamara James ____ ____
Commissioner Marco Salvino____ ____
Vice Mayor Lori Lewellen ____ ____
Mayor Archibald J. Ryan IV ____ ____
ATTEST:
ELORA RIERA, MMC ARCHIBALD J. RYAN IV
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
Notice of Final Award
FSA23-VEL31.0: Pursuit, Administrative, & Other Vehicles
Date: October 1, 2023
To: Bidders and Purchasers
From: Hugh Oliver, Cooperative Purchasing Program Manger
Re: Notice of Final Award for FSA23-VEL31.0: Pursuit, Administrative, & Other Vehicles
Florida Sheriffs Association (FSA) has completed its 31st year of the cooperative purchasing pursuit,
administrative, and other vehicles contract. FSA is issuing the Notice of Final Award for contract FSA23-
VEL31.0: Pursuit, Administrative, & Other Vehicles that will be effective from October 1, 2023, through
September 30, 2024. This year’s bid included 216 items. The contract will offer pursuit rated vehicles,
administrative sedans, pickup trucks, electric vehicles, cargo and passenger vans, electric bikes,
motorcycles, and other light and midsize vehicles.
The competitive process for this award began in May 2023, when stakeholders were surveyed regarding
procurement needs. Items were added based on survey results and the Fleet Advisory Committee’s
review of products.
An advertisement for the Invitation to Bid was published in the Florida Administrative Weekly, as well as
the State of Florida’s Office of Supplier Diversity and the FSA websites. On May 5, 2023, a direct
notification was sent to 716 prospective bidders to participate in a voluntary bidder workshop. The ITB
advertisement resulted in 51 pre-bid attendees or waivers. Of these respondents, 22 submitted bids and
19 qualified. FSA has identified intended awardees in the attached Final Award Report. The Final Award
Report shows up to three lowest bidders per item, per zone.
The Florida Sheriffs Association Cooperative Purchasing Program has followed the Contract Terms and
Conditions for this procurement. Bidders that become awarded vendors are governed by their
manufacturer agreements and the Contract Terms and Conditions.
Contract pricing will be extended and guaranteed to the Florida Sheriffs Association, any unit of local
government, political subdivision or agency of the State of Florida, or to other entities approved by
manufacturers to buy from this contract, which can include out-of-state sales. Vendors that wish to
extend contract pricing to entities other than those defined here are governed by their manufacturer’s
agreement. All purchasers are bound by state law, local ordinances, rules, and regulations for purchases
made under this contract.
Generac #092222-GNR
Pricing for contract #092222-GNR is provided to Sourcewell participating agencies at a percentage
range off list prices, depending on product line. There are also quantity discounts that can be offered
on a case-by-case basis.
Job Name:Dania Beach Public Service
Prepared For:City of Dania Beach
Contact:Yamil Lobo
Project Rep:William Gonzalez
Phone:954-956-9252
Email:wgonzalez@gensetservices.com
We are pleased to offer the following proposal:
Reference: Dania Beach Public Services
We are pleased to offer the following quote for the above project:
Quantity 2 - MDG150DF4-STD3: Trailer Mounted Diesel Genset, 150KVA, 240V single phase, 480V three phase, John Deere Tier IV
engine
Quantity 1 - Transport to jobsite
Total investment for the above equipment (Not including any applicable tax or freight): $166,336.52
Revision No. 1: 11/29/2023, Proposal based on "Sourcewell" pricing contract No. 092222 GNR
Total investments for the above equipment (not including any taxes):$ 166,336.52
Terms and Conditions:
30% deposit with order, balance before shipping. Other payment terms need to be approved by the credit department before
a purchase order is accepted. Payment obligations are not dependent or contingent upon the manner in which purchaser
may receive.
In the event of significant delay or price increase of material occurring during the performance of the contract through no
fault of Genset, the contract sum, time of performance, and contract requirements shall be equitably adjusted by change
order in accordance with the procedures of the contract documents.
Estimated Delivery:20 to 24 (Subject to change)
FOB:Jobsite installation and offloading by others unless included in the above BOM
Quoted Per:Customer Request No Drawings / Electrical Riser Not Provided
Proposal#: 46783 Proposal Date: 11/14/2023 Valid Until: 12/14/2023
Revision : 1
3100 Gateway Drive - Pompano Beach, FL 33069 - Phone: (954) 956-9252 - Fax: (954) 968-6110
578 Cooper Oaks Court - Apopka, FL 32703 – Phone: 407-532-0414 – Fax: 407-532-0415
www.gensetservices.com
1 of 4
Exceptions to the
specifications:
Proposal no. 46783 Based on "Sourcewell Pricing" Contract No. 092222 GNR
Proposal#: 46783 Proposal Date: 11/14/2023 Valid Until: 12/14/2023
Revision : 1
3100 Gateway Drive - Pompano Beach, FL 33069 - Phone: (954) 956-9252 - Fax: (954) 968-6110
578 Cooper Oaks Court - Apopka, FL 32703 – Phone: 407-532-0414 – Fax: 407-532-0415
www.gensetservices.com
2 of 4
Free Text
Free Text
1652884791563_s_0
Hold for Release
1652884791563_s_1
Release to Manufacturer
Customer Authorization:
(by signing below, I acknowledge that I have read and accept the Genset terms and conditions that follow).
Signature:
1649791066109_s_ph
Print Name:
1657746476411_s_ph
Title:
1649791072875_s_ph
Date:
1649791076114_s_ph
P.O.#:
1649791078790_s_ph
Project Status
1652884791563_s_ph
Proposal#: 46783 Proposal Date: 11/14/2023 Valid Until: 12/14/2023
Revision : 1
3100 Gateway Drive - Pompano Beach, FL 33069 - Phone: (954) 956-9252 - Fax: (954) 968-6110
578 Cooper Oaks Court - Apopka, FL 32703 – Phone: 407-532-0414 – Fax: 407-532-0415
www.gensetservices.com
3 of 4
GENSET SERVICES SERVICE TERMS & CONDITIONS 1. Agreement and Order. The terms and conditions set forth below (the Terms and Conditions) and on Gensets proposal, quotation or order form attached hereto (collectively referred to as
the "Proposal" and together with these Terms and Conditions, the Agreement) constitute the complete and exclusive statement of the terms of this transaction by and between Genset Services, Inc. (Genset) and the customer identified on the Proposal
(the Customer) for the performance of the services specifically set forth on the Proposal (the Services). To the extent that the terms contained on the Proposal differ from the terms contained in these Terms and Conditions, the terms of the Proposal shall
govern to the extent of such differences provided that Genset has executed the version of the Proposal containing such terms following the addition or inclusion of such terms. Genset shall have no obligation to perform other services not described on
the Proposal, but Genset may provide other Services at Customers request, as and when needed pursuant to the Agreement. Any additional Services performed shall be subject to these Terms and Conditions 2. Parts. Genset shall furnish parts as
necessary at Gensets then current scheduled price or on an exchange basis, regardless of when installed, and such parts shall either be new or equivalent to new in performance when used in Customers equipment. 3. Modification of Terms. No terms
contained on any purchase order, service order, contract or other document prepared by or submitted to Genset by Customer or its agents, including modification of the terms contained on the Proposal and in these Terms and Conditions, shall be
effective or bind Genset unless Genset agrees to such terms or requirements by executing and returning to Customer such purchase order, agreement or other document. Failure by Genset to respond in writing to Customer upon receipt of Genset of a
purchase order or other agreement by Customer shall not be a waiver of the requirement that Genset agree in writing to any terms contained in a purchase order or other contract. All representations, promises, warranties or statements by any agent or
employee of Genset that differ in any way from the Proposal as prepared by Genset or the Terms and Conditions in the Agreement shall be of no force or effect. No course of prior dealings between the parties and no usage of the trade shall be relevant
to this transaction. Prices quoted on the Proposal are good for a period of thirty (30) days from the date of the Proposal, provided that prior to the execution of the Proposal by Customer and acceptance by Genset, prices are subject to change without
notice. 4. Charges. Charges for the Services described on the Proposal are described thereon. Charges for on-call, unscheduled or additional Services requested by Customer, but not described on the reverse, shall be at the rates then published by
Genset in writing. Customer shall be responsible for any parts and shipping charges for such parts ordered by Genset in order to perform the Services 5. Taxes. Quoted prices do not include any applicable sales, use, transfer, excise or other taxes, tariffs
or custom duties unless required by federal, state or local law, in which case, the quoted price shall include only such items of sales, use, transfer, excise or other taxes, tariffs or custom duties as are required by federal, state or local law. Customer
will pay directly or to Genset any such taxes, tariffs or duties levied upon the sale, transfer, import, or service or necessary components thereof unless Customer provides Genset with a valid tax exemption certificate. Genset shall provide Customer
with any tax payment certificate upon request and after acceptance of the Services being provided hereunder and full payment to Genset. 6. Time of Performance. If performance of the Services is delayed through no fault of Genset, then the time for
performance of the work shall be extended to the extent of such delay. Genset shall not be liable for any delays in performance directly or indirectly resulting from acts of Customer, its agents, employees, or subcontractors, or any other causes beyond
the control of Genset. If any necessary components of the Services become unavailable, then Genset shall be released from any obligation to provide the specified materials which are unavailable and Customer agrees to pay Genset for any difference
between the cost of the unavailable materials or equipment and the cost of any reasonably available substitute. The estimated date of performance indicated on the Proposal is subject to delay due to availability of necessary components, and Genset
shall not be liable for any such delay. 7. Payment. Upon Customers execution and return of the Proposal, Customer must provide a deposit in the amount of 30% of the service fee contained in the Proposal unless some other amount is set forth on the
Proposal. Unless otherwise set forth on the Proposal, the entire service fee, plus all applicable sales tax and other charges contained on the Proposal must be tendered by Customer to Genset within 2 days following notification by Genset to Customer
that the Services are ready to be performed. In any case full and final payment must be made by Customer and received by Genset no later than two days prior to Genset performing the Services, and Genset shall have no obligation to perform the
Services prior to receiving full and final payment. Customer is responsible for the payment of all registration fees, use tax or similar assessments and taxes which may be imposed upon the service or the sale, possession or use of any necessary parts
or components. Customer hereby grants Genset a security interest in Customers generator and any parts installed by Genset until such time as Genset is actually paid in full, and Customer will assist Genset in any action necessary to perfect Gensets
security interest, provided that Genset may prepare, file and record a UCC financing statement to evidence the security interest with no further notice to or consent by Customer. No parts or components furnished by Genset shall become a fixture by
reason of being attached to real estate until payment in full has been received and acknowledged by Genset. Customer shall not be entitled to set-off any amounts due from Customer against any amount due to Genset in connection with this transaction.
8. Warranty; Limitation. (a) CUSTOMER ACKNOWLEDGES THAT THE ONLY WARRANTIES WITH RESPECT TO THE SERVICES ARE ANY APPLICABLE WARRANTIES OFFERED BY THE MANUFACTURER OF ANY
NECESSARY PART OR COMPONENT THEREOF AND THAT GENSET MAKES NO REPRESENTATION OR WARRANTY, EXPRESS OR IMPLIED, WITH RESPECT TO THE SERVICES, NOR DOES IT WARRANT
THE MERCHANTABILITY OF THE COMPONENTS OR THAT THE COMPONENTS ARE FIT FOR A PARTICULAR PURPOSE. PARTS AND COMPONENTS ARE SOLD AND SERVICES PROVIDED BY GENSET TO PURCHASER AS
IS WHERE IS AND WITH ALL FAULTS. (b) CUSTOMER ACKNOWLEDGES THAT IT HAS DECIDED TO CONTRACT FOR SERVICES BASED ON ITS OWN ASSESSMENT OF ITS NEEDS. CUSTOMER ACKNOWLEDGES AND
AGREES THAT GENSET HAS NOT MADE ANY STATEMENTS OF FACT CONCERNING THE SERVICES, AND CUSTOMER HAS NOT RELIED UPON ANY STATEMENT BY GENSET IN DECIDING TO CONTRACT FOR THE
SERVICES. (c) CUSTOMER IS SOLELY RESPONSIBLE FOR FOLLOWING ALL MANUFACTURER REQUIREMENTS WITH RESPECT TO THE EQUIPMENT ON WHICH THE SERVICES ARE PERFORMED. (d) Customer further
agrees that in no event shall Genset's liability to Customer for damages of any nature exceed the amounts actually paid by Customer to Genset for the Services. 9. Access to Equipment; Performance of Services; Customer Obligations. (a) Genset's
maintenance personnel shall have free access to the Customers Equipment for the purpose of providing Services. (b) During any Services provided pursuant to this Agreement as to the System, whether an interruption in electrical service is
contemplated by Customer or Genset or not, as a matter of allocating between Customer and Genset the risks associated with an interruption in electrical services and/or taking the Customers equipment off line, Customer agrees to use its best efforts to
fully and completely secure all or any part of any facility in which the equipment is located, as the case may be, for any and all safety issues that an electrical service interruption might give rise to, including but not limited to injury to building
occupants, customers, invitees, or any third party and/or property damage, or work interruption, arising out of any event of repairs performed by Genset as to the equipment. Customer agrees with Genset that securing of the premises in order for
Genset to perform its Services is a material and critical element of this Agreement and, prior to the -performance of any Services under this Agreement, Customer will receive and execute with Genset a written Notification and Acknowledgement of
Inspection and Warning (Notification) related to the Services provided herein. The Notification shall include Genset's estimate as to when interruption of electrical services may occur during the performance of its obligations under this Agreement.
Customer further agrees that Genset shall have no liability to Customer or any third party for any estimate given in connection with potential interruptions in electrical services during the performance of Genset's obligations herein, it being
acknowledged by Customer that Genset's Services are often affected by acts of third parties and/or components or elements of the System that do not allow for more specific and accurate estimates as to when an electrical service interruption may
occur. 10. Damages. CUSTOMER AGREES THAT GENSET SHALL NOT BE LIABLE BEYOND THE REMEDIES EXPRESSLY SET FORTH HEREIN. GENSET SHALL NOT BE RESPONSIBLE FOR ANY SPECIAL, INCIDENTAL,
INDIRECT OR CONSEQUENTIAL DAMAGES ARISING IN ANY MANNER FROM THE GOODS, EQUIPMENT OR MATERIALS FURNISHED OR THE WORK PERFORMED PURSUANT TO THE AGREEMENT, WHETHER BASED
ON BREACH OF WARRANTY, NEGLIGENCE, STRICT LIABILITY IN TORT OR OTHERWISE, OR FOR THE LOSS OF PROFITS, REVENUES, OR OTHER LOSSES ARISING OUT OF ANY DEFAULT UNDER THIS AGREEMENT,
EVEN IF GENSET SHALL HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH POTENTIAL LOSS OR DAMAGE. THE PRICE OF THE GOODS AND SERVICES PURCHASED BY CUSTOMER IS CONSIDERATION FOR
LIMITING GENSETS LIABILITY. GENSETS LIABILITY FOR ANY CLAIM ASSERTED BY CUSTOMER, WHETHER BASED ON A THEORY OF CONTRACT OR TORT, SHALL NOT EXCEED THE CONTRACT PRICE OF THE
SERVICES HEREUNDER. NO ACTION OR SUIT TO ENFORCE RIGHTS OR REMEDIES ARISING FROM THIS TRANSACTION SHALL BE COMMENCED LATER THAN ONE YEAR FROM THE DATE OF GENSETS LAST
FURNISHING SERVICES UNDER THIS AGREEMENT. 11. Cancellation. Service Orders cannot be cancelled or after Customer signs and returns a Proposal which is accepted by Genset, except with Gensets written consent and subject to
conditions then agreed upon which shall indemnify Genset against liability and expense incurred and commitments made by Genset. No materials or products provided in conjunction with the Services may be returned. 12. Indemnity. Customer
represents and warrants that is fully insured for any and all potential damages arising out of or in connection with the Services performed by or to be performed by Genset hereunder. Customer shall defend, indemnify and hold harmless Genset and its
officers, directors, employees, agents, owners and affiliates, from and against any and all damages, costs, liability, and expense whatsoever (including attorneys' fees and related disbursements) incurred in whole or in part, directly or indirectly, by
reason of: (a) any failure by Customer to perform any covenant or agreement of Customer set forth herein or the breach of any representations or warranties set forth herein; (b) death or bodily injury or loss of or damage to property which arising out
of or in connection with the Services provided and any goods, parts or components provided; or (c) any acts of Customer or Customer's personnel; or (d) the unloading, installation, operation, storage or use by Customer of any goods provided by
Genset or any other party or subsequent owner. The foregoing obligation shall survive the termination or expiration of this Contract. 13. Miscellaneous. In addition to the other terms and conditions, Customer and Genset further agree that the
following shall also govern this Agreement: (a) Waivers. The failure or delay of any party at any time to require performance by another party of any provision of this Agreement, even if known, shall not affect the right of such party to require
performance of that provision or to exercise any right, power or remedy under this Agreement. Any waiver by any party of any breach of any provision of this Agreement should not be construed as a waiver of any continuing or succeeding breach of
such provision, a waiver of the provision itself, or a waiver of any right, power or remedy under this Agreement. No notice to or demand on any party in any circumstance shall, of itself, entitle such party to any other or further notice or demand in
similar or other circumstances. (b) Governing Law; Construction. This Agreement is being delivered and performed in the State of Florida and shall be construed in accordance with, and governed by, the law of the State of Florida. Venue of any
action related to this Agreement shall be placed in the courts of Broward County, Florida, exclusively. This Agreement, together with any other documents executed in conjunction with or pursuant to this Agreement shall not be construed against
either Customer or Genset, regardless of which party drafted the Agreement. It is intended that this Agreement is the product of informed negotiations between both parties with full knowledge of the meaning of the terms and conditions hereto. (c)
Enforcement. In connection with any action arising out of this Agreement, or in any way relating to the transactions contemplated hereby, the prevailing party in such action shall be entitled to recover from the non-prevailing party all court costs and
expenses of litigation, including attorneys fees, court costs, costs of investigation, accounting and other costs reasonably related to the litigation, including, without limitation, all attorneys fees and costs subsequent to entry of any judgment on behalf
of the prevailing party, on appeal; in connection with any bankruptcy proceedings, or in any alternative dispute resolution proceedings. THE PARTIES TO THIS AGREEMENT HEREBY WAIVE, WITHOUT EXCEPTION, ANY RIGHT TO JURY
TRIAL RELATED TO ANY ISSUE OR MATTER ARISING OUT OF OR IN CONNECTION WITH THIS AGREEMENT. (d) Successors and Assigns. All of the terms and conditions of this Agreement, and the -rights and obligations of the parties
hereunder, shall be binding upon and shall inure to the benefit of the respective heirs, personal representatives, and permitted successors and assigns of the parties hereto. This Agreement does not confer upon or give to any person other than the parties
any rights or benefits hereunder. (e) Entire Agreement. This Agreement, any Agreements referenced herein and exhibits attached hereto constitute the entire Agreement and understanding of the parties with respect to the transactions contemplated
hereby as an exclusive statement and incorporate and supercede all prior and contemporaneous negotiations, agreements and understandings related to the subject matter hereof. This Agreement, referenced Agreements, and exhibits may not be
amended, terminated or otherwise modified, except by a written instrument executed by all of the parties to be bound thereby. (f) Notice. Subject to written notice of change of address, any notice, request, instruction, or other document to be given
under this Agreement by any party to any other party shall be in writing, signed by or on behalf of the party giving notice, and shall be deemed to have been given on the earlier to occur of: (1) the date of actual performance; or (2) five (5) days after
the date on which such notice is mailed by United States Mail, postage prepaid to each party at the addresses listed below; or (3) the date of electronic facsimile transmission that is verified by the issuance of a successful facsimile transmission report at
the facsimile telephone number for the receiving party, which is currently on file with the sending party; or (4) the business day following the day on which such notice is sent by any next day or overnight delivery service to each party at the address
listed below. If to Customer: To the address and contact person identified on the Proposal. If to Genset: Genset Services, Inc., 3100 Gateway Drive, Pompano Beach, FL 33069 Genset shall not be in default of any of its obligations hereunder unless
Customer provides Genset with seven (7) days written notice of default and specifying the action required to cure the default and Genset fails to cure such default.
Terms and Conditions
Proposal#: 46783 Proposal Date: 11/14/2023 Valid Until: 12/14/2023
Revision : 1
3100 Gateway Drive - Pompano Beach, FL 33069 - Phone: (954) 956-9252 - Fax: (954) 968-6110
578 Cooper Oaks Court - Apopka, FL 32703 – Phone: 407-532-0414 – Fax: 407-532-0415
www.gensetservices.com
4 of 4
City of Dania Beach
Public Services Memorandum
DATE: 3/26/2024
TO: Mayor and Commissioners
FROM: Ana M. Garcia, ICMA-CM, City Manager
VIA: Fernando J. Rodriguez, Public Services Director
Dincer A. OZaydin, P.E., Deputy Director/City Engineer
SUBJECT: APPROVAL OF FLORIDA INLAND NAVIGATION DISTRICT
APPLICATION FOR THE “GRIFFIN MARINE BOAT RAMP AND DOCK
REPLACEMENT” PROJECT
Request:
The Public Services Department (PSD) requests approval of a Florida Inland Navigation District
(FIND) application for a grant in the amount of $750,000 for the “Griffin Marine Park Boat
Ramp and Dock Replacement” Project.
Background:
The boat ramp's pitch and surface friction properties at Griffin Marine Park have been identified
as the cause of several incidents where boat launching vehicles have slid down the ramp and into
the canal. Despite frequent and regular maintenance of the boat ramp, its surface has reached a
point where insufficient ramp friction results in cases of vehicle slippage. The floating docks are
over 20 years old and require replacement. It was, therefore, decided that the ramp be rebuilt
with a safe and proper surface for boaters and replace the docks.
FIND funds local projects that promote boating activities on the Intracoastal Waterway. The
FIND rules require grant recipients to provide a 50% cash match for the project. Craven
Thompson and Associates, the project's design engineer, estimated the ramp replacement and
new floating docks cost to be $1,500,000. FIND requires a resolution authorizing the application
from the municipality.
Budgetary Impact
The City’s Five (5)-Year Capital Investment Plan includes funding in the amount of $500,000
for the “Griffin Marine Park Boat Ramp and Dock Replacement” Project. If approved, the FIND
grant provides up to $750,000 in funding.
Recommendation
PSD recommends authorizing the approval of the FIND application for funding the “Griffin
Marine Park Boat Ramp and Dock Replacement” Project.
RESOLUTION NO. 2024-______
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF DANIA
BEACH, FLORIDA, AUTHORIZING THE CITY’S APPLICATION TO THE
FLORIDA INLAND NAVIGATION DISTRICT IN THE AMOUNT OF SEVEN
HUNDRED FIFTY THOUSAND DOLLARS ($750,000.00), TO PROVIDE
FUNDING FOR THE GRIFFIN MARINE PARK BOAT RAMP AND DOCK
REPLACEMENT PROJECT; PROVIDING FOR CONFLICTS; FURTHER,
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City of Dania Beach is interested in carrying out the Griffin Marine Park
Boat Ramp and Dock Replacement Project for the safe use and enjoyment of a public boat ramp
for the citizenry of the City of Dania Beach and the state of Florida, for a total cost estimate of
$1,500,000.00, which project is to redesign and replace existing boat ramp with ramp with a less
steep entrance slope; replace the floating docks; and
WHEREAS, the City of Dania Beach shall make application to the Florida Inland
Navigation District in the amount of $750,000.00 which is half of the actual cost of the project in
behalf of the City of Dania Beach; and
WHEREAS, the City Commission seeks financial assistance is requested for the program
mentioned above from the Florida Inland Navigation District Grant Program.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF DANIA BEACH, FLORIDA,
Section 1.That the above “Whereas” clauses are ratified and confirmed, and they are
made a part of and incorporated into this Resolution by this reference.
Section 2.That the Florida Inland Navigation District (“FIND”) Grant Program Grant
application is approved, and the proper City officials are authorized to execute and submit the
application.
Section 3. That the City will accept the terms and conditions set forth in FIND Rule
66B-2 F.A.C. and which will be a part of the project agreement for any assistance awarded under
the attached application.
Section 4. That the City it is in complete accord with the attached application,
incorporated into this Resolution as Exhibit “A”, and that it will carry out the program in the
manner described in the application and any plans and specifications attached hereto unless prior
approval for any change has been received from the District.
2 RESOLUTION #2024-______
Section 5. That the City will not discriminate against any person on the basis of race,
color or national origin in the use of any property or facility acquired or developed pursuant to this
application and shall comply with the terms and intent of the Title VI of the Civil Rights Act of
1964, Pl. 88-352 (1964) in design and construct all facilities to comply fully with statutes relating
to accessibility by persons with disabilities as well as other federal, state and local laws rules and
requirements.
Section 6. That the City will maintain adequate financial records on the proposed
project to substantiate claims for reimbursement.
Section 7. That the City has the ability and intention to finance its share of the cost of
the project and that the project will be operated and maintained at the expense of the City of Dania
Beach for public use.
Section 8.That the City will make available to FIND if requested a post audit of
expenses incurred on the project prior to or in conjunction with request for the final10% of the
funding agreed to by FIND.
Section 9. That the City Manager and City Attorney are authorized to make minor
revisions to the application as may be deemed necessary and proper for the best interests of the
City.
Section 10.That all resolutions or parts of resolutions in conflict with this Resolution
are repealed to the extent of such conflict.
Section 11.That this Resolution shall be effective 10 days after passage.
PASSED AND ADOPTED on __________________, 2024.
Motion by __________________________, second by ___________________________.
FINAL VOTE ON ADOPTION: Unanimous ____
Yes No
Commissioner Joyce L. Davis ____ ____
Commissioner Tamara James ____ ____
Commissioner Marco Salvino ____ ____
Vice Mayor Lori Lewellen ____ ____
Mayor Archibald J. Ryan IV ____ ____
3 RESOLUTION #2024-______
ATTEST:
ELORA RIERA, MMC ARCHIBALD J. RYAN IV
CITY CLERK MAYOR
APPROVED AS TO FORM AND CORRECTNESS:
EVE A. BOUTSIS
CITY ATTORNEY
WATERWAYS ASSISTANCE PROGRAMAPPLICATION PACKAGE
Part 2. Attachment E
FY 2024-2025
WATERWAYS ASSISTANCE PROGRAM
APPLICATION PACKAGE
Part 2. Attachment E
The following attachment E-1 through E-8, in addition to
the requirements of items 10 through 13 of the
application checklist, constitute your formal application.
SUBMIT THE APPLICATION INFORMATION IN
THE ORDER LISTED ON THE CHECKLIST.
Applications must be received by the District by 4:30 p.m. on April 1, 2024.
SUBMIT THE ENTIRE APPLICATION TO:
Electronic submission
via email to:
CKelley@aicw.org
(pdf file size 15MB or
less and permits should
be sent in separate
emails to reduce file size)
Application must be received by the deadline, no exceptions.
Attachment E - Applicant Tips Sheet
(Mistakes Common to the application process and how to avoid them)
SCHEDULING
The new application is available by January each year, and District funding is available AFTER October 1st
of each year. Applicants should plan their schedule to avoid commonly missed deadlines: Application due
– 1st of April; Property control/Technical sufficiency items – 15th of May, Permits – 16th of September.
(Staff suggestion: Begin to secure property control and permits PRIOR to applying for funding.)
PROPERTY CONTROL VERIFICATION
Please have your attorney complete and sign the form in the application verifying applicant property
control. In the case of leases or management agreements, please forward a copy to the District well in
advance of the deadline to verify consistency with our program rules. (Staff suggestion: Resolve this
requirement outside the application “window”.)
PROJECT COSTS ELIGIBILITY
Please note the eligible project costs in Rule Section 66B-2.008, F.A.C. If you are not sure about an item’s
eligibility, ask! Note: Any ineligible cost, including in-house project management and administration, is also
not eligible for an applicant’s match. Make sure you have delineated your required minimum cost-share on
the project cost estimate. (Staff suggestion: If you have questions about the eligibility of an item, work up a
mock cost-sheet and send it to our office well before the deadline.)
COST-SHARE
Although the applicant must provide a minimum of 50% of the total project costs (25% for eligible public
navigation dredging), there is no specific requirement to split each item. (Staff suggestion: You may want to
organize project elements in a certain manner for easier accounting.)
PRE-AGREEMENT EXPENSES
Rule 66B-2.005(3), F.A.C. requires any activity in the submitted project cost estimate occurring PRIOR
to October 1st to be considered as pre-agreement expenses. The Board’s past philosophy has been to fund
only those projects that require District funding assistance to be completed. It is best to avoid
pre-agreement expenses if possible. Note: Pre-agreement expenses must be limited to 50% or less
of the total project costs, and they are eligible for only ½ of the original District funding. (Example: A project
with a total cost of $200,000 is Board-approved for one-half construction PRIOR to October 1st. In this case,
District funding will be limited as follows: Only 50% of the $100,000 project cost prior to October 1st is eligible
as project expenses (i.e. $50,000). Then only ½ of the eligible project expenses ($50,000) are eligible for
District funding assistance (i.e. $25,000).
SUBMITTED MATERIALS & JUNE PRESENTATION
The Board must review and evaluate every application and each year we receive about 90 applications
for consideration. The final product for the Board’s review is two 8-1/2” x 11” spiral-bound notebooks
containing the essential information for the application. NOTE: Make sure your final submitted material is the
same material you will be presenting to the Board at our June meeting. This will avoid confusion and
strengthen your presentation. (Staff suggestion: Limit the submitted materials to the requested information,
in the required format and make sure it is consistent with your June presentation. Do not submit additional
material at the June presentation!)
ELECTRONIC SUBMISSIONS
Grant applications are ONLY being accepted by email. Grant applications shall be submitted via email as
a pdf attachment (15mb maximum size and permits attached separately). Make sure to label your pdf
attachment with the applicant and project title. You will receive a confirmation email letting you know that
your application has been received. Email your completed application to CKelley@aicw.org
Applications must be received by the District by 4:30 p.m. on April 1, 2024.
ATTACHMENT E-1
APPLICATION CHECKLIST
WATERWAY ASSISTANCE PROGRAM FY 2024
Project Title:
Applicant:
This checklist and the other items listed below in items 1 through 13 constitute your
application. The required information shall be submitted in the order listed.
An electronic copy shall be emailed (15mb maximum file size) to CKelley@aicw.org.
Applications must be received by the deadline, no exceptions.
All information will be printed on 8 ½”x11” paper to be included in agenda books
bound by staff.
YES NO
1. District Commissioner Review (prior to March 4th)
(NOTE: For District Commissioner initials ONLY!)
(District Commissioner must initial the yes line on this
checklist for the application to be deemed complete)
2. Application Checklist – E-1 (Form No. 90-26, 2 pages)
(Form must be signed and dated)
3. Applicant Info/Project Summary – E-2 (Form No. 90-22, 1
page)(Form must be completed and signed)
4. Project Information – E-3 (Form No. 90-22a, 1 page)
5. Application and Evaluation Worksheet – E-4(+) (Form
No.91-25) (One proper sub-attachment included, 7 pages)
Must answer questions 1-10. No signatures required
6. Project Cost Estimate – E-5 (Form No. 90-25, 1 page)
(Must be on District form)
7. Project Timeline – E-6 (Form No. 96-10, 1 page)
8. Official Resolution Form – E-7 (Form No. 90-21, 2 pages)
(Resolution must be in District format and include
items 1-6)
ATTACHMENT E-1 (Continued)
APPLICATION CHECKLIST
WATERWAY ASSISTANCE PROGRAM FY 2024
9. Attorney’s Certification (Land Ownership) – E-8
(Must be on or follow format of Form No. 94-26,
Legal descriptions NOT accepted in lieu of form)
10. County/City Location Map
11. Project Boundary Map
12. Clear & Detailed Site Development Plan Map
13. Copies of all Required Permits: ACOE, DEP, WMD
(Required of development projects only)
YES NO
The undersigned, as applicant, acknowledges that Items 1 through 12 above constitutes
a complete application and that this information is due in the District office no later than
4:30 PM, April 1, 2024. By May 15, 2024, my application must be deemed complete
(except for permits) or it will be removed from any further consideration by the District. I
also acknowledge that the information in Item 13 is due to the District no later than
September 16, 2024. If the information in Item 13 is not submitted to the District office by
September 16, 2024, I am aware that my application will be removed from any further
funding consideration by the District.
LIAISON: TITLE:
** SIGNATURE - PROJECT LIAISON **DATE
Form No. 90-26 - New 9/2/92, Revised 07-30-02.
FIND OFFICE USE ONLY
Date Received:
Local FIND Commissioner Review:
All Required Supporting Documents:
Applicant Eligibility:
Project Eligibility:Available Score:
Compliance with Rule 66B-2 F.A.C.:
Eligibility of Project Cost:
ATTACHMENT E-2
APPLICANT INFORMATION & PROJECT SUMMARY
WATERWAY ASSISTANCE PROGRAM FY 2024
APPLICANT INFORMATION
Applicant:
Department:
Project Title:
Project Director: Title:
Project Liaison:
(if different from Director)Title:
Mailing Address:
City:Zip Code:
Email Address:Phone #:
Project Address:
*** I hereby certify that the information provided in this application is true and accurate. ***
SIGNATURE: DATE:
Form No. 90-22, Rule 66B-2, (New 12/17/90, Rev.07-30-02, 04-24-06)
PROJECT NARRATIVE (Please summarize the project in space provided below in 2 paragraphs or less.)
☐
ATTACHMENT E-3
PROJECT INFORMATION
WATERWAY ASSISTANCE PROGRAM FY 2024
Applicant:Project Title:
Total Project Cost: $FIND Funding
Requested: $
% of Total Cost:
Amount of Applicant’s Matching Funds:
Source of Applicant’s Matching Funds:
1. Ownership of Project Site (check one): Own:Leased:Other:
2. If leased or other, please describe lease or terms and conditions:
3. Has the District previously provided assistance funding to this project or site? Yes: ☐ No: ☐
4. If yes, please list:
5. What is the current level of public access in terms of the number of boat ramps, boat slips and
trailer parking spaces, linear feet of boardwalk (etc.)? (as applicable):
6. How many additional ramps, slips, parking spaces or other access features will be added by this
project?
7. Are fees charged for the use of this project? No Yes **
**If yes, please attach additional documentation of fees and how they compare with fees from
similar public & private facilities in the area.
Please list all Environmental Resource Permits required for this project:
AGENCY Yes / No / N/A Date Applied For Date Received
WMD
DEP
ACOE
Form No. 90-22a (New 10-14-92, Rev. 04-24-06, 4-15-07)
☐
☐☐
ATTACHMENT E-4
EVALUATION WORKSHEET
WATERWAY ASSISTANCE PROGRAM FY 2024
DIRECTIONS:
All applicants will complete questions 1 through 6, and then based on the type of
project, complete one and only one subsection (E-4A, B, C, D or E) for questions 7-10.
***Please keep your answers brief and do not change the pagination of Attachment E-4***
All other sub-attachments that are not applicable to an applicant's project should not be
included in the submitted application.
Project Title:
Applicant:
1) PRIORITY LIST:
a) Denote the priority list category of this project from Attachment C in the application.
(The application may only be of one type based upon the predominant cost of the
project elements.)
b) Explain how the project fits this priority category.
(For reviewer only)
Max. Available Score for application
Question 1. Range of Score (1 to points)
2)WATERWAY RELATIONSHIP:
a)Explain how the project relates to the ICW and the mission of the Navigation District.
b) What public access or navigational benefit to the ICW or adjoining waterway will
result from this project?
(For reviewer only)
(1-6 points)
3)PUBLIC USAGE & BENEFITS:
a)Describe how the project increases/improves boater/public access.
Estimate the amount of total public use.
b) Discuss the regional and local public benefits provided by the project.
Can residents from other counties of the District reasonably access and use the
project? Explain.
c) Has the local Sponsor implemented or plans to implement any boating access, speed
zone, commercial access or other restrictive use of this site?
(For reviewer only)
(1-8 points)
4)TIMELINESS:
a)Describe current status of the project and present a reasonable and effective
timeline for the completion of the project consistent with Attachment E-6.
b) Briefly explain any unique aspects of this project that could influence the timeline.
(For reviewer only)
(1-3 points)
5)COSTS & EFFICIENCY:
a)List funding sources and the status and amount of the corresponding funding that will
be utilized to complete this project including any cash match or matching grant funds.
b) Identify and describe any project costs that may be increased because of the materials
utilized or specific site conditions.
c) Are there any fees associated with the use of this facility? If so, please list or attach fee sheet.
d) If there are any fees, please explain where these fees go and what they are used for. In
addition, please provide a listing of the fees charged by similar facilities, public and private, in
the project area.
(For reviewer only)
(1-6 points)
6) PROJECT VIABILITY:
a) Why is the project necessary and what need will it fill? Why are existing facilities
insufficient to meet demand?
b) Clearly demonstrate how the project will continue to be maintained and funded after funding is
completed.
c) Is this project referenced or incorporated in an existing maritime management, public
access or comp plan?
(For reviewer only)
(1-7 points)
SUB-TOTAL
FIND FORM NO. 91-25
Rule 66B-2.005 (Effective Date: 3-21-01, Revised 4-24-06, 1-27-14)
ATTACHMENT E-4A
EVALUATION WORKSHEET
DEVELOPMENT & CONSTRUCTION PROJECTS
WATERWAY ASSISTANCE PROGRAM FY 2024
THIS ATTACHMENT IS TO BE COMPLETED IF YOUR PROJECT IS A DEVELOPMENT OR
CONSTRUCTION PROJECT BUT IS NOT AN INLET MANAGEMENT OR BEACH
RENOURISHMENT PROJECT.
7) PERMITTING:
a) Have all required environmental permits been applied for? (USACE, DEP and WMD)
If permits are NOT required, explain why not.
b) If the project is a Phase I project, please provide a general cost estimate for the future
Phase II work.
c) Detail any significant impediments that may have been identified that would
potentially delay the timely issuance of the required permits.
(For reviewer only)
(1-4 points)
8)PROJECT DESIGN:
a)Has the design work been completed?
If this is a Phase I project, has a preliminary design been developed?
b) Are there unique beneficial aspects to the proposed design that enhance public
usage or access, minimize environmental impacts, improve water quality or
reduce costs?
(For reviewer only)
(1-2 points)
9)CONSTRUCTION TECHNIQUES:
a)Briefly explain the construction techniques and materials to be utilized for this project.
Identify any unique construction materials that may significantly alter the project costs.
If a Phase 1, elaborate on potential techniques.
b) What is the design life of the proposed materials compared to other available
materials?
(For reviewer only)
(1-3 points)
10) ENVIRONMENTAL COMPONENTS:
a) How has the facility where the project is located demonstrated commitment to
environmental compliance, sustainability, and stewardship?
b) What considerations, if any, have been made for sea level rise impacts in the design
and life span of this project?
(For reviewer only)
(1-3 points)
RATING POINT TOTAL
Note:
The total maximum score possible is dependent upon the project priority category but
cannot exceed 50 points unless the project qualifies as an emergency-related project.
The minimum score possible is 10 points. A score of 35 points or more is required to be
considered for funding.
Form No. 91-25A
Rule 66B-2.005 (Effective Date: 3-21-01, revised 4-24-06, 1-27-14)
ATTACHMENT E-4B
EVALUATION WORKSHEET
ENVIRONMENTAL EDUCATION PROJECTS
WATERWAY ASSISTANCE PROGRAM FY 2024
THIS ATTACHMENT IS TO BE COMPLETED IF YOUR PROJECT IS AN
ENVIRONMENTAL EDUCATION PROJECT
7)THOROUGHNESS:
a)Who is the primary target audience or user group for the project and how were they
identified?
b)How have the needs of the target audience been evaluated and met?
c)How many people will the program serve on an annual basis? What will be the
measurable results?
(For reviewer only)
(1-5 points)
8)DELIVERABLES:
a)Describe the materials and project deliverables to be produced by this project.
b)Is there a clear and effective plan of dissemination of the materials produced
through the project? Please describe.
(For reviewer only)
(1-2 points)
9)EXPERIENCE & QUALIFICATIONS:
a)Please briefly describe the qualifications of the program administrator(s), including
prior experience, and areas of expertise.
b)What previous projects of this nature have been completed by the program
manager?
(For reviewer only)
(1-2 points)
10)PROJECT GOALS:
a)What are the long-term goals of this project as it relates to the ICW?
b)What is the expected duration/frequency of this program?
(For reviewer only)
(1-3 points)
RATING POINT TOTAL
Note:
The total maximum score possible is dependent upon the project priority category but
cannot exceed 50 points unless the project qualifies as an emergency-related project.
The minimum score possible is 10 points. A score of 35 points or more is required to be
considered for funding.
Form No. 91-25B
Rule 66B-2.005 (Effective Date: 3-21-01, Revised 4-24-06, 1-27-14)
ATTACHMENT E-4C
EVALUATION WORKSHEET
LAW ENFORCEMENT & BOATING SAFETY PROJECTS
WATERWAY ASSISTANCE PROGRAM FY 2024
THIS ATTACHMENT IS TO BE COMPLETED IF YOUR PROJECT IS A LAW
ENFORCEMENT OR BOATING SAFETY PROJECT
7) VIABILITY:
c)Describe how the project will address particular public health, safety, or welfare
issues of the Navigation District’s Waterways.
d)How does the project provide significant benefits or enhancements to the District’s
Waterways?
(For reviewer only)
(1-3 points)
8)EXPERIENCE & QUALIFICATIONS:
a)List the personnel tasked with the implementation of this project, their qualifications,
previous training and experience.
b)Have the personnel participated in or received state marine law enforcement training?
(For reviewer only)
(1-2 points)
9)DELIVERABLES:
a)Describe the anticipated, long-term measurable results of implementing this project.
b)What is the range or area of coverage for this project? Please provide a map of the
coverage area.
c)Does the project fulfill a particular community need?
For reviewer only)
(1-4 points)
10)EDUCATION:
a)What are the educational benefits (if any) of this proposed project?
b)How does the project or program provide effective public boating education
or expand boater safety?
(For reviewer only)
(1 -3 points)
RATING POINT TOTAL
Note:
The total maximum score possible is dependent upon the project priority category but
cannot exceed 50 points unless the project qualifies as an emergency-related project.
The minimum score possible is 10 points. A score of 35 points or more is required to be
considered for funding.
Form No. 91-25C
Rule 66B-2.005 (Effective Date: 3-21-01, revised 4-24-06, 1-27-14)
ATTACHMENT E-4D
EVALUATION WORKSHEET
INLET MANAGEMENT & PUBLIC NAVIGATION PROJECTS
WATERWAY ASSISTANCE PROGRAM FY 2024
THIS ATTACHMENT IS TO BE COMPLETED IF YOUR PROJECT IS AN INLET
MANAGEMENT OR PUBLIC NAVIGATION PROJECT
7)WATERWAY RELATIONSHIP:
a)How does the project directly benefit the Atlantic Intracoastal Waterway (AICW)?
b) Identify any long-term sedimentation problems and briefly discuss any methods
or activities that will address these issues.
c) Will the project inhibit sediment inflow into, or reduce the dredging frequency
o f the AICW?
(For reviewer only)
(1-5 points)
8)PUBLIC ACCESS:
a)Will the project enhance public access to or from the waterways? Describe in
brief detail.
b)List the upstream publicly accessible facilities with improved access as a result
of this project.
(For reviewer only)
(1 -3 points)
9)BENEFICIAL PROJECT ELEMENTS:
a)Are there additional economic benefits to be realized by implementing this project?
b) Briefly spell out any water quality, environmental or habitat benefits to be realized
by this project.
(For reviewer only)
(1 -2 points)
10) PROJECT MAINTENANCE:
a) When was this area last dredged? What is the expected frequency of future dredging?
b) Explain the funding mechanism for the long-term maintenance of the project.
c) Describe the long-range dredge material management plans.
(For reviewer only)
(1 -2 points)
RATING POINT TOTAL
Note:
The total maximum score possible is dependent upon the project priority category but
cannot exceed 50 points unless the project qualifies as an emergency-related project.
The minimum score possible is 10 points. A score of 35 points or more is required to be
considered for funding.
Form No. 91-25D
Rule 66B-2.005 (Effective Date: 3-21-01, Revised 4-24-06, 1-27-14)