Loading...
HomeMy WebLinkAboutInv# June2025FPL - FPL - 06/16/2025 (2)FPL.com Page 1 Summary Bill Statement Statement Date: Jun 16, 2025 Master Account #: 17071-61087 Total Number of Subordinates: 68 CURRENT BILL $78,241.20 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY CITY OF DANIA BEACH SUMMARY BILL Total kWh       512,451 Total accounts billed 68 Total accounts not billed 0 For Summary Billing inquiries, please email SUMB@FPL.com Please return the coupon below with payment for the Total Amount You Owe. Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) 17071-61087 $78,241.20 Jul 7, 2025 $ ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED Make check payable to FPL in U.S. funds and mail along with this coupon to: FPL Summary Bill P.O. BOX 524013 MIAMI, FL 33152-4013 / 27 9011170716108790214287000 SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 Intentionally left blank Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 17071-61087 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. Get tips  › Download the app Get instant, secure access to outage and billing info from your mobile device. Download now  › When you pay by check, you authorize FPL to process your payment electronically or as a draft. If your payment is processed electronically, your checking account may be debited on the same day we receive the check and your check will not be returned with your checking account statement. FPL does not agree to any restrictions, conditions or endorsements placed on any bill statement or payments such as check, money order or other forms of payment. We will process the payment as if these restrictions or conditions do not exist. Customer Name:Account Number:FPL.com Page 3 CITY OF DANIA BEACH 17071-61087 Account Number Service Address Meter No.Read Date/ Svc Days kWh / Max kWd Amount Due Remarks 00281-29336 100 W DANIA BEACH BLVD #TRLRS KLL8786 2025-06-10 32 5935 / 0 $810.38 00550-18501 235 SW 1ST CT # OL 2025-06-10 32 88 / 0 $24.11 01992-62544 200 SE 5TH AVE #LS 5 KJ47680 2025-06-09 32 1564 / 0 $223.88 02234-54661 631 NE 2ND ST # LS6 SJ88528 2025-06-09 32 4520 / 24 $691.50 02794-18123 1220 NW 10TH ST # WALL AA15361 2025-06-10 32 38 / 0 $29.28 05703-29326 1905 TIGERTAIL BLVD # LS15 SN88478 2025-06-10 32 415 / 2 $140.69 06011-26295 599 S FEDERAL HWY # IRR ACD8198 2025-06-09 32 0 / 0 $27.21 07471-54557 2901 SW 52ND ST # BALLFIELD KLL4255 2025-06-02 32 2128 / 52 $933.53 07481-52584 2901 SW 52ND ST # BPW KU31193 2025-06-02 32 0 / 0 $27.21 07531-57502 2901 SW 52ND ST # N BASKETBALL CO KC78811 2025-06-02 32 325 / 0 $57.61 07541-55539 2900 SW 52ND ST # SOCCER KN68310 2025-06-02 32 136 / 1 $56.74 07551-53566 2901 SW 52ND ST # OL 2025-06-10 32 168 / 0 $34.90 09702-57515 495 TAYLOR LN # LS12 SN88486 2025-06-10 32 0 / 0 $97.75 09830-79450 3151 GRIFFIN RD #LIGHTS ACD1309 2025-06-02 32 0 / 0 $27.21 09860-17234 434 SE 3RD TER #PUMP KN46905 2025-06-09 32 25 / 10 $180.72 10708-66452 800 NW 2ND ST KCJ4317 2025-06-10 32 8122 / 23 $1,103.82 18630-57590 116 W DANIA BEACH BLVD AC97190 2025-06-10 32 3471 / 0 $479.76 19577-56503 W DIXIE CRSSVR #CEMETERY AC09306 2025-06-10 32 337 / 0 $59.24 19587-54531 300 W DIXIE HWY KJ37966 2025-06-10 32 37 / 0 $29.24 23433-62451 100 W DANIA BEACH BLVD #GARAGE KNJ8374 2025-06-10 32 15946 / 39 $1,662.26 27785-15128 5440 RAVENSWOOD RD #IRR KJ62786 2025-06-10 32 31 / 0 $28.91 29082-54531 1700 NE 7TH AVE # LS11 SN88487 2025-06-10 32 5359 / 41 $1,042.28 29634-25166 300 NE 2ND ST # JR REC CT KJL7051 2025-06-09 32 6274 / 24 $800.42 30507-57602 1151 SE 5TH CT # LS-4 SJ88488 2025-06-09 32 2107 / 5 $317.13 32275-56614 50 SE 2ND AVE # LS 1 ST38232 2025-06-09 32 12900 / 42 $1,574.59 Continue on next page Customer Name:Account Number:FPL.com Page 4 CITY OF DANIA BEACH 17071-61087 Account Number Service Address Meter No.Read Date/ Svc Days kWh / Max kWd Amount Due Remarks 34681-37470 206 SW 1ST AVE # PARK AC09337 2025-06-10 32 32 / 0 $28.96 34854-42168 300 NE 2ND ST # PARK LTS ACD4012 2025-06-09 32 0 / 0 $27.21 36838-26311 279 N BRYAN RD # LS-17 KN52041 2025-06-10 32 76 / 0 $31.39 38600-56542 100 W DANIA BEACH BLVD #POLICE DEPT KU30441 2025-06-10 32 22920 / 66 $2,519.90 39978-40511 300 N BEACH RD #C HSE-PIER-PRK LIGHTS KL87259 2025-06-09 32 2396 / 0 $335.49 43965-11000 151 SW 18TH CT # LS 16 SJ88479 2025-06-10 32 2258 / 11 $414.74 44225-67430 102 W DANIA BEACH BLVD # A AC04327 2025-06-10 32 2860 / 0 $397.77 44452-56607 400 SE 2ND AVE # LS 2 PT38743 2025-06-09 32 11100 / 39 $1,411.17 45043-43023 300 N BEACH RD # LS 14 SC88219 2025-06-09 32 148 / 1 $106.34 48600-12451 100 W DANIA BEACH BLVD #B KLL2558 2025-06-10 32 4649 / 0 $637.82 49909-59571 1100 PHIPPEN WAITERS RD # PUMP KJ71604 2025-06-10 32 692 / 0 $106.86 49929-53523 1200 PHIPPEN WAITERS RD ACD7432 2025-06-10 32 55 / 0 $30.23 53065-79458 1800 GRIFFIN RD #LIGHTS ACD3226 2025-06-02 32 0 / 0 $27.21 55113-16357 301 E DANIA BEACH BLVD #ST LT KI91602 2025-06-09 32 5 / 0 $27.50 58069-19410 200 NE 2ND ST #CONCESSION AED7769 2025-06-09 32 667 / 0 $103.51 60629-55627 311 SE 3RD ST # PMP SN88527 2025-06-09 32 91 / 0 $110.14 62074-52647 901 NE 3RD ST #CIVIC CTR KT58793 2025-06-09 32 9840 / 30 $1,125.04 62624-58257 100 NW 8TH AVE #STAND ACD1416 2025-06-10 32 2943 / 0 $408.91 62762-57638 1200 SE 2ND AVE # LS 3 PT32736 2025-06-09 32 10260 / 27 $1,180.18 62926-58660 951 NW 10 ST #IRR PUMP ACD8555 2025-06-10 32 0 / 0 $27.21 62936-56697 900 NW 10 ST #LIGHTS ACD5956 2025-06-10 32 63 / 0 $30.66 64800-94298 506 NE 3RD ST # OL 2025-06-09 32 29 / 0 $14.19 67543-69459 1901 GRIFFIN RD #LIGHTS ACD3114 2025-06-02 32 0 / 0 $27.21 69593-35123 1000 N FEDERAL HWY #SIGN AC58673 2025-06-10 32 20 / 0 $27.84 74042-50974 STREET LIGHTS #DANIA 2025-06-03 32 93962 / 0 $31,254.62 Continue on next page Customer Name:Account Number:FPL.com Page 5 CITY OF DANIA BEACH 17071-61087 Account Number Service Address Meter No.Read Date/ Svc Days kWh / Max kWd Amount Due Remarks 74309-73243 106 N BEACH RD KE82004 2025-06-09 32 60 / 0 $30.51 75296-61378 1201 STIRLING RD #PSAB KU38133 2025-06-10 32 14820 / 35 $1,529.04 75572-89456 4155 GRIFFIN RD #LIGHTS ACD3228 2025-06-02 32 0 / 0 $27.21 75615-78464 1200 NW 1ST ST ACD1767 2025-06-10 32 1690 / 0 $270.48 77463-97251 2901 SW 52ND ST #POOL MLL7780 2025-06-02 32 18928 / 56 $2,213.61 78869-61130 1201 STIRLING RD #HSPS MV57024 2025-06-10 32 132480 / 193 $11,379.38 82314-31431 803 NW 1ST ST #PKGLTLGTS ACD7830 2025-06-10 32 37 / 0 $29.24 82343-56627 200 NE 2 ST #CTS KEL4829 2025-06-09 32 2293 / 33 $667.17 82363-52681 200 NE 2 ST KLL4681 2025-06-09 32 0 / 0 $188.57 83534-55572 128 NW 10 CT # LS7 ST38676 2025-06-10 32 10800 / 25 $1,186.87 83594-58521 120 NW 10 CT ACD6938 2025-06-10 32 407 / 0 $68.62 83671-08357 1855 GRIFFIN RD #LS 10 KJJ8920 2025-06-10 32 989 / 9 $230.21 83822-11186 4540 SW 27TH AVE # OL 2025-06-02 32 77 / 0 $16.86 83875-32461 101 N BEACH RD #MARINA MV58927 2025-06-09 32 87240 / 178 $8,409.25 92733-58607 300 NE 2ND ST # OL 2025-06-09 32 256 / 0 $59.01 95580-98431 2901 SW 52ND ST AC03956 2025-06-02 32 4349 / 0 $597.56 96241-18460 230 SW 12TH AVE KLL3254 2025-06-10 32 2983 / 0 $414.27 97812-54595 2301 STIRLING RD # WELLFLD MN56162 2025-06-03 32 50 / 1 $50.87 TOTAL AMOUNT OF BILL $78,241.20 CURRENT BILL $1,430.88 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 620.50 Balance before new charges 620.50 Total new charges 810.38 Total amount you owe $1,430.88 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 00281-29336 Service Address: 100 W DANIA BEACH BLVD #TRLRS DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 00281-29336 $1,430.88 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 6,550 kWh 5,240 kWh 3,930 kWh 2,620 kWh 1,310 kWh 0 kWh A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $620.50 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 00281-29336 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 620.50 Balance before new charges $620.50 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$570.36 Fuel:( $0.027180 per kWh)$161.31 Electric service amount 744.54 Gross receipts tax (State tax)19.11 Franchise fee (Reqd local fee)46.04 Taxes and charges 65.15 Regulatory fee (State fee)0.69 Total new charges $810.38 Total amount you owe $1,430.88 METER SUMMARY Meter reading - Meter KLL8786. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 46176 40241 5935 ENERGY USAGE COMPARISON This Month Last Month Service to Jun 10, 2025 May 9, 2025 kWh Used 5935 4520 Service days 32 30 kWh/day 185 150 Amount $810.38 $620.50 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $48.22 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 24.11 Balance before new charges 24.11 Total new charges 24.11 Total amount you owe $48.22 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 00550-18501 Service Address: 235 SW 1ST CT # OL DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 00550-18501 $48.22 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 110 kWh 88 kWh 66 kWh 44 kWh 22 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $24.11 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · Charges and energy usage are based on the facilities contracted. Facility, energy and fuel costs are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 00550-18501 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 24.11 Balance before new charges $24.11 New Charges Rate: OL-1 OUTDOOR LIGHTING Electric service amount **22.45 Gross receipts tax (State tax)0.27 Franchise fee (Reqd local fee)1.37 Taxes and charges 1.64 Regulatory fee (State fee)0.02 Total new charges $24.11 Total amount you owe $48.22 ** Your electric service amount includes the following charges: Non-fuel energy charge: $0.091030 per kWh Fuel charge:$0.026470 per kWh METER SUMMARY Next bill date Jul 10, 2025. Usage Type Usage Total kWh used 88 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 88 88 88 Service days 32 30 32 kWh/day 3 3 3 Amount $24.11 $24.11 $19.15 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $466.54 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 242.66 Balance before new charges 242.66 Total new charges 223.88 Total amount you owe $466.54 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 01992-62544 Service Address: 200 SE 5TH AVE #LS 5 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 01992-62544 $466.54 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 2,650 kWh 2,120 kWh 1,590 kWh 1,060 kWh 530 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $242.66 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 01992-62544 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 242.66 Balance before new charges $242.66 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$150.31 Fuel:( $0.027180 per kWh)$42.51 Electric service amount 205.69 Gross receipts tax (State tax)5.28 Franchise fee (Reqd local fee)12.72 Taxes and charges 18.00 Regulatory fee (State fee)0.19 Total new charges $223.88 Total amount you owe $466.54 METER SUMMARY Meter reading - Meter KJ47680. Next meter reading Jul 9, 2025. Usage Type Current -Previous =Usage kWh used 74993 73429 1564 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 1564 1704 1429 Service days 32 30 32 kWh/day 48 56 44 Amount $223.88 $242.66 $207.97 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,233.66 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 542.16 Balance before new charges 542.16 Total new charges 691.50 Total amount you owe $1,233.66 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 02234-54661 Service Address: 631 NE 2ND ST # LS6 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 02234-54661 $1,233.66 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 5,000 kWh 4,000 kWh 3,000 kWh 2,000 kWh 1,000 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $542.16 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 02234-54661 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 542.16 Balance before new charges $542.16 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$434.37 Fuel:( $0.027180 per kWh)$122.85 Electric service amount 570.09 Gross receipts tax (State tax)14.63 Franchise fee (Reqd local fee)35.25 Taxes and charges 49.88 Regulatory fee (State fee)0.53 Total new charges $620.50 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $1,233.66 METER SUMMARY Meter reading - Meter SJ88528. Next meter reading Jul 9, 2025. Usage Type Current -Previous =Usage kWh used 65035 60515 4520 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 4520 3407 2836 Service days 32 30 32 kWh/day 141 113 88 Amount $620.50 $471.16 $359.35 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $58.47 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 29.19 Balance before new charges 29.19 Total new charges 29.28 Total amount you owe $58.47 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 02794-18123 Service Address: 1220 NW 10TH ST # WALL DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 02794-18123 $58.47 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 60 kWh 48 kWh 36 kWh 24 kWh 12 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $29.19 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 02794-18123 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 29.19 Balance before new charges $29.19 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$9.36 Non-fuel:( $0.096100 per kWh)$3.65 Fuel:( $0.027180 per kWh)$1.03 Electric service amount 26.91 Gross receipts tax (State tax)0.69 Franchise fee (Reqd local fee)1.66 Taxes and charges 2.35 Regulatory fee (State fee)0.02 Total new charges $29.28 Total amount you owe $58.47 METER SUMMARY Meter reading - Meter AA15361. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 01404 01366 38 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 38 36 42 Service days 32 30 32 kWh/day 1 1 1 Amount $29.28 $29.19 $29.02 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $278.57 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 137.88 Balance before new charges 137.88 Total new charges 140.69 Total amount you owe $278.57 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 05703-29326 Service Address: 1905 TIGERTAIL BLVD # LS15 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 05703-29326 $278.57 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O LIFT STATION # 15 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 950 kWh 760 kWh 570 kWh 380 kWh 190 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $137.88 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 05703-29326 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 137.88 Balance before new charges $137.88 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$39.88 Fuel:( $0.027180 per kWh)$11.28 Electric service amount 64.03 Gross receipts tax (State tax)1.64 Franchise fee (Reqd local fee)3.96 Taxes and charges 5.60 Regulatory fee (State fee)0.06 Total new charges $69.69 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $278.57 METER SUMMARY Meter reading - Meter SN88478. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 23327 22912 415 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 415 394 517 Service days 32 30 32 kWh/day 12 13 16 Amount $69.69 $66.88 $76.88 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $54.42 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 27.21 Balance before new charges 27.21 Total new charges 27.21 Total amount you owe $54.42 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 06011-26295 Service Address: 599 S FEDERAL HWY # IRR DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 06011-26295 $54.42 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 5 kWh 4 kWh 3 kWh 2 kWh 1 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $27.21 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 06011-26295 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 27.21 Balance before new charges $27.21 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $54.42 METER SUMMARY Meter reading - Meter ACD8198. Next meter reading Jul 9, 2025. Usage Type Current -Previous =Usage kWh used 00021 00021 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 0 0 0 Service days 32 30 32 kWh/day 0 0 0 Amount $27.21 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,856.05 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 1,807.51 Payments received -884.99 Balance before new charges 922.52 Total new charges 933.53 Total amount you owe $1,856.05 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 1, 2025 to Jun 2, 2025 (32 days) Statement Date: Jun 2, 2025 Account Number: 07471-54557 Service Address: 2901 SW 52ND ST # BALLFIELD FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 07471-54557 $1,856.05 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 2,350 kWh 1,880 kWh 1,410 kWh 940 kWh 470 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 07471-54557 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 1,807.51 Payment received - Thank you −884.99 Balance before new charges $922.52 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$72.12 Fuel:( $0.027180 per kWh)$57.84 Demand:($13.41 per KW)$697.32 Electric service amount 857.69 Gross receipts tax (State tax)22.01 Franchise fee (Reqd local fee)53.04 Taxes and charges 75.05 Regulatory fee (State fee)0.79 Total new charges $933.53 Total amount you owe $1,856.05 METER SUMMARY Meter reading - Meter KLL4255. Next meter reading Jul 1, 2025. Usage Type Current -Previous =Usage kWh used 02675 00547 2128 Demand KW 52.39 52 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 2, 2025 May 1, 2025 Jun 3, 2024 kWh Used 2128 1743 1599 Service days 32 30 33 kWh/day 66 58 48 Amount $933.53 $922.52 $898.90 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $54.42 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 54.42 Payments received -27.21 Balance before new charges 27.21 Total new charges 27.21 Total amount you owe $54.42 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 1, 2025 to Jun 2, 2025 (32 days) Statement Date: Jun 2, 2025 Account Number: 07481-52584 Service Address: 2901 SW 52ND ST # BPW FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 07481-52584 $54.42 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 150 kWh 120 kWh 90 kWh 60 kWh 30 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 07481-52584 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 54.42 Payment received - Thank you −27.21 Balance before new charges $27.21 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $54.42 METER SUMMARY Meter reading - Meter KU31193. Next meter reading Jul 1, 2025. Usage Type Current -Previous x Const =Usage kWh used 00036 00036 60 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 2, 2025 May 1, 2025 Jun 3, 2024 kWh Used 0 0 0 Service days 32 30 33 kWh/day 0 0 0 Amount $27.21 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $150.79 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 192.11 Payments received -98.93 Balance before new charges 93.18 Total new charges 57.61 Total amount you owe $150.79 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 1, 2025 to Jun 2, 2025 (32 days) Statement Date: Jun 2, 2025 Account Number: 07531-57502 Service Address: 2901 SW 52ND ST # N BASKETBALL CO FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 07531-57502 $150.79 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 950 kWh 760 kWh 570 kWh 380 kWh 190 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 07531-57502 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 192.11 Payment received - Thank you −98.93 Balance before new charges $93.18 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$31.23 Fuel:( $0.027180 per kWh)$8.83 Electric service amount 52.93 Gross receipts tax (State tax)1.36 Franchise fee (Reqd local fee)3.27 Taxes and charges 4.63 Regulatory fee (State fee)0.05 Total new charges $57.61 Total amount you owe $150.79 METER SUMMARY Meter reading - Meter KC78811. Next meter reading Jul 1, 2025. Usage Type Current -Previous =Usage kWh used 74313 73988 325 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 2, 2025 May 1, 2025 Jun 3, 2024 kWh Used 325 590 843 Service days 32 30 33 kWh/day 10 19 25 Amount $57.61 $93.18 $116.59 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $112.81 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 653.18 Payments received -597.11 Balance before new charges 56.07 Total new charges 56.74 Total amount you owe $112.81 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 1, 2025 to Jun 2, 2025 (32 days) Statement Date: Jun 2, 2025 Account Number: 07541-55539 Service Address: 2900 SW 52ND ST # SOCCER FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 07541-55539 $112.81 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 200 kWh 160 kWh 120 kWh 80 kWh 40 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 07541-55539 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 653.18 Payment received - Thank you −597.11 Balance before new charges $56.07 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$4.61 Fuel:( $0.027180 per kWh)$3.70 Demand:($13.41 per KW)$13.41 Electric service amount 52.13 Gross receipts tax (State tax)1.34 Franchise fee (Reqd local fee)3.22 Taxes and charges 4.56 Regulatory fee (State fee)0.05 Total new charges $56.74 Total amount you owe $112.81 METER SUMMARY Meter reading - Meter KN68310. Next meter reading Jul 1, 2025. Usage Type Current -Previous =Usage Total kWh used 02817 02681 136 On-Peak kWh used 00000 00000 0 Off-peak kWh used 136 On-peak demand 0.00 0 Maximum demand 1 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 2, 2025 May 1, 2025 Jun 3, 2024 kWh Used 136 126 138 Service days 32 30 33 kWh/day 4 4 4 Amount $56.74 $56.07 $55.75 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $69.80 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 34.90 Balance before new charges 34.90 Total new charges 34.90 Total amount you owe $69.80 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 07551-53566 Service Address: 2901 SW 52ND ST # OL FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 07551-53566 $69.80 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 200 kWh 160 kWh 120 kWh 80 kWh 40 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $34.90 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · Charges and energy usage are based on the facilities contracted. Facility, energy and fuel costs are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 07551-53566 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 34.90 Balance before new charges $34.90 New Charges Rate: OL-1 OUTDOOR LIGHTING Electric service amount **32.38 Gross receipts tax (State tax)0.51 Franchise fee (Reqd local fee)1.98 Taxes and charges 2.49 Regulatory fee (State fee)0.03 Total new charges $34.90 Total amount you owe $69.80 ** Your electric service amount includes the following charges: Non-fuel energy charge: $0.091030 per kWh Fuel charge:$0.026470 per kWh METER SUMMARY Next bill date Jul 10, 2025. Usage Type Usage Total kWh used 168 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 168 168 168 Service days 32 30 32 kWh/day 5 6 5 Amount $34.90 $34.90 $25.49 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $202.64 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 104.89 Balance before new charges 104.89 Total new charges 97.75 Total amount you owe $202.64 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 09702-57515 Service Address: 495 TAYLOR LN # LS12 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 09702-57515 $202.64 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 600 kWh 480 kWh 360 kWh 240 kWh 120 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $104.89 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 09702-57515 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 104.89 Balance before new charges $104.89 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.09 Taxes and charges 1.73 Regulatory fee (State fee)0.02 Total new charges $26.75 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $202.64 METER SUMMARY Meter reading - Meter SN88486. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 11802 11802 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 0 132 162 Service days 32 30 32 kWh/day 0 4 5 Amount $26.75 $33.89 $33.69 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $54.42 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 54.42 Payments received -27.21 Balance before new charges 27.21 Total new charges 27.21 Total amount you owe $54.42 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 1, 2025 to Jun 2, 2025 (32 days) Statement Date: Jun 2, 2025 Account Number: 09830-79450 Service Address: 3151 GRIFFIN RD #LIGHTS DANIA, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 09830-79450 $54.42 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 5 kWh 4 kWh 3 kWh 2 kWh 1 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · We have billed you for the minimum base charge for eight consecutive months due to your meter registering zero usage. Call us if you wish to temporarily disconnect your service. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 09830-79450 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 54.42 Payment received - Thank you −27.21 Balance before new charges $27.21 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $54.42 METER SUMMARY Meter reading - Meter ACD1309. Next meter reading Jul 1, 2025. Usage Type Current -Previous =Usage kWh used 00108 00108 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 2, 2025 May 1, 2025 Jun 3, 2024 kWh Used 0 0 0 Service days 32 30 33 kWh/day 0 0 0 Amount $27.21 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $229.41 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 48.69 Balance before new charges 48.69 Total new charges 180.72 Total amount you owe $229.41 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 09860-17234 Service Address: 434 SE 3RD TER #PUMP DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 09860-17234 $229.41 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O DANIA FL 33004 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 5,800 kWh 4,640 kWh 3,480 kWh 2,320 kWh 1,160 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $48.69 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 09860-17234 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 48.69 Balance before new charges $48.69 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$0.85 Fuel:( $0.027180 per kWh)$0.68 Demand:($13.41 per KW)$134.10 Electric service amount 166.04 Gross receipts tax (State tax)4.26 Franchise fee (Reqd local fee)10.27 Taxes and charges 14.53 Regulatory fee (State fee)0.15 Total new charges $180.72 Total amount you owe $229.41 METER SUMMARY Meter reading - Meter KN46905. Next meter reading Jul 9, 2025. Usage Type Current -Previous =Usage kWh used 56129 56104 25 Demand KW 9.77 10 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 25 15 105 Service days 32 30 32 kWh/day 0 0 3 Amount $180.72 $48.69 $152.86 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,799.65 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 695.83 Balance before new charges 695.83 Total new charges 1,103.82 Total amount you owe $1,799.65 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 10708-66452 Service Address: 800 NW 2ND ST DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 10708-66452 $1,799.65 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 11,150 kWh 8,920 kWh 6,690 kWh 4,460 kWh 2,230 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $695.83 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · The rate used to calculate your bill has changed due to your demand usage. Call Customer Service if you have any questions. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 10708-66452 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 695.83 Balance before new charges $695.83 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$780.51 Fuel:( $0.027180 per kWh)$220.76 Electric service amount 1,014.14 Gross receipts tax (State tax)26.03 Franchise fee (Reqd local fee)62.71 Taxes and charges 88.74 Regulatory fee (State fee)0.94 Total new charges $1,103.82 Total amount you owe $1,799.65 METER SUMMARY Meter reading - Meter KCJ4317. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 03865 95743 8122 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 8122 5359 10101 Service days 32 30 32 kWh/day 253 178 315 Amount $1,103.82 $695.83 $1,023.72 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $809.64 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 329.88 Balance before new charges 329.88 Total new charges 479.76 Total amount you owe $809.64 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 18630-57590 Service Address: 116 W DANIA BEACH BLVD DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 18630-57590 $809.64 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 4,100 kWh 3,280 kWh 2,460 kWh 1,640 kWh 820 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $329.88 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 18630-57590 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 329.88 Balance before new charges $329.88 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$333.57 Fuel:( $0.027180 per kWh)$94.34 Electric service amount 440.78 Gross receipts tax (State tax)11.31 Franchise fee (Reqd local fee)27.26 Taxes and charges 38.57 Regulatory fee (State fee)0.41 Total new charges $479.76 Total amount you owe $809.64 METER SUMMARY Meter reading - Meter AC97190. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 27327 23856 3471 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 3471 2354 3247 Service days 32 30 32 kWh/day 108 78 101 Amount $479.76 $329.88 $409.41 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $111.48 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 52.24 Balance before new charges 52.24 Total new charges 59.24 Total amount you owe $111.48 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 19577-56503 Service Address: W DIXIE CRSSVR #CEMETERY DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 19577-56503 $111.48 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 1,350 kWh 1,080 kWh 810 kWh 540 kWh 270 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $52.24 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 19577-56503 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 52.24 Balance before new charges $52.24 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$32.39 Fuel:( $0.027180 per kWh)$9.16 Electric service amount 54.42 Gross receipts tax (State tax)1.40 Franchise fee (Reqd local fee)3.37 Taxes and charges 4.77 Regulatory fee (State fee)0.05 Total new charges $59.24 Total amount you owe $111.48 METER SUMMARY Meter reading - Meter AC09306. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 63929 63592 337 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 337 285 1211 Service days 32 30 32 kWh/day 11 10 38 Amount $59.24 $52.24 $161.41 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $135.70 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 106.46 Balance before new charges 106.46 Total new charges 29.24 Total amount you owe $135.70 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 19587-54531 Service Address: 300 W DIXIE HWY DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 19587-54531 $135.70 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 1,400 kWh 1,120 kWh 840 kWh 560 kWh 280 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $106.46 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 19587-54531 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 106.46 Balance before new charges $106.46 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$9.44 Non-fuel:( $0.096100 per kWh)$3.55 Fuel:( $0.027180 per kWh)$1.01 Electric service amount 26.87 Gross receipts tax (State tax)0.69 Franchise fee (Reqd local fee)1.66 Taxes and charges 2.35 Regulatory fee (State fee)0.02 Total new charges $29.24 Total amount you owe $135.70 METER SUMMARY Meter reading - Meter KJ37966. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 90507 90470 37 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 37 689 1268 Service days 32 30 32 kWh/day 1 22 39 Amount $29.24 $106.46 $168.37 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $3,246.46 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 1,584.20 Balance before new charges 1,584.20 Total new charges 1,662.26 Total amount you owe $3,246.46 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 23433-62451 Service Address: 100 W DANIA BEACH BLVD #GARAGE DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 23433-62451 $3,246.46 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 18,850 kWh 15,080 kWh 11,310 kWh 7,540 kWh 3,770 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $1,584.20 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 23433-62451 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 1,584.20 Balance before new charges $1,584.20 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$540.41 Fuel:( $0.027180 per kWh)$433.41 Demand:($13.41 per KW)$522.99 Electric service amount 1,527.22 Gross receipts tax (State tax)39.19 Franchise fee (Reqd local fee)94.44 Taxes and charges 133.63 Regulatory fee (State fee)1.41 Total new charges $1,662.26 Total amount you owe $3,246.46 METER SUMMARY Meter reading - Meter KNJ8374. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 57117 41171 15946 Demand KW 39.13 39 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 15946 14113 14647 Service days 32 30 32 kWh/day 498 470 457 Amount $1,662.26 $1,584.20 $1,395.23 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $57.71 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 28.80 Balance before new charges 28.80 Total new charges 28.91 Total amount you owe $57.71 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 27785-15128 Service Address: 5440 RAVENSWOOD RD #IRR FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 27785-15128 $57.71 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 300 kWh 240 kWh 180 kWh 120 kWh 60 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $28.80 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 27785-15128 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 28.80 Balance before new charges $28.80 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$9.87 Non-fuel:( $0.096100 per kWh)$2.99 Fuel:( $0.027180 per kWh)$0.84 Electric service amount 26.57 Gross receipts tax (State tax)0.68 Franchise fee (Reqd local fee)1.64 Taxes and charges 2.32 Regulatory fee (State fee)0.02 Total new charges $28.91 Total amount you owe $57.71 METER SUMMARY Meter reading - Meter KJ62786. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 20759 20728 31 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 31 29 194 Service days 32 30 32 kWh/day 0 0 6 Amount $28.91 $28.80 $37.54 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $2,037.33 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 995.05 Balance before new charges 995.05 Total new charges 1,042.28 Total amount you owe $2,037.33 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 29082-54531 Service Address: 1700 NE 7TH AVE # LS11 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 29082-54531 $2,037.33 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 7,200 kWh 5,760 kWh 4,320 kWh 2,880 kWh 1,440 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $995.05 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 29082-54531 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 995.05 Balance before new charges $995.05 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$181.62 Fuel:( $0.027180 per kWh)$145.66 Demand:($13.41 per KW)$549.81 Electric service amount 907.50 Gross receipts tax (State tax)23.29 Franchise fee (Reqd local fee)39.67 Taxes and charges 62.96 Regulatory fee (State fee)0.82 Total new charges $971.28 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $2,037.33 METER SUMMARY Meter reading - Meter SN88487. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 41469 36110 5359 Demand KW 41 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 5359 4417 31 Service days 32 30 32 kWh/day 167 147 0 Amount $971.28 $924.05 $34.31 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,399.74 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 599.32 Balance before new charges 599.32 Total new charges 800.42 Total amount you owe $1,399.74 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 29634-25166 Service Address: 300 NE 2ND ST # JR REC CT DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 29634-25166 $1,399.74 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 9,450 kWh 7,560 kWh 5,670 kWh 3,780 kWh 1,890 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $599.32 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 29634-25166 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 599.32 Balance before new charges $599.32 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$212.62 Fuel:( $0.027180 per kWh)$170.53 Demand:($13.41 per KW)$321.84 Electric service amount 735.40 Gross receipts tax (State tax)18.87 Franchise fee (Reqd local fee)45.47 Taxes and charges 64.34 Regulatory fee (State fee)0.68 Total new charges $800.42 Total amount you owe $1,399.74 METER SUMMARY Meter reading - Meter KJL7051. Next meter reading Jul 9, 2025. Usage Type Current -Previous =Usage kWh used 77699 71425 6274 Demand KW 23.79 24 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 6274 4566 7301 Service days 32 30 32 kWh/day 196 152 228 Amount $800.42 $599.32 $818.92 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $598.06 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 280.93 Balance before new charges 280.93 Total new charges 317.13 Total amount you owe $598.06 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 30507-57602 Service Address: 1151 SE 5TH CT # LS-4 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 30507-57602 $598.06 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O DANIA FL 33004 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 3,550 kWh 2,840 kWh 2,130 kWh 1,420 kWh 710 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $280.93 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 30507-57602 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 280.93 Balance before new charges $280.93 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$71.41 Fuel:( $0.027180 per kWh)$57.27 Demand:($13.41 per KW)$67.05 Electric service amount 226.14 Gross receipts tax (State tax)5.80 Franchise fee (Reqd local fee)13.98 Taxes and charges 19.78 Regulatory fee (State fee)0.21 Total new charges $246.13 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $598.06 METER SUMMARY Meter reading - Meter SJ88488. Next meter reading Jul 9, 2025. Usage Type Current -Previous =Usage kWh used 84896 82789 2107 Demand KW 5 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 2107 1782 1958 Service days 32 30 32 kWh/day 65 59 61 Amount $246.13 $209.93 $283.81 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $3,272.22 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 1,697.63 Balance before new charges 1,697.63 Total new charges 1,574.59 Total amount you owe $3,272.22 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 32275-56614 Service Address: 50 SE 2ND AVE # LS 1 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 32275-56614 $3,272.22 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 22,400 kWh 17,920 kWh 13,440 kWh 8,960 kWh 4,480 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $1,697.63 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 32275-56614 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 1,697.63 Balance before new charges $1,697.63 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$437.19 Fuel:( $0.027180 per kWh)$350.62 Demand:($13.41 per KW)$563.22 Electric service amount 1,381.44 Gross receipts tax (State tax)35.45 Franchise fee (Reqd local fee)85.42 Taxes and charges 120.87 Regulatory fee (State fee)1.28 Total new charges $1,503.59 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $3,272.22 METER SUMMARY Meter reading - Meter ST38232. Next meter reading Jul 9, 2025. Usage Type Current -Previous x Const =Usage kWh used 08137 07922 60 12900 Demand KW 42 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 12900 10140 12420 Service days 32 30 32 kWh/day 403 338 388 Amount $1,503.59 $1,626.63 $1,439.12 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $57.87 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 28.91 Balance before new charges 28.91 Total new charges 28.96 Total amount you owe $57.87 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 34681-37470 Service Address: 206 SW 1ST AVE # PARK DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 34681-37470 $57.87 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 40 kWh 32 kWh 24 kWh 16 kWh 8 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $28.91 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 34681-37470 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 28.91 Balance before new charges $28.91 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$9.80 Non-fuel:( $0.096100 per kWh)$3.07 Fuel:( $0.027180 per kWh)$0.87 Electric service amount 26.61 Gross receipts tax (State tax)0.68 Franchise fee (Reqd local fee)1.65 Taxes and charges 2.33 Regulatory fee (State fee)0.02 Total new charges $28.96 Total amount you owe $57.87 METER SUMMARY Meter reading - Meter AC09337. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 00092 00060 32 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 32 31 0 Service days 32 30 32 kWh/day 1 1 0 Amount $28.96 $28.91 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $67.13 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 39.92 Balance before new charges 39.92 Total new charges 27.21 Total amount you owe $67.13 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 34854-42168 Service Address: 300 NE 2ND ST # PARK LTS DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 34854-42168 $67.13 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 1,600 kWh 1,280 kWh 960 kWh 640 kWh 320 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $39.92 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 34854-42168 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 39.92 Balance before new charges $39.92 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $67.13 METER SUMMARY Meter reading - Meter ACD4012. Next meter reading Jul 9, 2025. Usage Type Current -Previous =Usage kWh used 07812 07812 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 0 193 0 Service days 32 30 32 kWh/day 0 6 0 Amount $27.21 $39.92 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $63.19 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 31.80 Balance before new charges 31.80 Total new charges 31.39 Total amount you owe $63.19 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 36838-26311 Service Address: 279 N BRYAN RD # LS-17 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 36838-26311 $63.19 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 400 kWh 320 kWh 240 kWh 160 kWh 80 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $31.80 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 36838-26311 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 31.80 Balance before new charges $31.80 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$6.60 Non-fuel:( $0.096100 per kWh)$7.30 Fuel:( $0.027180 per kWh)$2.07 Electric service amount 28.84 Gross receipts tax (State tax)0.74 Franchise fee (Reqd local fee)1.78 Taxes and charges 2.52 Regulatory fee (State fee)0.03 Total new charges $31.39 Total amount you owe $63.19 METER SUMMARY Meter reading - Meter KN52041. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 17062 16986 76 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 76 83 76 Service days 32 30 32 kWh/day 2 2 2 Amount $31.39 $31.80 $30.49 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $5,006.56 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 2,486.66 Balance before new charges 2,486.66 Total new charges 2,519.90 Total amount you owe $5,006.56 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 38600-56542 Service Address: 100 W DANIA BEACH BLVD #POLICE DEPT DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 38600-56542 $5,006.56 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 37,500 kWh 30,000 kWh 22,500 kWh 15,000 kWh 7,500 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $2,486.66 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 38600-56542 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 2,486.66 Balance before new charges $2,486.66 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$776.75 Fuel:( $0.027180 per kWh)$622.97 Demand:($13.41 per KW)$885.06 Electric service amount 2,315.19 Gross receipts tax (State tax)59.41 Franchise fee (Reqd local fee)143.16 Taxes and charges 202.57 Regulatory fee (State fee)2.14 Total new charges $2,519.90 Total amount you owe $5,006.56 METER SUMMARY Meter reading - Meter KU30441. Next meter reading Jul 10, 2025. Usage Type Current -Previous x Const =Usage kWh used 56330 55948 60 22920 Demand KW 1.10 60.00 66 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 22920 22200 34080 Service days 32 30 32 kWh/day 716 740 1065 Amount $2,519.90 $2,486.66 $3,370.97 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $599.87 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 264.38 Balance before new charges 264.38 Total new charges 335.49 Total amount you owe $599.87 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 39978-40511 Service Address: 300 N BEACH RD #C HSE-PIER-PRK LIGHTS DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 39978-40511 $599.87 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA BEACH FL 33004-3699 ENERGY USAGE HISTORY 2,850 kWh 2,280 kWh 1,710 kWh 1,140 kWh 570 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $264.38 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 39978-40511 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 264.38 Balance before new charges $264.38 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$230.25 Fuel:( $0.027180 per kWh)$65.12 Electric service amount 308.24 Gross receipts tax (State tax)7.91 Franchise fee (Reqd local fee)19.06 Taxes and charges 26.97 Regulatory fee (State fee)0.28 Total new charges $335.49 Total amount you owe $599.87 METER SUMMARY Meter reading - Meter KL87259. Next meter reading Jul 9, 2025. Usage Type Current -Previous =Usage kWh used 55781 53385 2396 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 2396 1866 2540 Service days 32 30 32 kWh/day 74 62 79 Amount $335.49 $264.38 $323.28 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $763.51 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 348.77 Balance before new charges 348.77 Total new charges 414.74 Total amount you owe $763.51 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 43965-11000 Service Address: 151 SW 18TH CT # LS 16 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 43965-11000 $763.51 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 2,750 kWh 2,200 kWh 1,650 kWh 1,100 kWh 550 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $348.77 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 43965-11000 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 348.77 Balance before new charges $348.77 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$76.53 Fuel:( $0.027180 per kWh)$61.37 Demand:($13.41 per KW)$147.51 Electric service amount 315.82 Gross receipts tax (State tax)8.10 Franchise fee (Reqd local fee)19.53 Taxes and charges 27.63 Regulatory fee (State fee)0.29 Total new charges $343.74 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $763.51 METER SUMMARY Meter reading - Meter SJ88479. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 87917 85659 2258 Demand KW 11 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 2258 2144 1995 Service days 32 30 32 kWh/day 70 71 62 Amount $343.74 $277.77 $256.91 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $641.51 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 243.74 Balance before new charges 243.74 Total new charges 397.77 Total amount you owe $641.51 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 44225-67430 Service Address: 102 W DANIA BEACH BLVD # A DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 44225-67430 $641.51 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 3,200 kWh 2,560 kWh 1,920 kWh 1,280 kWh 640 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $243.74 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 44225-67430 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 243.74 Balance before new charges $243.74 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$274.85 Fuel:( $0.027180 per kWh)$77.73 Electric service amount 365.45 Gross receipts tax (State tax)9.38 Franchise fee (Reqd local fee)22.60 Taxes and charges 31.98 Regulatory fee (State fee)0.34 Total new charges $397.77 Total amount you owe $641.51 METER SUMMARY Meter reading - Meter AC04327. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 98708 95848 2860 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 2860 1712 461 Service days 32 30 32 kWh/day 89 57 14 Amount $397.77 $243.74 $70.06 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $2,681.48 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 1,270.31 Balance before new charges 1,270.31 Total new charges 1,411.17 Total amount you owe $2,681.48 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 44452-56607 Service Address: 400 SE 2ND AVE # LS 2 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 44452-56607 $2,681.48 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 17,600 kWh 14,080 kWh 10,560 kWh 7,040 kWh 3,520 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $1,270.31 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 44452-56607 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 1,270.31 Balance before new charges $1,270.31 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$376.19 Fuel:( $0.027180 per kWh)$301.70 Demand:($13.41 per KW)$522.99 Electric service amount 1,231.29 Gross receipts tax (State tax)31.60 Franchise fee (Reqd local fee)76.14 Taxes and charges 107.74 Regulatory fee (State fee)1.14 Total new charges $1,340.17 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $2,681.48 METER SUMMARY Meter reading - Meter PT38743. Next meter reading Jul 9, 2025. Usage Type Current -Previous x Const =Usage kWh used 00440 00255 60 11100 Demand KW 39 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 11100 9420 8340 Service days 32 30 32 kWh/day 346 314 260 Amount $1,340.17 $1,199.31 $912.75 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $212.51 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 106.17 Balance before new charges 106.17 Total new charges 106.34 Total amount you owe $212.51 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 45043-43023 Service Address: 300 N BEACH RD # LS 14 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 45043-43023 $212.51 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 300 kWh 240 kWh 180 kWh 120 kWh 60 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $106.17 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 45043-43023 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 106.17 Balance before new charges $106.17 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$1.35 Non-fuel:( $0.096100 per kWh)$14.23 Fuel:( $0.027180 per kWh)$4.02 Electric service amount 32.47 Gross receipts tax (State tax)0.83 Franchise fee (Reqd local fee)2.01 Taxes and charges 2.84 Regulatory fee (State fee)0.03 Total new charges $35.34 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $212.51 METER SUMMARY Meter reading - Meter SC88219. Next meter reading Jul 9, 2025. Usage Type Current -Previous =Usage kWh used 06450 06302 148 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 148 145 206 Service days 32 30 32 kWh/day 4 4 6 Amount $35.34 $35.17 $39.01 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,170.18 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 532.36 Balance before new charges 532.36 Total new charges 637.82 Total amount you owe $1,170.18 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 48600-12451 Service Address: 100 W DANIA BEACH BLVD #B DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 48600-12451 $1,170.18 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 6,350 kWh 5,080 kWh 3,810 kWh 2,540 kWh 1,270 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $532.36 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 48600-12451 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 532.36 Balance before new charges $532.36 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$446.77 Fuel:( $0.027180 per kWh)$126.36 Electric service amount 586.00 Gross receipts tax (State tax)15.04 Franchise fee (Reqd local fee)36.24 Taxes and charges 51.28 Regulatory fee (State fee)0.54 Total new charges $637.82 Total amount you owe $1,170.18 METER SUMMARY Meter reading - Meter KLL2558. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 78673 74024 4649 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 4649 3863 5744 Service days 32 30 32 kWh/day 145 128 179 Amount $637.82 $532.36 $713.56 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $177.24 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 70.38 Balance before new charges 70.38 Total new charges 106.86 Total amount you owe $177.24 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 49909-59571 Service Address: 1100 PHIPPEN WAITERS RD # PUMP DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 49909-59571 $177.24 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O CITY HALL 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 800 kWh 640 kWh 480 kWh 320 kWh 160 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $70.38 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 49909-59571 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 70.38 Balance before new charges $70.38 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$66.50 Fuel:( $0.027180 per kWh)$18.81 Electric service amount 98.18 Gross receipts tax (State tax)2.52 Franchise fee (Reqd local fee)6.07 Taxes and charges 8.59 Regulatory fee (State fee)0.09 Total new charges $106.86 Total amount you owe $177.24 METER SUMMARY Meter reading - Meter KJ71604. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 45130 44438 692 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 692 420 625 Service days 32 30 32 kWh/day 21 14 19 Amount $106.86 $70.38 $90.04 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $60.31 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 30.08 Balance before new charges 30.08 Total new charges 30.23 Total amount you owe $60.31 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 49929-53523 Service Address: 1200 PHIPPEN WAITERS RD DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 49929-53523 $60.31 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH CITY HALL 100 W DANIA BLV DANAIA FL 33004 ENERGY USAGE HISTORY 70 kWh 56 kWh 42 kWh 28 kWh 14 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $30.08 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 49929-53523 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 30.08 Balance before new charges $30.08 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$8.12 Non-fuel:( $0.096100 per kWh)$5.29 Fuel:( $0.027180 per kWh)$1.49 Electric service amount 27.77 Gross receipts tax (State tax)0.71 Franchise fee (Reqd local fee)1.72 Taxes and charges 2.43 Regulatory fee (State fee)0.03 Total new charges $30.23 Total amount you owe $60.31 METER SUMMARY Meter reading - Meter ACD7432. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 00560 00505 55 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 55 52 21 Service days 32 30 32 kWh/day 2 2 1 Amount $30.23 $30.08 $28.10 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $54.42 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 54.42 Payments received -27.21 Balance before new charges 27.21 Total new charges 27.21 Total amount you owe $54.42 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 1, 2025 to Jun 2, 2025 (32 days) Statement Date: Jun 2, 2025 Account Number: 53065-79458 Service Address: 1800 GRIFFIN RD #LIGHTS DANIA, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 53065-79458 $54.42 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 150 kWh 120 kWh 90 kWh 60 kWh 30 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 53065-79458 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 54.42 Payment received - Thank you −27.21 Balance before new charges $27.21 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $54.42 METER SUMMARY Meter reading - Meter ACD3226. Next meter reading Jul 1, 2025. Usage Type Current -Previous =Usage kWh used 00288 00288 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 2, 2025 May 1, 2025 Jun 3, 2024 kWh Used 0 0 0 Service days 32 30 33 kWh/day 0 0 0 Amount $27.21 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $128.72 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 101.22 Balance before new charges 101.22 Total new charges 27.50 Total amount you owe $128.72 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 55113-16357 Service Address: 301 E DANIA BEACH BLVD #ST LT DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 55113-16357 $128.72 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 5 kWh 4 kWh 3 kWh 2 kWh 1 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $101.22 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 55113-16357 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 101.22 Balance before new charges $101.22 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$11.77 Non-fuel:( $0.096100 per kWh)$0.49 Fuel:( $0.027180 per kWh)$0.14 Electric service amount 25.27 Gross receipts tax (State tax)0.65 Franchise fee (Reqd local fee)1.56 Taxes and charges 2.21 Regulatory fee (State fee)0.02 Total new charges $27.50 Total amount you owe $128.72 METER SUMMARY Meter reading - Meter KI91602. Next meter reading Jul 9, 2025. Note(s): Your meter has changed. Usage Type Current Usage kWh used 00005 5 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 5 0 0 Service days 32 30 32 kWh/day 0 0 0 Amount $27.50 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $216.67 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 113.16 Balance before new charges 113.16 Total new charges 103.51 Total amount you owe $216.67 *ESTIMATED BILL* (See page 2 for bill details.) FPL.com Page 1 *ESTIMATED BILL* For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 58069-19410 Service Address: 200 NE 2ND ST #CONCESSION DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 58069-19410 $216.67 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 950 kWh 760 kWh 570 kWh 380 kWh 190 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $113.16 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 58069-19410 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 113.16 Balance before new charges $113.16 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$64.10 Fuel:( $0.027180 per kWh)$18.13 Electric service amount 95.10 Gross receipts tax (State tax)2.44 Franchise fee (Reqd local fee)5.88 Taxes and charges 8.32 Regulatory fee (State fee)0.09 Total new charges $103.51 Total amount you owe $216.67 *ESTIMATED BILL* METER SUMMARY Meter reading - Meter AED7769. Next meter reading Jul 9, 2025. Usage Type Estimated -Previous =Usage kWh used 28745 28078 667 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 667 739 776 Service days 32 30 32 kWh/day 21 25 24 Amount $103.51 $113.16 $108.43 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. · Your current month’s bill is an estimate based on prior consumption. This is because we were unable to obtain an actual meter reading on your scheduled read date. Rest assured, no action is required from you. For more information, visit FPL.com/Meters. CURRENT BILL $221.08 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 110.94 Balance before new charges 110.94 Total new charges 110.14 Total amount you owe $221.08 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 60629-55627 Service Address: 311 SE 3RD ST # PMP DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 60629-55627 $221.08 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 3,050 kWh 2,440 kWh 1,830 kWh 1,220 kWh 610 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $110.94 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 60629-55627 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 110.94 Balance before new charges $110.94 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$3.09 Fuel:( $0.027180 per kWh)$2.47 Demand charge:$13.41 per KW Electric service amount 35.97 Gross receipts tax (State tax)0.92 Franchise fee (Reqd local fee)2.22 Taxes and charges 3.14 Regulatory fee (State fee)0.03 Total new charges $39.14 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $221.08 METER SUMMARY Meter reading - Meter SN88527. Next meter reading Jul 9, 2025. Usage Type Current -Previous =Usage kWh used 36857 36766 91 Demand KW 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 91 103 110 Service days 32 30 32 kWh/day 2 3 3 Amount $39.14 $39.94 $54.00 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,977.68 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 852.64 Balance before new charges 852.64 Total new charges 1,125.04 Total amount you owe $1,977.68 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 62074-52647 Service Address: 901 NE 3RD ST #CIVIC CTR DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 62074-52647 $1,977.68 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 11,100 kWh 8,880 kWh 6,660 kWh 4,440 kWh 2,220 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $852.64 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 62074-52647 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 852.64 Balance before new charges $852.64 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$333.48 Fuel:( $0.027180 per kWh)$267.45 Demand:($13.41 per KW)$402.30 Electric service amount 1,033.64 Gross receipts tax (State tax)26.53 Franchise fee (Reqd local fee)63.92 Taxes and charges 90.45 Regulatory fee (State fee)0.95 Total new charges $1,125.04 Total amount you owe $1,977.68 METER SUMMARY Meter reading - Meter KT58793. Next meter reading Jul 9, 2025. Usage Type Current -Previous x Const =Usage kWh used 07153 07071 120 9840 Demand KW .25 120.00 30 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 9840 6840 10080 Service days 32 30 32 kWh/day 307 228 315 Amount $1,125.04 $852.64 $937.37 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $714.63 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 305.72 Balance before new charges 305.72 Total new charges 408.91 Total amount you owe $714.63 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 62624-58257 Service Address: 100 NW 8TH AVE #STAND DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 62624-58257 $714.63 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 3,250 kWh 2,600 kWh 1,950 kWh 1,300 kWh 650 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $305.72 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 62624-58257 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 305.72 Balance before new charges $305.72 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$282.83 Fuel:( $0.027180 per kWh)$79.99 Electric service amount 375.69 Gross receipts tax (State tax)9.64 Franchise fee (Reqd local fee)23.23 Taxes and charges 32.87 Regulatory fee (State fee)0.35 Total new charges $408.91 Total amount you owe $714.63 METER SUMMARY Meter reading - Meter ACD1416. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 48440 45497 2943 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 2943 2174 1524 Service days 32 30 32 kWh/day 92 72 48 Amount $408.91 $305.72 $199.53 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $2,289.92 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 1,109.74 Balance before new charges 1,109.74 Total new charges 1,180.18 Total amount you owe $2,289.92 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 62762-57638 Service Address: 1200 SE 2ND AVE # LS 3 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 62762-57638 $2,289.92 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 14,350 kWh 11,480 kWh 8,610 kWh 5,740 kWh 2,870 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $1,109.74 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 62762-57638 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 1,109.74 Balance before new charges $1,109.74 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$347.72 Fuel:( $0.027180 per kWh)$278.87 Demand:($13.41 per KW)$362.07 Electric service amount 1,019.07 Gross receipts tax (State tax)26.15 Franchise fee (Reqd local fee)63.02 Taxes and charges 89.17 Regulatory fee (State fee)0.94 Total new charges $1,109.18 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $2,289.92 METER SUMMARY Meter reading - Meter PT32736. Next meter reading Jul 9, 2025. Usage Type Current -Previous x Const =Usage kWh used 00423 00252 60 10260 Demand KW 27 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 10260 9420 360 Service days 32 30 32 kWh/day 320 314 11 Amount $1,109.18 $1,038.74 $69.74 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $54.42 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 27.21 Balance before new charges 27.21 Total new charges 27.21 Total amount you owe $54.42 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 62926-58660 Service Address: 951 NW 10 ST #IRR PUMP DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 62926-58660 $54.42 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O DANIA FL 33004 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 5 kWh 4 kWh 3 kWh 2 kWh 1 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $27.21 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 62926-58660 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 27.21 Balance before new charges $27.21 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $54.42 METER SUMMARY Meter reading - Meter ACD8555. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 00000 00000 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 0 0 0 Service days 32 30 32 kWh/day 0 0 0 Amount $27.21 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $61.88 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 31.22 Balance before new charges 31.22 Total new charges 30.66 Total amount you owe $61.88 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 62936-56697 Service Address: 900 NW 10 ST #LIGHTS DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 62936-56697 $61.88 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 120 kWh 96 kWh 72 kWh 48 kWh 24 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $31.22 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 62936-56697 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 31.22 Balance before new charges $31.22 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$7.54 Non-fuel:( $0.096100 per kWh)$6.05 Fuel:( $0.027180 per kWh)$1.71 Electric service amount 28.17 Gross receipts tax (State tax)0.72 Franchise fee (Reqd local fee)1.74 Taxes and charges 2.46 Regulatory fee (State fee)0.03 Total new charges $30.66 Total amount you owe $61.88 METER SUMMARY Meter reading - Meter ACD5956. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 02455 02392 63 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 63 73 96 Service days 32 30 32 kWh/day 2 2 3 Amount $30.66 $31.22 $31.35 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $28.38 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 14.19 Balance before new charges 14.19 Total new charges 14.19 Total amount you owe $28.38 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 64800-94298 Service Address: 506 NE 3RD ST # OL DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) Hello City Of Dania Beach, Here's what you owe for this billing period. E001 64800-94298 $28.38 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 30 kWh 24 kWh 18 kWh 12 kWh 6 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Payments received after September 04, 2025 are considered late; a late payment charge, the greater of $0.00 or 1.5% of your past due balance will apply. Your account may also be billed a deposit adjustment. · Charges and energy usage are based on the facilities contracted. Facility, energy and fuel costs are available upon request. E001Customer Name:Account Number:FPL.com Page 2 City Of Dania Beach 64800-94298 Cool down costs Discover how you can reduce your energy use this summer and increase your savings. FPL.com/EnergyManager Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 14.19 Balance before new charges $14.19 New Charges Rate: OL-1 OUTDOOR LIGHTING Electric service amount **11.60 Gross receipts tax (State tax)0.09 Franchise fee (Reqd local fee)0.70 Utility tax (Local tax)1.18 Florida sales tax (State tax)0.52 County sales tax (Local tax)0.09 Taxes and charges 2.58 Regulatory fee (State fee)0.01 Total new charges $14.19 Total amount you owe $28.38 ** Your electric service amount includes the following charges: Non-fuel energy charge: $0.091030 per kWh Fuel charge:$0.026470 per kWh METER SUMMARY Next bill date Jul 9, 2025. Usage Type Usage Total kWh used 29 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 29 29 29 Service days 32 30 32 kWh/day 1 1 1 Amount $14.19 $14.19 $12.35 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $54.42 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 54.42 Payments received -27.21 Balance before new charges 27.21 Total new charges 27.21 Total amount you owe $54.42 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 1, 2025 to Jun 2, 2025 (32 days) Statement Date: Jun 2, 2025 Account Number: 67543-69459 Service Address: 1901 GRIFFIN RD #LIGHTS DANIA, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 67543-69459 $54.42 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O CITY OF DANIA BEACH 1201 STIRLING RD DANIA FL 33004-3555 ENERGY USAGE HISTORY 20 kWh 16 kWh 12 kWh 8 kWh 4 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · We have billed you for the minimum base charge for eight consecutive months due to your meter registering zero usage. Call us if you wish to temporarily disconnect your service. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 67543-69459 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 54.42 Payment received - Thank you −27.21 Balance before new charges $27.21 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $54.42 METER SUMMARY Meter reading - Meter ACD3114. Next meter reading Jul 1, 2025. Usage Type Current -Previous =Usage kWh used 00011 00011 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 2, 2025 May 1, 2025 Jun 3, 2024 kWh Used 0 0 0 Service days 32 30 33 kWh/day 0 0 0 Amount $27.21 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $71.97 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 44.13 Balance before new charges 44.13 Total new charges 27.84 Total amount you owe $71.97 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 69593-35123 Service Address: 1000 N FEDERAL HWY #SIGN DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 69593-35123 $71.97 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 800 kWh 640 kWh 480 kWh 320 kWh 160 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $44.13 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 69593-35123 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 44.13 Balance before new charges $44.13 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$10.67 Non-fuel:( $0.096100 per kWh)$1.93 Fuel:( $0.027180 per kWh)$0.54 Electric service amount 26.01 Gross receipts tax (State tax)0.67 Franchise fee (Reqd local fee)1.14 Taxes and charges 1.81 Regulatory fee (State fee)0.02 Total new charges $27.84 Total amount you owe $71.97 METER SUMMARY Meter reading - Meter AC58673. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 47938 47918 20 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 20 230 523 Service days 32 30 32 kWh/day 1 8 16 Amount $27.84 $44.13 $76.45 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $62,509.24 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 62,924.87 Payments received -31,670.25 Balance before new charges 31,254.62 Total new charges 31,254.62 Total amount you owe $62,509.24 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 2, 2025 to Jun 3, 2025 (32 days) Statement Date: Jun 3, 2025 Account Number: 74042-50974 Service Address: STREET LIGHTS #DANIA DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 74042-50974 $62,509.24 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O CITY HALL PO BOX 1708 DANIA FL 33004-1708 ENERGY USAGE HISTORY 103,400 kWh 82,720 kWh 62,040 kWh 41,360 kWh 20,680 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · Charges and energy usage are based on the facilities contracted. Facility, energy and fuel costs are available upon request. · This bill reflects a credit to the fuel charge portion of your bill for each street light fixture turned off during sea turtle nesting and hatching season. Thank you for helping us protect sea turtles. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 74042-50974 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 62,924.87 Payment received - Thank you −31,670.25 Balance before new charges $31,254.62 New Charges Rate: SL-1 STREET LIGHTING SERVICE Electric service amount 29,246.53 Gross receipts tax (State tax)205.90 Franchise fee (Reqd local fee)1,775.69 Taxes and charges 1,981.59 Regulatory fee (State fee)26.50 Total new charges $31,254.62 Total amount you owe $62,509.24 METER SUMMARY Next bill date Jul 2, 2025. Usage Type Usage Total kWh used 93962 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 3, 2025 May 2, 2025 Jun 4, 2024 kWh Used 93962 93962 93767 Service days 32 30 33 kWh/day 2936 3132 2841 Amount $31,254.62 $31,254.62 $28,581.40 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. Component Code Watts Lumens Owner/ Maint *Quantity Rate/Unit kWh Used Amount 60 KWH E 20 1,200 Energy 2.080000 41.60 88 KWH E 1 88 Energy 3.040000 3.04 168 KWH E 161 27,048 Energy 5.810000 935.41 28 KWH E 4 112 Energy 0.970000 3.88 104 KWH E 8 832 Energy 3.600000 28.80 160 KWH E 11 1,760 Energy 5.530000 60.83 168 KWH E 31 5,208 Energy 5.810000 180.11 C700304 47 5392 F 158 2,528 Energy 0.600000 94.80 Non-energy Fixtures 6.610000 1,044.38 Maintenance 1.470000 232.26 C700305 76 8653 F 751 19,526 Energy 0.800000 600.80 Non-energy Fixtures 6.610000 4,964.11 Maintenance 1.470000 1,103.97 C700306 118 15453 F 63 2,583 Energy 1.400000 88.20 For: 05-02-2025 to 06-03-2025 (32 days) kWh/Day: 2,936 Service Address: STREET LIGHTS #DANIA DANIA, FL 33004 FPL.com Page 1Customer Name: CITY OF DANIA BEACH Detail of Rate Schedule Charges for Street Lights CITY OF DANIA BEACH C/O CITY HALL PO BOX 1708 DANIA FL 33004-1708 Account Number: 74042-50974 * F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER ESLA Customer Name: CITY OF DANIA BEACH Component Code Watts Lumens Owner/ Maint *Quantity Rate/Unit kWh Used Amount Non-energy Fixtures 9.610000 605.43 Maintenance 1.470000 92.61 C700307 259 27874 F 25 2,275 Energy 3.200000 80.00 Non-energy Fixtures 9.610000 240.25 Maintenance 1.470000 36.75 C700602 26 3300 F 409 3,681 Energy 0.400000 163.60 Non-energy Fixtures 6.610000 2,703.49 Maintenance 1.470000 601.23 C700613 144 2700 F 1 50 Energy 1.800000 1.80 Non-energy Fixtures 12.610000 12.61 Maintenance 1.470000 1.47 C700627 144 5300 F 12 600 Energy 1.800000 21.60 Non-energy Fixtures 12.610000 151.32 Maintenance 1.470000 17.64 C863210 38 2500 F 95 1,235 Energy 0.400000 38.00 Non-energy Fixtures 6.610000 627.95 Maintenance 1.470000 139.65 F600222 59 7500 F 2 40 Account Number: 74042-50974 For: 05-02-2025 to 06-03-2025 (32 days) kWh/Day: 2,936 Service Address: STREET LIGHTS #DANIA DANIA, FL 33004 FPL.com Page 2 * F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER ESLA Customer Name: CITY OF DANIA BEACH Component Code Watts Lumens Owner/ Maint *Quantity Rate/Unit kWh Used Amount Energy 0.600000 1.20 Non-energy Fixtures 4.500000 9.00 Maintenance 1.470000 2.94 F700305 76 8653 F 94 2,444 Energy 0.800000 75.20 Non-energy Fixtures 4.500000 423.00 Maintenance 1.470000 138.18 F700307 259 27874 F 4 364 Energy 3.200000 12.80 Non-energy Fixtures 7.500000 30.00 Maintenance 1.470000 5.88 F700308 268 32329 F 2 188 Energy 3.200000 6.40 Non-energy Fixtures 10.500000 21.00 Maintenance 1.470000 2.94 F861224 39 3500 F 15 195 Energy 0.400000 6.00 Non-energy Fixtures 7.500000 112.50 Maintenance 1.470000 22.05 HPS0070 70 6300 F 30 870 Energy 1.000000 30.00 Non-energy Fixtures 5.380000 161.40 Maintenance 2.190000 65.70 HPS0100 100 9500 F 31 1,271 Energy 1.420000 44.02 Non-energy Fixtures 4.990000 154.69 Maintenance 2.200000 68.20 HPS0150 150 16000 F 51 3,060 Energy 2.080000 106.08 Non-energy Fixtures 5.140000 262.14 Maintenance 2.230000 113.73 Account Number: 74042-50974 For: 05-02-2025 to 06-03-2025 (32 days) kWh/Day: 2,936 Service Address: STREET LIGHTS #DANIA DANIA, FL 33004 FPL.com Page 3 * F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER ESLA Customer Name: CITY OF DANIA BEACH Component Code Watts Lumens Owner/ Maint *Quantity Rate/Unit kWh Used Amount HPS0200 200 22000 F 103 9,064 Energy 3.040000 313.12 Non-energy Fixtures 7.800000 803.40 Maintenance 2.850000 293.55 HPS0400 400 50000 F 7 1,176 Energy 5.810000 40.67 Non-energy Fixtures 7.880000 55.16 Maintenance 2.840000 19.88 HPS0250 250 27500 R 3 348 Energy 4.010000 12.03 Non-energy Relamp 3.090000 9.27 HPS0400 400 50000 R 37 6,216 Energy 5.810000 214.97 Non-energy Relamp 2.850000 105.45 PMC0001 308 Non-energy Fixtures 8.250000 2,541.00 PMF0001 15 Non-energy Fixtures 9.740000 146.10 PMW0001 377 Non-energy Fixtures 6.030000 2,273.31 UCNP 13,456 Non-energy Maintenance 0.049350 664.05 UCUP 408 Non-energy Maintenance 0.120540 49.18 Additional lighting facility charge Non-energy 94.52 Account Number: 74042-50974 For: 05-02-2025 to 06-03-2025 (32 days) kWh/Day: 2,936 Service Address: STREET LIGHTS #DANIA DANIA, FL 33004 FPL.com Page 4 * F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER ESLA Customer Name: CITY OF DANIA BEACH Component Code Watts Lumens Owner/ Maint *Quantity Rate/Unit kWh Used Amount Energy sub total 3,204.96 Non-energy sub total 21,223.34 Sub total 93,962 24,428.30 Energy conservation cost recovery 36.65 Capacity payment recovery charge 6.58 Environmental cost recovery charge 46.04 Storm restoration recovery charge 1,946.89 Transition rider credit −194.50 Storm protection recovery charge 524.31 Fuel charge 2,452.26 Electric service amount 29,246.53 Gross receipts tax (State tax)205.90 Regulatory fee (State fee)26.50 Franchise fee (Reqd local fee)1,775.69 Total 93,962 31,254.62 Account Number: 74042-50974 For: 05-02-2025 to 06-03-2025 (32 days) kWh/Day: 2,936 Service Address: STREET LIGHTS #DANIA DANIA, FL 33004 FPL.com Page 5 * F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER ESLA CURRENT BILL $60.91 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 30.40 Balance before new charges 30.40 Total new charges 30.51 Total amount you owe $60.91 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 74309-73243 Service Address: 106 N BEACH RD DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 74309-73243 $60.91 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 70 kWh 56 kWh 42 kWh 28 kWh 14 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $30.40 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 74309-73243 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 30.40 Balance before new charges $30.40 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$7.76 Non-fuel:( $0.096100 per kWh)$5.77 Fuel:( $0.027180 per kWh)$1.63 Electric service amount 28.03 Gross receipts tax (State tax)0.72 Franchise fee (Reqd local fee)1.73 Taxes and charges 2.45 Regulatory fee (State fee)0.03 Total new charges $30.51 Total amount you owe $60.91 METER SUMMARY Meter reading - Meter KE82004. Next meter reading Jul 9, 2025. Usage Type Current -Previous =Usage kWh used 02868 02808 60 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 60 58 9 Service days 32 30 32 kWh/day 1 1 0 Amount $30.51 $30.40 $27.59 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $2,856.13 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 1,327.09 Balance before new charges 1,327.09 Total new charges 1,529.04 Total amount you owe $2,856.13 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 75296-61378 Service Address: 1201 STIRLING RD #PSAB DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 75296-61378 $2,856.13 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 17,100 kWh 13,680 kWh 10,260 kWh 6,840 kWh 3,420 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $1,327.09 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 75296-61378 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 1,327.09 Balance before new charges $1,327.09 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$502.25 Fuel:( $0.027180 per kWh)$402.81 Demand:($13.41 per KW)$469.35 Electric service amount 1,404.82 Gross receipts tax (State tax)36.05 Franchise fee (Reqd local fee)86.87 Taxes and charges 122.92 Regulatory fee (State fee)1.30 Total new charges $1,529.04 Total amount you owe $2,856.13 METER SUMMARY Meter reading - Meter KU38133. Next meter reading Jul 10, 2025. Usage Type Current -Previous x Const =Usage kWh used 31665 31418 60 14820 Demand KW .59 60.00 35 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 14820 12660 15540 Service days 32 30 32 kWh/day 463 422 485 Amount $1,529.04 $1,327.09 $1,508.20 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $54.42 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 54.42 Payments received -27.21 Balance before new charges 27.21 Total new charges 27.21 Total amount you owe $54.42 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 1, 2025 to Jun 2, 2025 (32 days) Statement Date: Jun 2, 2025 Account Number: 75572-89456 Service Address: 4155 GRIFFIN RD #LIGHTS DANIA, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 75572-89456 $54.42 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 150 kWh 120 kWh 90 kWh 60 kWh 30 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 75572-89456 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 54.42 Payment received - Thank you −27.21 Balance before new charges $27.21 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$12.13 Non-fuel energy charge: $0.096100 per kWh Fuel charge:$0.027180 per kWh Electric service amount 25.00 Gross receipts tax (State tax)0.64 Franchise fee (Reqd local fee)1.55 Taxes and charges 2.19 Regulatory fee (State fee)0.02 Total new charges $27.21 Total amount you owe $54.42 METER SUMMARY Meter reading - Meter ACD3228. Next meter reading Jul 1, 2025. Usage Type Current -Previous =Usage kWh used 00233 00233 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 2, 2025 May 1, 2025 Jun 3, 2024 kWh Used 0 0 0 Service days 32 30 33 kWh/day 0 0 0 Amount $27.21 $27.21 $27.21 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $588.70 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 318.22 Additional Activity −10.09 Balance before new charges 308.13 Total new charges 280.57 Total amount you owe $588.70 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 75615-78464 Service Address: 1200 NW 1ST ST DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) DANIA BEACH COMMUNITY REDEVELOPMENT AGENCY, Here's what you owe for this billing period. E001 75615-78464 $588.70 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 DANIA BEACH COMMUNITY REDEVELOPMENT AGENCY 100 W DANIA BEACH BLVD DANIA BEACH FL 33004-3643 ENERGY USAGE HISTORY 2,300 kWh 1,840 kWh 1,380 kWh 920 kWh 460 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $318.22 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payments received after July 07, 2025 are considered late; a late payment charge, the greater of $5.00 or 1.5% of your past due balance will apply. Your account may also be billed a deposit adjustment. E001Customer Name:Account Number:FPL.com Page 2 DANIA BEACH COMMUNITY REDEVELOPMENT AGENCY 75615-78464 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 318.22 Additional activity Deposit Interest −10.09 Balance before new charges $308.13 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$162.42 Fuel:( $0.027180 per kWh)$45.93 Electric service amount 221.22 Gross receipts tax (State tax)5.68 Franchise fee (Reqd local fee)13.68 Utility tax (Local tax)20.65 Florida sales tax (State tax)16.73 County sales tax (Local tax)2.41 Taxes and charges 59.15 Regulatory fee (State fee)0.20 Total new charges $280.57 Total amount you owe $588.70 METER SUMMARY Meter reading - Meter ACD1767. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 12649 10959 1690 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 1690 1931 2061 Service days 32 30 32 kWh/day 53 64 64 Amount $280.57 $318.22 $307.76 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $4,703.79 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 5,440.13 Payments received -2,949.95 Balance before new charges 2,490.18 Total new charges 2,213.61 Total amount you owe $4,703.79 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 1, 2025 to Jun 2, 2025 (32 days) Statement Date: Jun 2, 2025 Account Number: 77463-97251 Service Address: 2901 SW 52ND ST #POOL FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 77463-97251 $4,703.79 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH C/O TANIA STEVENS 100 W DANIA BEACH BLVD DANIA BEACH FL 33004-3699 ENERGY USAGE HISTORY 47,100 kWh 37,680 kWh 28,260 kWh 18,840 kWh 9,420 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 77463-97251 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 5,440.13 Payment received - Thank you −2,949.95 Balance before new charges $2,490.18 New Charges Rate: HLFT-1 HIGH LOAD FACTOR DEMAND TIME OF USE Electric service amount **2,033.78 Gross receipts tax (State tax)52.19 Franchise fee (Reqd local fee)125.76 Taxes and charges 177.95 Regulatory fee (State fee)1.88 Total new charges $2,213.61 Total amount you owe $4,703.79 ** Your electric service amount includes the following charges: Base charge:$30.41 Non-fuel energy charge: On-peak $0.030330 per kWh Off-peak $0.022150 per kWh Fuel charge: On-peak $0.030740 per kWh Off-peak $0.025650 per kWh Demand charge: On-Peak $15.45 per KW Maximum $2.80 per KW METER SUMMARY Meter reading - Meter MLL7780. Next meter reading Jul 1, 2025. Usage Type Current -Previous =Usage Total kWh used 41562 22634 18928 On-Peak kWh used 14758 10462 4296 Off-peak kWh used 14632 On-peak demand 55.89 56 Maximum demand 63 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 2, 2025 May 1, 2025 Jun 3, 2024 kWh Used 18928 24058 20554 Service days 32 30 33 kWh/day 591 801 622 Amount $2,213.61 $2,490.18 $1,897.90 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $22,268.21 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 10,888.83 Balance before new charges 10,888.83 Total new charges 11,379.38 Total amount you owe $22,268.21 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 78869-61130 Service Address: 1201 STIRLING RD #HSPS DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 78869-61130 $22,268.21 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 145,750 kWh 116,600 kWh 87,450 kWh 58,300 kWh 29,150 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $10,888.83 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 78869-61130 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 10,888.83 Balance before new charges $10,888.83 New Charges Rate: GSDT-1 GENERAL SERVICE DEMAND TIME OF USE Electric service amount **10,454.93 Gross receipts tax (State tax)268.30 Franchise fee (Reqd local fee)646.50 Taxes and charges 914.80 Regulatory fee (State fee)9.65 Total new charges $11,379.38 Total amount you owe $22,268.21 ** Your electric service amount includes the following charges: Base charge:$30.41 Non-fuel energy charge: On-peak $0.062970 per kWh Off-peak $0.022150 per kWh Fuel charge: On-peak $0.030740 per kWh Off-peak $0.025650 per kWh Demand charge:$12.69 per KW Maximum $0.71 per KW METER SUMMARY Meter reading - Meter MV57024. Next meter reading Jul 10, 2025. Usage Type Current -Previous x Const =Usage Total kWh used 18276 17172 120 132480 On-Peak kWh used 29994 29723 120 32520 Off-peak kWh used 99960 On-peak demand 1.61 120.00 193 Maximum demand 211 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 132480 122880 122400 Service days 32 30 32 kWh/day 4140 4096 3825 Amount $11,379.38 $10,888.83 $10,100.56 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $58.31 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 29.07 Balance before new charges 29.07 Total new charges 29.24 Total amount you owe $58.31 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 82314-31431 Service Address: 803 NW 1ST ST #PKGLTLGTS DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 82314-31431 $58.31 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH PO BOX 1708 DANIA FL 33004-1708 ENERGY USAGE HISTORY 50 kWh 40 kWh 30 kWh 20 kWh 10 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $29.07 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 82314-31431 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 29.07 Balance before new charges $29.07 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Minimum base bill charge:$9.44 Non-fuel:( $0.096100 per kWh)$3.55 Fuel:( $0.027180 per kWh)$1.01 Electric service amount 26.87 Gross receipts tax (State tax)0.69 Franchise fee (Reqd local fee)1.66 Taxes and charges 2.35 Regulatory fee (State fee)0.02 Total new charges $29.24 Total amount you owe $58.31 METER SUMMARY Meter reading - Meter ACD7830. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 07050 07013 37 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 37 34 35 Service days 32 30 32 kWh/day 1 1 1 Amount $29.24 $29.07 $28.71 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,374.12 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 706.95 Balance before new charges 706.95 Total new charges 667.17 Total amount you owe $1,374.12 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 82343-56627 Service Address: 200 NE 2 ST #CTS DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 82343-56627 $1,374.12 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 3,600 kWh 2,880 kWh 2,160 kWh 1,440 kWh 720 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $706.95 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 82343-56627 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 706.95 Balance before new charges $706.95 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$77.71 Fuel:( $0.027180 per kWh)$62.32 Demand:($13.41 per KW)$442.53 Electric service amount 612.97 Gross receipts tax (State tax)15.73 Franchise fee (Reqd local fee)37.90 Taxes and charges 53.63 Regulatory fee (State fee)0.57 Total new charges $667.17 Total amount you owe $1,374.12 METER SUMMARY Meter reading - Meter KEL4829. Next meter reading Jul 9, 2025. Usage Type Current -Previous =Usage kWh used 30233 27940 2293 Demand KW 33.34 33 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 2293 2672 1149 Service days 32 30 32 kWh/day 71 89 35 Amount $667.17 $706.95 $615.46 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $498.33 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 309.76 Balance before new charges 309.76 Total new charges 188.57 Total amount you owe $498.33 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 82363-52681 Service Address: 200 NE 2 ST DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 82363-52681 $498.33 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 3,450 kWh 2,760 kWh 2,070 kWh 1,380 kWh 690 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $309.76 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · A secondary metering adjustment of 3% has been added to metered KWH per Tariff Sheet 10.010. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 82363-52681 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 309.76 Balance before new charges $309.76 New Charges Rate: OS-2 SPORTS FIELD SERVICE Electric service amount **156.45 Gross receipts tax (State tax)4.01 Franchise fee (Reqd local fee)9.67 Taxes and charges 13.68 Facilities rental 18.28 Regulatory fee (State fee)0.16 Total new charges $188.57 Total amount you owe $498.33 ** Your electric service amount includes the following charges: Base charge:$156.45 Non-fuel energy charge: $0.136790 per kWh Fuel charge:$0.026940 per kWh METER SUMMARY Meter reading - Meter KLL4681. Next meter reading Jul 9, 2025. Usage Type Current -Previous =Usage kWh used 82991 82991 0 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 0 680 0 Service days 32 30 32 kWh/day 0 22 0 Amount $170.27 $291.46 $169.15 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $2,224.99 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 1,038.12 Balance before new charges 1,038.12 Total new charges 1,186.87 Total amount you owe $2,224.99 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 83534-55572 Service Address: 128 NW 10 CT # LS7 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 83534-55572 $2,224.99 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 16,200 kWh 12,960 kWh 9,720 kWh 6,480 kWh 3,240 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $1,038.12 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · Pulse metering conversion factors are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 83534-55572 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 1,038.12 Balance before new charges $1,038.12 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$366.01 Fuel:( $0.027180 per kWh)$293.54 Demand:($13.41 per KW)$335.25 Electric service amount 1,025.21 Gross receipts tax (State tax)26.31 Franchise fee (Reqd local fee)63.40 Taxes and charges 89.71 Regulatory fee (State fee)0.95 Total new charges $1,115.87 FPL Affiliate and Other Programs Power monitoring-premium plus 71.00 --For ??, please contact your account manager Total FPL affiliate and other charges $71.00 Total amount you owe $2,224.99 METER SUMMARY Meter reading - Meter ST38676. Next meter reading Jul 10, 2025. Usage Type Current -Previous x Const =Usage kWh used 06218 06038 60 10800 Demand KW 25 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 10800 9660 8580 Service days 32 30 32 kWh/day 337 322 268 Amount $1,115.87 $967.12 $1,069.59 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $115.11 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 46.49 Balance before new charges 46.49 Total new charges 68.62 Total amount you owe $115.11 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 83594-58521 Service Address: 120 NW 10 CT DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 83594-58521 $115.11 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 500 kWh 400 kWh 300 kWh 200 kWh 100 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $46.49 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 83594-58521 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 46.49 Balance before new charges $46.49 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$39.11 Fuel:( $0.027180 per kWh)$11.06 Electric service amount 63.04 Gross receipts tax (State tax)1.62 Franchise fee (Reqd local fee)3.90 Taxes and charges 5.52 Regulatory fee (State fee)0.06 Total new charges $68.62 Total amount you owe $115.11 METER SUMMARY Meter reading - Meter ACD6938. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 08818 08411 407 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 407 242 56 Service days 32 30 32 kWh/day 13 8 2 Amount $68.62 $46.49 $29.63 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $414.69 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 184.48 Balance before new charges 184.48 Total new charges 230.21 Total amount you owe $414.69 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 83671-08357 Service Address: 1855 GRIFFIN RD #LS 10 DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 83671-08357 $414.69 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 1855 GRIFFIN RD # LS10 DANIA FL 33004-2436 ENERGY USAGE HISTORY 1,250 kWh 1,000 kWh 750 kWh 500 kWh 250 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $184.48 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 83671-08357 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 184.48 Balance before new charges $184.48 New Charges Rate: GSD-1 GENERAL SERVICE DEMAND Base charge:$30.41 Non-fuel:( $0.033890 per kWh)$33.52 Fuel:( $0.027180 per kWh)$26.88 Demand:($13.41 per KW)$120.69 Electric service amount 211.50 Gross receipts tax (State tax)5.43 Franchise fee (Reqd local fee)13.08 Taxes and charges 18.51 Regulatory fee (State fee)0.20 Total new charges $230.21 Total amount you owe $414.69 METER SUMMARY Meter reading - Meter KJJ8920. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 41224 40235 989 Demand KW 8.71 9 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 989 960 731 Service days 32 30 32 kWh/day 30 32 22 Amount $230.21 $184.48 $102.95 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $33.72 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 33.72 Payments received -16.86 Balance before new charges 16.86 Total new charges 16.86 Total amount you owe $33.72 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 1, 2025 to Jun 2, 2025 (32 days) Statement Date: Jun 2, 2025 Account Number: 83822-11186 Service Address: 4540 SW 27TH AVE # OL FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) Hello City Of Dania Beach, Here's what you owe for this billing period. E001 83822-11186 $33.72 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 90 kWh 72 kWh 54 kWh 36 kWh 18 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · Charges and energy usage are based on the facilities contracted. Facility, energy and fuel costs are available upon request. E001Customer Name:Account Number:FPL.com Page 2 City Of Dania Beach 83822-11186 Cool down costs Discover how you can reduce your energy use this summer and increase your savings. FPL.com/EnergyManager Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 33.72 Payment received - Thank you −16.86 Balance before new charges $16.86 New Charges Rate: OL-1 OUTDOOR LIGHTING Electric service amount **15.66 Gross receipts tax (State tax)0.23 Franchise fee (Reqd local fee)0.96 Taxes and charges 1.19 Regulatory fee (State fee)0.01 Total new charges $16.86 Total amount you owe $33.72 ** Your electric service amount includes the following charges: Non-fuel energy charge: $0.091030 per kWh Fuel charge:$0.026470 per kWh METER SUMMARY Next bill date Jul 1, 2025. Usage Type Usage Total kWh used 77 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 2, 2025 May 1, 2025 Jun 3, 2024 kWh Used 77 77 77 Service days 32 30 33 kWh/day 2 3 2 Amount $16.86 $16.86 $12.53 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $15,250.25 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 6,841.00 Balance before new charges 6,841.00 Total new charges 8,409.25 Total amount you owe $15,250.25 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 83875-32461 Service Address: 101 N BEACH RD #MARINA DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 83875-32461 $15,250.25 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 131,500 kWh 105,200 kWh 78,900 kWh 52,600 kWh 26,300 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $6,841.00 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 83875-32461 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 6,841.00 Balance before new charges $6,841.00 New Charges Rate: GSDT-1 GENERAL SERVICE DEMAND TIME OF USE Electric service amount **7,726.09 Gross receipts tax (State tax)198.27 Franchise fee (Reqd local fee)477.76 Taxes and charges 676.03 Regulatory fee (State fee)7.13 Total new charges $8,409.25 Total amount you owe $15,250.25 ** Your electric service amount includes the following charges: Base charge:$30.41 Non-fuel energy charge: On-peak $0.062970 per kWh Off-peak $0.022150 per kWh Fuel charge: On-peak $0.030740 per kWh Off-peak $0.025650 per kWh Demand charge:$12.69 per KW Maximum $0.71 per KW METER SUMMARY Meter reading - Meter MV58927. Next meter reading Jul 9, 2025. Usage Type Current -Previous x Const =Usage Total kWh used 42890 42163 120 87240 On-Peak kWh used 11969 11762 120 24840 Off-peak kWh used 62400 On-peak demand 1.48 120.00 178 Maximum demand 178 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 87240 66840 115920 Service days 32 30 32 kWh/day 2726 2228 3622 Amount $8,409.25 $6,841.00 $10,440.79 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $118.02 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 59.01 Balance before new charges 59.01 Total new charges 59.01 Total amount you owe $118.02 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 8, 2025 to Jun 9, 2025 (32 days) Statement Date: Jun 9, 2025 Account Number: 92733-58607 Service Address: 300 NE 2ND ST # OL DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 92733-58607 $118.02 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 300 kWh 240 kWh 180 kWh 120 kWh 60 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $59.01 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. · Charges and energy usage are based on the facilities contracted. Facility, energy and fuel costs are available upon request. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 92733-58607 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 59.01 Balance before new charges $59.01 New Charges Rate: OL-1 OUTDOOR LIGHTING Electric service amount **54.84 Gross receipts tax (State tax)0.77 Franchise fee (Reqd local fee)3.35 Taxes and charges 4.12 Regulatory fee (State fee)0.05 Total new charges $59.01 Total amount you owe $118.02 ** Your electric service amount includes the following charges: Non-fuel energy charge: $0.091030 per kWh Fuel charge:$0.026470 per kWh METER SUMMARY Next bill date Jul 9, 2025. Usage Type Usage Total kWh used 256 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 9, 2025 May 8, 2025 Jun 10, 2024 kWh Used 256 256 256 Service days 32 30 32 kWh/day 8 9 8 Amount $59.01 $59.01 $44.64 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $1,051.82 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 815.93 Payments received -361.67 Balance before new charges 454.26 Total new charges 597.56 Total amount you owe $1,051.82 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 1, 2025 to Jun 2, 2025 (32 days) Statement Date: Jun 2, 2025 Account Number: 95580-98431 Service Address: 2901 SW 52ND ST FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 95580-98431 $1,051.82 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 5,950 kWh 4,760 kWh 3,570 kWh 2,380 kWh 1,190 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 95580-98431 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 815.93 Payment received - Thank you −361.67 Balance before new charges $454.26 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$417.93 Fuel:( $0.027180 per kWh)$118.21 Electric service amount 549.01 Gross receipts tax (State tax)14.09 Franchise fee (Reqd local fee)33.95 Taxes and charges 48.04 Regulatory fee (State fee)0.51 Total new charges $597.56 Total amount you owe $1,051.82 METER SUMMARY Meter reading - Meter AC03956. Next meter reading Jul 1, 2025. Usage Type Current -Previous =Usage kWh used 12664 08315 4349 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 2, 2025 May 1, 2025 Jun 3, 2024 kWh Used 4349 3281 5042 Service days 32 30 33 kWh/day 136 109 153 Amount $597.56 $454.26 $628.06 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $679.88 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 265.61 Balance before new charges 265.61 Total new charges 414.27 Total amount you owe $679.88 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 9, 2025 to Jun 10, 2025 (32 days) Statement Date: Jun 10, 2025 Account Number: 96241-18460 Service Address: 230 SW 12TH AVE DANIA, FL 33004 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 96241-18460 $679.88 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W DANIA BEACH BLVD DANIA FL 33004-3699 ENERGY USAGE HISTORY 6,600 kWh 5,280 kWh 3,960 kWh 2,640 kWh 1,320 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Did you forget? $265.61 of this bill is past due. If payment has been made, we thank you and apologize for this reminder. · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 96241-18460 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 265.61 Balance before new charges $265.61 New Charges Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS Base charge:$12.87 Non-fuel:( $0.096100 per kWh)$286.66 Fuel:( $0.027180 per kWh)$81.08 Electric service amount 380.61 Gross receipts tax (State tax)9.77 Franchise fee (Reqd local fee)23.54 Taxes and charges 33.31 Regulatory fee (State fee)0.35 Total new charges $414.27 Total amount you owe $679.88 METER SUMMARY Meter reading - Meter KLL3254. Next meter reading Jul 10, 2025. Usage Type Current -Previous =Usage kWh used 14956 11973 2983 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 10, 2025 May 9, 2025 Jun 11, 2024 kWh Used 2983 1875 5969 Service days 32 30 32 kWh/day 93 62 186 Amount $414.27 $265.61 $740.98 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees. CURRENT BILL $87.94 TOTAL AMOUNT YOU OWE Jul 7, 2025 NEW CHARGES DUE BY BILL SUMMARY Amount of your last bill 1,012.61 Payments received -975.54 Balance before new charges 37.07 Total new charges 50.87 Total amount you owe $87.94 (See page 2 for bill details.) FPL.com Page 1 Electric Bill Statement For: May 2, 2025 to Jun 3, 2025 (32 days) Statement Date: Jun 3, 2025 Account Number: 97812-54595 Service Address: 2301 STIRLING RD # WELLFLD FORT LAUDERDALE, FL 33312 Customer Service: Outside Florida: Summary Bill Coordinator 1-800-226-3545 Report Power Outages: Hearing/Speech Impaired: 1-800-4OUTAGE (468-8243) 711 (Relay Service) CITY OF DANIA BEACH, Here's what you owe for this billing period. E001 97812-54595 $87.94 Jul 7, 2025 $SEND MASTER COUPON ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED / 3* SEND SUMMARY BILL MASTER COUPON ONLY* SUMMARY BILL MASTER 17071-61087 CITY OF DANIA BEACH 100 W BCH BLV DANIA FL 33004 ENERGY USAGE HISTORY 23,850 kWh 19,080 kWh 14,310 kWh 9,540 kWh 4,770 kWh 0 kWh J J A S O N D J F M A M J2024 2025 KEEP IN MIND · Payment received after September 04, 2025 is considered LATE; a late payment charge of 1% will apply. E001Customer Name:Account Number:FPL.com Page 2 CITY OF DANIA BEACH 97812-54595 Enhance your savings Discover how you can reduce your business's energy use while increasing your savings. FPL.com/BEM Download the app Get instant, secure access to outage and billing info from your mobile device. FPL.com/MobileApp BILL DETAILS Amount of your last bill 1,012.61 Payment received - Thank you −975.54 Balance before new charges $37.07 New Charges Rate: GSDT-1 GENERAL SERVICE DEMAND TIME OF USE Electric service amount **46.74 Gross receipts tax (State tax)1.20 Franchise fee (Reqd local fee)2.89 Taxes and charges 4.09 Regulatory fee (State fee)0.04 Total new charges $50.87 Total amount you owe $87.94 ** Your electric service amount includes the following charges: Base charge:$30.41 Non-fuel energy charge: On-peak $0.062970 per kWh Off-peak $0.022150 per kWh Fuel charge: On-peak $0.030740 per kWh Off-peak $0.025650 per kWh Demand charge:$12.69 per KW Maximum $0.71 per KW METER SUMMARY Meter reading - Meter MN56162. Next meter reading Jul 2, 2025. Note(s): Your meter has changed. Usage Type Current Usage Total kWh used 00034 50 On-Peak kWh used 00009 On-peak kWh used 12 Off-peak kWh used 38 On-peak demand 0.27 0 Maximum demand 1 ENERGY USAGE COMPARISON This Month Last Month Last Year Service to Jun 3, 2025 May 2, 2025 Jun 4, 2024 kWh Used 50 60 19 Service days 32 30 33 kWh/day 1 2 0 Amount $50.87 $37.07 $28.02 KEEP IN MIND · Taxes, fees, and charges on your bill are determined and required by your local and state government to be used at their discretion. · The fuel charge represents the cost of fuel used to generate electricity. It is a direct pass-through to customers. FPL does not profit from fuel, although higher costs do result in higher state and local taxes and fees.