Loading...
HomeMy WebLinkAboutInv# May2025FPL - FPL - 05/15/2025 (2)FPL.com Page 1 Summary Bill Statement Statement Date: May 15, 2025 Master Account #: 17071-61087 Total Number of Subordinates: 68 CURRENT BILL $73,852.02 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY CITY OF DANIA BEACH SUMMARY BILL Total kWh       460,580 Total accounts billed 68 Total accounts not billed 0 For Summary Billing inquiries, please email SUMB@FPL.com Please return the coupon below with payment for the Total Amount You Owe. Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) 17071-61087 $73,852.02 Jun 5, 2025 $ ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED Make check payable to FPL in U.S. funds and mail along with this coupon to: FPL Summary Bill P.O. BOX 524013 MIAMI, FL 33152-4013 / 27 90111707161087 2025837000 SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 Intentionally left blank Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 17071-61087 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. Switch and save  › Download the app Get instant, secure access to outage and billing info from your mobile device. Download now  › When you pay by check, you authorize FPL to process your payment electronically or as a draft. If your payment is processed electronically, your checking account may be debited on the same day we receive the check and your check will not be returned with your checking account statement. FPL does not agree to any restrictions, conditions or endorsements placed on any bill statement or payments such as check, money order or other forms of payment. We will process the payment as if these restrictions or conditions do not exist. Customer Name:Account Number:FPL.com Page 3 CITY OF DANIA BEACH 17071-61087 Account Number Service Address Meter No.Read Date/ Svc Days kWh / Max kWd Amount Due Remarks 00281-29336 100 W DANIA BEACH BLVD #TRLRS KLL8786 2025-05-09 30 4520 / 0 $620.50 00550-18501 235 SW 1ST CT # OL 2025-05-09 30 88 / 0 $24.11 01992-62544 200 SE 5TH AVE #LS 5 KJ47680 2025-05-08 30 1704 / 0 $242.66 02234-54661 631 NE 2ND ST # LS6 SJ88528 2025-05-08 30 3407 / 23 $542.16 02794-18123 1220 NW 10TH ST # WALL AA15361 2025-05-09 30 36 / 0 $29.19 05703-29326 1905 TIGERTAIL BLVD # LS15 SN88478 2025-05-09 30 394 / 2 $137.88 06011-26295 599 S FEDERAL HWY # IRR ACD8198 2025-05-08 30 0 / 0 $27.21 07471-54557 2901 SW 52ND ST # BALLFIELD KLL4255 2025-05-01 30 1743 / 53 $922.52 07481-52584 2901 SW 52ND ST # BPW KU31193 2025-05-01 30 0 / 0 $27.21 07531-57502 2901 SW 52ND ST # N BASKETBALL CO KC78811 2025-05-01 30 590 / 0 $93.18 07541-55539 2900 SW 52ND ST # SOCCER KN68310 2025-05-01 30 126 / 1 $56.07 07551-53566 2901 SW 52ND ST # OL 2025-05-09 30 168 / 0 $34.90 09702-57515 495 TAYLOR LN # LS12 SN88486 2025-05-09 30 132 / 17 $104.89 09830-79450 3151 GRIFFIN RD #LIGHTS ACD1309 2025-05-01 30 0 / 0 $27.21 09860-17234 434 SE 3RD TER #PUMP KN46905 2025-05-08 30 15 / 1 $48.69 10708-66452 800 NW 2ND ST KCJ4317 2025-05-09 30 5359 / 21 $695.83 18630-57590 116 W DANIA BEACH BLVD AC97190 2025-05-09 30 2354 / 0 $329.88 19577-56503 W DIXIE CRSSVR #CEMETERY AC09306 2025-05-09 30 285 / 0 $52.24 19587-54531 300 W DIXIE HWY KJ37966 2025-05-09 30 689 / 0 $106.46 23433-62451 100 W DANIA BEACH BLVD #GARAGE KNJ8374 2025-05-09 30 14113 / 42 $1,584.20 27785-15128 5440 RAVENSWOOD RD #IRR KJ62786 2025-05-09 30 29 / 0 $28.80 29082-54531 1700 NE 7TH AVE # LS11 SN88487 2025-05-09 30 4417 / 42 $995.05 29634-25166 300 NE 2ND ST # JR REC CT KJL7051 2025-05-08 30 4566 / 18 $599.32 30507-57602 1151 SE 5TH CT # LS-4 SJ88488 2025-05-08 30 1782 / 4 $280.93 32275-56614 50 SE 2ND AVE # LS 1 ST38232 2025-05-08 30 10140 / 63 $1,697.63 Continue on next page Customer Name:Account Number:FPL.com Page 4 CITY OF DANIA BEACH 17071-61087 Account Number Service Address Meter No.Read Date/ Svc Days kWh / Max kWd Amount Due Remarks 34681-37470 206 SW 1ST AVE # PARK AC09337 2025-05-09 30 31 / 0 $28.91 34854-42168 300 NE 2ND ST # PARK LTS ACD4012 2025-05-08 30 193 / 0 $39.92 36838-26311 279 N BRYAN RD # LS-17 KN52041 2025-05-09 30 83 / 0 $31.80 38600-56542 100 W DANIA BEACH BLVD #POLICE DEPT KU30441 2025-05-09 30 22200 / 67 $2,486.66 39978-40511 300 N BEACH RD #C HSE-PIER-PRK LIGHTS KL87259 2025-05-08 30 1866 / 0 $264.38 43965-11000 151 SW 18TH CT # LS 16 SJ88479 2025-05-09 30 2144 / 7 $348.77 44225-67430 102 W DANIA BEACH BLVD # A AC04327 2025-05-09 30 1712 / 0 $243.74 44452-56607 400 SE 2ND AVE # LS 2 PT38743 2025-05-08 30 9420 / 37 $1,270.31 45043-43023 300 N BEACH RD # LS 14 SC88219 2025-05-08 30 145 / 1 $106.17 48600-12451 100 W DANIA BEACH BLVD #B KLL2558 2025-05-09 30 3863 / 0 $532.36 49909-59571 1100 PHIPPEN WAITERS RD # PUMP KJ71604 2025-05-09 30 420 / 0 $70.38 49929-53523 1200 PHIPPEN WAITERS RD ACD7432 2025-05-09 30 52 / 0 $30.08 53065-79458 1800 GRIFFIN RD #LIGHTS ACD3226 2025-05-01 30 0 / 0 $27.21 55113-16357 301 E DANIA BEACH BLVD #ST LT KI90174 2025-05-08 0 0 / 0 $101.22 58069-19410 200 NE 2ND ST #CONCESSION AED7769 2025-05-08 30 739 / 0 $113.16 60629-55627 311 SE 3RD ST # PMP SN88527 2025-05-08 30 103 / 0 $110.94 62074-52647 901 NE 3RD ST #CIVIC CTR KT58793 2025-05-08 30 6840 / 25 $852.64 62624-58257 100 NW 8TH AVE #STAND ACD1416 2025-05-09 30 2174 / 0 $305.72 62762-57638 1200 SE 2ND AVE # LS 3 PT32736 2025-05-08 30 9420 / 26 $1,109.74 62926-58660 951 NW 10 ST #IRR PUMP ACD8555 2025-05-09 30 0 / 0 $27.21 62936-56697 900 NW 10 ST #LIGHTS ACD5956 2025-05-09 30 73 / 0 $31.22 64800-94298 506 NE 3RD ST # OL 2025-05-08 30 29 / 0 $14.19 67543-69459 1901 GRIFFIN RD #LIGHTS ACD3114 2025-05-01 30 0 / 0 $27.21 69593-35123 1000 N FEDERAL HWY #SIGN AC58673 2025-05-09 30 230 / 0 $44.13 74042-50974 STREET LIGHTS #DANIA 2025-05-02 30 93962 / 0 $31,254.62 Continue on next page Customer Name:Account Number:FPL.com Page 5 CITY OF DANIA BEACH 17071-61087 Account Number Service Address Meter No.Read Date/ Svc Days kWh / Max kWd Amount Due Remarks 74309-73243 106 N BEACH RD KE82004 2025-05-08 30 58 / 0 $30.40 75296-61378 1201 STIRLING RD #PSAB KU38133 2025-05-09 30 12660 / 31 $1,327.09 75572-89456 4155 GRIFFIN RD #LIGHTS ACD3228 2025-05-01 30 0 / 0 $27.21 75615-78464 1200 NW 1ST ST ACD1767 2025-05-09 30 1931 / 0 $318.22 77463-97251 2901 SW 52ND ST #POOL MLL7780 2025-05-01 30 24058 / 56 $2,490.18 78869-61130 1201 STIRLING RD #HSPS MV57024 2025-05-09 30 122880 / 188 $10,888.83 82314-31431 803 NW 1ST ST #PKGLTLGTS ACD7830 2025-05-09 30 34 / 0 $29.07 82343-56627 200 NE 2 ST #CTS KEL4829 2025-05-08 30 2672 / 34 $706.95 82363-52681 200 NE 2 ST KLL4681 2025-05-08 30 680 / 0 $309.76 83534-55572 128 NW 10 CT # LS7 ST38676 2025-05-09 30 9660 / 20 $1,038.12 83594-58521 120 NW 10 CT ACD6938 2025-05-09 30 242 / 0 $46.49 83671-08357 1855 GRIFFIN RD #LS 10 KJJ8920 2025-05-09 30 960 / 6 $184.48 83822-11186 4540 SW 27TH AVE # OL 2025-05-01 30 77 / 0 $16.86 83875-32461 101 N BEACH RD #MARINA MV58927 2025-05-08 30 66840 / 149 $6,841.00 92733-58607 300 NE 2ND ST # OL 2025-05-08 30 256 / 0 $59.01 95580-98431 2901 SW 52ND ST AC03956 2025-05-01 30 3281 / 0 $454.26 96241-18460 230 SW 12TH AVE KLL3254 2025-05-09 30 1875 / 0 $265.61 97812-54595 2301 STIRLING RD # WELLFLD MN55198 2025-05-02 30 60 / 0 $37.07 TOTAL AMOUNT OF BILL $73,852.02 CURRENT BILL $620.50 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 533.56 Payments received -533.56 Balance before new charges 0.00 Total new charges 620.50 Total amount you owe $620.50 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 00281-29336 Service Address: 100 W DANIA BEACH BLVD #TRLRS DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 00281-29336 $620.50 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 5,250 kWh 4,200 kWh 3,150 kWh 2,100 kWh 1,050 kWh 0 kWh A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 00281-29336 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 533.56 Payment received - Thank you −533.56 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$434.37 Fuel:( $0.027180 per kWh)$122.85 Electric service amount 570.09 Gross receipts tax (State tax)14.63 Franchise fee (Reqd local fee)35.25 Taxes and charges 49.88 Regulatory fee (State fee)0.53 Total new charges $620.50 Total amount you owe $620.50 METER SUMMARY Meter reading - Meter KLL8786. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 40241 35721 4520 ENERGY USAGE COMPARISON This Month Last Month Service to May 9, 2025 Apr 9, 2025 kWh Used 4520 3872 Service days 30 29 kWh/day 150 133 Amount $620.50 $533.56 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $24.11 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 24.11 Payments received -24.11 Balance before new charges 0.00 Total new charges 24.11 Total amount you owe $24.11 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 00550-18501 Service Address: 235 SW 1ST CT # OL DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 00550-18501 $24.11 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 110 kWh 88 kWh 66 kWh 44 kWh 22 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · Charges and energy usage are based on the facilities contracted. Facility, energy and fuel costs are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 00550-18501 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 24.11 Payment received - Thank you −24.11 Balance before new charges $0.00 New Charges Rate: OL-1 OUTDOOR LIGHTING Electric service amount **22.45 Gross receipts tax (State tax)0.27 Franchise fee (Reqd local fee)1.37 Taxes and charges 1.64 Regulatory fee (State fee)0.02 Total new charges $24.11 Total amount you owe $24.11 ** Your electric service amount includes the following charges: Non-fuel energy charge: $0.091030 per kWh Fuel charge:$0.026470 per kWh METER SUMMARY Next bill date Jun 10, 2025. Usage Type Usage Total kWh used 88 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 88 88 88 Service days 30 29 30 kWh/day 3 3 3 Amount $24.11 $24.11 $19.15 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $242.66 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 212.05 Payments received -212.05 Balance before new charges 0.00 Total new charges 242.66 Total amount you owe $242.66 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 01992-62544 Service Address: 200 SE 5TH AVE #LS 5 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 01992-62544 $242.66 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 2,650 kWh 2,120 kWh 1,590 kWh 1,060 kWh 530 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 01992-62544 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 212.05 Payment received - Thank you −212.05 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$163.76 Fuel:( $0.027180 per kWh)$46.31 Electric service amount 222.94 Gross receipts tax (State tax)5.72 Franchise fee (Reqd local fee)13.79 Taxes and charges 19.51 Regulatory fee (State fee)0.21 Total new charges $242.66 Total amount you owe $242.66 METER SUMMARY Meter reading - Meter KJ47680. Next meter reading Jun 9, 2025. Usage Type Current -Previous =Usage kWh used 73429 71725 1704 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 1704 1476 1350 Service days 30 29 30 kWh/day 56 50 45 Amount $242.66 $212.05 $217.15 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $542.16 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 430.79 Payments received -430.79 Balance before new charges 0.00 Total new charges 542.16 Total amount you owe $542.16 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 02234-54661 Service Address: 631 NE 2ND ST # LS6 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 02234-54661 $542.16 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 4,850 kWh 3,880 kWh 2,910 kWh 1,940 kWh 970 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 02234-54661 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 430.79 Payment received - Thank you −430.79 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$327.41 Fuel:( $0.027180 per kWh)$92.60 Electric service amount 432.88 Gross receipts tax (State tax)11.11 Franchise fee (Reqd local fee)26.77 Taxes and charges 37.88 Regulatory fee (State fee)0.40 Total new charges $471.16 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $542.16 METER SUMMARY Meter reading - Meter SJ88528. Next meter reading Jun 9, 2025. Usage Type Current -Previous =Usage kWh used 60515 57108 3407 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 3407 2577 3056 Service days 30 29 30 kWh/day 113 88 101 Amount $471.16 $359.79 $386.15 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $29.19 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 29.85 Payments received -29.85 Balance before new charges 0.00 Total new charges 29.19 Total amount you owe $29.19 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 02794-18123 Service Address: 1220 NW 10TH ST # WALL DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 02794-18123 $29.19 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 60 kWh 48 kWh 36 kWh 24 kWh 12 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 02794-18123 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 29.85 Payment received - Thank you −29.85 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$9.51 Non-fuel:( $0.096100 per kWh)$3.46 Fuel:( $0.027180 per kWh)$0.98 Electric service amount 26.82 Gross receipts tax (State tax)0.69 Franchise fee (Reqd local fee)1.66 Taxes and charges 2.35 Regulatory fee (State fee)0.02 Total new charges $29.19 Total amount you owe $29.19 METER SUMMARY Meter reading - Meter AA15361. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 01366 01330 36 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 36 48 26 Service days 30 29 30 kWh/day 1 2 1 Amount $29.19 $29.85 $28.33 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $137.88 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 174.38 Payments received -174.38 Balance before new charges 0.00 Total new charges 137.88 Total amount you owe $137.88 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 05703-29326 Service Address: 1905 TIGERTAIL BLVD # LS15 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 05703-29326 $137.88 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O LIFT STATION # 15 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 950 kWh 760 kWh 570 kWh 380 kWh 190 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 05703-29326 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 174.38 Payment received - Thank you −174.38 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$37.86 Fuel:( $0.027180 per kWh)$10.71 Electric service amount 61.44 Gross receipts tax (State tax)1.58 Franchise fee (Reqd local fee)3.80 Taxes and charges 5.38 Regulatory fee (State fee)0.06 Total new charges $66.88 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $137.88 METER SUMMARY Meter reading - Meter SN88478. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 22912 22518 394 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 394 666 425 Service days 30 29 30 kWh/day 13 22 14 Amount $66.88 $103.38 $65.68 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $27.21 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 27.21 Payments received -27.21 Balance before new charges 0.00 Total new charges 27.21 Total amount you owe $27.21 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 06011-26295 Service Address: 599 S FEDERAL HWY # IRR DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 06011-26295 $27.21 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 5 kWh 4 kWh 3 kWh 2 kWh 1 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · We have billed you for the minimum base charge for eight consecutive months due to your meter registering zero usage. Call us if you wish to temporarily disconnect your service. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 06011-26295 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 27.21 Payment received - Thank you −27.21 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $27.21 METER SUMMARY Meter reading - Meter ACD8198. Next meter reading Jun 9, 2025. Usage Type Current -Previous =Usage kWh used 00021 00021 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 0 0 0 Service days 30 29 30 kWh/day 0 0 0 Amount $27.21 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,807.51 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 884.99 Balance before new charges 884.99 Total new charges 922.52 Total amount you owe $1,807.51 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 1, 2025 to May 1, 2025 (30 days) Statement Date: May 1, 2025 Account Number: 07471-54557 Service Address: 2901 SW 52ND ST # BALLFIELD FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 07471-54557 $1,807.51 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 2,350 kWh 1,880 kWh 1,410 kWh 940 kWh 470 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 07471-54557 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 884.99 Balance before new charges $884.99 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$59.07 Fuel:( $0.027180 per kWh)$47.37 Demand:($13.41 per KW)$710.73 Electric service amount 847.58 Gross receipts tax (State tax)21.75 Franchise fee (Reqd local fee)52.41 Taxes and charges 74.16 Regulatory fee (State fee)0.78 Total new charges $922.52 Total amount you owe $1,807.51 METER SUMMARY Meter reading - Meter KLL4255. Next meter reading Jun 2, 2025. Usage Type Current -Previous =Usage kWh used 00547 98804 1743 Demand KW 52.58 53 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 1, 2025 Apr 1, 2025 May 1, 2024 kWh Used 1743 1178 2054 Service days 30 29 30 kWh/day 58 40 68 Amount $922.52 $884.99 $927.58 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $54.42 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 27.21 Balance before new charges 27.21 Total new charges 27.21 Total amount you owe $54.42 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 1, 2025 to May 1, 2025 (30 days) Statement Date: May 1, 2025 Account Number: 07481-52584 Service Address: 2901 SW 52ND ST # BPW FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 07481-52584 $54.42 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 150 kWh 120 kWh 90 kWh 60 kWh 30 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 07481-52584 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 27.21 Balance before new charges $27.21 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $54.42 METER SUMMARY Meter reading - Meter KU31193. Next meter reading Jun 2, 2025. Usage Type Current -Previous x Const =Usage kWh used 00036 00036 60 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 1, 2025 Apr 1, 2025 May 1, 2024 kWh Used 0 0 0 Service days 30 29 30 kWh/day 0 0 0 Amount $27.21 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $192.11 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 98.93 Balance before new charges 98.93 Total new charges 93.18 Total amount you owe $192.11 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 1, 2025 to May 1, 2025 (30 days) Statement Date: May 1, 2025 Account Number: 07531-57502 Service Address: 2901 SW 52ND ST # N BASKETBALL CO FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 07531-57502 $192.11 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 950 kWh 760 kWh 570 kWh 380 kWh 190 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 07531-57502 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 98.93 Balance before new charges $98.93 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$56.70 Fuel:( $0.027180 per kWh)$16.04 Electric service amount 85.61 Gross receipts tax (State tax)2.20 Franchise fee (Reqd local fee)5.29 Taxes and charges 7.49 Regulatory fee (State fee)0.08 Total new charges $93.18 Total amount you owe $192.11 METER SUMMARY Meter reading - Meter KC78811. Next meter reading Jun 2, 2025. Usage Type Current -Previous =Usage kWh used 73988 73398 590 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 1, 2025 Apr 1, 2025 May 1, 2024 kWh Used 590 633 727 Service days 30 29 30 kWh/day 19 21 24 Amount $93.18 $98.93 $102.48 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $653.18 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 597.11 Balance before new charges 597.11 Total new charges 56.07 Total amount you owe $653.18 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 1, 2025 to May 1, 2025 (30 days) Statement Date: May 1, 2025 Account Number: 07541-55539 Service Address: 2900 SW 52ND ST # SOCCER FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 07541-55539 $653.18 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 200 kWh 160 kWh 120 kWh 80 kWh 40 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 07541-55539 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 597.11 Balance before new charges $597.11 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$4.27 Fuel:( $0.027180 per kWh)$3.42 Demand:($13.41 per KW)$13.41 Electric service amount 51.51 Gross receipts tax (State tax)1.32 Franchise fee (Reqd local fee)3.19 Taxes and charges 4.51 Regulatory fee (State fee)0.05 Total new charges $56.07 Total amount you owe $653.18 METER SUMMARY Meter reading - Meter KN68310. Next meter reading Jun 2, 2025. Usage Type Current -Previous =Usage Total kWh used 02681 02555 126 On-Peak kWh used 00000 00000 0 Off-peak kWh used 126 On-peak demand 0.00 0 Maximum demand 1 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 1, 2025 Apr 1, 2025 May 1, 2024 kWh Used 126 141 127 Service days 30 29 30 kWh/day 4 4 4 Amount $56.07 $597.11 $55.07 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $34.90 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 34.90 Payments received -34.90 Balance before new charges 0.00 Total new charges 34.90 Total amount you owe $34.90 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 07551-53566 Service Address: 2901 SW 52ND ST # OL FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 07551-53566 $34.90 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 200 kWh 160 kWh 120 kWh 80 kWh 40 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · Charges and energy usage are based on the facilities contracted. Facility, energy and fuel costs are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 07551-53566 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 34.90 Payment received - Thank you −34.90 Balance before new charges $0.00 New Charges Rate: OL-1 OUTDOOR LIGHTING Electric service amount **32.38 Gross receipts tax (State tax)0.51 Franchise fee (Reqd local fee)1.98 Taxes and charges 2.49 Regulatory fee (State fee)0.03 Total new charges $34.90 Total amount you owe $34.90 ** Your electric service amount includes the following charges: Non-fuel energy charge: $0.091030 per kWh Fuel charge:$0.026470 per kWh METER SUMMARY Next bill date Jun 10, 2025. Usage Type Usage Total kWh used 168 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 168 168 168 Service days 30 29 30 kWh/day 6 6 6 Amount $34.90 $34.90 $25.49 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $104.89 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 119.33 Payments received -119.33 Balance before new charges 0.00 Total new charges 104.89 Total amount you owe $104.89 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 09702-57515 Service Address: 495 TAYLOR LN # LS12 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 09702-57515 $104.89 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 600 kWh 480 kWh 360 kWh 240 kWh 120 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 09702-57515 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 119.33 Payment received - Thank you −119.33 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$2.52 Non-fuel:( $0.096100 per kWh)$12.69 Fuel:( $0.027180 per kWh)$3.59 Electric service amount 31.67 Gross receipts tax (State tax)0.81 Franchise fee (Reqd local fee)1.38 Taxes and charges 2.19 Regulatory fee (State fee)0.03 Total new charges $33.89 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $104.89 METER SUMMARY Meter reading - Meter SN88486. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 11802 11670 132 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 132 262 174 Service days 30 29 30 kWh/day 4 9 5 Amount $33.89 $48.33 $34.60 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $54.42 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 27.21 Balance before new charges 27.21 Total new charges 27.21 Total amount you owe $54.42 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 1, 2025 to May 1, 2025 (30 days) Statement Date: May 1, 2025 Account Number: 09830-79450 Service Address: 3151 GRIFFIN RD #LIGHTS DANIA, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 09830-79450 $54.42 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 5 kWh 4 kWh 3 kWh 2 kWh 1 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 09830-79450 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 27.21 Balance before new charges $27.21 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $54.42 METER SUMMARY Meter reading - Meter ACD1309. Next meter reading Jun 2, 2025. Usage Type Current -Previous =Usage kWh used 00108 00108 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 1, 2025 Apr 1, 2025 May 1, 2024 kWh Used 0 0 0 Service days 30 29 30 kWh/day 0 0 0 Amount $27.21 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $48.69 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 63.41 Payments received -63.41 Balance before new charges 0.00 Total new charges 48.69 Total amount you owe $48.69 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 09860-17234 Service Address: 434 SE 3RD TER #PUMP DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 09860-17234 $48.69 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O DANIA FL 33004 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 5,800 kWh 4,640 kWh 3,480 kWh 2,320 kWh 1,160 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 09860-17234 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 63.41 Payment received - Thank you −63.41 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$0.50 Fuel:( $0.027180 per kWh)$0.41 Demand:($13.41 per KW)$13.41 Electric service amount 44.73 Gross receipts tax (State tax)1.15 Franchise fee (Reqd local fee)2.77 Taxes and charges 3.92 Regulatory fee (State fee)0.04 Total new charges $48.69 Total amount you owe $48.69 METER SUMMARY Meter reading - Meter KN46905. Next meter reading Jun 9, 2025. Usage Type Current -Previous =Usage kWh used 56104 56089 15 Demand KW .94 1 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 15 17 221 Service days 30 29 30 kWh/day 0 0 7 Amount $48.69 $63.41 $287.72 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $695.83 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 623.26 Payments received -623.26 Balance before new charges 0.00 Total new charges 695.83 Total amount you owe $695.83 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 10708-66452 Service Address: 800 NW 2ND ST DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 10708-66452 $695.83 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 11,150 kWh 8,920 kWh 6,690 kWh 4,460 kWh 2,230 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 10708-66452 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 623.26 Payment received - Thank you −623.26 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$181.62 Fuel:( $0.027180 per kWh)$145.66 Demand:($13.41 per KW)$281.61 Electric service amount 639.30 Gross receipts tax (State tax)16.41 Franchise fee (Reqd local fee)39.53 Taxes and charges 55.94 Regulatory fee (State fee)0.59 Total new charges $695.83 Total amount you owe $695.83 METER SUMMARY Meter reading - Meter KCJ4317. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 95743 90384 5359 Demand KW 20.87 21 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 5359 4926 8568 Service days 30 29 30 kWh/day 178 169 285 Amount $695.83 $623.26 $898.77 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $329.88 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 259.69 Payments received -259.69 Balance before new charges 0.00 Total new charges 329.88 Total amount you owe $329.88 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 18630-57590 Service Address: 116 W DANIA BEACH BLVD DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 18630-57590 $329.88 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 4,100 kWh 3,280 kWh 2,460 kWh 1,640 kWh 820 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 18630-57590 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 259.69 Payment received - Thank you −259.69 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$226.23 Fuel:( $0.027180 per kWh)$63.98 Electric service amount 303.08 Gross receipts tax (State tax)7.78 Franchise fee (Reqd local fee)18.74 Taxes and charges 26.52 Regulatory fee (State fee)0.28 Total new charges $329.88 Total amount you owe $329.88 METER SUMMARY Meter reading - Meter AC97190. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 23856 21502 2354 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 2354 1831 2420 Service days 30 29 30 kWh/day 78 63 81 Amount $329.88 $259.69 $308.69 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $52.24 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 46.89 Payments received -46.89 Balance before new charges 0.00 Total new charges 52.24 Total amount you owe $52.24 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 19577-56503 Service Address: W DIXIE CRSSVR #CEMETERY DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 19577-56503 $52.24 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 1,350 kWh 1,080 kWh 810 kWh 540 kWh 270 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 19577-56503 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 46.89 Payment received - Thank you −46.89 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$27.38 Fuel:( $0.027180 per kWh)$7.75 Electric service amount 48.00 Gross receipts tax (State tax)1.23 Franchise fee (Reqd local fee)2.97 Taxes and charges 4.20 Regulatory fee (State fee)0.04 Total new charges $52.24 Total amount you owe $52.24 METER SUMMARY Meter reading - Meter AC09306. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 63592 63307 285 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 285 245 258 Service days 30 29 30 kWh/day 10 8 9 Amount $52.24 $46.89 $45.34 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $106.46 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 96.12 Payments received -96.12 Balance before new charges 0.00 Total new charges 106.46 Total amount you owe $106.46 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 19587-54531 Service Address: 300 W DIXIE HWY DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 19587-54531 $106.46 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 1,600 kWh 1,280 kWh 960 kWh 640 kWh 320 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 19587-54531 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 96.12 Payment received - Thank you −96.12 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$66.21 Fuel:( $0.027180 per kWh)$18.73 Electric service amount 97.81 Gross receipts tax (State tax)2.51 Franchise fee (Reqd local fee)6.05 Taxes and charges 8.56 Regulatory fee (State fee)0.09 Total new charges $106.46 Total amount you owe $106.46 METER SUMMARY Meter reading - Meter KJ37966. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 90470 89781 689 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 689 612 1440 Service days 30 29 30 kWh/day 22 21 48 Amount $106.46 $96.12 $189.32 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,584.20 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 1,472.99 Payments received -1,472.99 Balance before new charges 0.00 Total new charges 1,584.20 Total amount you owe $1,584.20 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 23433-62451 Service Address: 100 W DANIA BEACH BLVD #GARAGE DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 23433-62451 $1,584.20 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 18,850 kWh 15,080 kWh 11,310 kWh 7,540 kWh 3,770 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 23433-62451 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 1,472.99 Payment received - Thank you −1,472.99 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$478.29 Fuel:( $0.027180 per kWh)$383.59 Demand:($13.41 per KW)$563.22 Electric service amount 1,455.51 Gross receipts tax (State tax)37.35 Franchise fee (Reqd local fee)90.00 Taxes and charges 127.35 Regulatory fee (State fee)1.34 Total new charges $1,584.20 Total amount you owe $1,584.20 METER SUMMARY Meter reading - Meter KNJ8374. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 41171 27058 14113 Demand KW 42.02 42 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 14113 13318 13365 Service days 30 29 30 kWh/day 470 459 445 Amount $1,584.20 $1,472.99 $1,328.61 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $28.80 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 28.62 Payments received -28.62 Balance before new charges 0.00 Total new charges 28.80 Total amount you owe $28.80 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 27785-15128 Service Address: 5440 RAVENSWOOD RD #IRR FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 27785-15128 $28.80 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 300 kWh 240 kWh 180 kWh 120 kWh 60 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 27785-15128 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 28.62 Payment received - Thank you −28.62 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$10.02 Non-fuel:( $0.096100 per kWh)$2.78 Fuel:( $0.027180 per kWh)$0.79 Electric service amount 26.46 Gross receipts tax (State tax)0.68 Franchise fee (Reqd local fee)1.64 Taxes and charges 2.32 Regulatory fee (State fee)0.02 Total new charges $28.80 Total amount you owe $28.80 METER SUMMARY Meter reading - Meter KJ62786. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 20728 20699 29 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 29 26 179 Service days 30 29 30 kWh/day 0 0 5 Amount $28.80 $28.62 $35.71 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $995.05 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 997.02 Payments received -997.02 Balance before new charges 0.00 Total new charges 995.05 Total amount you owe $995.05 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 29082-54531 Service Address: 1700 NE 7TH AVE # LS11 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 29082-54531 $995.05 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 7,200 kWh 5,760 kWh 4,320 kWh 2,880 kWh 1,440 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 29082-54531 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 997.02 Payment received - Thank you −997.02 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$149.69 Fuel:( $0.027180 per kWh)$120.05 Demand:($13.41 per KW)$563.22 Electric service amount 863.37 Gross receipts tax (State tax)22.16 Franchise fee (Reqd local fee)37.74 Taxes and charges 59.90 Regulatory fee (State fee)0.78 Total new charges $924.05 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $995.05 METER SUMMARY Meter reading - Meter SN88487. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 36110 31693 4417 Demand KW 42 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 4417 4447 52 Service days 30 29 30 kWh/day 147 153 1 Amount $924.05 $926.02 $35.63 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $599.32 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 662.73 Payments received -662.73 Balance before new charges 0.00 Total new charges 599.32 Total amount you owe $599.32 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 29634-25166 Service Address: 300 NE 2ND ST # JR REC CT DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 29634-25166 $599.32 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 9,450 kWh 7,560 kWh 5,670 kWh 3,780 kWh 1,890 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 29634-25166 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 662.73 Payment received - Thank you −662.73 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$154.74 Fuel:( $0.027180 per kWh)$124.10 Demand:($13.41 per KW)$241.38 Electric service amount 550.63 Gross receipts tax (State tax)14.13 Franchise fee (Reqd local fee)34.05 Taxes and charges 48.18 Regulatory fee (State fee)0.51 Total new charges $599.32 Total amount you owe $599.32 METER SUMMARY Meter reading - Meter KJL7051. Next meter reading Jun 9, 2025. Usage Type Current -Previous =Usage kWh used 71425 66859 4566 Demand KW 18.12 18 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 4566 4422 4837 Service days 30 29 30 kWh/day 152 152 161 Amount $599.32 $662.73 $592.79 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $280.93 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 449.04 Payments received -449.04 Balance before new charges 0.00 Total new charges 280.93 Total amount you owe $280.93 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 30507-57602 Service Address: 1151 SE 5TH CT # LS-4 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 30507-57602 $280.93 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O DANIA FL 33004 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 3,550 kWh 2,840 kWh 2,130 kWh 1,420 kWh 710 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 30507-57602 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 449.04 Payment received - Thank you −449.04 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$60.39 Fuel:( $0.027180 per kWh)$48.43 Demand:($13.41 per KW)$53.64 Electric service amount 192.87 Gross receipts tax (State tax)4.95 Franchise fee (Reqd local fee)11.93 Taxes and charges 16.88 Regulatory fee (State fee)0.18 Total new charges $209.93 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $280.93 METER SUMMARY Meter reading - Meter SJ88488. Next meter reading Jun 9, 2025. Usage Type Current -Previous =Usage kWh used 82789 81007 1782 Demand KW 4 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 1782 1237 1886 Service days 30 29 30 kWh/day 59 42 62 Amount $209.93 $378.04 $222.60 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,697.63 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 1,664.78 Payments received -1,664.78 Balance before new charges 0.00 Total new charges 1,697.63 Total amount you owe $1,697.63 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 32275-56614 Service Address: 50 SE 2ND AVE # LS 1 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 32275-56614 $1,697.63 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 22,400 kWh 17,920 kWh 13,440 kWh 8,960 kWh 4,480 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 32275-56614 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 1,664.78 Payment received - Thank you −1,664.78 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$343.64 Fuel:( $0.027180 per kWh)$275.61 Demand:($13.41 per KW)$844.83 Electric service amount 1,494.49 Gross receipts tax (State tax)38.35 Franchise fee (Reqd local fee)92.41 Taxes and charges 130.76 Regulatory fee (State fee)1.38 Total new charges $1,626.63 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $1,697.63 METER SUMMARY Meter reading - Meter ST38232. Next meter reading Jun 9, 2025. Usage Type Current -Previous x Const =Usage kWh used 07922 07753 60 10140 Demand KW 63 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 10140 12720 11580 Service days 30 29 30 kWh/day 338 438 386 Amount $1,626.63 $1,593.78 $1,527.89 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $28.91 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 27.81 Payments received -27.81 Balance before new charges 0.00 Total new charges 28.91 Total amount you owe $28.91 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 34681-37470 Service Address: 206 SW 1ST AVE # PARK DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 34681-37470 $28.91 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 40 kWh 32 kWh 24 kWh 16 kWh 8 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 34681-37470 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 27.81 Payment received - Thank you −27.81 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$9.87 Non-fuel:( $0.096100 per kWh)$2.99 Fuel:( $0.027180 per kWh)$0.84 Electric service amount 26.57 Gross receipts tax (State tax)0.68 Franchise fee (Reqd local fee)1.64 Taxes and charges 2.32 Regulatory fee (State fee)0.02 Total new charges $28.91 Total amount you owe $28.91 METER SUMMARY Meter reading - Meter AC09337. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 00060 00029 31 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 31 11 0 Service days 30 29 30 kWh/day 1 0 0 Amount $28.91 $27.81 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $39.92 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 57.22 Payments received -57.22 Balance before new charges 0.00 Total new charges 39.92 Total amount you owe $39.92 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 34854-42168 Service Address: 300 NE 2ND ST # PARK LTS DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 34854-42168 $39.92 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 1,600 kWh 1,280 kWh 960 kWh 640 kWh 320 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 34854-42168 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 57.22 Payment received - Thank you −57.22 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$18.56 Fuel:( $0.027180 per kWh)$5.25 Electric service amount 36.68 Gross receipts tax (State tax)0.94 Franchise fee (Reqd local fee)2.27 Taxes and charges 3.21 Regulatory fee (State fee)0.03 Total new charges $39.92 Total amount you owe $39.92 METER SUMMARY Meter reading - Meter ACD4012. Next meter reading Jun 9, 2025. Usage Type Current -Previous =Usage kWh used 07812 07619 193 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 193 322 422 Service days 30 29 30 kWh/day 6 11 14 Amount $39.92 $57.22 $65.32 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $31.80 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 32.77 Payments received -32.77 Balance before new charges 0.00 Total new charges 31.80 Total amount you owe $31.80 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 36838-26311 Service Address: 279 N BRYAN RD # LS-17 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 36838-26311 $31.80 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 400 kWh 320 kWh 240 kWh 160 kWh 80 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 36838-26311 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 32.77 Payment received - Thank you −32.77 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$6.09 Non-fuel:( $0.096100 per kWh)$7.99 Fuel:( $0.027180 per kWh)$2.26 Electric service amount 29.21 Gross receipts tax (State tax)0.75 Franchise fee (Reqd local fee)1.81 Taxes and charges 2.56 Regulatory fee (State fee)0.03 Total new charges $31.80 Total amount you owe $31.80 METER SUMMARY Meter reading - Meter KN52041. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 16986 16903 83 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 83 101 64 Service days 30 29 30 kWh/day 2 3 2 Amount $31.80 $32.77 $29.97 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $2,486.66 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 2,409.68 Payments received -2,409.68 Balance before new charges 0.00 Total new charges 2,486.66 Total amount you owe $2,486.66 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 38600-56542 Service Address: 100 W DANIA BEACH BLVD #POLICE DEPT DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 38600-56542 $2,486.66 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 37,500 kWh 30,000 kWh 22,500 kWh 15,000 kWh 7,500 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 38600-56542 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 2,409.68 Payment received - Thank you −2,409.68 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$752.36 Fuel:( $0.027180 per kWh)$603.40 Demand:($13.41 per KW)$898.47 Electric service amount 2,284.64 Gross receipts tax (State tax)58.63 Franchise fee (Reqd local fee)141.28 Taxes and charges 199.91 Regulatory fee (State fee)2.11 Total new charges $2,486.66 Total amount you owe $2,486.66 METER SUMMARY Meter reading - Meter KU30441. Next meter reading Jun 10, 2025. Usage Type Current -Previous x Const =Usage kWh used 55948 55578 60 22200 Demand KW 1.12 60.00 67 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 22200 22140 25260 Service days 30 29 30 kWh/day 740 763 842 Amount $2,486.66 $2,409.68 $2,630.90 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $264.38 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 250.43 Payments received -250.43 Balance before new charges 0.00 Total new charges 264.38 Total amount you owe $264.38 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 39978-40511 Service Address: 300 N BEACH RD #C HSE-PIER-PRK LIGHTS DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 39978-40511 $264.38 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA BEACH FL 33004-3699 ENERGY USAGE HISTORY 2,850 kWh 2,280 kWh 1,710 kWh 1,140 kWh 570 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 39978-40511 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 250.43 Payment received - Thank you −250.43 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$179.32 Fuel:( $0.027180 per kWh)$50.72 Electric service amount 242.91 Gross receipts tax (State tax)6.23 Franchise fee (Reqd local fee)15.02 Taxes and charges 21.25 Regulatory fee (State fee)0.22 Total new charges $264.38 Total amount you owe $264.38 METER SUMMARY Meter reading - Meter KL87259. Next meter reading Jun 9, 2025. Usage Type Current -Previous =Usage kWh used 53385 51519 1866 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 1866 1762 2088 Service days 30 29 30 kWh/day 62 60 69 Amount $264.38 $250.43 $268.25 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $348.77 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 601.50 Payments received -601.50 Balance before new charges 0.00 Total new charges 348.77 Total amount you owe $348.77 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 43965-11000 Service Address: 151 SW 18TH CT # LS 16 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 43965-11000 $348.77 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 2,750 kWh 2,200 kWh 1,650 kWh 1,100 kWh 550 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 43965-11000 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 601.50 Payment received - Thank you −601.50 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$72.65 Fuel:( $0.027180 per kWh)$58.27 Demand:($13.41 per KW)$93.87 Electric service amount 255.20 Gross receipts tax (State tax)6.55 Franchise fee (Reqd local fee)15.78 Taxes and charges 22.33 Regulatory fee (State fee)0.24 Total new charges $277.77 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $348.77 METER SUMMARY Meter reading - Meter SJ88479. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 85659 83515 2144 Demand KW 7 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 2144 2213 2125 Service days 30 29 30 kWh/day 71 76 70 Amount $277.77 $530.50 $365.20 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $243.74 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 209.24 Payments received -209.24 Balance before new charges 0.00 Total new charges 243.74 Total amount you owe $243.74 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 44225-67430 Service Address: 102 W DANIA BEACH BLVD # A DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 44225-67430 $243.74 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 1,900 kWh 1,520 kWh 1,140 kWh 760 kWh 380 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 44225-67430 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 209.24 Payment received - Thank you −209.24 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$164.53 Fuel:( $0.027180 per kWh)$46.53 Electric service amount 223.93 Gross receipts tax (State tax)5.75 Franchise fee (Reqd local fee)13.85 Taxes and charges 19.60 Regulatory fee (State fee)0.21 Total new charges $243.74 Total amount you owe $243.74 METER SUMMARY Meter reading - Meter AC04327. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 95848 94136 1712 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 1712 1455 242 Service days 30 29 30 kWh/day 57 50 8 Amount $243.74 $209.24 $43.41 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,270.31 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 1,260.97 Payments received -1,260.97 Balance before new charges 0.00 Total new charges 1,270.31 Total amount you owe $1,270.31 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 44452-56607 Service Address: 400 SE 2ND AVE # LS 2 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 44452-56607 $1,270.31 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 17,600 kWh 14,080 kWh 10,560 kWh 7,040 kWh 3,520 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 44452-56607 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 1,260.97 Payment received - Thank you −1,260.97 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$319.25 Fuel:( $0.027180 per kWh)$256.04 Demand:($13.41 per KW)$496.17 Electric service amount 1,101.87 Gross receipts tax (State tax)28.28 Franchise fee (Reqd local fee)68.14 Taxes and charges 96.42 Regulatory fee (State fee)1.02 Total new charges $1,199.31 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $1,270.31 METER SUMMARY Meter reading - Meter PT38743. Next meter reading Jun 9, 2025. Usage Type Current -Previous x Const =Usage kWh used 00255 00098 60 9420 Demand KW 37 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 9420 9060 9000 Service days 30 29 30 kWh/day 314 312 300 Amount $1,199.31 $1,189.97 $968.50 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $106.17 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 106.67 Payments received -106.67 Balance before new charges 0.00 Total new charges 106.17 Total amount you owe $106.17 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 45043-43023 Service Address: 300 N BEACH RD # LS 14 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 45043-43023 $106.17 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 300 kWh 240 kWh 180 kWh 120 kWh 60 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 45043-43023 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 106.67 Payment received - Thank you −106.67 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$1.57 Non-fuel:( $0.096100 per kWh)$13.93 Fuel:( $0.027180 per kWh)$3.94 Electric service amount 32.31 Gross receipts tax (State tax)0.83 Franchise fee (Reqd local fee)2.00 Taxes and charges 2.83 Regulatory fee (State fee)0.03 Total new charges $35.17 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $106.17 METER SUMMARY Meter reading - Meter SC88219. Next meter reading Jun 9, 2025. Usage Type Current -Previous =Usage kWh used 06302 06157 145 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 145 154 232 Service days 30 29 30 kWh/day 4 5 7 Amount $35.17 $35.67 $42.18 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $532.36 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 573.27 Payments received -573.27 Balance before new charges 0.00 Total new charges 532.36 Total amount you owe $532.36 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 48600-12451 Service Address: 100 W DANIA BEACH BLVD #B DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 48600-12451 $532.36 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 6,350 kWh 5,080 kWh 3,810 kWh 2,540 kWh 1,270 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 48600-12451 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 573.27 Payment received - Thank you −573.27 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$371.24 Fuel:( $0.027180 per kWh)$105.00 Electric service amount 489.11 Gross receipts tax (State tax)12.55 Franchise fee (Reqd local fee)30.25 Taxes and charges 42.80 Regulatory fee (State fee)0.45 Total new charges $532.36 Total amount you owe $532.36 METER SUMMARY Meter reading - Meter KLL2558. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 74024 70161 3863 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 3863 4168 4078 Service days 30 29 30 kWh/day 128 143 135 Amount $532.36 $573.27 $510.63 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $70.38 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 66.20 Payments received -66.20 Balance before new charges 0.00 Total new charges 70.38 Total amount you owe $70.38 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 49909-59571 Service Address: 1100 PHIPPEN WAITERS RD # PUMP DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 49909-59571 $70.38 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O CITY HALL 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 800 kWh 640 kWh 480 kWh 320 kWh 160 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 49909-59571 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 66.20 Payment received - Thank you −66.20 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$40.37 Fuel:( $0.027180 per kWh)$11.42 Electric service amount 64.66 Gross receipts tax (State tax)1.66 Franchise fee (Reqd local fee)4.00 Taxes and charges 5.66 Regulatory fee (State fee)0.06 Total new charges $70.38 Total amount you owe $70.38 METER SUMMARY Meter reading - Meter KJ71604. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 44438 44018 420 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 420 389 504 Service days 30 29 30 kWh/day 14 13 16 Amount $70.38 $66.20 $75.30 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $30.08 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 29.97 Payments received -29.97 Balance before new charges 0.00 Total new charges 30.08 Total amount you owe $30.08 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 49929-53523 Service Address: 1200 PHIPPEN WAITERS RD DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 49929-53523 $30.08 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH CITY HALL 100 W DANIA BLV DANAIA FL 33004 ENERGY USAGE HISTORY 60 kWh 48 kWh 36 kWh 24 kWh 12 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 49929-53523 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 29.97 Payment received - Thank you −29.97 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$8.34 Non-fuel:( $0.096100 per kWh)$5.01 Fuel:( $0.027180 per kWh)$1.41 Electric service amount 27.63 Gross receipts tax (State tax)0.71 Franchise fee (Reqd local fee)1.71 Taxes and charges 2.42 Regulatory fee (State fee)0.03 Total new charges $30.08 Total amount you owe $30.08 METER SUMMARY Meter reading - Meter ACD7432. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 00505 00453 52 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 52 50 21 Service days 30 29 30 kWh/day 2 2 1 Amount $30.08 $29.97 $28.10 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $54.42 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 27.21 Balance before new charges 27.21 Total new charges 27.21 Total amount you owe $54.42 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 1, 2025 to May 1, 2025 (30 days) Statement Date: May 1, 2025 Account Number: 53065-79458 Service Address: 1800 GRIFFIN RD #LIGHTS DANIA, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 53065-79458 $54.42 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 150 kWh 120 kWh 90 kWh 60 kWh 30 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 53065-79458 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 27.21 Balance before new charges $27.21 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $54.42 METER SUMMARY Meter reading - Meter ACD3226. Next meter reading Jun 2, 2025. Usage Type Current -Previous =Usage kWh used 00288 00288 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 1, 2025 Apr 1, 2025 May 1, 2024 kWh Used 0 0 0 Service days 30 29 30 kWh/day 0 0 0 Amount $27.21 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $101.22 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill −62.04 Balance before new charges −62.04 Total new charges 163.26 Total amount you owe $101.22 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Nov 7, 2024 to May 8, 2025 Statement Date: May 12, 2025 Account Number: 55113-16357 Service Address: 301 E DANIA BEACH BLVD #ST LT DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 55113-16357 $101.22 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 5 kWh 4 kWh 3 kWh 2 kWh 1 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · This bill is for multiple (6) billing periods. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 55113-16357 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill −62.04 Balance before new charges −$62.04 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Electric service amount 150.00 Gross receipts tax (State tax)3.84 Franchise fee (Reqd local fee)9.30 Taxes and charges 13.14 Regulatory fee (State fee)0.12 Total new charges $163.26 Total amount you owe $101.22 METER SUMMARY Multiple-month usage Meter no. KI90174 Next meter reading Jun 9, 2025 Total kWh 0 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. ECOMCustomer Name:Account Number:FPL.com Page 1 CITY OF DANIA BEACH 55113-16357 BILLING STATEMENT - MULTIPLE BILLING PERIODS BILLING STATEMENT For: Nov 07 2024 to Dec 09 2024 (32 days) Rate Schedule GS-1 Meter Number KI90174 Current kWh Reading 02041 Previous kWh Reading 02041 Curr On-peak kWh Rdg 00000 Prev On-peak kWh Rdg 00000 kWh Constant 00001 Average kWh per Day 0 Storm Charge 0.00 Total kWh Used 0 On-peak kWh Used 0 Off-peak kWh Used 0 Demand Reading 000.00 On-peak Demand Rdg 000.00 KW Constant 1 Demand Used 0 Max Demand 0 Max Month Demand 0 On-peak Demand 0 Contract Demand 0 Service Amount 25.00 FPL SolarTogethr Chg 0.00 FPL SolarTogethr Cr 0.00 Transformer Credit 0.00 Curtailment/CDR Cr 0.00 Non-Std Mtr Enroll 0.00 Non-Std Mtr Surchg 0.00 Fixed Rate differential 0.00 Gross receipts tax 0.64 Regulatory Assessment Fee 0.02 Franchise Charge 1.55 Utility Tax 0.00 Florida Sales Tax 0.00 Disc FL Sales Surtax 0.00 VSP Solar Charge 0.00 Facility Rental 0.00 Fac Rental Sales Tax 0.00 Fac Rental Disc Tax 0.00 Late Payment Charge 0.00 Care To Share donation 0.00 Contracted Service Charge 0.00 Total New Charges 27.21 BILLING STATEMENT For: Dec 09 2024 to Jan 09 2025 (31 days) Rate Schedule GS-1 Meter Number KI90174 Current kWh Reading 02041 Previous kWh Reading 02041 Curr On-peak kWh Rdg 00000 Prev On-peak kWh Rdg 00000 kWh Constant 00001 Average kWh per Day 0 Storm Charge 0.00 Total kWh Used 0 On-peak kWh Used 0 Off-peak kWh Used 0 Demand Reading 000.00 On-peak Demand Rdg 000.00 KW Constant 1 Demand Used 0 Max Demand 0 Max Month Demand 0 On-peak Demand 0 Contract Demand 0 Service Amount 25.00 FPL SolarTogethr Chg 0.00 FPL SolarTogethr Cr 0.00 Transformer Credit 0.00 Curtailment/CDR Cr 0.00 Non-Std Mtr Enroll 0.00 Non-Std Mtr Surchg 0.00 Fixed Rate differential 0.00 Gross receipts tax 0.64 Regulatory Assessment Fee 0.02 Franchise Charge 1.55 Utility Tax 0.00 Florida Sales Tax 0.00 Disc FL Sales Surtax 0.00 VSP Solar Charge 0.00 Facility Rental 0.00 Fac Rental Sales Tax 0.00 Fac Rental Disc Tax 0.00 Late Payment Charge 0.00 Care To Share donation 0.00 Contracted Service Charge 0.00 Total New Charges 27.21 ECOMCustomer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 55113-16357 BILLING STATEMENT For: Jan 09 2025 to Feb 10 2025 (32 days) Rate Schedule GS-1 Meter Number KI90174 Current kWh Reading 02041 Previous kWh Reading 02041 Curr On-peak kWh Rdg 00000 Prev On-peak kWh Rdg 00000 kWh Constant 00001 Average kWh per Day 0 Storm Charge 0.00 Total kWh Used 0 On-peak kWh Used 0 Off-peak kWh Used 0 Demand Reading 000.00 On-peak Demand Rdg 000.00 KW Constant 1 Demand Used 0 Max Demand 0 Max Month Demand 0 On-peak Demand 0 Contract Demand 0 Service Amount 25.00 FPL SolarTogethr Chg 0.00 FPL SolarTogethr Cr 0.00 Transformer Credit 0.00 Curtailment/CDR Cr 0.00 Non-Std Mtr Enroll 0.00 Non-Std Mtr Surchg 0.00 Fixed Rate differential 0.00 Gross receipts tax 0.64 Regulatory Assessment Fee 0.02 Franchise Charge 1.55 Utility Tax 0.00 Florida Sales Tax 0.00 Disc FL Sales Surtax 0.00 VSP Solar Charge 0.00 Facility Rental 0.00 Fac Rental Sales Tax 0.00 Fac Rental Disc Tax 0.00 Late Payment Charge 0.00 Care To Share donation 0.00 Contracted Service Charge 0.00 Total New Charges 27.21 BILLING STATEMENT For: Feb 10 2025 to Mar 10 2025 (28 days) Rate Schedule GS-1 Meter Number KI90174 Current kWh Reading 02041 Previous kWh Reading 02041 Curr On-peak kWh Rdg 00000 Prev On-peak kWh Rdg 00000 kWh Constant 00001 Average kWh per Day 0 Storm Charge 0.00 Total kWh Used 0 On-peak kWh Used 0 Off-peak kWh Used 0 Demand Reading 000.00 On-peak Demand Rdg 000.00 KW Constant 1 Demand Used 0 Max Demand 0 Max Month Demand 0 On-peak Demand 0 Contract Demand 0 Service Amount 25.00 FPL SolarTogethr Chg 0.00 FPL SolarTogethr Cr 0.00 Transformer Credit 0.00 Curtailment/CDR Cr 0.00 Non-Std Mtr Enroll 0.00 Non-Std Mtr Surchg 0.00 Fixed Rate differential 0.00 Gross receipts tax 0.64 Regulatory Assessment Fee 0.02 Franchise Charge 1.55 Utility Tax 0.00 Florida Sales Tax 0.00 Disc FL Sales Surtax 0.00 VSP Solar Charge 0.00 Facility Rental 0.00 Fac Rental Sales Tax 0.00 Fac Rental Disc Tax 0.00 Late Payment Charge 0.00 Care To Share donation 0.00 Contracted Service Charge 0.00 Total New Charges 27.21 ECOMCustomer Name:Account Number:FPL.com Page 3 CITY OF DANIA BEACH 55113-16357 BILLING STATEMENT For: Mar 10 2025 to Apr 08 2025 (29 days) Rate Schedule GS-1 Meter Number KI90174 Current kWh Reading 02041 Previous kWh Reading 02041 Curr On-peak kWh Rdg 00000 Prev On-peak kWh Rdg 00000 kWh Constant 00001 Average kWh per Day 0 Storm Charge 0.00 Total kWh Used 0 On-peak kWh Used 0 Off-peak kWh Used 0 Demand Reading 000.00 On-peak Demand Rdg 000.00 KW Constant 1 Demand Used 0 Max Demand 0 Max Month Demand 0 On-peak Demand 0 Contract Demand 0 Service Amount 25.00 FPL SolarTogethr Chg 0.00 FPL SolarTogethr Cr 0.00 Transformer Credit 0.00 Curtailment/CDR Cr 0.00 Non-Std Mtr Enroll 0.00 Non-Std Mtr Surchg 0.00 Fixed Rate differential 0.00 Gross receipts tax 0.64 Regulatory Assessment Fee 0.02 Franchise Charge 1.55 Utility Tax 0.00 Florida Sales Tax 0.00 Disc FL Sales Surtax 0.00 VSP Solar Charge 0.00 Facility Rental 0.00 Fac Rental Sales Tax 0.00 Fac Rental Disc Tax 0.00 Late Payment Charge 0.00 Care To Share donation 0.00 Contracted Service Charge 0.00 Total New Charges 27.21 BILLING STATEMENT For: Apr 08 2025 to May 08 2025 (30 days) Rate Schedule GS-1 Meter Number KI90174 Current kWh Reading 02041 Previous kWh Reading 02041 Curr On-peak kWh Rdg 00000 Prev On-peak kWh Rdg 00000 kWh Constant 00001 Average kWh per Day 0 Storm Charge 0.00 Total kWh Used 0 On-peak kWh Used 0 Off-peak kWh Used 0 Demand Reading 000.00 On-peak Demand Rdg 000.00 KW Constant 1 Demand Used 0 Max Demand 0 Max Month Demand 0 On-peak Demand 0 Contract Demand 0 Service Amount 25.00 FPL SolarTogethr Chg 0.00 FPL SolarTogethr Cr 0.00 Transformer Credit 0.00 Curtailment/CDR Cr 0.00 Non-Std Mtr Enroll 0.00 Non-Std Mtr Surchg 0.00 Fixed Rate differential 0.00 Gross receipts tax 0.64 Regulatory Assessment Fee 0.02 Franchise Charge 1.55 Utility Tax 0.00 Florida Sales Tax 0.00 Disc FL Sales Surtax 0.00 VSP Solar Charge 0.00 Facility Rental 0.00 Fac Rental Sales Tax 0.00 Fac Rental Disc Tax 0.00 Late Payment Charge 0.00 Care To Share donation 0.00 Contracted Service Charge 0.00 Total New Charges 27.21 CURRENT BILL $113.16 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 98.26 Payments received -98.26 Balance before new charges 0.00 Total new charges 113.16 Total amount you owe $113.16 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 58069-19410 Service Address: 200 NE 2ND ST #CONCESSION DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 58069-19410 $113.16 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 950 kWh 760 kWh 570 kWh 380 kWh 190 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 58069-19410 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 98.26 Payment received - Thank you −98.26 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$71.00 Fuel:( $0.027180 per kWh)$20.09 Electric service amount 103.96 Gross receipts tax (State tax)2.67 Franchise fee (Reqd local fee)6.43 Taxes and charges 9.10 Regulatory fee (State fee)0.10 Total new charges $113.16 Total amount you owe $113.16 METER SUMMARY Meter reading - Meter AED7769. Next meter reading Jun 9, 2025. Usage Type Current -Previous =Usage kWh used 28078 27339 739 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 739 628 582 Service days 30 29 30 kWh/day 25 22 19 Amount $113.16 $98.26 $84.79 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $110.94 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 773.61 Payments received -773.61 Balance before new charges 0.00 Total new charges 110.94 Total amount you owe $110.94 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 60629-55627 Service Address: 311 SE 3RD ST # PMP DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 60629-55627 $110.94 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 3,050 kWh 2,440 kWh 1,830 kWh 1,220 kWh 610 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 60629-55627 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 773.61 Payment received - Thank you −773.61 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$3.49 Fuel:( $0.027180 per kWh)$2.80 Demand charge:$13.41 per KW Electric service amount 36.70 Gross receipts tax (State tax)0.94 Franchise fee (Reqd local fee)2.27 Taxes and charges 3.21 Regulatory fee (State fee)0.03 Total new charges $39.94 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $110.94 METER SUMMARY Meter reading - Meter SN88527. Next meter reading Jun 9, 2025. Usage Type Current -Previous =Usage kWh used 36766 36663 103 Demand KW 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 103 191 105 Service days 30 29 30 kWh/day 3 6 3 Amount $39.94 $702.61 $82.01 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $852.64 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 932.09 Payments received -932.09 Balance before new charges 0.00 Total new charges 852.64 Total amount you owe $852.64 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 62074-52647 Service Address: 901 NE 3RD ST #CIVIC CTR DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 62074-52647 $852.64 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 11,100 kWh 8,880 kWh 6,660 kWh 4,440 kWh 2,220 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 62074-52647 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 932.09 Payment received - Thank you −932.09 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$231.81 Fuel:( $0.027180 per kWh)$185.91 Demand:($13.41 per KW)$335.25 Electric service amount 783.38 Gross receipts tax (State tax)20.10 Franchise fee (Reqd local fee)48.44 Taxes and charges 68.54 Regulatory fee (State fee)0.72 Total new charges $852.64 Total amount you owe $852.64 METER SUMMARY Meter reading - Meter KT58793. Next meter reading Jun 9, 2025. Usage Type Current -Previous x Const =Usage kWh used 07071 07014 120 6840 Demand KW .21 120.00 25 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 6840 5400 5400 Service days 30 29 30 kWh/day 228 186 180 Amount $852.64 $932.09 $599.92 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $305.72 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 262.63 Payments received -262.63 Balance before new charges 0.00 Total new charges 305.72 Total amount you owe $305.72 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 62624-58257 Service Address: 100 NW 8TH AVE #STAND DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 62624-58257 $305.72 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 3,250 kWh 2,600 kWh 1,950 kWh 1,300 kWh 650 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 62624-58257 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 262.63 Payment received - Thank you −262.63 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$208.92 Fuel:( $0.027180 per kWh)$59.09 Electric service amount 280.88 Gross receipts tax (State tax)7.21 Franchise fee (Reqd local fee)17.37 Taxes and charges 24.58 Regulatory fee (State fee)0.26 Total new charges $305.72 Total amount you owe $305.72 METER SUMMARY Meter reading - Meter ACD1416. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 45497 43323 2174 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 2174 1853 726 Service days 30 29 30 kWh/day 72 64 24 Amount $305.72 $262.63 $102.34 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,109.74 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 1,249.07 Payments received -1,249.07 Balance before new charges 0.00 Total new charges 1,109.74 Total amount you owe $1,109.74 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 62762-57638 Service Address: 1200 SE 2ND AVE # LS 3 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 62762-57638 $1,109.74 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 14,350 kWh 11,480 kWh 8,610 kWh 5,740 kWh 2,870 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 62762-57638 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 1,249.07 Payment received - Thank you −1,249.07 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$319.25 Fuel:( $0.027180 per kWh)$256.04 Demand:($13.41 per KW)$348.66 Electric service amount 954.36 Gross receipts tax (State tax)24.49 Franchise fee (Reqd local fee)59.01 Taxes and charges 83.50 Regulatory fee (State fee)0.88 Total new charges $1,038.74 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $1,109.74 METER SUMMARY Meter reading - Meter PT32736. Next meter reading Jun 9, 2025. Usage Type Current -Previous x Const =Usage kWh used 00252 00095 60 9420 Demand KW 26 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 9420 9540 360 Service days 30 29 30 kWh/day 314 328 12 Amount $1,038.74 $1,178.07 $69.74 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $27.21 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 27.21 Payments received -27.21 Balance before new charges 0.00 Total new charges 27.21 Total amount you owe $27.21 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 62926-58660 Service Address: 951 NW 10 ST #IRR PUMP DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 62926-58660 $27.21 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O DANIA FL 33004 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 5 kWh 4 kWh 3 kWh 2 kWh 1 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 62926-58660 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 27.21 Payment received - Thank you −27.21 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $27.21 METER SUMMARY Meter reading - Meter ACD8555. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 00000 00000 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 0 0 0 Service days 30 29 30 kWh/day 0 0 0 Amount $27.21 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $31.22 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 30.17 Payments received -30.17 Balance before new charges 0.00 Total new charges 31.22 Total amount you owe $31.22 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 62936-56697 Service Address: 900 NW 10 ST #LIGHTS DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 62936-56697 $31.22 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 120 kWh 96 kWh 72 kWh 48 kWh 24 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 62936-56697 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 30.17 Payment received - Thank you −30.17 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$6.81 Non-fuel:( $0.096100 per kWh)$7.02 Fuel:( $0.027180 per kWh)$1.98 Electric service amount 28.68 Gross receipts tax (State tax)0.74 Franchise fee (Reqd local fee)1.77 Taxes and charges 2.51 Regulatory fee (State fee)0.03 Total new charges $31.22 Total amount you owe $31.22 METER SUMMARY Meter reading - Meter ACD5956. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 02392 02319 73 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 73 54 77 Service days 30 29 30 kWh/day 2 2 3 Amount $31.22 $30.17 $30.52 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $14.19 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 14.19 Payments received -14.19 Balance before new charges 0.00 Total new charges 14.19 Total amount you owe $14.19 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 64800-94298 Service Address: 506 NE 3RD ST # OL DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) Hello City Of Dania Beach, Here's what you owe for this billing period. E001 64800-94298 $14.19 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 30 kWh 24 kWh 18 kWh 12 kWh 6 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payments received after August 06, 2025 are considered late; a late payment charge, the greater of $0.00 or 1.5% of your past due balance will apply. Your account may also be billed a deposit adjustment. · Charges and energy usage are based on the facilities contracted. Facility, energy and fuel costs are available upon request. E001Customer Name:Account Number:FPL.com Page 2 City Of Dania Beach 64800-94298 Stay cool, save big Claim up to $1,420 in savings by upgrading your insulation. Save energy and keep the heat out! FPL.com/CeilingInsulation Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 14.19 Payment received - Thank you −14.19 Balance before new charges $0.00 New Charges Rate: OL-1 OUTDOOR LIGHTING Electric service amount **11.60 Gross receipts tax (State tax)0.09 Franchise fee (Reqd local fee)0.70 Utility tax (Local tax)1.18 Florida sales tax (State tax)0.52 County sales tax (Local tax)0.09 Taxes and charges 2.58 Regulatory fee (State fee)0.01 Total new charges $14.19 Total amount you owe $14.19 ** Your electric service amount includes the following charges: Non-fuel energy charge: $0.091030 per kWh Fuel charge:$0.026470 per kWh METER SUMMARY Next bill date Jun 9, 2025. Usage Type Usage Total kWh used 29 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 29 29 29 Service days 30 29 30 kWh/day 1 1 1 Amount $14.19 $14.19 $12.35 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $54.42 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 27.21 Balance before new charges 27.21 Total new charges 27.21 Total amount you owe $54.42 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 1, 2025 to May 1, 2025 (30 days) Statement Date: May 1, 2025 Account Number: 67543-69459 Service Address: 1901 GRIFFIN RD #LIGHTS DANIA, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 67543-69459 $54.42 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O CITY OF DANIA BEACH 1201 STIRLING RD DANIA FL 33004-3555 ENERGY USAGE HISTORY 20 kWh 16 kWh 12 kWh 8 kWh 4 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 67543-69459 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 27.21 Balance before new charges $27.21 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $54.42 METER SUMMARY Meter reading - Meter ACD3114. Next meter reading Jun 2, 2025. Usage Type Current -Previous =Usage kWh used 00011 00011 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 1, 2025 Apr 1, 2025 May 1, 2024 kWh Used 0 0 0 Service days 30 29 30 kWh/day 0 0 0 Amount $27.21 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $44.13 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 73.94 Payments received -73.94 Balance before new charges 0.00 Total new charges 44.13 Total amount you owe $44.13 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 69593-35123 Service Address: 1000 N FEDERAL HWY #SIGN DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 69593-35123 $44.13 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 800 kWh 640 kWh 480 kWh 320 kWh 160 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 69593-35123 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 73.94 Payment received - Thank you −73.94 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$22.11 Fuel:( $0.027180 per kWh)$6.25 Electric service amount 41.23 Gross receipts tax (State tax)1.06 Franchise fee (Reqd local fee)1.80 Taxes and charges 2.86 Regulatory fee (State fee)0.04 Total new charges $44.13 Total amount you owe $44.13 METER SUMMARY Meter reading - Meter AC58673. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 47918 47688 230 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 230 456 495 Service days 30 29 30 kWh/day 8 16 17 Amount $44.13 $73.94 $73.10 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $62,924.87 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 62,509.24 Additional Activity −30,838.99 Balance before new charges 31,670.25 Total new charges 31,254.62 Total amount you owe $62,924.87 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 2, 2025 to May 2, 2025 (30 days) Statement Date: May 2, 2025 Account Number: 74042-50974 Service Address: STREET LIGHTS #DANIA DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 74042-50974 $62,924.87 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O CITY HALL PO BOX 1708 DANIA FL 33004-1708 ENERGY USAGE HISTORY 103,400 kWh 82,720 kWh 62,040 kWh 41,360 kWh 20,680 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · Charges and energy usage are based on the facilities contracted. Facility, energy and fuel costs are available upon request. · This bill reflects a credit to the fuel charge portion of your bill for each street light fixture turned off during sea turtle nesting and hatching season. Thank you for helping us protect sea turtles. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 74042-50974 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 62,509.24 Additional activity Credit −30,838.99 Balance before new charges $31,670.25 New Charges Rate: SL-1 STREET LIGHTING SERVICE Electric service amount 29,246.53 Gross receipts tax (State tax)205.90 Franchise fee (Reqd local fee)1,775.69 Taxes and charges 1,981.59 Regulatory fee (State fee)26.50 Total new charges $31,254.62 Total amount you owe $62,924.87 METER SUMMARY Next bill date Jun 3, 2025. Usage Type Usage Total kWh used 93962 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 2, 2025 Apr 2, 2025 May 2, 2024 kWh Used 93962 93962 93767 Service days 30 29 30 kWh/day 3132 3240 3126 Amount $31,254.62 $31,254.62 $28,581.40 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. Component Code Watts Lumens Owner/ Maint *Quantity Rate/Unit kWh Used Amount 60 KWH E 20 1,200 Energy 2.080000 41.60 88 KWH E 1 88 Energy 3.040000 3.04 168 KWH E 161 27,048 Energy 5.810000 935.41 28 KWH E 4 112 Energy 0.970000 3.88 104 KWH E 8 832 Energy 3.600000 28.80 160 KWH E 11 1,760 Energy 5.530000 60.83 168 KWH E 31 5,208 Energy 5.810000 180.11 C700304 47 5392 F 158 2,528 Energy 0.600000 94.80 Non-energy Fixtures 6.610000 1,044.38 Maintenance 1.470000 232.26 C700305 76 8653 F 751 19,526 Energy 0.800000 600.80 Non-energy Fixtures 6.610000 4,964.11 Maintenance 1.470000 1,103.97 C700306 118 15453 F 63 2,583 Energy 1.400000 88.20 For: 04-02-2025 to 05-02-2025 (30 days) kWh/Day: 3,132 Service Address: STREET LIGHTS #DANIA DANIA, FL 33004 FPL.com Page 1Customer Name: CITY OF DANIA BEACH Detail of Rate Schedule Charges for Street Lights CITY OF DANIA BEACH C/O CITY HALL PO BOX 1708 DANIA FL 33004-1708 Account Number: 74042-50974 * F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER ESLA Customer Name: CITY OF DANIA BEACH Component Code Watts Lumens Owner/ Maint *Quantity Rate/Unit kWh Used Amount Non-energy Fixtures 9.610000 605.43 Maintenance 1.470000 92.61 C700307 259 27874 F 25 2,275 Energy 3.200000 80.00 Non-energy Fixtures 9.610000 240.25 Maintenance 1.470000 36.75 C700602 26 3300 F 409 3,681 Energy 0.400000 163.60 Non-energy Fixtures 6.610000 2,703.49 Maintenance 1.470000 601.23 C700613 144 2700 F 1 50 Energy 1.800000 1.80 Non-energy Fixtures 12.610000 12.61 Maintenance 1.470000 1.47 C700627 144 5300 F 12 600 Energy 1.800000 21.60 Non-energy Fixtures 12.610000 151.32 Maintenance 1.470000 17.64 C863210 38 2500 F 95 1,235 Energy 0.400000 38.00 Non-energy Fixtures 6.610000 627.95 Maintenance 1.470000 139.65 F600222 59 7500 F 2 40 Account Number: 74042-50974 For: 04-02-2025 to 05-02-2025 (30 days) kWh/Day: 3,132 Service Address: STREET LIGHTS #DANIA DANIA, FL 33004 FPL.com Page 2 * F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER ESLA Customer Name: CITY OF DANIA BEACH Component Code Watts Lumens Owner/ Maint *Quantity Rate/Unit kWh Used Amount Energy 0.600000 1.20 Non-energy Fixtures 4.500000 9.00 Maintenance 1.470000 2.94 F700305 76 8653 F 94 2,444 Energy 0.800000 75.20 Non-energy Fixtures 4.500000 423.00 Maintenance 1.470000 138.18 F700307 259 27874 F 4 364 Energy 3.200000 12.80 Non-energy Fixtures 7.500000 30.00 Maintenance 1.470000 5.88 F700308 268 32329 F 2 188 Energy 3.200000 6.40 Non-energy Fixtures 10.500000 21.00 Maintenance 1.470000 2.94 F861224 39 3500 F 15 195 Energy 0.400000 6.00 Non-energy Fixtures 7.500000 112.50 Maintenance 1.470000 22.05 HPS0070 70 6300 F 30 870 Energy 1.000000 30.00 Non-energy Fixtures 5.380000 161.40 Maintenance 2.190000 65.70 HPS0100 100 9500 F 31 1,271 Energy 1.420000 44.02 Non-energy Fixtures 4.990000 154.69 Maintenance 2.200000 68.20 HPS0150 150 16000 F 51 3,060 Energy 2.080000 106.08 Non-energy Fixtures 5.140000 262.14 Maintenance 2.230000 113.73 Account Number: 74042-50974 For: 04-02-2025 to 05-02-2025 (30 days) kWh/Day: 3,132 Service Address: STREET LIGHTS #DANIA DANIA, FL 33004 FPL.com Page 3 * F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER ESLA Customer Name: CITY OF DANIA BEACH Component Code Watts Lumens Owner/ Maint *Quantity Rate/Unit kWh Used Amount HPS0200 200 22000 F 103 9,064 Energy 3.040000 313.12 Non-energy Fixtures 7.800000 803.40 Maintenance 2.850000 293.55 HPS0400 400 50000 F 7 1,176 Energy 5.810000 40.67 Non-energy Fixtures 7.880000 55.16 Maintenance 2.840000 19.88 HPS0250 250 27500 R 3 348 Energy 4.010000 12.03 Non-energy Relamp 3.090000 9.27 HPS0400 400 50000 R 37 6,216 Energy 5.810000 214.97 Non-energy Relamp 2.850000 105.45 PMC0001 308 Non-energy Fixtures 8.250000 2,541.00 PMF0001 15 Non-energy Fixtures 9.740000 146.10 PMW0001 377 Non-energy Fixtures 6.030000 2,273.31 UCNP 13,456 Non-energy Maintenance 0.049350 664.05 UCUP 408 Non-energy Maintenance 0.120540 49.18 Additional lighting facility charge Non-energy 94.52 Account Number: 74042-50974 For: 04-02-2025 to 05-02-2025 (30 days) kWh/Day: 3,132 Service Address: STREET LIGHTS #DANIA DANIA, FL 33004 FPL.com Page 4 * F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER ESLA Customer Name: CITY OF DANIA BEACH Component Code Watts Lumens Owner/ Maint *Quantity Rate/Unit kWh Used Amount Energy sub total 3,204.96 Non-energy sub total 21,223.34 Sub total 93,962 24,428.30 Energy conservation cost recovery 36.65 Capacity payment recovery charge 6.58 Environmental cost recovery charge 46.04 Storm restoration recovery charge 1,946.89 Transition rider credit −194.50 Storm protection recovery charge 524.31 Fuel charge 2,452.26 Electric service amount 29,246.53 Gross receipts tax (State tax)205.90 Regulatory fee (State fee)26.50 Franchise fee (Reqd local fee)1,775.69 Total 93,962 31,254.62 Account Number: 74042-50974 For: 04-02-2025 to 05-02-2025 (30 days) kWh/Day: 3,132 Service Address: STREET LIGHTS #DANIA DANIA, FL 33004 FPL.com Page 5 * F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER ESLA CURRENT BILL $30.40 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 27.43 Payments received -27.43 Balance before new charges 0.00 Total new charges 30.40 Total amount you owe $30.40 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 74309-73243 Service Address: 106 N BEACH RD DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 74309-73243 $30.40 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 70 kWh 56 kWh 42 kWh 28 kWh 14 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 74309-73243 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 27.43 Payment received - Thank you −27.43 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$7.91 Non-fuel:( $0.096100 per kWh)$5.56 Fuel:( $0.027180 per kWh)$1.58 Electric service amount 27.92 Gross receipts tax (State tax)0.72 Franchise fee (Reqd local fee)1.73 Taxes and charges 2.45 Regulatory fee (State fee)0.03 Total new charges $30.40 Total amount you owe $30.40 METER SUMMARY Meter reading - Meter KE82004. Next meter reading Jun 9, 2025. Usage Type Current -Previous =Usage kWh used 02808 02750 58 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 58 4 11 Service days 30 29 30 kWh/day 1 0 0 Amount $30.40 $27.43 $27.67 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,327.09 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 1,357.63 Payments received -1,357.63 Balance before new charges 0.00 Total new charges 1,327.09 Total amount you owe $1,327.09 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 75296-61378 Service Address: 1201 STIRLING RD #PSAB DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 75296-61378 $1,327.09 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 17,100 kWh 13,680 kWh 10,260 kWh 6,840 kWh 3,420 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 75296-61378 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 1,357.63 Payment received - Thank you −1,357.63 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$429.05 Fuel:( $0.027180 per kWh)$344.10 Demand:($13.41 per KW)$415.71 Electric service amount 1,219.27 Gross receipts tax (State tax)31.29 Franchise fee (Reqd local fee)75.40 Taxes and charges 106.69 Regulatory fee (State fee)1.13 Total new charges $1,327.09 Total amount you owe $1,327.09 METER SUMMARY Meter reading - Meter KU38133. Next meter reading Jun 10, 2025. Usage Type Current -Previous x Const =Usage kWh used 31418 31207 60 12660 Demand KW .52 60.00 31 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 12660 12900 11760 Service days 30 29 30 kWh/day 422 444 392 Amount $1,327.09 $1,357.63 $1,227.47 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $54.42 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 27.21 Balance before new charges 27.21 Total new charges 27.21 Total amount you owe $54.42 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 1, 2025 to May 1, 2025 (30 days) Statement Date: May 1, 2025 Account Number: 75572-89456 Service Address: 4155 GRIFFIN RD #LIGHTS DANIA, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 75572-89456 $54.42 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 150 kWh 120 kWh 90 kWh 60 kWh 30 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 75572-89456 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 27.21 Balance before new charges $27.21 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $54.42 METER SUMMARY Meter reading - Meter ACD3228. Next meter reading Jun 2, 2025. Usage Type Current -Previous =Usage kWh used 00233 00233 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 1, 2025 Apr 1, 2025 May 1, 2024 kWh Used 0 0 0 Service days 30 29 30 kWh/day 0 0 0 Amount $27.21 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $318.22 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 206.34 Payments received -206.34 Balance before new charges 0.00 Total new charges 318.22 Total amount you owe $318.22 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 75615-78464 Service Address: 1200 NW 1ST ST DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) DANIA BEACH COMMUNITY REDEVELOPMENT AGENCY, Here's what you owe for this billing period. E001 75615-78464 $318.22 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 DANIA BEACH COMMUNITY REDEVELOPMENT AGENCY 100 W DANIA BEACH BLVD DANIA BEACH FL 33004-3643 ENERGY USAGE HISTORY 2,350 kWh 1,880 kWh 1,410 kWh 940 kWh 470 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payments received after June 05, 2025 are considered late; a late payment charge, the greater of $5.00 or 1.5% of your past due balance will apply. Your account may also be billed a deposit adjustment. E001Customer Name:Account Number:FPL.com Page 2 DANIA BEACH COMMUNITY REDEVELOPMENT AGENCY 75615-78464 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 206.34 Payment received - Thank you −206.34 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$185.58 Fuel:( $0.027180 per kWh)$52.48 Electric service amount 250.93 Gross receipts tax (State tax)6.44 Franchise fee (Reqd local fee)15.52 Utility tax (Local tax)23.39 Florida sales tax (State tax)18.98 County sales tax (Local tax)2.73 Taxes and charges 67.06 Regulatory fee (State fee)0.23 Total new charges $318.22 Total amount you owe $318.22 METER SUMMARY Meter reading - Meter ACD1767. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 10959 09028 1931 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 1931 1215 2129 Service days 30 29 30 kWh/day 64 42 71 Amount $318.22 $206.34 $317.37 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $5,440.13 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 2,949.95 Balance before new charges 2,949.95 Total new charges 2,490.18 Total amount you owe $5,440.13 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 1, 2025 to May 1, 2025 (30 days) Statement Date: May 1, 2025 Account Number: 77463-97251 Service Address: 2901 SW 52ND ST #POOL FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 77463-97251 $5,440.13 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O TANIA STEVENS 100 W DANIA BEACH BLVD DANIA BEACH FL 33004-3699 ENERGY USAGE HISTORY 47,100 kWh 37,680 kWh 28,260 kWh 18,840 kWh 9,420 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 77463-97251 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 2,949.95 Balance before new charges $2,949.95 New Charges Rate: HLFT-1 HIGH LOAD FACTOR DEMAND TIME OF USE Electric service amount **2,287.88 Gross receipts tax (State tax)58.71 Franchise fee (Reqd local fee)141.48 Taxes and charges 200.19 Regulatory fee (State fee)2.11 Total new charges $2,490.18 Total amount you owe $5,440.13 ** Your electric service amount includes the following charges: Base charge:$30.41 Non-fuel energy charge: On-peak $0.030330 per kWh Off-peak $0.022150 per kWh Fuel charge: On-peak $0.030740 per kWh Off-peak $0.025650 per kWh Demand charge: On-Peak $15.45 per KW Maximum $2.80 per KW METER SUMMARY Meter reading - Meter MLL7780. Next meter reading Jun 2, 2025. Usage Type Current -Previous =Usage Total kWh used 22634 98576 24058 On-Peak kWh used 10462 05496 4966 Off-peak kWh used 19092 On-peak demand 56.05 56 Maximum demand 63 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 1, 2025 Apr 1, 2025 May 1, 2024 kWh Used 24058 29622 28839 Service days 30 29 30 kWh/day 801 1021 961 Amount $2,490.18 $2,949.95 $2,513.68 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $10,888.83 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 10,845.24 Payments received -10,845.24 Balance before new charges 0.00 Total new charges 10,888.83 Total amount you owe $10,888.83 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 78869-61130 Service Address: 1201 STIRLING RD #HSPS DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 78869-61130 $10,888.83 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 135,200 kWh 108,160 kWh 81,120 kWh 54,080 kWh 27,040 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 78869-61130 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 10,845.24 Payment received - Thank you −10,845.24 Balance before new charges $0.00 New Charges Rate: GSDT-1 GENERAL SERVICE DEMAND TIME OF USE Electric service amount **10,004.23 Gross receipts tax (State tax)256.74 Franchise fee (Reqd local fee)618.63 Taxes and charges 875.37 Regulatory fee (State fee)9.23 Total new charges $10,888.83 Total amount you owe $10,888.83 ** Your electric service amount includes the following charges: Base charge:$30.41 Non-fuel energy charge: On-peak $0.062970 per kWh Off-peak $0.022150 per kWh Fuel charge: On-peak $0.030740 per kWh Off-peak $0.025650 per kWh Demand charge:$12.69 per KW Maximum $0.71 per KW METER SUMMARY Meter reading - Meter MV57024. Next meter reading Jun 10, 2025. Usage Type Current -Previous x Const =Usage Total kWh used 17172 16148 120 122880 On-Peak kWh used 29723 29439 120 34080 Off-peak kWh used 88800 On-peak demand 1.57 120.00 188 Maximum demand 211 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 122880 119040 108480 Service days 30 29 30 kWh/day 4096 4104 3616 Amount $10,888.83 $10,845.24 $9,354.87 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $29.07 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 29.19 Payments received -29.19 Balance before new charges 0.00 Total new charges 29.07 Total amount you owe $29.07 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 82314-31431 Service Address: 803 NW 1ST ST #PKGLTLGTS DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 82314-31431 $29.07 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH PO BOX 1708 DANIA FL 33004-1708 ENERGY USAGE HISTORY 50 kWh 40 kWh 30 kWh 20 kWh 10 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 82314-31431 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 29.19 Payment received - Thank you −29.19 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$9.65 Non-fuel:( $0.096100 per kWh)$3.27 Fuel:( $0.027180 per kWh)$0.92 Electric service amount 26.71 Gross receipts tax (State tax)0.69 Franchise fee (Reqd local fee)1.65 Taxes and charges 2.34 Regulatory fee (State fee)0.02 Total new charges $29.07 Total amount you owe $29.07 METER SUMMARY Meter reading - Meter ACD7830. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 07013 06979 34 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 34 36 34 Service days 30 29 30 kWh/day 1 1 1 Amount $29.07 $29.19 $28.67 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $706.95 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 716.51 Payments received -716.51 Balance before new charges 0.00 Total new charges 706.95 Total amount you owe $706.95 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 82343-56627 Service Address: 200 NE 2 ST #CTS DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 82343-56627 $706.95 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 3,600 kWh 2,880 kWh 2,160 kWh 1,440 kWh 720 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 82343-56627 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 716.51 Payment received - Thank you −716.51 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$90.55 Fuel:( $0.027180 per kWh)$72.62 Demand:($13.41 per KW)$455.94 Electric service amount 649.52 Gross receipts tax (State tax)16.67 Franchise fee (Reqd local fee)40.16 Taxes and charges 56.83 Regulatory fee (State fee)0.60 Total new charges $706.95 Total amount you owe $706.95 METER SUMMARY Meter reading - Meter KEL4829. Next meter reading Jun 9, 2025. Usage Type Current -Previous =Usage kWh used 27940 25268 2672 Demand KW 33.54 34 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 2672 2596 1185 Service days 30 29 30 kWh/day 89 89 39 Amount $706.95 $716.51 $631.90 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $309.76 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 335.61 Payments received -335.61 Balance before new charges 0.00 Total new charges 309.76 Total amount you owe $309.76 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 82363-52681 Service Address: 200 NE 2 ST DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 82363-52681 $309.76 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 3,450 kWh 2,760 kWh 2,070 kWh 1,380 kWh 690 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · A secondary metering adjustment of 3% has been added to metered KWH per Tariff Sheet 10.010. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 82363-52681 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 335.61 Payment received - Thank you −335.61 Balance before new charges $0.00 New Charges Rate: OS-2 SPORTS FIELD SERVICE Electric service amount **267.78 Gross receipts tax (State tax)6.87 Franchise fee (Reqd local fee)16.56 Taxes and charges 23.43 Facilities rental 18.28 Regulatory fee (State fee)0.27 Total new charges $309.76 Total amount you owe $309.76 ** Your electric service amount includes the following charges: Base charge:$156.45 Non-fuel energy charge: $0.136790 per kWh Fuel charge:$0.026940 per kWh METER SUMMARY Meter reading - Meter KLL4681. Next meter reading Jun 9, 2025. Usage Type Current -Previous =Usage kWh used 82991 82330 680 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 680 825 1220 Service days 30 29 30 kWh/day 22 27 39 Amount $291.46 $317.31 $360.74 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,038.12 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 1,936.34 Payments received -1,936.34 Balance before new charges 0.00 Total new charges 1,038.12 Total amount you owe $1,038.12 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 83534-55572 Service Address: 128 NW 10 CT # LS7 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 83534-55572 $1,038.12 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 16,200 kWh 12,960 kWh 9,720 kWh 6,480 kWh 3,240 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 83534-55572 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 1,936.34 Payment received - Thank you −1,936.34 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$327.38 Fuel:( $0.027180 per kWh)$262.56 Demand:($13.41 per KW)$268.20 Electric service amount 888.55 Gross receipts tax (State tax)22.80 Franchise fee (Reqd local fee)54.95 Taxes and charges 77.75 Regulatory fee (State fee)0.82 Total new charges $967.12 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $1,038.12 METER SUMMARY Meter reading - Meter ST38676. Next meter reading Jun 10, 2025. Usage Type Current -Previous x Const =Usage kWh used 06038 05877 60 9660 Demand KW 20 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 9660 9120 2100 Service days 30 29 30 kWh/day 322 314 70 Amount $967.12 $1,865.34 $689.56 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $46.49 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 46.34 Payments received -46.34 Balance before new charges 0.00 Total new charges 46.49 Total amount you owe $46.49 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 83594-58521 Service Address: 120 NW 10 CT DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 83594-58521 $46.49 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 300 kWh 240 kWh 180 kWh 120 kWh 60 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 83594-58521 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 46.34 Payment received - Thank you −46.34 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$23.26 Fuel:( $0.027180 per kWh)$6.58 Electric service amount 42.71 Gross receipts tax (State tax)1.10 Franchise fee (Reqd local fee)2.64 Taxes and charges 3.74 Regulatory fee (State fee)0.04 Total new charges $46.49 Total amount you owe $46.49 METER SUMMARY Meter reading - Meter ACD6938. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 08411 08169 242 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 242 241 2 Service days 30 29 30 kWh/day 8 8 0 Amount $46.49 $46.34 $27.29 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $184.48 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 367.87 Payments received -367.87 Balance before new charges 0.00 Total new charges 184.48 Total amount you owe $184.48 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 83671-08357 Service Address: 1855 GRIFFIN RD #LS 10 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 83671-08357 $184.48 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 1855 GRIFFIN RD # LS10 DANIA FL 33004-2436 ENERGY USAGE HISTORY 1,250 kWh 1,000 kWh 750 kWh 500 kWh 250 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 83671-08357 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 367.87 Payment received - Thank you −367.87 Balance before new charges $0.00 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$32.53 Fuel:( $0.027180 per kWh)$26.09 Demand:($13.41 per KW)$80.46 Electric service amount 169.49 Gross receipts tax (State tax)4.35 Franchise fee (Reqd local fee)10.48 Taxes and charges 14.83 Regulatory fee (State fee)0.16 Total new charges $184.48 Total amount you owe $184.48 METER SUMMARY Meter reading - Meter KJJ8920. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 40235 39275 960 Demand KW 6.42 6 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 960 1084 707 Service days 30 29 30 kWh/day 32 37 23 Amount $184.48 $367.87 $148.29 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $33.72 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 16.86 Balance before new charges 16.86 Total new charges 16.86 Total amount you owe $33.72 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 1, 2025 to May 1, 2025 (30 days) Statement Date: May 1, 2025 Account Number: 83822-11186 Service Address: 4540 SW 27TH AVE # OL FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) Hello City Of Dania Beach, Here's what you owe for this billing period. E001 83822-11186 $33.72 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 90 kWh 72 kWh 54 kWh 36 kWh 18 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · Charges and energy usage are based on the facilities contracted. Facility, energy and fuel costs are available upon request. E001Customer Name:Account Number:FPL.com Page 2 City Of Dania Beach 83822-11186 Stay cool, save big Claim up to $1,420 in savings by upgrading your insulation. Save energy and keep the heat out! FPL.com/CeilingInsulation Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 16.86 Balance before new charges $16.86 New Charges Rate: OL-1 OUTDOOR LIGHTING Electric service amount **15.66 Gross receipts tax (State tax)0.23 Franchise fee (Reqd local fee)0.96 Taxes and charges 1.19 Regulatory fee (State fee)0.01 Total new charges $16.86 Total amount you owe $33.72 ** Your electric service amount includes the following charges: Non-fuel energy charge: $0.091030 per kWh Fuel charge:$0.026470 per kWh METER SUMMARY Next bill date Jun 2, 2025. Usage Type Usage Total kWh used 77 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 1, 2025 Apr 1, 2025 May 1, 2024 kWh Used 77 77 77 Service days 30 29 30 kWh/day 3 3 3 Amount $16.86 $16.86 $12.53 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $6,841.00 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 6,424.33 Payments received -6,424.33 Balance before new charges 0.00 Total new charges 6,841.00 Total amount you owe $6,841.00 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 83875-32461 Service Address: 101 N BEACH RD #MARINA DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 83875-32461 $6,841.00 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 131,500 kWh 105,200 kWh 78,900 kWh 52,600 kWh 26,300 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 83875-32461 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 6,424.33 Payment received - Thank you −6,424.33 Balance before new charges $0.00 New Charges Rate: GSDT-1 GENERAL SERVICE DEMAND TIME OF USE Electric service amount **6,285.24 Gross receipts tax (State tax)161.30 Franchise fee (Reqd local fee)388.66 Taxes and charges 549.96 Regulatory fee (State fee)5.80 Total new charges $6,841.00 Total amount you owe $6,841.00 ** Your electric service amount includes the following charges: Base charge:$30.41 Non-fuel energy charge: On-peak $0.062970 per kWh Off-peak $0.022150 per kWh Fuel charge: On-peak $0.030740 per kWh Off-peak $0.025650 per kWh Demand charge:$12.69 per KW Maximum $0.71 per KW METER SUMMARY Meter reading - Meter MV58927. Next meter reading Jun 9, 2025. Usage Type Current -Previous x Const =Usage Total kWh used 42163 41606 120 66840 On-Peak kWh used 11762 11569 120 23160 Off-peak kWh used 43680 On-peak demand 1.24 120.00 149 Maximum demand 149 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 66840 59760 79560 Service days 30 29 30 kWh/day 2228 2060 2652 Amount $6,841.00 $6,424.33 $7,723.14 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $59.01 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 59.01 Payments received -59.01 Balance before new charges 0.00 Total new charges 59.01 Total amount you owe $59.01 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 8, 2025 to May 8, 2025 (30 days) Statement Date: May 8, 2025 Account Number: 92733-58607 Service Address: 300 NE 2ND ST # OL DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 92733-58607 $59.01 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 300 kWh 240 kWh 180 kWh 120 kWh 60 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. · Charges and energy usage are based on the facilities contracted. Facility, energy and fuel costs are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 92733-58607 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 59.01 Payment received - Thank you −59.01 Balance before new charges $0.00 New Charges Rate: OL-1 OUTDOOR LIGHTING Electric service amount **54.84 Gross receipts tax (State tax)0.77 Franchise fee (Reqd local fee)3.35 Taxes and charges 4.12 Regulatory fee (State fee)0.05 Total new charges $59.01 Total amount you owe $59.01 ** Your electric service amount includes the following charges: Non-fuel energy charge: $0.091030 per kWh Fuel charge:$0.026470 per kWh METER SUMMARY Next bill date Jun 9, 2025. Usage Type Usage Total kWh used 256 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 8, 2025 Apr 8, 2025 May 9, 2024 kWh Used 256 256 256 Service days 30 29 30 kWh/day 9 9 9 Amount $59.01 $59.01 $44.64 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $815.93 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 361.67 Balance before new charges 361.67 Total new charges 454.26 Total amount you owe $815.93 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 1, 2025 to May 1, 2025 (30 days) Statement Date: May 1, 2025 Account Number: 95580-98431 Service Address: 2901 SW 52ND ST FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 95580-98431 $815.93 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 5,950 kWh 4,760 kWh 3,570 kWh 2,380 kWh 1,190 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 95580-98431 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 361.67 Balance before new charges $361.67 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$315.30 Fuel:( $0.027180 per kWh)$89.18 Electric service amount 417.35 Gross receipts tax (State tax)10.71 Franchise fee (Reqd local fee)25.81 Taxes and charges 36.52 Regulatory fee (State fee)0.39 Total new charges $454.26 Total amount you owe $815.93 METER SUMMARY Meter reading - Meter AC03956. Next meter reading Jun 2, 2025. Usage Type Current -Previous =Usage kWh used 08315 05034 3281 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 1, 2025 Apr 1, 2025 May 1, 2024 kWh Used 3281 2591 3173 Service days 30 29 30 kWh/day 109 89 106 Amount $454.26 $361.67 $400.40 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $265.61 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 256.32 Payments received -256.32 Balance before new charges 0.00 Total new charges 265.61 Total amount you owe $265.61 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 9, 2025 to May 9, 2025 (30 days) Statement Date: May 9, 2025 Account Number: 96241-18460 Service Address: 230 SW 12TH AVE DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 96241-18460 $265.61 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 6,600 kWh 5,280 kWh 3,960 kWh 2,640 kWh 1,320 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 96241-18460 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 256.32 Payment received - Thank you −256.32 Balance before new charges $0.00 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$180.20 Fuel:( $0.027180 per kWh)$50.96 Electric service amount 244.03 Gross receipts tax (State tax)6.26 Franchise fee (Reqd local fee)15.09 Taxes and charges 21.35 Regulatory fee (State fee)0.23 Total new charges $265.61 Total amount you owe $265.61 METER SUMMARY Meter reading - Meter KLL3254. Next meter reading Jun 10, 2025. Usage Type Current -Previous =Usage kWh used 11973 10098 1875 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 9, 2025 Apr 9, 2025 May 10, 2024 kWh Used 1875 1806 3994 Service days 30 29 30 kWh/day 62 62 133 Amount $265.61 $256.32 $500.40 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,012.61 TOTAL AMOUNT YOU OWE Jun 5, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 975.54 Balance before new charges 975.54 Total new charges 37.07 Total amount you owe $1,012.61 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: Apr 2, 2025 to May 2, 2025 (30 days) Statement Date: May 2, 2025 Account Number: 97812-54595 Service Address: 2301 STIRLING RD # WELLFLD FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 97812-54595 $1,012.61 Jun 5, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W BCH BLV DANIA FL 33004 ENERGY USAGE HISTORY 23,850 kWh 19,080 kWh 14,310 kWh 9,540 kWh 4,770 kWh 0 kWh M J J A S O N D J F M A M2024 2025 KEEP IN MIND · Payment received after August 06, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 97812-54595 Shine brighter with LEDs Make the switch to LEDs for longer-lasting light, lower energy costs and qualify for our rebates. FPL.com/BizLighting Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 975.54 Balance before new charges $975.54 New Charges Rate: GSDT-1 GENERAL SERVICE DEMAND TIME OF USE Electric service amount **34.06 Gross receipts tax (State tax)0.87 Franchise fee (Reqd local fee)2.11 Taxes and charges 2.98 Regulatory fee (State fee)0.03 Total new charges $37.07 Total amount you owe $1,012.61 ** Your electric service amount includes the following charges: Base charge:$30.41 Non-fuel energy charge: On-peak $0.062970 per kWh Off-peak $0.022150 per kWh Fuel charge: On-peak $0.030740 per kWh Off-peak $0.025650 per kWh Demand charge:$12.69 per KW Maximum $0.71 per KW METER SUMMARY Meter reading - Meter MN55198. Next meter reading Jun 3, 2025. Usage Type Current -Previous =Usage Total kWh used 40693 40633 60 On-Peak kWh used 33914 33897 17 Off-peak kWh used 43 On-peak demand 0.18 0 Maximum demand 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to May 2, 2025 Apr 2, 2025 May 2, 2024 kWh Used 60 8320 17 Service days 30 29 30 kWh/day 2 286 0 Amount $37.07 $975.54 $27.94 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees.