HomeMy WebLinkAboutInv# Pay App 7 - RIC-MAN CONSTRUCTION FLORIDA, INC. - 03/31/2025 (3)
IF ENCLOSURES ARE NOT INDICATED , PLEASE NOTIFY
RIC-M A N C O N S T R U C T I O N F L O R I D A , I NC.
A n E q u a l O p p o r t u n i t y E m p l o y e r
Deerfield Office
3100 SW 15th Street
Deerfield Beach, FL 33442
Office: 954-426-1221 Fax: 954-426-1226
Miami Office
1205 Lincoln Road, Suite 219
Miami Beach, FL 33139
Office: 305.-379-4000 Fax: 305-379-4124
L E T T E R O F
T R A N S M I T T A L
TO
City of Dania Beach
ATTN: Alvaro Cortes
Hugo Da Silva
FROM
Ric-Man Construction Fl, Inc.
3100 SW 15th Street
Deerfield Beach, FL 33442
Office: (954)426-1221
Fax: (954)426-1226
PHONE 954-924-6800
DATE 05/05/2025
HERE WITH , WE TRANSMITTED THE FOLLOWING
FED-EX
X E-MAILED
PICK -UP BY
COPIES DESCRIPTION
1 Invoice thru 03/31/2025 Project – Southeast Drainage Retrofit Project – Phase I
1 Waiver and Release of Lien (Subs/Suppliers)
1 Certified Payrolls – RMCF/Subs
1 Schedule
FOR YOUR
APPROVAL X REVIEW AND S IGNATURE
REVISION RESUBMIT
AS REQUESTED, APPROVED AS NOTED
OTHER
REMARKS
RECEIVED BY PRINT NAME
SIGNED BY PRINT NAME
Recommended by:
Hugo E. Da Silva, P.E.
CEI - Project Administrator
June 19, 2025
CONTINUATION SHEET AIA DOCUMENT G703 PAGE 2 OF 2 PAGES
AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO:7
Subcontractor's signed certification is attached.APPLICATION DATE:3/31/25
In tabulations below, amounts are stated to the nearest dollar.PERIOD TO:3/31/2025
Use Column I on Contracts where variable retainage for line items may apply.ARCHITECT'S PROJECT NO:
A B C D E F G H I J K L M N O P
ITEM DESCRIPTION OF WORK Quantity UNIT UNIT VALVE SCHEDULED MATERIALS QUANTITY TO DATE TOTAL %BALANCE RETAINAGE
NO.VALUE QUANTITY FROM PREVIOUS QUANTITY THIS PERIOD PRESENTLY COMPLETED (N ÷ F)TO FINISH (IF VARIABLE
APPLICATION STORED AND STORED (C - G)RATE)
(NOT IN TO DATE 5%
D OR E)
1 Mobilization 1 LS $1,859,420.00 $1,859,420.00 1 $1,859,420.00 0 $0.00 1 $1,859,420.00 100.00%0.00 $92,971.00
2 MOT 182.5 DAY $531.00 $96,907.50 145 $76,995.00 31 $16,461.00 176 $93,456.00 96.44%$3,451.50 $4,672.80
3 Inlet Protection 140 EA $225.00 $31,500.00 108 $24,300.00 13 $2,925.00 121 $27,225.00 86.43%$4,275.00 $1,361.25
4 Clearing & Grubbing 0.5 ACRE $29,956.00 $14,978.00 0.4 $11,982.40 0 $0.00 0.4 $11,982.40 80.00%$2,995.60 $599.12
5 Embankment 75 CY $378.00 $28,350.00 0 $0.00 0 $0.00 0 $0.00 0.00%$28,350.00 $0.00
6 Optional Base Group 04 - Asphalt Base 8205 SY $39.00 $319,995.00 3086 $120,354.00 2990 $116,610.00 6076 $236,964.00 74.05%$83,031.00 $11,848.20
7 Stabilization Type B 8205 SY $71.00 $582,555.00 3042 $215,982.00 2990 $212,290.00 6032 $428,272.00 73.52%$154,283.00 $21,413.60
8 Turnout Construction 8250 SY $19.00 $156,750.00 0 $0.00 0 $0.00 0 $0.00 0.00%$156,750.00 $0.00
9 Pavers, Arch Concrete, Sidewalk, Apshalt Driveway Repairs 900 SY $218.00 $196,200.00 900 $196,200.00 0 $0.00 900 $196,200.00 100.00%0.00 $9,810.00
10 Milling Existing Asphalt Pavement 1.5" Avg Depth 9610 SY $5.50 $52,855.00 9610 $52,855.00 0 $0.00 9610 $52,855.00 100.00%0.00 $2,642.75
11 Super Pave Asphaltic Concrete, Traffic A 693 TN $220.00 $152,460.00 0 $0.00 294 $64,680.00 294 $64,680.00 42.42%$87,780.00 $3,234.00
12 Pavement Marking 1 LS $32,248.00 $32,248.00 0 $0.00 0 $0.00 0 $0.00 0.00%$32,248.00 $0.00
13 Thermoplastic, Standard, White Solid 24"720 LF $5.60 $4,032.00 0 $0.00 0 $0.00 0 $0.00 0.00%$4,032.00 $0.00
14 Thermoplastic, Standard-Other Surfaces, Yellow Solid 6"1.4 GM $3,406.00 $4,768.40 0 $0.00 0 $0.00 0 $0.00 0.00%$4,768.40 $0.00
15 Sediment Barrier 16470 LF $5.00 $82,350.00 1100 $5,500.00 0 $0.00 1100 $5,500.00 6.68%$76,850.00 $275.00
16 Roadway Excavation 1830 CY $15.00 $27,450.00 0 $0.00 0 $0.00 0 $0.00 0.00%$27,450.00 $0.00
17 Utility Pipe, Remove & Dispose (8-19.9")300 LF $96.00 $28,800.00 126 $12,096.00 110 $10,560.00 236 $22,656.00 78.67%$6,144.00 $1,132.80
18 8" WM DI Pipe Furnish & Install 300 LF $146.00 $43,800.00 0 $0.00 0 $0.00 0 $0.00 0.00%$43,800.00 $0.00
19 Utility Fittings, DI, Furnish & Install Elbow 8"8 EA $1,004.00 $8,032.00 0 $0.00 0 $0.00 0 $0.00 0.00%$8,032.00 $0.00
20 Adjust Manhole (Utilities) (Top Adjustment)30 SY $1,773.00 $53,190.00 7.98 $14,148.54 0 $0.00 7.98 $14,148.54 26.60%$39,041.46 $707.43
21 Utility Pipe-PVC, Funrish & Install, Water/Sewer 24"780 LF $376.00 $293,280.00 0 $0.00 0 $0.00 0 $0.00 0.00%$293,280.00 $0.00
22 Utility Pipe-PVC, Funrish & Install, Water/Sewer 18"741 LF $387.00 $286,767.00 0 $0.00 0 $0.00 0 $0.00 0.00%$286,767.00 $0.00
23 Utility Pipe-PVC, Funrish & Install, Water/Sewer 12"362 LF $330.00 $119,460.00 0 $0.00 0 $0.00 0 $0.00 0.00%$119,460.00 $0.00
24 Utility Fixture, Mech Joint Restraint, Furnish & Install 24"99 EA $1,065.00 $105,435.00 0 $0.00 0 $0.00 0 $0.00 0.00%$105,435.00 $0.00
25 Utility Fixture, Mech Joint Restraint, Furnish & Install 18"40 EA $810.00 $32,400.00 0 $0.00 0 $0.00 0 $0.00 0.00%$32,400.00 $0.00
26 Utility Fixture, Mech Joint Restraint, Furnish & Install 12"20 EA $483.00 $9,660.00 0 $0.00 0 $0.00 0 $0.00 0.00%$9,660.00 $0.00
27 Utility Fittings, DI/CI, Furnish & Install Elbow 24"9 EA $3,543.00 $31,887.00 0 $0.00 0 $0.00 0 $0.00 0.00%$31,887.00 $0.00
28 Utility Fittings, DI/CI, Furnish & Install Elbow 18"8 EA $1,369.00 $10,952.00 0 $0.00 0 $0.00 0 $0.00 0.00%$10,952.00 $0.00
29 Utility Fitting, DI/CI, Furnish & Install Tee 20-49.9"14 EA $3,902.00 $54,628.00 0 $0.00 0 $0.00 0 $0.00 0.00%$54,628.00 $0.00
30 Utility Fittings, PVC, Furnish & Install Elbow 12"8 EA $682.00 $5,456.00 0 $0.00 0 $0.00 0 $0.00 0.00%$5,456.00 $0.00
31 Utility Fitting, DI/CI, Furnish & Install Reducer 20-49.9"2 EA $1,818.00 $3,636.00 0 $0.00 0 $0.00 0 $0.00 0.00%$3,636.00 $0.00
32 Utility Fixture, Gate Valve Assembly, Furnish & Install 24"12 EA $31,736.00 $380,832.00 0 $0.00 0 $0.00 0 $0.00 0.00%$380,832.00 $0.00
33 Inlets, DT Bot, Type D < 10'47 EA $15,565.00 $731,555.00 47 $731,555.00 0 $0.00 47 $731,555.00 100.00%0.00 $36,577.75
34 Manholes, J-7 > 10'2 EA $29,326.00 $58,652.00 0 $0.00 0 $0.00 0 $0.00 0.00%$58,652.00 $0.00
35 Drainage Manhole, Utility Conflict Structure 3 EA $30,248.83 $90,746.49 0 $0.00 0 $0.00 0 $0.00 0.00%$90,746.49 $0.00
36 Pipe Culvert, Optional Material Round, 12" SD 1200 LF $220.00 $264,000.00 913 $200,860.00 122 $26,840.00 1035 $227,700.00 86.25%$36,300.00 $11,385.00
37 Pipe Culvert, Optional Material Round, 15" SD 2263 LF $212.00 $479,756.00 2263 $479,756.00 0 $0.00 2263 $479,756.00 100.00%0.00 $23,987.80
38 Pipe Culvert, Optional Material Round, 18" SD 350 LF $332.00 $116,200.00 350 $116,200.00 0 $0.00 350 $116,200.00 100.00%0.00 $5,810.00
39 Pipe Culvert, Optional Material Round, 24" SD 1000 LF $345.00 $345,000.00 891 $307,395.00 109 $37,605.00 1000 $345,000.00 100.00%0.00 $17,250.00
40 Furnish 24" Plug Valves - Pump Station 2 EA $39,188.00 $78,376.00 0 $0.00 0 $0.00 0 $0.00 0.00%$78,376.00 $0.00
41 Furnish 24" Swing Check Valves - Pump Station 2 EA $43,329.00 $86,658.00 0 $0.00 0 $0.00 0 $0.00 0.00%$86,658.00 $0.00
42 Furnish & Install Injection Wells and Ancillary Equip 12 EA $121,625.00 $1,459,500.00 6 $729,750.00 0 $0.00 6 $729,750.00 50.00%$729,750.00 $36,487.50
43 Support of Excavation - Cofferdam 1 LS $751,332.00 $751,332.00 0 $0.00 0 $0.00 0 $0.00 0.00%$751,332.00 $0.00
44 Regular Excvation 13050 CY $15.00 $195,750.00 11167 $167,506.90 401.788291 $6,026.82 11568.91474 $173,533.72 88.65%$22,216.28 $8,676.69
45 Select Bedding Material (Storm Pipe Bedding)1877.5 CY $108.00 $202,770.00 827 $89,350.52 102.16588 $11,033.92 929.48552 $100,384.44 49.51%$102,385.56 $5,019.22
46 Select Backfill 11172.5 CY $6.00 $67,035.00 3074 $18,444.72 308.92188 $1,853.53 3383.04152 $20,298.25 30.28%$46,736.75 $1,014.91
47 Furnish & Install Pumps 2 EA $874,577.00 $1,749,154.00 0 $0.00 0 $0.00 0 $0.00 0.00%$1,749,154.00 $0.00
48 Furnish & Install Contech Treatment Unit 1 EA $265,033.00 $265,033.00 0 $0.00 0 $0.00 0 $0.00 0.00%$265,033.00 $0.00
49 Pump Station Electrical 1 LS $374,073.00 $374,073.00 0 $0.00 0 $0.00 0 $0.00 0.00%$374,073.00 $0.00
50 Concrete - Pump Station 169.4 CY $2,193.00 $371,494.20 0 $0.00 0 $0.00 0 $0.00 0.00%$371,494.20 $0.00
51 Misc Steel - Pump Station 61350 LB $4.00 $245,400.00 0 $0.00 0 $0.00 0 $0.00 0.00%$245,400.00 $0.00
52 Exfiltration Trench 3105 LF $458.75 $1,424,418.75 2837 $1,301,473.75 0 $0.00 2837 $1,301,473.75 91.37%$122,945.00 $65,073.69
53 Landscape 59 EA $194.00 $11,446.00 0 $0.00 0 $0.00 0 $0.00 0.00%$11,446.00 $0.00
54 Relocation/Replacement of Existing Trees 27 EA $3,225.00 $87,075.00 13 $41,925.00 3 $9,675.00 16 $51,600.00 59.26%$35,475.00 $2,580.00
55 Sod Restoration 1513 SY $37.00 $55,981.00 0 $0.00 0 $0.00 0 $0.00 0.00%$55,981.00 $0.00
56 Contingency - Unforseen Conditions 1 LS $2,193,365.90 $2,193,365.90 0.406522332 $891,652.22 0.258920666 $567,907.76 0.665442998 $1,459,559.98 66.54%$733,805.92 $72,978.00
Totals:$16,815,805.24 $7,665,702.05 $1,084,468.03 $0.00 $8,750,170.08 52.04%$8,065,635.16 $437,508.50
CO/Item Contingency Draws
1 Drainage Investigation/Lamping LS 1 LS $108,506.88 $108,506.88
2 Change Order #2
Item 1 Pipe Removal 1756 LF $77.00 $135,212.00
Item 2 Modification of Existing Structures 35 EA $566.30 $19,820.50
Item 3 Cofferdam Redesign 1 LS $6,030.00 $6,030.00
Item 4 Watermain Abandonment 1 LS $36,095.64 $36,095.64
Item 5 Permit Fees Reimbursable 1 LS $31,695.50 $31,695.50
3 Change Order #3
Item 1 Pipe Removal 2606 LF $77.00 $200,662.00
Item 2 Modification of Existing Structures 49 EA $566.30 $27,748.70
Item 3 Paver, Concrete, Asphalt Driveways 151.5 SY $218.00 $33,027.00
Item 4 Inlets, DT Bot, Type D <10'10 EA $15,565.00 $155,650.00
Item 5 Pipe Culvert, Optional Material, 15" SD 536 LF $212.00 $113,632.00
Item 6 Pipe Culvert, Optional Material, 18" SD 71 LF 332 $23,572.00
4 Change Order #4
Item 1 Removal & Disposal of Existing MH Struc 30 EA $3,000.00 $90,000.00
Item 2 Drainage Investigation/Lamping 13.5 HR $565.14 $7,629.39
Item 3 Mod of Existing Structures (per opening)10 EA $566.30 $5,663.00
Item 4 Removal & Disposal of Storm Drainage Piping 272 LF $77.00 $20,944.00
Item 5 WM Cut/Cap @ Pump Station 1 LS $6,041.37 $6,041.37
Item 6 Asphalt Driveway Aprons in Swale 794 SY $165.00 $131,010.00
Item 7 Pavers, Arch Concrete, Sidewalk, Apshalt Driveway Repairs 384 SY $218.00 $83,712.00
Item 8 Inlets, DT Bot, Type D < 10'9 EA $15,565.00 $140,085.00
Item 9 Pipe Culvert, Optional Material Round, 15" SD 256 LF $212.00 $54,272.00
Item 10 Pipe Culvert, Optional Material Round, 18" SD 33 LF $332.00 $10,956.00
Item 11 Pipe Culvert, Optional Material Round, 24" SD 51 LF $345.00 $17,595.00
WORK COMPLETED
PARTIAL WAIVER & RELEASE OF LIEN
KNOW ALL MEN BY THESE PRESENTS
That the undersigned lienor in consideration of the progress payment in the amount of $46.222.13 has been paid in
full all amounts due and owed to it by Ric-Man Construction Florida, Inc., and does hereby waive, release and
relinquish any and all rights, liens, lien rights, claims or demands of any kind whatsoever, thru 1/31/2025 against,
City of Dania Beach, the Owner, its successors and/or assigns and its surety if one exists arising out of or in
connection with the following project:
Southeast Drainage Retrofit Project, Phase I
City of Dania Beach
1201 Stirling Road, Dania Beach PL 330004
Broward County
IN WITNESS WHERE OF, ^ (I -/) ^
I have executed this instrument under seal effective the 3^ dav of 203i^
Lienor's Name Allied
By
llied king of Flo
Print Name
fpttdcin
jlQuuiiJzJI
STATE OF
COUNTY OF
IDA
/2UjUL ladU.
The foregoing instrument was acknowledged befj
By tiO as
e this c^. day of QpifiJ ,20^
[Name of Signatay)(Title)
for Allied Trucking of Florida, Inc.
(Lienor)
Notailotapii.^
( Who is personally known to me or
( ] Has pydduced identification^.D.:
(Notary Signature)
Notary Seal:
MILANGELA VARGAS
Notary Public-State of Florida
5 I ffllll r- jt uu annt AS_ Commission # HH 600146
My Commission Expires
nrtoher 03. 2028
3rd April 25
Palm Beach
Wesley Foster
3rd April 25
Wesley Foster President
28 April 25
Wesley Foster
Palm Beach
28 April 25
Wesley Foster President
STATEMENT OF COMPLIANCE
DATE: 04-22-2025
I, Donna Porcaro , do hereby state:
(1) That I pay or supervise the payment of the persons employed by Ric-Man Construction Florida, Inc. on the (building or work),
Contract# ITB 23-014 SE Drainage Retrofit ;that during the payroll period 03-02-25 to 03-08-25 ; all persons employed on said
project have been paid the full weekly wages earned, that no rebates have been or will be made either directly or indirectly to
or on behalf of said (Contractor or Subcontractor) Ric-Man Construction Florida, Inc. from the full weekly wages earned by any person,
and that no deductions have been made either directly or indirectly from the full wages earned by any person.
other than permissible deductions as defined in Regulations, Part 3 (29 CFR Subtitle A), issued by the Secretary of Labor
under the Copeland Act, as amended (48 Stat. 948;63 Stat. 108;72 Stat. 967;76 Stat. 357;40 U.S.C. 276c), and described below:
___________________________________________________________________________________________________
___________________________________________________________________________________________________
(2) That any payrolls otherwise under this contract required to be submitted for the above periods are correct and complete;
that the wage rates for laborers and mechanics contained therein are not less than the applicable wage rates contained in any
wage determination incorporated into the contract; that the classifications set forth therein for each laborer or mechanic
conform with the work performed.
(3) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered
with a State apprenticeship agency recognized by the Bureau of Apprenticeship and Training, United States Department of Labor,
or if no such recognized agency exists in a State, are registered with the Bureau of Apprenticeship and Training, United
States Department of Labor.
(4) That:
(a) Where fringe benefits are paid to approved plans, funds, or programs:
_
|_| In addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above referenced
payroll, payments of fringe benefits as listed in the contract have been or will be made to the appropriate
programs for the benefit of such employees, except as noted in Section 4(c) below.
(b) Where fringe benefits are paid in cash:
_
|_| Each laborer or mechanic listed in the above referenced payroll has been paid, as indicated on the payroll,
an amount not less than the sum of the applicable basic hourly wage rate plus the amount of the required
fringe benefits as listed in the contract, except as noted in Section 4(c) below.
(c) Exceptions:
Craft (Exception)Explanation
__________________________ _____________________________________________________________________________
__________________________ _____________________________________________________________________________
__________________________ _____________________________________________________________________________
__________________________ _____________________________________________________________________________
Remarks: ________________________________________________________________________________________________
Name Title
Donna Porcaro Accounting Manager Signature ________________________________________________________________
THE WILLFUL FALSIFICATION OF ANY OF THE ABOVE STATEMENTS MAY SUBJECT THE CONTRACTOR OR SUBCONTRACTOR TO CIVIL
OR CRIMINAL PROSECUTION. SEE SECTION 1001 OF TITLE 18 AND SECTION 231 OF TITLE 31 OF THE UNITED STATES CODE.
Certified Payroll ReportRic-Man Construction Florida Page 104-22-2025
System Date: 04-22-2025
System Time: 12:41 pm
For the Period Ending: 03-08-25
Job: 24-SDRP SE Drainage Retrofit Dania Bch
Broward ,
Horacio Cacique Operator
2437 Pinecrest Ct.
West Palm Beach, FL 33415 03-02 03-03 03-04 03-05 03-06 03-07 03-08 Total Gross Total FWH SWH Other
XXX-XX-7214 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Operator Reg 8.00 8.00 8.00 8.00 8.00 40.00 35.00 1,400.00 1,951.25 106.94 415.01 1,470.86
Operator OT 1.00 2.50 3.00 2.00 2.00 10.50 52.50 551.25
Operator 175.00
2,126.25 133.44
Djhonson Cherancy Driver
4912 NE 1st Terrace
Pompano Beach, FL 33064 03-02 03-03 03-04 03-05 03-06 03-07 03-08 Total Gross Total FWH SWH Other
XXX-XX-5937 Black Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Driver Reg 8.00 8.00 8.00 8.00 8.00 40.00 29.50 1,180.00 2,308.39 379.88 368.80 1,383.91
Driver OT 3.00 4.00 4.50 3.00 3.50 5.50 23.50 44.25 1,039.89
2,219.89 175.80
Robert Kelly Day Superintendent
30 SE 10th Terrace
Dania Beach, FL 33004 03-02 03-03 03-04 03-05 03-06 03-07 03-08 Total Gross Total FWH SWH Other
XXX-XX-5911 Caucasian Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Foreman Reg 8.00 8.00 8.00 8.00 8.00 40.00 49.40 1,976.00 1,976.00 134.36 222.85 1,469.46
1,976.00 149.33
Jose Flores Operator
1577 SE 26th Road
Homestead, FL 33035 03-02 03-03 03-04 03-05 03-06 03-07 03-08 Total Gross Total FWH SWH Other
XXX-XX-1690 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Operator Reg 8.00 8.00 8.00 8.00 8.00 40.00 42.00 1,680.00 2,593.50 232.30 159.88 2,178.25
Operator OT 1.00 2.50 3.00 2.00 2.00 4.00 14.50 63.00 913.50
Operator 175.00
2,768.50 198.07
Armando Guerra Garcia Laborer
1576 63rd Way South # 2317
West Palm Beach, FL 33415 03-02 03-03 03-04 03-05 03-06 03-07 03-08 Total Gross Total FWH SWH Other
XXX-XX-4775 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Laborer Reg 8.00 2.00 8.00 8.00 8.00 34.00 20.00 680.00 1,145.00 21.69 1,035.72
Laborer OT 1.00 3.50 3.00 2.00 2.00 11.50 30.00 345.00
1,025.00 87.59
Roberto Ojeda-Herrera Driver
3037 Riverside Drive
Coral Springs, FL 33065 03-02 03-03 03-04 03-05 03-06 03-07 03-08 Total Gross Total FWH SWH Other
XXX-XX-9257 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Driver Reg 8.00 8.00 33.00 264.00 1,988.25 141.85 235.46 1,467.73
Driver OT 1.00 1.00 49.50 49.50
313.50 143.21
Yonatan Perez Fuentez Pipe Layer
115 Broward Ave
Greenacres, FL 33463 03-02 03-03 03-04 03-05 03-06 03-07 03-08 Total Gross Total FWH SWH Other
XXX-XX-6959 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Pipelayer Reg 8.00 8.00 8.00 8.00 8.00 40.00 33.00 1,320.00 1,839.75 121.55 8.11 1,569.97
Pipelayer OT 1.00 2.50 3.00 2.00 2.00 10.50 49.50 519.75
1,839.75 140.12
Rogelio Mata Laborer
15200 SW 308th Street
Homestead, FL 33033 03-02 03-03 03-04 03-05 03-06 03-07 03-08 Total Gross Total FWH SWH Other
XXX-XX-0784 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Laborer Reg 8.00 8.00 8.00 8.00 8.00 40.00 28.00 1,120.00 1,729.00 63.48 8.11 1,700.76
Laborer OT 1.00 2.50 3.00 2.00 2.00 4.00 14.50 42.00 609.00
Laborer 175.00
1,904.00 131.65
Samuel Sales Foreman
2470 NW 55th Terrace
Lauderhill, FL 33313 03-02 03-03 03-04 03-05 03-06 03-07 03-08 Total Gross Total FWH SWH Other
XXX-XX-0745 Black Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Foreman Reg 8.00 8.00 8.00 8.00 8.00 40.00 58.75 2,350.01 2,350.01 26.04 117.50 2,026.69
2,350.01 179.78
Totals for SE Drainage Retrofit Dania Bch
03-02-25 03-03-25 03-04-25 03-05-25 03-06-25 03-07-25 03-08-25 Total Gross Total
Sunday Monday Tuesday Wednesdy Thursday Friday Saturday Hours This Job Gross Deductions Net
.00 81.00 75.50 83.50 77.00 77.50 13.50 408.00 16522.90 17,881.15 FWH 1,228.09 14,303.35
FICA 1,338.99
SWH .00
SDI .00
Other 1,535.72
STATEMENT OF COMPLIANCE
DATE: 04-22-2025
I, Donna Porcaro , do hereby state:
(1) That I pay or supervise the payment of the persons employed by Ric-Man Construction Florida, Inc. on the (building or work),
Contract# ITB 23-014 SE Drainage Retrofit ;that during the payroll period 03-09-25 to 03-15-25 ; all persons employed on said
project have been paid the full weekly wages earned, that no rebates have been or will be made either directly or indirectly to
or on behalf of said (Contractor or Subcontractor) Ric-Man Construction Florida, Inc. from the full weekly wages earned by any person,
and that no deductions have been made either directly or indirectly from the full wages earned by any person.
other than permissible deductions as defined in Regulations, Part 3 (29 CFR Subtitle A), issued by the Secretary of Labor
under the Copeland Act, as amended (48 Stat. 948;63 Stat. 108;72 Stat. 967;76 Stat. 357;40 U.S.C. 276c), and described below:
___________________________________________________________________________________________________
___________________________________________________________________________________________________
(2) That any payrolls otherwise under this contract required to be submitted for the above periods are correct and complete;
that the wage rates for laborers and mechanics contained therein are not less than the applicable wage rates contained in any
wage determination incorporated into the contract; that the classifications set forth therein for each laborer or mechanic
conform with the work performed.
(3) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered
with a State apprenticeship agency recognized by the Bureau of Apprenticeship and Training, United States Department of Labor,
or if no such recognized agency exists in a State, are registered with the Bureau of Apprenticeship and Training, United
States Department of Labor.
(4) That:
(a) Where fringe benefits are paid to approved plans, funds, or programs:
_
|_| In addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above referenced
payroll, payments of fringe benefits as listed in the contract have been or will be made to the appropriate
programs for the benefit of such employees, except as noted in Section 4(c) below.
(b) Where fringe benefits are paid in cash:
_
|_| Each laborer or mechanic listed in the above referenced payroll has been paid, as indicated on the payroll,
an amount not less than the sum of the applicable basic hourly wage rate plus the amount of the required
fringe benefits as listed in the contract, except as noted in Section 4(c) below.
(c) Exceptions:
Craft (Exception) Explanation
__________________________ _____________________________________________________________________________
__________________________ _____________________________________________________________________________
__________________________ _____________________________________________________________________________
__________________________ _____________________________________________________________________________
Remarks: ________________________________________________________________________________________________
Name Title
Donna Porcaro Accounting Manager Signature ________________________________________________________________
THE WILLFUL FALSIFICATION OF ANY OF THE ABOVE STATEMENTS MAY SUBJECT THE CONTRACTOR OR SUBCONTRACTOR TO CIVIL
OR CRIMINAL PROSECUTION. SEE SECTION 1001 OF TITLE 18 AND SECTION 231 OF TITLE 31 OF THE UNITED STATES CODE.
Certified Payroll ReportRic-Man Construction Florida Page 104-22-2025
System Date: 04-22-2025
System Time: 12:41 pm
For the Period Ending: 03-15-25
Job: 24-SDRP SE Drainage Retrofit Dania Bch
Broward ,
Horacio Cacique Operator
2437 Pinecrest Ct.
West Palm Beach, FL 33415 03-09 03-10 03-11 03-12 03-13 03-14 03-15 Total Gross Total FWH SWH Other
XXX-XX-7214 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Operator Reg 8.00 8.00 8.00 8.00 8.00 40.00 35.00 1,400.00 2,056.25 118.78 421.31 1,549.68
Operator OT 5.50 2.00 2.00 1.00 2.00 12.50 52.50 656.25
Operator 175.00
2,231.25 141.48
Djhonson Cherancy Driver
4912 NE 1st Terrace
Pompano Beach, FL 33064 03-09 03-10 03-11 03-12 03-13 03-14 03-15 Total Gross Total FWH SWH Other
XXX-XX-5937 Black Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Driver Reg 8.00 8.00 8.00 8.00 8.00 40.00 29.50 1,180.00 2,374.77 393.35 375.44 1,425.10
Driver OT 6.00 4.50 3.50 3.50 3.50 21.00 44.25 929.27
2,109.27 180.88
Robert Kelly Day Superintendent
30 SE 10th Terrace
Dania Beach, FL 33004 03-09 03-10 03-11 03-12 03-13 03-14 03-15 Total Gross Total FWH SWH Other
XXX-XX-5911 Caucasian Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Foreman Reg 8.00 8.00 8.00 8.00 8.00 40.00 49.40 1,976.00 1,976.00 134.36 222.85 1,469.47
1,976.00 149.32
Ethan Duey Operator
3652 SW 60th Terrace
Davie, FL 33314 03-09 03-10 03-11 03-12 03-13 03-14 03-15 Total Gross Total FWH SWH Other
XXX-XX-6825 Caucasian Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Operator OT 4.00 4.00 40.50 162.00 1,910.25 235.93 105.93 1,422.97
162.00 145.42
Klein Fernandes Laborer
7550 Taylor Street
Hollywood, FL 33024 03-09 03-10 03-11 03-12 03-13 03-14 03-15 Total Gross Total FWH SWH Other
XXX-XX-7074 Black Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Laborer Reg 8.00 8.00 8.00 8.00 8.00 40.00 17.00 680.00 1,100.75 54.43 962.11
Laborer OT 5.50 2.00 2.00 1.00 2.00 4.00 16.50 25.50 420.75
1,100.75 84.21
Jose Flores Operator
1577 SE 26th Road
Homestead, FL 33035 03-09 03-10 03-11 03-12 03-13 03-14 03-15 Total Gross Total FWH SWH Other
XXX-XX-1690 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Operator Reg 8.00 8.00 8.00 8.00 8.00 40.00 42.00 1,680.00 2,467.50 205.97 152.32 2,095.77
Operator OT 5.50 2.00 2.00 1.00 2.00 12.50 63.00 787.50
Operator 175.00
2,642.50 188.44
Armando Guerra Garcia Laborer
1576 63rd Way South # 2317
West Palm Beach, FL 33415 03-09 03-10 03-11 03-12 03-13 03-14 03-15 Total Gross Total FWH SWH Other
XXX-XX-4775 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Laborer Reg 8.00 8.00 8.00 8.00 8.00 40.00 20.00 800.00 1,175.00 25.29 1,059.82
Laborer OT 5.50 2.00 2.00 1.00 2.00 12.50 30.00 375.00
1,175.00 89.89
Angel Munoz Caballero Laborer
4607 SW 12th Place
Deerfield Beach, FL 33442 03-09 03-10 03-11 03-12 03-13 03-14 03-15 Total Gross Total FWH SWH Other
XXX-XX-7955 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Laborer Reg 2.00 2.00 16.00 32.00 952.00 69.19 49.91 760.15
32.00 72.75
Roberto Ojeda-Herrera Driver
3037 Riverside Drive
Coral Springs, FL 33065 03-09 03-10 03-11 03-12 03-13 03-14 03-15 Total Gross Total FWH SWH Other
XXX-XX-9257 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Driver Reg 5.00 5.00 33.00 165.00 2,235.75 169.77 250.31 1,653.51
165.00 162.16
Yonatan Perez Fuentez Pipe Layer
115 Broward Ave
Greenacres, FL 33463 03-09 03-10 03-11 03-12 03-13 03-14 03-15 Total Gross Total FWH SWH Other
XXX-XX-6959 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Pipelayer Reg 8.00 8.00 8.00 8.00 8.00 40.00 33.00 1,320.00 1,938.75 133.43 8.11 1,649.51
Pipelayer OT 5.50 2.00 2.00 1.00 2.00 12.50 49.50 618.75
1,938.75 147.70
Rogelio Mata Laborer
15200 SW 308th Street
Homestead, FL 33033 03-09 03-10 03-11 03-12 03-13 03-14 03-15 Total Gross Total FWH SWH Other
XXX-XX-0784 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Laborer Reg 8.00 8.00 8.00 8.00 8.00 40.00 28.00 1,120.00 1,645.00 45.00 8.11 1,641.68
Laborer OT 5.50 2.00 2.00 1.00 2.00 12.50 42.00 525.00
Laborer 175.00
1,820.00 125.21
Certified Payroll ReportRic-Man Construction Florida Page 204-22-2025
System Date: 04-22-2025
System Time: 12:41 pm
For the Period Ending: 03-15-25
Job: 24-SDRP SE Drainage Retrofit Dania Bch
Broward ,
Samuel Sales Foreman
2470 NW 55th Terrace
Lauderhill, FL 33313 03-09 03-10 03-11 03-12 03-13 03-14 03-15 Total Gross Total FWH SWH Other
XXX-XX-0745 Black Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Foreman Reg 8.00 8.00 8.00 8.00 8.00 40.00 58.75 2,350.00 2,350.00 26.03 117.50 2,026.70
2,350.00 179.77
Totals for SE Drainage Retrofit Dania Bch
03-09-25 03-10-25 03-11-25 03-12-25 03-13-25 03-14-25 03-15-25 Total Gross Total
Sunday Monday Tuesday Wednesdy Thursday Friday Saturday Hours This Job Gross Deductions Net
4.00 111.00 95.50 87.50 81.50 87.50 4.00 471.00 17702.52 22,182.02 FWH 1,611.53 17,716.47
FICA 1,667.23
SWH .00
SDI .00
Other 1,711.79
STATEMENT OF COMPLIANCE
DATE: 04-22-2025
I, Donna Porcaro , do hereby state:
(1) That I pay or supervise the payment of the persons employed by Ric-Man Construction Florida, Inc. on the (building or work),
Contract# ITB 23-014 SE Drainage Retrofit ;that during the payroll period 03-16-25 to 03-22-25 ; all persons employed on said
project have been paid the full weekly wages earned, that no rebates have been or will be made either directly or indirectly to
or on behalf of said (Contractor or Subcontractor) Ric-Man Construction Florida, Inc. from the full weekly wages earned by any person,
and that no deductions have been made either directly or indirectly from the full wages earned by any person.
other than permissible deductions as defined in Regulations, Part 3 (29 CFR Subtitle A), issued by the Secretary of Labor
under the Copeland Act, as amended (48 Stat. 948;63 Stat. 108;72 Stat. 967;76 Stat. 357;40 U.S.C. 276c), and described below:
___________________________________________________________________________________________________
___________________________________________________________________________________________________
(2) That any payrolls otherwise under this contract required to be submitted for the above periods are correct and complete;
that the wage rates for laborers and mechanics contained therein are not less than the applicable wage rates contained in any
wage determination incorporated into the contract; that the classifications set forth therein for each laborer or mechanic
conform with the work performed.
(3) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered
with a State apprenticeship agency recognized by the Bureau of Apprenticeship and Training, United States Department of Labor,
or if no such recognized agency exists in a State, are registered with the Bureau of Apprenticeship and Training, United
States Department of Labor.
(4) That:
(a) Where fringe benefits are paid to approved plans, funds, or programs:
_
|_| In addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above referenced
payroll, payments of fringe benefits as listed in the contract have been or will be made to the appropriate
programs for the benefit of such employees, except as noted in Section 4(c) below.
(b) Where fringe benefits are paid in cash:
_
|_| Each laborer or mechanic listed in the above referenced payroll has been paid, as indicated on the payroll,
an amount not less than the sum of the applicable basic hourly wage rate plus the amount of the required
fringe benefits as listed in the contract, except as noted in Section 4(c) below.
(c) Exceptions:
Craft (Exception) Explanation
__________________________ _____________________________________________________________________________
__________________________ _____________________________________________________________________________
__________________________ _____________________________________________________________________________
__________________________ _____________________________________________________________________________
Remarks: ________________________________________________________________________________________________
Name Title
Donna Porcaro Accounting Manager Signature ________________________________________________________________
THE WILLFUL FALSIFICATION OF ANY OF THE ABOVE STATEMENTS MAY SUBJECT THE CONTRACTOR OR SUBCONTRACTOR TO CIVIL
OR CRIMINAL PROSECUTION. SEE SECTION 1001 OF TITLE 18 AND SECTION 231 OF TITLE 31 OF THE UNITED STATES CODE.
Certified Payroll ReportRic-Man Construction Florida Page 104-22-2025
System Date: 04-22-2025
System Time: 12:41 pm
For the Period Ending: 03-22-25
Job: 24-SDRP SE Drainage Retrofit Dania Bch
Broward ,
Brian M. Baribeault General Superintndnt
4 Royal Palm Way #108
Boca Raton, FL 33432 03-16 03-17 03-18 03-19 03-20 03-21 03-22 Total Gross Total FWH SWH Other
XXX-XX-9840 Caucasian Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Genrl Supr Reg 4.00 4.00 88.95 355.80 3,558.00 630.25 238.02 2,479.24
Genrl Supr 60.00
415.80 270.49
Horacio Cacique Operator
2437 Pinecrest Ct.
West Palm Beach, FL 33415 03-16 03-17 03-18 03-19 03-20 03-21 03-22 Total Gross Total FWH SWH Other
XXX-XX-7214 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Operator Reg 8.00 8.00 8.00 8.00 8.00 40.00 35.00 1,400.00 1,977.50 109.90 416.58 1,490.58
Operator OT 2.00 2.00 3.00 2.00 2.00 11.00 52.50 577.50
Operator 175.00
2,152.50 135.44
Djhonson Cherancy Driver
4912 NE 1st Terrace
Pompano Beach, FL 33064 03-16 03-17 03-18 03-19 03-20 03-21 03-22 Total Gross Total FWH SWH Other
XXX-XX-5937 Black Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Driver Reg 8.00 8.00 16.00 29.50 472.00 2,839.40 493.71 421.90 1,767.38
Driver OT 4.00 7.50 4.50 16.00 44.25 708.01
1,180.01 216.41
Robert Kelly Day Superintendent
30 SE 10th Terrace
Dania Beach, FL 33004 03-16 03-17 03-18 03-19 03-20 03-21 03-22 Total Gross Total FWH SWH Other
XXX-XX-5911 Caucasian Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Foreman Reg 2.00 8.00 8.00 8.00 8.00 6.00 40.00 49.40 1,976.00 1,976.00 134.36 365.99 1,386.33
Foreman 60.00
2,036.00 149.32
Klein Fernandes Laborer
7550 Taylor Street
Hollywood, FL 33024 03-16 03-17 03-18 03-19 03-20 03-21 03-22 Total Gross Total FWH SWH Other
XXX-XX-7074 Black Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Laborer Reg 8.00 8.00 8.00 8.00 8.00 40.00 17.00 680.00 1,088.00 52.90 951.87
Laborer OT 2.00 2.00 3.00 2.00 2.00 5.00 16.00 25.50 408.00
1,088.00 83.23
Jose Flores Operator
1577 SE 26th Road
Homestead, FL 33035 03-16 03-17 03-18 03-19 03-20 03-21 03-22 Total Gross Total FWH SWH Other
XXX-XX-1690 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Operator Reg 8.00 8.00 8.00 8.00 8.00 40.00 42.00 1,680.00 2,373.00 186.43 146.65 2,033.71
Operator OT 2.00 2.00 3.00 2.00 2.00 11.00 63.00 693.00
Operator 175.00
2,548.00 181.21
Armando Guerra Garcia Laborer
1576 63rd Way South # 2317
West Palm Beach, FL 33415 03-16 03-17 03-18 03-19 03-20 03-21 03-22 Total Gross Total FWH SWH Other
XXX-XX-4775 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Laborer Reg 8.00 8.00 8.00 8.00 8.00 40.00 20.00 800.00 1,130.00 19.89 1,023.67
Laborer OT 2.00 2.00 3.00 2.00 2.00 11.00 30.00 330.00
1,130.00 86.44
Andres Molina Diaz Laborer
6831 SW 18th Court
N Lauderdale, FL 33068 03-16 03-17 03-18 03-19 03-20 03-21 03-22 Total Gross Total FWH SWH Other
XXX-XX-6934 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Laborer OT 4.00 4.00 38.25 153.00 1,861.52 80.90 61.46 1,577.18
153.00 141.98
Roberto Ojeda-Herrera Driver
3037 Riverside Drive
Coral Springs, FL 33065 03-16 03-17 03-18 03-19 03-20 03-21 03-22 Total Gross Total FWH SWH Other
XXX-XX-9257 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Driver Reg 4.00 4.00 33.00 132.00 2,928.75 275.76 291.89 2,205.94
132.00 215.16
Yonatan Perez Fuentez Pipe Layer
115 Broward Ave
Greenacres, FL 33463 03-16 03-17 03-18 03-19 03-20 03-21 03-22 Total Gross Total FWH SWH Other
XXX-XX-6959 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Pipelayer Reg 8.00 8.00 8.00 8.00 8.00 40.00 33.00 1,320.00 1,864.50 124.52 8.11 1,589.86
Pipelayer OT 2.00 2.00 3.00 2.00 2.00 11.00 49.50 544.50
1,864.50 142.01
Rogelio Mata Laborer
15200 SW 308th Street
Homestead, FL 33033 03-16 03-17 03-18 03-19 03-20 03-21 03-22 Total Gross Total FWH SWH Other
XXX-XX-0784 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Laborer Reg 8.00 8.00 8.00 8.00 8.00 40.00 28.00 1,120.00 1,582.00 31.14 8.11 1,597.33
Laborer OT 2.00 2.00 3.00 2.00 2.00 11.00 42.00 462.00
Laborer 175.00
1,757.00 120.42
Certified Payroll ReportRic-Man Construction Florida Page 204-22-2025
System Date: 04-22-2025
System Time: 12:41 pm
For the Period Ending: 03-22-25
Job: 24-SDRP SE Drainage Retrofit Dania Bch
Broward ,
Samuel Sales Foreman
2470 NW 55th Terrace
Lauderhill, FL 33313 03-16 03-17 03-18 03-19 03-20 03-21 03-22 Total Gross Total FWH SWH Other
XXX-XX-0745 Black Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Foreman Reg 8.00 8.00 8.00 8.00 8.00 40.00 58.75 2,350.00 2,350.00 26.03 117.50 2,086.69
Foreman 60.00
2,410.00 179.78
Totals for SE Drainage Retrofit Dania Bch
03-16-25 03-17-25 03-18-25 03-19-25 03-20-25 03-21-25 03-22-25 Total Gross Total
Sunday Monday Tuesday Wednesdy Thursday Friday Saturday Hours This Job Gross Deductions Net
6.00 80.00 76.00 94.00 83.50 90.50 5.00 435.00 16866.81 25,528.67 FWH 2,165.79 20,189.78
FICA 1,921.89
SWH .00
SDI .00
Other 2,076.21
STATEMENT OF COMPLIANCE
DATE: 04-22-2025
I, Donna Porcaro , do hereby state:
(1) That I pay or supervise the payment of the persons employed by Ric-Man Construction Florida, Inc. on the (building or work),
Contract# ITB 23-014 SE Drainage Retrofit ;that during the payroll period 03-23-25 to 03-29-25 ; all persons employed on said
project have been paid the full weekly wages earned, that no rebates have been or will be made either directly or indirectly to
or on behalf of said (Contractor or Subcontractor) Ric-Man Construction Florida, Inc. from the full weekly wages earned by any person,
and that no deductions have been made either directly or indirectly from the full wages earned by any person.
other than permissible deductions as defined in Regulations, Part 3 (29 CFR Subtitle A), issued by the Secretary of Labor
under the Copeland Act, as amended (48 Stat. 948;63 Stat. 108;72 Stat. 967;76 Stat. 357;40 U.S.C. 276c), and described below:
___________________________________________________________________________________________________
___________________________________________________________________________________________________
(2) That any payrolls otherwise under this contract required to be submitted for the above periods are correct and complete;
that the wage rates for laborers and mechanics contained therein are not less than the applicable wage rates contained in any
wage determination incorporated into the contract; that the classifications set forth therein for each laborer or mechanic
conform with the work performed.
(3) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered
with a State apprenticeship agency recognized by the Bureau of Apprenticeship and Training, United States Department of Labor,
or if no such recognized agency exists in a State, are registered with the Bureau of Apprenticeship and Training, United
States Department of Labor.
(4) That:
(a) Where fringe benefits are paid to approved plans, funds, or programs:
_
|_| In addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above referenced
payroll, payments of fringe benefits as listed in the contract have been or will be made to the appropriate
programs for the benefit of such employees, except as noted in Section 4(c) below.
(b) Where fringe benefits are paid in cash:
_
|_| Each laborer or mechanic listed in the above referenced payroll has been paid, as indicated on the payroll,
an amount not less than the sum of the applicable basic hourly wage rate plus the amount of the required
fringe benefits as listed in the contract, except as noted in Section 4(c) below.
(c) Exceptions:
Craft (Exception) Explanation
__________________________ _____________________________________________________________________________
__________________________ _____________________________________________________________________________
__________________________ _____________________________________________________________________________
__________________________ _____________________________________________________________________________
Remarks: ________________________________________________________________________________________________
Name Title
Donna Porcaro Accounting Manager Signature ________________________________________________________________
THE WILLFUL FALSIFICATION OF ANY OF THE ABOVE STATEMENTS MAY SUBJECT THE CONTRACTOR OR SUBCONTRACTOR TO CIVIL
OR CRIMINAL PROSECUTION. SEE SECTION 1001 OF TITLE 18 AND SECTION 231 OF TITLE 31 OF THE UNITED STATES CODE.
Certified Payroll ReportRic-Man Construction Florida Page 104-22-2025
System Date: 04-22-2025
System Time: 12:41 pm
For the Period Ending: 03-29-25
Job: 24-SDRP SE Drainage Retrofit Dania Bch
Broward ,
Horacio Cacique Operator
2437 Pinecrest Ct.
West Palm Beach, FL 33415 03-23 03-24 03-25 03-26 03-27 03-28 03-29 Total Gross Total FWH SWH Other
XXX-XX-7214 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Operator Reg 8.00 8.00 8.00 8.00 8.00 40.00 35.00 1,400.00 2,161.25 130.63 427.61 1,628.50
Operator OT 3.50 2.50 2.50 4.00 2.00 14.50 52.50 761.25
Operator 175.00
2,336.25 149.51
Djhonson Cherancy Driver
4912 NE 1st Terrace
Pompano Beach, FL 33064 03-23 03-24 03-25 03-26 03-27 03-28 03-29 Total Gross Total FWH SWH Other
XXX-XX-5937 Black Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Driver Reg 3.00 8.00 8.00 3.00 22.00 29.50 649.00 2,640.27 450.70 401.99 1,586.39
Driver OT 5.50 5.00 6.50 17.00 44.25 752.26
1,401.26 201.19
Robert Kelly Day Superintendent
30 SE 10th Terrace
Dania Beach, FL 33004 03-23 03-24 03-25 03-26 03-27 03-28 03-29 Total Gross Total FWH SWH Other
XXX-XX-5911 Caucasian Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Foreman Reg 8.00 8.00 8.00 8.00 8.00 40.00 49.40 1,976.00 1,976.00 134.36 220.64 1,471.67
1,976.00 149.33
Klein Fernandes Laborer
7550 Taylor Street
Hollywood, FL 33024 03-23 03-24 03-25 03-26 03-27 03-28 03-29 Total Gross Total FWH SWH Other
XXX-XX-7074 Black Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Laborer Reg 8.00 8.00 8.00 8.00 8.00 40.00 17.00 680.00 1,164.50 62.08 1,013.34
Laborer OT 4.00 2.50 2.50 4.00 2.00 4.00 19.00 25.50 484.50
1,164.50 89.08
Jose Flores Operator
1577 SE 26th Road
Homestead, FL 33035 03-23 03-24 03-25 03-26 03-27 03-28 03-29 Total Gross Total FWH SWH Other
XXX-XX-1690 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Operator Reg 8.00 8.00 8.00 8.00 8.00 40.00 42.00 1,680.00 2,593.50 232.30 159.88 2,178.24
Operator OT 3.50 2.50 2.50 4.00 2.00 14.50 63.00 913.50
Operator 175.00
2,768.50 198.08
Armando Guerra Garcia Laborer
1576 63rd Way South # 2317
West Palm Beach, FL 33415 03-23 03-24 03-25 03-26 03-27 03-28 03-29 Total Gross Total FWH SWH Other
XXX-XX-4775 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Laborer Reg 8.00 8.00 8.00 8.00 8.00 40.00 20.00 800.00 1,235.00 32.49 1,108.03
Laborer OT 3.50 2.50 2.50 4.00 2.00 14.50 30.00 435.00
1,235.00 94.48
Andres Molina Diaz Laborer
6831 SW 18th Court
N Lauderdale, FL 33068 03-23 03-24 03-25 03-26 03-27 03-28 03-29 Total Gross Total FWH SWH Other
XXX-XX-6934 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Laborer OT 4.00 4.00 38.25 153.00 1,976.26 105.38 64.90 1,655.23
153.00 150.75
Yonatan Perez Fuentez Pipe Layer
115 Broward Ave
Greenacres, FL 33463 03-23 03-24 03-25 03-26 03-27 03-28 03-29 Total Gross Total FWH SWH Other
XXX-XX-6959 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Pipelayer Reg 8.00 8.00 8.00 8.00 8.00 40.00 33.00 1,320.00 2,037.75 145.31 8.11 1,729.07
Pipelayer OT 3.50 2.50 2.50 4.00 2.00 14.50 49.50 717.75
2,037.75 155.26
Rogelio Mata Laborer
15200 SW 308th Street
Homestead, FL 33033 03-23 03-24 03-25 03-26 03-27 03-28 03-29 Total Gross Total FWH SWH Other
XXX-XX-0784 Hispanic Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Laborer Reg 8.00 8.00 8.00 8.00 8.00 40.00 28.00 1,120.00 1,729.00 63.48 8.11 1,700.77
Laborer OT 3.50 2.50 2.50 4.00 2.00 14.50 42.00 609.00
Laborer 175.00
1,904.00 131.64
Samuel Sales Foreman
2470 NW 55th Terrace
Lauderhill, FL 33313 03-23 03-24 03-25 03-26 03-27 03-28 03-29 Total Gross Total FWH SWH Other
XXX-XX-0745 Black Male Sun Mon Tue Wed Thu Fri Sat Hours Rate This Job Gross FICA SUI/SDI Deducts Net
Foreman Reg 8.00 8.00 8.00 8.00 8.00 40.00 58.75 2,350.00 2,350.00 26.03 117.50 2,026.70
2,350.00 179.77
Totals for SE Drainage Retrofit Dania Bch
03-23-25 03-24-25 03-25-25 03-26-25 03-27-25 03-28-25 03-29-25 Total Gross Total
Sunday Monday Tuesday Wednesdy Thursday Friday Saturday Hours This Job Gross Deductions Net
4.00 88.50 79.00 92.50 101.00 85.50 4.00 454.50 17326.26 19,863.53 FWH 1,382.76 16,097.94
FICA 1,499.09
SWH .00
SDI .00
Other 1,408.74
Activity ID Activity Name OD RD PCT Start Finish TF Calendar
South East Drainage Retrofit - Update 06 - March 31, 2025South East Drainage Retrofit - Update 06 - March 31, 2025South East Drainage Retrofit - Update 06 - March 31, 2025South East Drainage Retrofit - Update 06 - March 31, 2025South East Drainage Retrofit - Update 06 - March 31, 2025South East Drainage Retrofit - Update 06 - March 31, 2025South East Drainage Retrofit - Update 06 - March 31, 2025South East Drainage Retrofit - Update 06 - March 31, 2025South East Drainage Retrofit - Update 06 - March 31, 2025
MILESTONESMILESTONESMILESTONESMILESTONESMILESTONESMILESTONESMILESTONESMILESTONESMILESTONES
ML-1000 Notice of Intent to Award 0 0 0%01-Apr-25 -60 DANIA 7D
ML-1010 Notice to Proceed (10/14/2024)0 0 100%14-Oct-24 A DANIA 7D
ML-1020 Substantial Completion (NTP + 520 = 03/18/2026)0 0 0%21-May-26 21-May-26*-63 DANIA 7D
ML-1030 Final Completion (SC + 30 = 04/17/2026)0 0 0%19-Jun-26*-63 DANIA 7D
PERMITS & DESIGNPERMITS & DESIGNPERMITS & DESIGNPERMITS & DESIGNPERMITS & DESIGNPERMITS & DESIGNPERMITS & DESIGNPERMITS & DESIGNPERMITS & DESIGN
PER-1000 FDEP Well Permit 1 0 100%30-Mar-24 A 30-Mar-24 A DANIA 7D
PER-1010 Electrical Dania Beach Building Permit 1 0 100%01-Oct-24 A 01-Oct-24 A DANIA 7D
PER-1020 FDEP Stormwater Permit 1 0 100%17-Jun-24 A 17-Jun-24 A DANIA 7D
PER-1030 Dania Beach Row Permit 1 0 100%01-Oct-24 A 01-Oct-24 A DANIA 7D
PER-1040 SFWM - Dewatering Permit 1 0 100%01-Oct-24 A 01-Oct-24 A DANIA 7D
PER-1050 Broward County EPD Dewatering Permit 1 0 100%23-Sep-24 A 23-Sep-24 A DANIA 7D
PER-1060 NPDES - NOI/FDEP Generic Permit for Stormwater Discharge 1 0 100%26-Aug-24 A 26-Aug-24 A DANIA 7D
PER-1070 Tree Removal Permit 1 0 100%01-Oct-24 A 01-Oct-24 A DANIA 7D
PER-1080 Coffercell Design & Pump Station Design Location & Home Owner PIO 1 0 100%31-Aug-24 A 03-Jan-25 A DANIA 7D
SUBMITTALSSUBMITTALSSUBMITTALSSUBMITTALSSUBMITTALSSUBMITTALSSUBMITTALSSUBMITTALSSUBMITTALS
Prepare & SubmitPrepare & SubmitPrepare & SubmitPrepare & SubmitPrepare & SubmitPrepare & SubmitPrepare & SubmitPrepare & SubmitPrepare & Submit
SUB-1000 Prepare & Submit - Section 330520 - Storm Structures / Pipe & Castings 1 0 100%24-Sep-24 A 24-Sep-24 A DANIA 5D H
SUB-1010 Prepare & Submit - Section 017823 - Operating & Maintenace Manuals 15 15 0%01-Apr-25 21-Apr-25 213 DANIA 5D H
SUB-1020 Prepare & Submit - Section 031000 - Concrete Formwork 15 0 100%14-Oct-24 A 14-Oct-24 A DANIA 5D H
SUB-1030 Prepare & Submit - Section 033000 - Cast in Place Concrete (Mix Designs)15 0 100%14-Feb-25 A 14-Feb-25 A DANIA 5D H
SUB-1035-U03 Prepare & Submit - Section 260000 – Main Disconnect Panel & Manual Transfer Switch 15 0 100%03-Jan-25 A 03-Jan-25 A DANIA 5D H
SUB-1040 Prepare & Submit - Section 260500 - Basic Electrical Materials 15 0 100%24-Jan-25 A 24-Jan-25 A DANIA 5D H
SUB-1050 Prepare & Submit - Section 260600 - Grounding 15 0 100%24-Jan-25 A 24-Jan-25 A DANIA 5D H
SUB-1060 Prepare & Submit - Section 260700 - Equipment & Raceway Support Systems 15 0 100%24-Jan-25 A 24-Jan-25 A DANIA 5D H
SUB-1070 Prepare & Submit - Section 261100 - Raceways 15 0 100%24-Jan-25 A 24-Jan-25 A DANIA 5D H
SUB-1080 Prepare & Submit - Section 261200 - Instrumentation & Conductors (< 600V)15 0 100%24-Jan-25 A 24-Jan-25 A DANIA 5D H
SUB-1110 Prepare & Submit - Section 262650 - Variable Frequency Drives 15 0 100%31-Oct-24 A 12-Nov-24 A DANIA 5D H
SUB-1160 Prepare & Submit - Section 269400 - Control & Instrumentation Panels 15 0 100%31-Oct-24 A 12-Nov-24 A DANIA 5D H
SUB-1170 Prepare & Submit - Section 269500 - Electrical Testing 15 15 0%01-Apr-25 21-Apr-25 211 DANIA 5D H
SUB-1180 Prepare & Submit - Section 311000 - Site Clearing (Precon Video)15 0 100%08-Oct-24 A 08-Oct-24 A DANIA 5D H
SUB-1190 Prepare & Submit - Section 312000 - Earth Moving (Aggregates)15 0 100%01-Oct-24 A 01-Oct-24 A DANIA 5D H
SUB-1200 Prepare & Submit - Section 312319 - Dewatering 15 0 100%01-Oct-24 A 01-Oct-24 A DANIA 5D H
SUB-1210 Prepare & Submit - Section 321216 - Asphalt Paving (Mix Designs)15 0 100%20-Aug-24 A 20-Dec-24 A DANIA 5D H
SUB-1220 Prepare & Submit - Section 330520 - Piping - General 15 0 100%26-Aug-24 A 26-Aug-24 A DANIA 5D H
SUB-1230 Prepare & Submit - Section 330000 - Contech Treatment Unit 15 0 100%26-Aug-24 A 26-Aug-24 A DANIA 5D H
SUB-1240 Prepare & Submit - Section 334400 - Injection Wells 15 0 100%27-Aug-24 A 27-Aug-24 A DANIA 5D H
SUB-1250 Prepare & Submit - Section 334500 - Stormwater Pumps 15 0 100%31-Oct-24 A 12-Nov-24 A DANIA 5D H
Review & ApproveReview & ApproveReview & ApproveReview & ApproveReview & ApproveReview & ApproveReview & ApproveReview & ApproveReview & Approve
SUB-2000 Review & Approve - Section 330520 - Storm Structures / Pipe & Castings 15 0 100%24-Sep-24 A 27-Sep-24 A DANIA 5D H
SUB-2010 Review & Approve - Section 017823 - Operating & Maintenace Manuals 15 15 0%22-Apr-25 12-May-25 213 DANIA 5D H
SUB-2020 Review & Approve - Section 031000 - Concrete Formwork 13 0 100%14-Nov-24 A 14-Nov-24 A DANIA 5D H
SUB-2030 Review & Approve - Section 033000 - Cast in Place Concrete (Mix Designs)15 0 100%15-Feb-25 A 17-Feb-25 A DANIA 5D H
SUB-2035-U03 Review & Approve - Section 260000 – Main Disconnect Panel & Manual Transfer Switch 15 1 99%04-Jan-25 A 01-Apr-25 173 DANIA 5D H
SUB-2040 Review & Approve - Section 260500 - Basic Electrical Materials 15 1 99%25-Jan-25 A 01-Apr-25 163 DANIA 5D H
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2025 2026
South East Drainage Retrofit - Update 06 - March 31, 2025
TASK filter: All Activities
South East Drainage Retrofit - Update 06 - March 31, 2025
ALL ACTIVITIES
Run Date: 15-Apr-25
Data Date: 01-Apr-25
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Page 1 of 8
Activity ID Activity Name OD RD PCT Start Finish TF Calendar
SUB-2050 Review & Approve - Section 260600 - Grounding 15 1 99%25-Jan-25 A 01-Apr-25 179 DANIA 5D H
SUB-2060 Review & Approve - Section 260700 - Equipment & Raceway Support Systems 15 1 99%25-Jan-25 A 01-Apr-25 158 DANIA 5D H
SUB-2070 Review & Approve - Section 261100 - Raceways 15 1 99%25-Jan-25 A 01-Apr-25 158 DANIA 5D H
SUB-2080 Review & Approve - Section 261200 - Instrumentation & Conductors (< 600V)15 1 99%25-Jan-25 A 01-Apr-25 179 DANIA 5D H
SUB-2110 Review & Approve - Section 262650 - Variable Frequency Drives 15 1 99%13-Nov-24 A 01-Apr-25 -32 DANIA 5D H
SUB-2160 Review & Approve - Section 269400 - Control & Instrumentation Panels 15 1 99%13-Nov-24 A 01-Apr-25 -21 DANIA 5D H
SUB-2170 Review & Approve - Section 269500 - Electrical Testing 15 15 0%22-Apr-25 12-May-25 211 DANIA 5D H
SUB-2180 Review & Approve - Section 311000 - Site Clearing (Precon Video)15 0 100%08-Oct-24 A 08-Oct-24 A DANIA 5D H
SUB-2190 Review & Approve - Section 312000 - Earth Moving (Aggregates)15 0 100%08-Oct-24 A 08-Oct-24 A DANIA 5D H
SUB-2200 Review & Approve - Section 312319 - Dewatering 15 0 100%08-Oct-24 A 08-Oct-24 A DANIA 5D H
SUB-2210 Review & Approve - Section 321216 - Asphalt Paving (Mix Designs)15 0 100%21-Dec-24 A 02-Jan-25 A DANIA 5D H
SUB-2220 Review & Approve - Section 330520 - Piping - General 15 0 100%27-Aug-24 A 09-Sep-24 A DANIA 5D H
SUB-2230 Review & Approve - Section 330000 - Contech Treatment Unit 15 0 100%27-Aug-24 A 16-Sep-24 A DANIA 5D H
SUB-2240 Review & Approve - Section 334400 - Injection Wells 15 0 100%28-Aug-24 A 11-Sep-24 A DANIA 5D H
SUB-2250 Review & Approve - Section 334500 - Stormwater Pumps 15 1 99%13-Nov-24 A 01-Apr-25 -42 DANIA 5D H
Fab & DeliverFab & DeliverFab & DeliverFab & DeliverFab & DeliverFab & DeliverFab & DeliverFab & DeliverFab & Deliver
SUB-3000 Fab & Deliver - Section 330520 - Storm Structures / Pipe & Castings 15 0 100%28-Sep-24 A 15-Oct-24 A DANIA 5D H
SUB-3010 Fab & Deliver - Section 311000 - Site Clearing (Precon Video)5 0 100%09-Oct-24 A 09-Oct-24 A DANIA 5D H
SUB-3020 Fab & Deliver - Section 330520 - Piping - General 20 0 100%10-Sep-24 A 14-Oct-24 A DANIA 5D H
SUB-3030 Fab & Deliver - Section 334400 - Injection Wells 30 0 100%28-Sep-24 A 30-Nov-24 A DANIA 5D H
SUB-3035-U03 Fab & Deliver - Section 260000 – Main Disconnect Panel & Manual Transfer Switch 45 45 0%02-Apr-25 04-Jun-25 173 DANIA 5D H
SUB-3040 Fab & Deliver - Section 260500 - Basic Electrical Materials 45 45 0%02-Apr-25 04-Jun-25 163 DANIA 5D H
SUB-3050 Fab & Deliver - Section 260600 - Grounding 45 45 0%02-Apr-25 04-Jun-25 179 DANIA 5D H
SUB-3060 Fab & Deliver - Section 260700 - Equipment & Raceway Support Systems 45 45 0%02-Apr-25 04-Jun-25 158 DANIA 5D H
SUB-3070 Fab & Deliver - Section 261100 - Raceways 45 45 0%02-Apr-25 04-Jun-25 158 DANIA 5D H
SUB-3080 Fab & Deliver - Section 261200 - Instrumentation & Conductors (< 600V)45 45 0%02-Apr-25 04-Jun-25 179 DANIA 5D H
SUB-3110 Fab & Deliver - Section 330000 - Contech Treatment Unit 128 0 100%17-Sep-24 A 18-Dec-24 A DANIA 5D H
SUB-3120 Fab & Deliver - Section 262650 - Variable Frequency Drives 245 245 0%02-Apr-25 23-Mar-26 -32 DANIA 5D H
SUB-3170 Fab & Deliver - Section 269400 - Control & Instrumentation Panels 245 245 0%02-Apr-25 23-Mar-26 -21 DANIA 5D H
SUB-3180 Fab & Deliver - Section 334500 - Stormwater Pumps 245 245 0%02-Apr-25 23-Mar-26 -42 DANIA 5D H
CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTION
Pre ConstrcutionPre ConstrcutionPre ConstrcutionPre ConstrcutionPre ConstrcutionPre ConstrcutionPre ConstrcutionPre ConstrcutionPre Constrcution
PRE-1000 Pre Constrcution - Mobilization 1 0 100%15-Oct-24 A 15-Oct-24 A DANIA 5D HW
PRE-1010 Pre Constrcution - Pre-Con Video 1 0 100%10-Oct-24 A 10-Oct-24 A DANIA 5D HW
PRE-1020 Pre Constrcution - Survey Centerline & Offsets 1 0 100%11-Oct-24 A 11-Oct-24 A DANIA 5D HW
PRE-1030 Pre Constrcution - Establish Staging Area 1 0 100%11-Oct-24 A 11-Oct-24 A DANIA 5D HW
PRE-1040 Pre Constrcution - Sunshine Locate Utilities 5 0 100%11-Oct-24 A 11-Oct-24 A DANIA 5D HW
PRE-1050 Pre Constrcution - Pothole Existing Utilities 5 0 100%14-Oct-24 A 14-Oct-24 A DANIA 5D HW
PRE-1060 Pre Constrcution - Coordinate Utility Relocates (Starting With Pump Station Area Water Main)10 0 100%25-Oct-24 A 25-Oct-24 A DANIA 5D HW
PRE-1070 Pre Constrcution - Issue Construction Notices 1 0 100%15-Oct-24 A 15-Oct-24 A DANIA 5D HW
PRE-1080 Pre Constrcution - Establish NPDES Measures 1 0 100%15-Oct-24 A 15-Oct-24 A DANIA 5D HW
PRE-1090 Pre Constrcution - Soil Boring Pump Station 1 0 100%03-Oct-24 A 03-Oct-24 A DANIA 5D HW
PRE-1100 Pre Constrcution - Clean & Verify Existing State of Structures 2 0 100%15-Oct-24 A 15-Oct-24 A DANIA 5D HW
PRE-1110 Pre Constrcution - Tree Removal / Protection 2 0 100%15-Oct-24 A 15-Oct-24 A DANIA 5D HW
PRE-1120 Pre Constrcution - Pump Station Utilitity Location Verification 1 0 100%11-Oct-24 A 11-Oct-24 A DANIA 5D HW
PRE-1130 Pre Constrcution - Pump Station Relocate Conflicting Utilities 30 0 100%28-Jan-25 A 12-Mar-25 A DANIA 5D HW
PRE-1140 Pre Constrcution - Pump Station Confirm Layout of Location 1 1 0%01-Apr-25 01-Apr-25 83 DANIA 5D HW
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2025 2026
South East Drainage Retrofit - Update 06 - March 31, 2025
TASK filter: All Activities
South East Drainage Retrofit - Update 06 - March 31, 2025
ALL ACTIVITIES
Run Date: 15-Apr-25
Data Date: 01-Apr-25
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Page 2 of 8
Activity ID Activity Name OD RD PCT Start Finish TF Calendar
Drainage & RoadwayDrainage & RoadwayDrainage & RoadwayDrainage & RoadwayDrainage & RoadwayDrainage & RoadwayDrainage & RoadwayDrainage & RoadwayDrainage & Roadway
SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45)SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45)SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45)SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45)SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45)SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45)SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45)SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45)SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45)
DrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainage
DRA-1000 SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45) - Drainage - Establish Rolling MOT (14+00 to 20+45)10 0 100%15-Oct-24 A 16-Oct-24 A DANIA 5D HW
DRA-1010 SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45) - Drainage - Establish Dewatering System (14+00 to 20+45)10 0 100%15-Oct-24 A 16-Oct-24 A DANIA 5D HW
DRA-1020 SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45) - Drainage - Install Structures 10 0 100%15-Oct-24 A 16-Oct-24 A DANIA 5D HW
DRA-1030 SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45) - Drainage - Install / Replace Storm Pipe 10 0 100%15-Oct-24 A 16-Oct-24 A DANIA 5D HW
DRA-1040 SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45) - Drainage - MH Adjustments 1 0 100%15-Oct-24 A 16-Oct-24 A DANIA 5D HW
DRA-1050 SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45) - Drainage - Connect Existing Pipe to Stay With New Structures 1 0 100%15-Oct-24 A 16-Oct-24 A DANIA 5D HW
DRA-1060 SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45) - Drainage - Connect New Pipe to Existing Structures 1 0 100%15-Oct-24 A 16-Oct-24 A DANIA 5D HW
DRA-1070 SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45) - Drainage - Temp Restoration 2 0 100%15-Oct-24 A 16-Oct-24 A DANIA 5D HW
DRA-1080 SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45) - Drainage - Lamp New Drainage 1 0 100%26-Nov-24 A 26-Nov-24 A DANIA 5D HW
RoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadwork
RDW-1000 SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45) - Roadwork - Establish Phased MOT (14+00 to 20+45)15 0 100%13-Jan-25 A 04-Feb-25 A DANIA 5D HW
RDW-1010 SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45) - Roadwork - Driveway / Sidewalk Restoration 15 0 100%05-Feb-25 A 28-Feb-25 A DANIA 5D HW
RDW-1020 SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45) - Roadwork - Swale / Yard Grading 15 15 0%01-Apr-25 23-Apr-25 96 DANIA 5D HW
RDW-1030 SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45) - Roadwork - Landscaping & Irigation Restoration 15 15 0%24-Apr-25 19-May-25 96 DANIA 5D HW
RDW-1040 SE 3rd St - 4th Ave to 5th Ave (14+00 to 20+45) - Roadwork - Overbuild & Resurfacing / Reconstruction 15 0 100%13-Jan-25 A 04-Feb-25 A DANIA 5D HW
SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00)
DrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainage
DRA-1090 SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00) - Drainage - Establish Rolling MOT (07+00 to 14+00)10 0 100%17-Oct-24 A 29-Oct-24 A DANIA 5D HW
DRA-1100 SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00) - Drainage - Establish Dewatering System (07+00 to 14+00)10 0 100%17-Oct-24 A 29-Oct-24 A DANIA 5D HW
DRA-1110 SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00) - Drainage - Install Structures S-84 & S-81 10 0 100%17-Oct-24 A 29-Oct-24 A DANIA 5D HW
DRA-1120 SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00) - Drainage - Install / Replace Storm Pipe 10 0 100%17-Oct-24 A 29-Oct-24 A DANIA 5D HW
DRA-1130 SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00) - Drainage - MH Adjustments 1 0 100%17-Oct-24 A 29-Oct-24 A DANIA 5D HW
DRA-1140 SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00) - Drainage - Connect Existing Pipe to Stay With New Structures 1 0 100%17-Oct-24 A 29-Oct-24 A DANIA 5D HW
DRA-1150 SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00) - Drainage - Connect New Pipe to Existing Structures 1 0 100%17-Oct-24 A 29-Oct-24 A DANIA 5D HW
DRA-1160 SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00) - Drainage - Temp Restoration 2 0 100%17-Oct-24 A 29-Oct-24 A DANIA 5D HW
DRA-1170 SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00) - Drainage - Lamp New Drainage 1 0 100%26-Nov-24 A 26-Nov-24 A DANIA 5D HW
RoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadwork
RDW-1050 SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00) - Roadwork - Establish Rolling MOT (07+00 to 14+00)15 0 100%13-Jan-25 A 04-Feb-25 A DANIA 5D HW
RDW-1060 SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00) - Roadwork - Driveway / Sidewalk Restoration 15 0 100%05-Feb-25 A 28-Feb-25 A DANIA 5D HW
RDW-1070 SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00) - Roadwork - Swale / Yard Grading 15 15 0%20-May-25 17-Jun-25 96 DANIA 5D HW
RDW-1080 SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00) - Roadwork - Landscaping & Irigation Restoration 15 15 0%20-Jun-25 18-Jul-25 96 DANIA 5D HW
RDW-1090 SE 3rd St - 3rd Ave to 4th Ave (07+00 to 14+00) - Roadwork - Overbuild & Resurfacing / Reconstruction 15 0 100%13-Jan-25 A 04-Feb-25 A DANIA 5D HW
SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00)
DrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainage
DRA-1180 SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00) -Drainage - Establish Rolling MOT (0+00 to 07+00)15 0 100%30-Oct-24 A 18-Nov-24 A DANIA 5D HW
DRA-1190 SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00) -Drainage - Establish Dewatering System (0+00 to 07+00)15 0 100%30-Oct-24 A 18-Nov-24 A DANIA 5D HW
DRA-1200 SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00) -Drainage - Install S64 / S65 / S66 / S26 / S27 / S67 / S38 / S68 15 0 100%30-Oct-24 A 18-Nov-24 A DANIA 5D HW
DRA-1210 SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00) -Drainage - Install / Replace Storm Pipe 15 0 100%30-Oct-24 A 18-Nov-24 A DANIA 5D HW
DRA-1220 SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00) -Drainage - MH Adjustments 1 0 100%30-Oct-24 A 18-Nov-24 A DANIA 5D HW
DRA-1230 SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00) -Drainage - Connect Existing Pipe to Stay With New Structures 1 0 100%30-Oct-24 A 18-Nov-24 A DANIA 5D HW
DRA-1240 SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00) -Drainage - Connect New Pipe to Existing Structures 1 0 100%30-Oct-24 A 18-Nov-24 A DANIA 5D HW
DRA-1250 SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00) -Drainage - Temp Restoration 2 0 100%30-Oct-24 A 18-Nov-24 A DANIA 5D HW
DRA-1260 SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00) -Drainage - Lamp New Drainage 1 0 100%26-Nov-24 A 26-Nov-24 A DANIA 5D HW
RoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadwork
RDW-1100 SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00) -Roadwork - Establish Rolling MOT (0+00 to 07+00)15 0 100%13-Jan-25 A 04-Feb-25 A DANIA 5D HW
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2025 2026
South East Drainage Retrofit - Update 06 - March 31, 2025
TASK filter: All Activities
South East Drainage Retrofit - Update 06 - March 31, 2025
ALL ACTIVITIES
Run Date: 15-Apr-25
Data Date: 01-Apr-25
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Page 3 of 8
Activity ID Activity Name OD RD PCT Start Finish TF Calendar
RDW-1110 SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00) -Roadwork - Driveway / Sidewalk Restoration 15 0 100%05-Feb-25 A 28-Feb-25 A DANIA 5D HW
RDW-1120 SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00) -Roadwork - Swale / Yard Grading 15 15 0%21-Jul-25 15-Aug-25 96 DANIA 5D HW
RDW-1130 SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00) -Roadwork - Landscaping & Irigation Restoration 15 15 0%18-Aug-25 15-Sep-25 96 DANIA 5D HW
RDW-1140 SE 3rd St - 2nd Ave to 3rd Ave (00+00 to 07+00) -Roadwork - Overbuild & Resurfacing / Reconstruction 15 0 100%13-Jan-25 A 04-Feb-25 A DANIA 5D HW
SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75)SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75)SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75)SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75)SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75)SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75)SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75)SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75)SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75)
DrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainage
DRA-1270 SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75) - Drainage - Establish Rolling MOT (14+00 to 20+75)10 0 100%20-Nov-24 A 25-Nov-24 A DANIA 5D HW
DRA-1280 SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75) - Drainage - Establish Dewatering System (14+00 to 20+75)10 0 100%20-Nov-24 A 25-Nov-24 A DANIA 5D HW
DRA-1290 SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75) - Drainage - Install / Replace Storm Pipe 10 0 100%20-Nov-24 A 25-Nov-24 A DANIA 5D HW
DRA-1300 SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75) - Drainage - Install Structures JS-01 15 0 100%20-Nov-24 A 25-Nov-24 A DANIA 5D HW
DRA-1310 SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75) - Drainage - MH Adjustments 1 0 100%20-Nov-24 A 25-Nov-24 A DANIA 5D HW
DRA-1320 SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75) - Drainage - Connect Existing Pipe to Stay With New Structures 1 0 100%20-Nov-24 A 25-Nov-24 A DANIA 5D HW
DRA-1330 SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75) - Drainage - Connect New Pipe to Existing Structures 1 0 100%20-Nov-24 A 25-Nov-24 A DANIA 5D HW
DRA-1340 SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75) - Drainage - Temp Restoration 2 0 100%20-Nov-24 A 25-Nov-24 A DANIA 5D HW
DRA-1350 SE 3rd Terr - 4th Ave to 5th Ave (14+00 to 20+75) - Drainage - Lamp New Drainage 1 0 100%26-Nov-24 A 26-Nov-24 A DANIA 5D HW
SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00)SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00)
DrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainage
DRA-1360 SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00) -Drainage - Establish Rolling MOT (07+00 to 14+00 )10 0 100%20-Nov-24 A 26-Nov-24 A DANIA 5D HW
DRA-1370 SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00) -Drainage - Establish Dewatering System (07+00 to 14+00 )10 0 100%20-Nov-24 A 26-Nov-24 A DANIA 5D HW
DRA-1380 SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00) -Drainage - Install Structures S-88 / S-70 / S-87 / S-85 10 0 100%20-Nov-24 A 26-Nov-24 A DANIA 5D HW
DRA-1390 SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00) -Drainage - Install / Replace Storm Pipe 10 0 100%20-Nov-24 A 26-Nov-24 A DANIA 5D HW
DRA-1400 SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00) -Drainage - MH Adjustments 1 0 100%20-Nov-24 A 26-Nov-24 A DANIA 5D HW
DRA-1410 SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00) -Drainage - Connect Existing Pipe to Stay With New Structures 1 0 100%20-Nov-24 A 26-Nov-24 A DANIA 5D HW
DRA-1420 SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00) -Drainage - Connect New Pipe to Existing Structures 1 0 100%20-Nov-24 A 26-Nov-24 A DANIA 5D HW
DRA-1430 SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00) -Drainage - Temp Restoration 2 0 100%20-Nov-24 A 26-Nov-24 A DANIA 5D HW
DRA-1440 SE 3rd Terr - 3rd Ave to 4th Ave (07+00 to 14+00) -Drainage - Lamp New Drainage 1 0 100%20-Nov-24 A 26-Nov-24 A DANIA 5D HW
SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00)SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00)
DrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainage
DRA-1450 SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00) - Drainage - Establish Rolling MOT (0+00 to 07+00)15 0 100%02-Dec-24 A 20-Dec-24 A DANIA 5D HW
DRA-1460 SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00) - Drainage - Establish Dewatering System (0+00 to 07+00)15 0 100%02-Dec-24 A 20-Dec-24 A DANIA 5D HW
DRA-1470 SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00) - Install S52 / S48 / S22 / S110 / S108 / S76 / S21 / S72 / S29 15 0 100%02-Dec-24 A 20-Dec-24 A DANIA 5D HW
DRA-1480 SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00) - Drainage - Install / Replace Storm Pipe 15 0 100%02-Dec-24 A 20-Dec-24 A DANIA 5D HW
DRA-1490 SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00) - Drainage - MH Adjustments 1 0 100%02-Dec-24 A 20-Dec-24 A DANIA 5D HW
DRA-1500 SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00) - Drainage - Connect Existing Pipe to Stay With New Structures 1 0 100%02-Dec-24 A 20-Dec-24 A DANIA 5D HW
DRA-1510 SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00) - Drainage - Connect New Pipe to Existing Structures 1 0 100%02-Dec-24 A 20-Dec-24 A DANIA 5D HW
DRA-1520 SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00) - Drainage - Temp Restoration 2 0 100%02-Dec-24 A 20-Dec-24 A DANIA 5D HW
DRA-1530 SE 3rd Terr - 2nd Ave to 3rd Ave (00+00 to 07+00) - Drainage - Lamp New Drainage 1 0 100%02-Dec-24 A 20-Dec-24 A DANIA 5D HW
SE 3rd Terr Pressure Pipe & Injection WellsSE 3rd Terr Pressure Pipe & Injection WellsSE 3rd Terr Pressure Pipe & Injection WellsSE 3rd Terr Pressure Pipe & Injection WellsSE 3rd Terr Pressure Pipe & Injection WellsSE 3rd Terr Pressure Pipe & Injection WellsSE 3rd Terr Pressure Pipe & Injection WellsSE 3rd Terr Pressure Pipe & Injection WellsSE 3rd Terr Pressure Pipe & Injection Wells
Injection Wells Station 0+00 to 17+40Injection Wells Station 0+00 to 17+40Injection Wells Station 0+00 to 17+40Injection Wells Station 0+00 to 17+40Injection Wells Station 0+00 to 17+40Injection Wells Station 0+00 to 17+40Injection Wells Station 0+00 to 17+40Injection Wells Station 0+00 to 17+40Injection Wells Station 0+00 to 17+40
IW-1000 SE 3rd Terr - Injection Wells - Establish Rolling MOT (Sta 0+00 to Sta 17+40)65 19 75%22-Jan-25 A 29-Apr-25 61 DANIA 5D HW
IW-1010 SE 3rd Terr - Injection Wells - Drill Injection Wells IW1- IW12 (Casing 100 Ft Recommended)65 0 100%22-Jan-25 A 27-Feb-25 A DANIA 5D HW
IW-1020 SE 3rd Terr - Injection Wells - Complete Injection Well Detail (Structure / Tee / Valve / Pressure Sensor)65 19 75%22-Jan-25 A 03-Jun-25 61 DANIA 5D HW
IW-1030 SE 3rd Terr - Injection Wells - Injection Wells - Temp Restoration IW1-IW12 5 0 100%27-Feb-25 A 27-Feb-25 A DANIA 5D HW
IW-1040 SE 3rd Terr - Injection Wells - Injection Wells - Verify Injection Well 240 Gmp Per Ft of Head 1 0 100%22-Jan-25 A 27-Feb-25 A DANIA 5D HW
Pressure Pipe Station 0+00 to 17+40Pressure Pipe Station 0+00 to 17+40Pressure Pipe Station 0+00 to 17+40Pressure Pipe Station 0+00 to 17+40Pressure Pipe Station 0+00 to 17+40Pressure Pipe Station 0+00 to 17+40Pressure Pipe Station 0+00 to 17+40Pressure Pipe Station 0+00 to 17+40Pressure Pipe Station 0+00 to 17+40
PP-1000 SE 3rd Terr - Pressure Pipe - Establish Phased MOT 10 10 0%01-Apr-25 15-Apr-25 51 DANIA 5D HW
PP-1010 SE 3rd Terr - Pressure Pipe - Install 24" PVC Pipe & Fittings to Reducer 0+00 to 07+20 10 10 0%01-Apr-25 15-Apr-25 51 DANIA 5D HW
PP-1020 SE 3rd Terr - Pressure Pipe - Install 18" PVC Pipe & Fittings to Reducer 07+20 to Sta 13+60 10 10 0%01-Apr-25 15-Apr-25 51 DANIA 5D HW
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2025 2026
South East Drainage Retrofit - Update 06 - March 31, 2025
TASK filter: All Activities
South East Drainage Retrofit - Update 06 - March 31, 2025
ALL ACTIVITIES
Run Date: 15-Apr-25
Data Date: 01-Apr-25
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Page 4 of 8
Activity ID Activity Name OD RD PCT Start Finish TF Calendar
PP-1030 SE 3rd Terr - Pressure Pipe - Install 12" PVC Pipe & Fittings 13+60 to 17+40 5 5 0%17-Apr-25 23-Apr-25 51 DANIA 5D HW
PP-1040 SE 3rd Terr - Pressure Pipe - Flush & Pressure Test & Clearance 3 3 0%24-Apr-25 28-Apr-25 51 DANIA 5D HW
PP-1050 SE 3rd Terr - Pressure Pipe - Install JS-01 & JS-02 & Make Connections 15 15 0%29-Apr-25 23-May-25 51 DANIA 5D HW
PP-1060 SE 3rd Terr - Pressure Pipe - Complete Connections to IW1-IW12 12 12 0%05-May-25 23-May-25 51 DANIA 5D HW
PP-1070 SE 3rd Terr - Pressure Pipe - Install Section of 24" PVC Pipe & Fitting From Pump Station to 0+00 5 5 0%27-May-25 03-Jun-25 146 DANIA 5D HW
PP-1080 SE 3rd Terr - Pressure Pipe - Pressure Pipe - Temp Restoration 2 2 0%06-Jun-25 09-Jun-25 146 DANIA 5D HW
Roadwork 3rd Terr 2nd Ave to 5th AveRoadwork 3rd Terr 2nd Ave to 5th AveRoadwork 3rd Terr 2nd Ave to 5th AveRoadwork 3rd Terr 2nd Ave to 5th AveRoadwork 3rd Terr 2nd Ave to 5th AveRoadwork 3rd Terr 2nd Ave to 5th AveRoadwork 3rd Terr 2nd Ave to 5th AveRoadwork 3rd Terr 2nd Ave to 5th AveRoadwork 3rd Terr 2nd Ave to 5th Ave
RDW-1150 SE 3rd Terr - Roadwork - Rolling MOT Phased (0+00 to 20+75)15 15 0%27-May-25 26-Jun-25 51 DANIA 5D HW
RDW-1160 SE 3rd Terr - Roadwork - Driveway / Sidewalk Restoration 15 15 0%27-May-25 26-Jun-25 51 DANIA 5D HW
RDW-1170 SE 3rd Terr - Roadwork - Swale / Yard Grading 15 15 0%27-May-25 26-Jun-25 51 DANIA 5D HW
RDW-1180 SE 3rd Terr - Roadwork - Landscaping & Irigation Restoration 15 15 0%27-May-25 26-Jun-25 51 DANIA 5D HW
RDW-1190 SE 3rd Terr - Roadwork - Overbuild & Resurfacing / Reconstruction 15 15 0%27-May-25 26-Jun-25 51 DANIA 5D HW
SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40)SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40)SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40)SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40)SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40)SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40)SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40)SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40)SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40)
DrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainage
DRA-1540 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Drainage - Establish Rolling MOT (14+00 to 20+75)15 0 100%08-Jan-25 A 13-Jan-25 A DANIA 5D HW
DRA-1550 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Drainage - Establish Dewatering System (14+00 to 21+40)15 0 100%08-Jan-25 A 13-Jan-25 A DANIA 5D HW
DRA-1560 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Drainage - Install Structures S-62 / S-63 15 0 100%08-Jan-25 A 13-Jan-25 A DANIA 5D HW
DRA-1570 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Drainage - Install / Replace Storm Pipe 15 0 100%08-Jan-25 A 13-Jan-25 A DANIA 5D HW
DRA-1580 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Drainage - Install JS-02 10 0 100%08-Jan-25 A 13-Jan-25 A DANIA 5D HW
DRA-1590 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Drainage - MH Adjustments 1 0 100%08-Jan-25 A 13-Jan-25 A DANIA 5D HW
DRA-1600 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Drainage - Connect Existing Pipe to Stay With New Structures 1 0 100%08-Jan-25 A 13-Jan-25 A DANIA 5D HW
DRA-1610 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Drainage - Connect New Pipe to Existing Structures 1 0 100%08-Jan-25 A 13-Jan-25 A DANIA 5D HW
DRA-1620 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Drainage - Temp Restoration 2 0 100%08-Jan-25 A 13-Jan-25 A DANIA 5D HW
DRA-1630 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Drainage - Lamp New Drainage 1 0 100%08-Jan-25 A 13-Jan-25 A DANIA 5D HW
RoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadwork
RDW-1200 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Roadwork - Establish Phased MOT (14+00 to 21+40)15 2 90%25-Feb-25 A 30-Jun-25 51 DANIA 5D HW
RDW-1210 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Roadwork - Driveway / Sidewalk Restoration 15 14 5%31-Mar-25 A 22-Jul-25 51 DANIA 5D HW
RDW-1220 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Roadwork - Swale / Yard Grading 15 15 0%27-Jun-25 24-Jul-25 51 DANIA 5D HW
RDW-1230 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Roadwork - Landscaping & Irigation Restoration 15 15 0%27-Jun-25 24-Jul-25 51 DANIA 5D HW
RDW-1240 SE 3rd Pl - 4th Ave to 5th Ave (14+00 to 21+40) - Roadwork - Overbuild & Resurfacing / Reconstruction 15 8 50%25-Feb-25 A 24-Jul-25 51 DANIA 5D HW
SE 3rd Pl - 3rd Ave to 4th Ave (07+80 to 14+00)SE 3rd Pl - 3rd Ave to 4th Ave (07+80 to 14+00)SE 3rd Pl - 3rd Ave to 4th Ave (07+80 to 14+00)SE 3rd Pl - 3rd Ave to 4th Ave (07+80 to 14+00)SE 3rd Pl - 3rd Ave to 4th Ave (07+80 to 14+00)SE 3rd Pl - 3rd Ave to 4th Ave (07+80 to 14+00)SE 3rd Pl - 3rd Ave to 4th Ave (07+80 to 14+00)SE 3rd Pl - 3rd Ave to 4th Ave (07+80 to 14+00)SE 3rd Pl - 3rd Ave to 4th Ave (07+80 to 14+00)
RoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadwork
RDW-1250 SE 3rd Pl - 3rd Ave to 4th Ave (07+80 to 14+00) - Roadwork - Establish Phased MOT (7+80 to 14+00)10 1 90%25-Feb-25 A 25-Jul-25 51 DANIA 5D HW
RDW-1260 SE 3rd Pl - 3rd Ave to 4th Ave (07+80 to 14+00) - Roadwork - Driveway / Sidewalk Restoration 10 9 5%31-Mar-25 A 11-Aug-25 51 DANIA 5D HW
RDW-1270 SE 3rd Pl - 3rd Ave to 4th Ave (07+80 to 14+00) - Roadwork - Swale / Yard Grading 10 10 0%25-Jul-25 12-Aug-25 51 DANIA 5D HW
RDW-1280 SE 3rd Pl - 3rd Ave to 4th Ave (07+80 to 14+00) - Roadwork - Landscaping & Irigation Restoration 10 10 0%25-Jul-25 12-Aug-25 51 DANIA 5D HW
RDW-1290 SE 3rd Pl - 3rd Ave to 4th Ave (07+80 to 14+00) - Roadwork - Overbuild & Resurfacing / Reconstruction 10 5 50%25-Feb-25 A 12-Aug-25 51 DANIA 5D HW
SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80)SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80)SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80)SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80)SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80)SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80)SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80)SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80)SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80)
DrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainage
DRA-1640 SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80) - Drainage - Establish Rolling MOT (0+00 to 07+80)15 0 100%14-Jan-25 A 20-Jan-25 A DANIA 5D HW
DRA-1650 SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80) - Drainage - Establish Dewatering System (0+00 to 07+80)15 0 100%14-Jan-25 A 20-Jan-25 A DANIA 5D HW
DRA-1660 SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80) - Drainage - Install S58 / S57 / S59 / S60 / S61 / S50 / S41 / S40 15 0 100%14-Jan-25 A 20-Jan-25 A DANIA 5D HW
DRA-1670 SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80) - Drainage - Install / Replace Storm Pipe 15 0 100%14-Jan-25 A 20-Jan-25 A DANIA 5D HW
DRA-1680 SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80) - Drainage - MH Adjustments 1 0 100%14-Jan-25 A 20-Jan-25 A DANIA 5D HW
DRA-1690 SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80) - Drainage - Connect Existing Pipe to Stay With New Structures 1 0 100%14-Jan-25 A 20-Jan-25 A DANIA 5D HW
DRA-1700 SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80) - Drainage - Connect New Pipe to Existing Structures 1 0 100%14-Jan-25 A 20-Jan-25 A DANIA 5D HW
DRA-1710 SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80) - Drainage - Temp Restoration 2 0 100%14-Jan-25 A 20-Jan-25 A DANIA 5D HW
DRA-1720 SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80) - Drainage - Lamp New Drainage 1 0 100%14-Jan-25 A 20-Jan-25 A DANIA 5D HW
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2025 2026
South East Drainage Retrofit - Update 06 - March 31, 2025
TASK filter: All Activities
South East Drainage Retrofit - Update 06 - March 31, 2025
ALL ACTIVITIES
Run Date: 15-Apr-25
Data Date: 01-Apr-25
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Page 5 of 8
Activity ID Activity Name OD RD PCT Start Finish TF Calendar
RoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadwork
RDW-1300 SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80) - Roadwork - Establish Phased MOT (0+00 to 07+80)15 2 90%25-Feb-25 A 15-Aug-25 51 DANIA 5D HW
RDW-1310 SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80) - Roadwork - Driveway / Sidewalk Restoration 15 14 5%31-Mar-25 A 08-Sep-25 51 DANIA 5D HW
RDW-1320 SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80) - Roadwork - Swale / Yard Grading 15 15 0%14-Aug-25 11-Sep-25 51 DANIA 5D HW
RDW-1330 SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80) - Roadwork - Landscaping & Irigation Restoration 15 15 0%14-Aug-25 11-Sep-25 51 DANIA 5D HW
RDW-1340 SE 3rd Pl - 2nd Ave to 3rd Ave (00+00 to 07+80) - Roadwork - Overbuild & Resurfacing / Reconstruction 15 8 50%25-Feb-25 A 11-Sep-25 51 DANIA 5D HW
SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50)SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50)SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50)SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50)SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50)SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50)SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50)SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50)SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50)
DrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainage
DRA-1730 SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50) - Drainage - Establish Rolling MOT (0+00 to 07+50)15 0 100%04-Feb-25 A 12-Feb-25 A DANIA 5D HW
DRA-1740 SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50) - Drainage - Establish Dewatering System (0+00 to 07+50)15 0 100%04-Feb-25 A 12-Feb-25 A DANIA 5D HW
DRA-1750 SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50) - Drainage - Install S99 / S101 / S69 / S35 / S36 / S18 / S53 / S54 15 0 100%04-Feb-25 A 12-Feb-25 A DANIA 5D HW
DRA-1760 SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50) - Drainage - Install / Replace Storm Pipe 15 0 100%04-Feb-25 A 12-Feb-25 A DANIA 5D HW
DRA-1770 SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50) - Drainage - MH Adjustments 1 0 100%04-Feb-25 A 12-Feb-25 A DANIA 5D HW
DRA-1780 SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50) - Drainage - Connect Existing Pipe to Stay With New Structures 1 0 100%04-Feb-25 A 12-Feb-25 A DANIA 5D HW
DRA-1790 SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50) - Drainage - Connect New Pipe to Existing Structures 1 0 100%04-Feb-25 A 12-Feb-25 A DANIA 5D HW
DRA-1800 SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50) - Drainage - Temp Restoration 2 0 100%04-Feb-25 A 12-Feb-25 A DANIA 5D HW
DRA-1810 SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50) - Drainage - Lamp New Drainage 1 0 100%04-Feb-25 A 12-Feb-25 A DANIA 5D HW
RoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadwork
RDW-1350 SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50) - Roadwork - Establish Rolling MOT (0+00 to 07+50)15 15 0%12-Sep-25 09-Oct-25 51 DANIA 5D HW
RDW-1360 SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50) - Roadwork - Driveway / Sidewalk Restoration 15 15 0%12-Sep-25 09-Oct-25 51 DANIA 5D HW
RDW-1370 SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50) - Roadwork - Swale / Yard Grading 15 15 0%12-Sep-25 09-Oct-25 51 DANIA 5D HW
RDW-1380 SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50) - Roadwork - Landscaping & Irigation Restoration 15 15 0%12-Sep-25 09-Oct-25 51 DANIA 5D HW
RDW-1390 SE 4th St - 2nd Ave to 3rd Ave (00+00 to 07+50) - Roadwork - Overbuild & Resurfacing / Reconstruction 15 15 0%12-Sep-25 09-Oct-25 51 DANIA 5D HW
SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00)SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00)SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00)SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00)SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00)SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00)SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00)SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00)SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00)
DrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainage
DRA-1820 SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00) - Drainage - Establish Rolling MOT (13+80 to 18+00)10 10 0%06-Jun-25 26-Jun-25 100 DANIA 5D HW
DRA-1830 SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00) - Drainage - Establish Dewatering System (13+80 to 18+00)10 10 0%06-Jun-25 26-Jun-25 100 DANIA 5D HW
DRA-1840 SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00) - Drainage - Install Structures S-55 / S-56 / S-93 10 10 0%06-Jun-25 26-Jun-25 100 DANIA 5D HW
DRA-1850 SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00) - Drainage - Install / Replace Storm Pipe 10 10 0%06-Jun-25 26-Jun-25 100 DANIA 5D HW
DRA-1860 SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00) - Drainage - MH Adjustments 1 1 0%27-Jun-25 27-Jun-25 100 DANIA 5D HW
DRA-1870 SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00) - Drainage - Connect Existing Pipe to Stay With New Structures 1 1 0%30-Jun-25 30-Jun-25 100 DANIA 5D HW
DRA-1880 SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00) - Drainage - Connect New Pipe to Existing Structures 1 1 0%01-Jul-25 01-Jul-25 100 DANIA 5D HW
DRA-1890 SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00) - Drainage - Temp Restoration 2 2 0%03-Jul-25 07-Jul-25 100 DANIA 5D HW
DRA-1900 SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00) - Drainage - Lamp New Drainage 1 1 0%08-Jul-25 08-Jul-25 100 DANIA 5D HW
RoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadwork
RDW-1400 SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00) - Roadwork - Establish Phased MOT (14+00 to 20+45)15 15 0%10-Oct-25 03-Nov-25 51 DANIA 5D HW
RDW-1410 SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00) - Roadwork - Driveway / Sidewalk Restoration 15 15 0%10-Oct-25 03-Nov-25 51 DANIA 5D HW
RDW-1420 SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00) - Roadwork - Swale / Yard Grading 15 15 0%10-Oct-25 03-Nov-25 51 DANIA 5D HW
RDW-1430 SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00) - Roadwork - Landscaping & Irigation Restoration 15 15 0%10-Oct-25 03-Nov-25 51 DANIA 5D HW
RDW-1440 SE 4th St - 4th Ave to 5th Ave (13+80 to 10+00) - Roadwork - Overbuild & Resurfacing / Reconstruction 15 15 0%10-Oct-25 03-Nov-25 51 DANIA 5D HW
N to S SE - 2nd Ave (13+60 to 16+80)N to S SE - 2nd Ave (13+60 to 16+80)N to S SE - 2nd Ave (13+60 to 16+80)N to S SE - 2nd Ave (13+60 to 16+80)N to S SE - 2nd Ave (13+60 to 16+80)N to S SE - 2nd Ave (13+60 to 16+80)N to S SE - 2nd Ave (13+60 to 16+80)N to S SE - 2nd Ave (13+60 to 16+80)N to S SE - 2nd Ave (13+60 to 16+80)
DrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainage
DRA-1910 N to S SE - 2nd Ave (13+60 to 16+80) - Drainage - Abandon 6" Wm Sta 16+40 1 0 100%13-Feb-25 A 28-Feb-25 A DANIA 5D HW
DRA-1920 N to S SE - 2nd Ave (13+60 to 16+80) - Drainage - Establish Rolling MOT 13+60 to 16+80 15 0 100%13-Feb-25 A 28-Feb-25 A DANIA 5D HW
DRA-1930 N to S SE - 2nd Ave (13+60 to 16+80) - Drainage - Establish Dewatering System 13+60 to 16+80 15 0 100%13-Feb-25 A 28-Feb-25 A DANIA 5D HW
DRA-1940 N to S SE - 2nd Ave (13+60 to 16+80) - Drainage - Install S98 / S105 / CS01 / S103 / S106 / S97 / S96 / S91 / S82 15 0 100%13-Feb-25 A 28-Feb-25 A DANIA 5D HW
DRA-1950 N to S SE - 2nd Ave (13+60 to 16+80) - Drainage - Install / Replace Storm Pipe 15 0 100%13-Feb-25 A 28-Feb-25 A DANIA 5D HW
DRA-1960 N to S SE - 2nd Ave (13+60 to 16+80) - Drainage - MH Adjustments 1 0 100%13-Feb-25 A 28-Feb-25 A DANIA 5D HW
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2025 2026
South East Drainage Retrofit - Update 06 - March 31, 2025
TASK filter: All Activities
South East Drainage Retrofit - Update 06 - March 31, 2025
ALL ACTIVITIES
Run Date: 15-Apr-25
Data Date: 01-Apr-25
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Page 6 of 8
Activity ID Activity Name OD RD PCT Start Finish TF Calendar
DRA-1970 N to S SE - 2nd Ave (13+60 to 16+80) - Drainage - Connect Existing Pipe to Stay With New Structures 1 0 100%13-Feb-25 A 28-Feb-25 A DANIA 5D HW
DRA-1980 N to S SE - 2nd Ave (13+60 to 16+80) - Drainage - Connect New Pipe to Existing Structures 1 0 100%13-Feb-25 A 28-Feb-25 A DANIA 5D HW
DRA-1990 N to S SE - 2nd Ave (13+60 to 16+80) - Drainage - Temp Restoration 2 0 100%13-Feb-25 A 28-Feb-25 A DANIA 5D HW
DRA-2000 N to S SE - 2nd Ave (13+60 to 16+80) - Drainage - Lamp New Drainage 1 0 100%13-Feb-25 A 28-Feb-25 A DANIA 5D HW
RoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadwork
RDW-1450 N to S SE - 2nd Ave (13+60 to 16+80) - Roadwork - Establish Phased MOT 13+60 to 16+80 5 5 0%04-Nov-25 12-Nov-25 51 DANIA 5D HW
RDW-1460 N to S SE - 2nd Ave (13+60 to 16+80) - Roadwork - Driveway / Sidewalk Restoration 5 5 0%04-Nov-25 12-Nov-25 51 DANIA 5D HW
RDW-1470 N to S SE - 2nd Ave (13+60 to 16+80) - Roadwork - Swale / Yard Grading 5 5 0%04-Nov-25 12-Nov-25 51 DANIA 5D HW
RDW-1480 N to S SE - 2nd Ave (13+60 to 16+80) - Roadwork - Landscaping & Irigation Restoration 5 5 0%04-Nov-25 12-Nov-25 51 DANIA 5D HW
RDW-1490 N to S SE - 2nd Ave (13+60 to 16+80) - Roadwork - Overbuild & Resurfacing / Reconstruction 5 5 0%04-Nov-25 12-Nov-25 51 DANIA 5D HW
S to N SE - 3rd Ave (00+00 to 10+00)S to N SE - 3rd Ave (00+00 to 10+00)S to N SE - 3rd Ave (00+00 to 10+00)S to N SE - 3rd Ave (00+00 to 10+00)S to N SE - 3rd Ave (00+00 to 10+00)S to N SE - 3rd Ave (00+00 to 10+00)S to N SE - 3rd Ave (00+00 to 10+00)S to N SE - 3rd Ave (00+00 to 10+00)S to N SE - 3rd Ave (00+00 to 10+00)
DrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainageDrainage
DRA-2010 S to N SE - 3rd Ave (00+00 to 10+00) - Drainage - Establish Rolling MOT 0+00 to 10+00 10 0 100%04-Nov-24 A 21-Nov-24 A DANIA 5D HW
DRA-2020 S to N SE - 3rd Ave (00+00 to 10+00) - Drainage - Establish Dewatering System 0+00 to 10+00 10 0 100%04-Nov-24 A 21-Nov-24 A DANIA 5D HW
DRA-2030 S to N SE - 3rd Ave (00+00 to 10+00) - Drainage - Install Structures S-71 / S-89 10 0 100%04-Nov-24 A 21-Nov-24 A DANIA 5D HW
DRA-2040 S to N SE - 3rd Ave (00+00 to 10+00) - Drainage - Install / Replace Storm Pipe 10 0 100%04-Nov-24 A 21-Nov-24 A DANIA 5D HW
DRA-2050 S to N SE - 3rd Ave (00+00 to 10+00) - Drainage - MH Adjustments 1 0 100%04-Nov-24 A 21-Nov-24 A DANIA 5D HW
DRA-2060 S to N SE - 3rd Ave (00+00 to 10+00) - Drainage - Connect Existing Pipe to Stay With New Structures 1 0 100%04-Nov-24 A 21-Nov-24 A DANIA 5D HW
DRA-2070 S to N SE - 3rd Ave (00+00 to 10+00) - Drainage - Connect New Pipe to Existing Structures 1 0 100%04-Nov-24 A 21-Nov-24 A DANIA 5D HW
DRA-2080 S to N SE - 3rd Ave (00+00 to 10+00) - Drainage - Temp Restoration 2 0 100%04-Nov-24 A 21-Nov-24 A DANIA 5D HW
DRA-2090 S to N SE - 3rd Ave (00+00 to 10+00) - Drainage - Lamp New Drainage 1 0 100%22-Nov-24 A 22-Nov-24 A DANIA 5D HW
RoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadwork
RDW-1500 S to N SE - 3rd Ave (00+00 to 10+00) - Roadwork - Establish Phased MOT 0+00 to 10+00 10 10 0%13-Nov-25 01-Dec-25 51 DANIA 5D HW
RDW-1510 S to N SE - 3rd Ave (00+00 to 10+00) - Roadwork - Driveway / Sidewalk Restoration 10 10 0%13-Nov-25 01-Dec-25 51 DANIA 5D HW
RDW-1520 S to N SE - 3rd Ave (00+00 to 10+00) - Roadwork - Swale / Yard Grading 10 10 0%13-Nov-25 01-Dec-25 51 DANIA 5D HW
RDW-1530 S to N SE - 3rd Ave (00+00 to 10+00) - Roadwork - Landscaping & Irigation Restoration 10 10 0%13-Nov-25 01-Dec-25 51 DANIA 5D HW
RDW-1540 S to N SE - 3rd Ave (00+00 to 10+00) - Roadwork - Roadwork - Overbuild & Resurfacing / Reconstruction 10 10 0%13-Nov-25 01-Dec-25 51 DANIA 5D HW
S to N SE - 4th Ave & SE 5th Ave Road & DrainS to N SE - 4th Ave & SE 5th Ave Road & DrainS to N SE - 4th Ave & SE 5th Ave Road & DrainS to N SE - 4th Ave & SE 5th Ave Road & DrainS to N SE - 4th Ave & SE 5th Ave Road & DrainS to N SE - 4th Ave & SE 5th Ave Road & DrainS to N SE - 4th Ave & SE 5th Ave Road & DrainS to N SE - 4th Ave & SE 5th Ave Road & DrainS to N SE - 4th Ave & SE 5th Ave Road & Drain
RoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadworkRoadwork
RDW-1550 S to N SE - 4th Ave & SE 5th Ave Road & Drain - Roadwork - Establish Phased MOT 10 10 0%08-Jul-25 24-Jul-25 123 DANIA 5D HW
RDW-1560 S to N SE - 4th Ave & SE 5th Ave Road & Drain - Roadwork - Driveway / Sidewalk Restoration 10 10 0%08-Jul-25 24-Jul-25 123 DANIA 5D HW
RDW-1570 S to N SE - 4th Ave & SE 5th Ave Road & Drain - Roadwork - Swale / Yard Grading 10 10 0%08-Jul-25 24-Jul-25 123 DANIA 5D HW
RDW-1580 S to N SE - 4th Ave & SE 5th Ave Road & Drain - Roadwork - Landscaping & Irigation Restoration 10 10 0%08-Jul-25 24-Jul-25 123 DANIA 5D HW
RDW-1590 S to N SE - 4th Ave & SE 5th Ave Road & Drain - Overbuild & Resurfacing / Reconstruction 10 10 0%08-Jul-25 24-Jul-25 123 DANIA 5D HW
Pump Station ComponentsPump Station ComponentsPump Station ComponentsPump Station ComponentsPump Station ComponentsPump Station ComponentsPump Station ComponentsPump Station ComponentsPump Station Components
Treatment Well - Wet Well - Inlet - Valve Box - CofferdamTreatment Well - Wet Well - Inlet - Valve Box - CofferdamTreatment Well - Wet Well - Inlet - Valve Box - CofferdamTreatment Well - Wet Well - Inlet - Valve Box - CofferdamTreatment Well - Wet Well - Inlet - Valve Box - CofferdamTreatment Well - Wet Well - Inlet - Valve Box - CofferdamTreatment Well - Wet Well - Inlet - Valve Box - CofferdamTreatment Well - Wet Well - Inlet - Valve Box - CofferdamTreatment Well - Wet Well - Inlet - Valve Box - Cofferdam
PS-1000 Pump Station Components - Wells - Drive Sheeting & Weld Bracing For Entire Cofferdam (Pit #1 & Pit #2)15 15 0%03-Apr-25 24-Apr-25 83 DANIA 5D HW
PS-1010 Pump Station Components - Wells - Set Up Dewatering 2 2 0%25-Apr-25 28-Apr-25 83 DANIA 5D HW
PS-1020 Pump Station Components - Wells - Pit #1 Excavate / Clean Flutes & Prepare Grade 10 10 0%29-Apr-25 15-May-25 83 DANIA 5D HW
PS-1030 Pump Station Components - Wells - Stone Level to Grade 2 2 0%16-May-25 19-May-25 83 DANIA 5D HW
PS-1040 Pump Station Components - Wells - Wet Well Precaste Install 5 5 0%20-May-25 29-May-25 83 DANIA 5D HW
PS-1050 Pump Station Components - Wells - Treatment Unit Structure Install 4 4 0%30-May-25 06-Jun-25 83 DANIA 5D HW
PS-1060 Pump Station Components - Wells - Excavate Pit #2 & Partial Backfill Pit #1 4 4 0%09-Jun-25 13-Jun-25 83 DANIA 5D HW
PS-1070 Pump Station Components - Wells - Install Inlet Structure 1 1 0%16-Jun-25 16-Jun-25 83 DANIA 5D HW
PS-1080 Pump Station Components - Wells - Install Valve Box 2 2 0%17-Jun-25 20-Jun-25 83 DANIA 5D HW
PS-1090 Pump Station Components - Wells - Pull Center Sheets 1 1 0%23-Jun-25 23-Jun-25 83 DANIA 5D HW
PS-1100 Pump Station Components - Wells - Install Piping Between Structures 10 10 0%26-Jun-25 14-Jul-25 83 DANIA 5D HW
PS-1110 Pump Station Components - Wells - Weir & Slope Grout Floor Filets & Bitumous Coatings 5 5 0%12-Aug-25 19-Aug-25 84 DANIA 5D HW
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2025 2026
South East Drainage Retrofit - Update 06 - March 31, 2025
TASK filter: All Activities
South East Drainage Retrofit - Update 06 - March 31, 2025
ALL ACTIVITIES
Run Date: 15-Apr-25
Data Date: 01-Apr-25
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Page 7 of 8
Activity ID Activity Name OD RD PCT Start Finish TF Calendar
PS-2070 Pump Station Components - Connection & Internal Components - Sheeting & Waler Removal 5 5 0%15-Jul-25 22-Jul-25 83 DANIA 5D HW
PS-2080 Pump Station Components - Connection & Internal Components - Backfill & Temp Restore 10 10 0%24-Jul-25 11-Aug-25 83 DANIA 5D HW
Connections & Internal ComponentsConnections & Internal ComponentsConnections & Internal ComponentsConnections & Internal ComponentsConnections & Internal ComponentsConnections & Internal ComponentsConnections & Internal ComponentsConnections & Internal ComponentsConnections & Internal Components
PS-2000 Pump Station Components - Connection & Internal Components - Wet Well Intake / Discharge Tubes / Cover 5 5 0%21-Aug-25 28-Aug-25 84 DANIA 5D HW
PS-2010 Pump Station Components - Connection & Internal Components - Wet Well Pumps 5 5 0%24-Mar-26 30-Mar-26 -39 DANIA 5D HW
PS-2020 Pump Station Components - Connection & Internal Components - Wet Well Pressure Transducer 1 1 0%31-Mar-26 31-Mar-26 -39 DANIA 5D HW
PS-2030 Pump Station Components - Connection & Internal Components - Wet Well Float 1 1 0%02-Apr-26 02-Apr-26 -39 DANIA 5D HW
PS-2040 Pump Station Components - Connection & Internal Components - Valve Box Concrete Supports 3 3 0%03-Apr-26 07-Apr-26 -39 DANIA 5D HW
PS-2050 Pump Station Components - Connection & Internal Components - Valve Box Interneal Valves & Components 10 10 0%08-Apr-26 22-Apr-26 -39 DANIA 5D HW
PS-2060 Pump Station Components - Connection & Internal Components - Install Structure tops/Hatches/MH Covers 5 5 0%23-Apr-26 30-Apr-26 -39 DANIA 5D HW
Site ElectricSite ElectricSite ElectricSite ElectricSite ElectricSite ElectricSite ElectricSite ElectricSite Electric
PS-3000 Pump Station Components - Site Electric - Install Duct Bank From FPL Pole/Handhole to Transformer Inlet Pump Station10 10 0%12-Aug-25 28-Aug-25 94 DANIA 5D HW
PS-3010 Pump Station Components - Site Electric - Install All Electrical Conduit Between Inlet Pump Station & Control Platform 5 5 0%29-Aug-25 08-Sep-25 94 DANIA 5D HW
PS-3020 Pump Station Components - Site Electric - Pull Wire & Comm Cables 5 5 0%11-Sep-25 18-Sep-25 94 DANIA 5D HW
PS-3030 Pump Station Components - Site Electric - FPL Primary Feed Hot 5 5 0%24-Mar-26 30-Mar-26 -19 DANIA 5D HW
FPL TransformerFPL TransformerFPL TransformerFPL TransformerFPL TransformerFPL TransformerFPL TransformerFPL TransformerFPL Transformer
PS-4000 Pump Station Components - FPL Transformer - Install Underground Utility Conduit Stub-Outs 5 5 0%12-Aug-25 19-Aug-25 94 DANIA 5D HW
PS-4010 Pump Station Components - FPL Transformer - Backfill & Compact 5 5 0%21-Aug-25 28-Aug-25 94 DANIA 5D HW
PS-4020 Pump Station Components - FPL Transformer - Verify Controls & Conduit Alignment With Electrical Components 5 5 0%24-Mar-26 30-Mar-26 -29 DANIA 5D HW
PS-4030 Pump Station Components - FPL Transformer - Pour Slab On Grade With Boxouts For Conduits 5 5 0%31-Mar-26 07-Apr-26 -29 DANIA 5D HW
PS-4040 Pump Station Components - FPL Transformer - Set Transfromer & Wire (Fpl/Electriciain)5 5 0%08-Apr-26 14-Apr-26 -29 DANIA 5D HW
Control PlatformControl PlatformControl PlatformControl PlatformControl PlatformControl PlatformControl PlatformControl PlatformControl Platform
PS-5000 Pump Station Components - Control Platform - Dig & Pour Foundations With Sleaved Penetrations 10 10 0%12-Aug-25 28-Aug-25 83 DANIA 5D HW
PS-5010 Pump Station Components - Control Platform - Install Underground Utility Conduit Stub-Outs 5 5 0%29-Aug-25 08-Sep-25 83 DANIA 5D HW
PS-5020 Pump Station Components - Control Platform - Backfill & Compact 2 2 0%11-Sep-25 12-Sep-25 83 DANIA 5D HW
PS-5030 Pump Station Components - Control Platform - Verify Controls & Conduit Alignment With Electrical Components 1 1 0%15-Sep-25 15-Sep-25 83 DANIA 5D HW
PS-5040 Pump Station Components - Control Platform - Pour Slab 4 4 0%16-Sep-25 22-Sep-25 83 DANIA 5D HW
PS-5050 Pump Station Components - Control Platform - Install Staircase 3 3 0%23-Sep-25 29-Sep-25 83 DANIA 5D HW
PS-5060 Pump Station Components - Control Platform - Install Bonding / Main Breaker / Meter / Transformer & Pump Control Panel10 10 0%30-Sep-25 15-Oct-25 83 DANIA 5D HW
PS-5070 Pump Station Components - Control Platform - Operational Test 1 1 0%16-Oct-25 16-Oct-25 83 DANIA 5D HW
Restoration Start UpRestoration Start UpRestoration Start UpRestoration Start UpRestoration Start UpRestoration Start UpRestoration Start UpRestoration Start UpRestoration Start Up
PS-6000 Pump Station Components - Restoration Start Up - Pump Stations Testing & Functionality Test 5 5 0%01-May-26 08-May-26 -39 DANIA 5D HW
PS-6010 Pump Station Components - Restoration Start Up - Pump Stations Start Up & Commisioning/Performance Test 5 5 0%11-May-26 18-May-26 -39 DANIA 5D HW
CLOSEOUTCLOSEOUTCLOSEOUTCLOSEOUTCLOSEOUTCLOSEOUTCLOSEOUTCLOSEOUTCLOSEOUT
RestorationRestorationRestorationRestorationRestorationRestorationRestorationRestorationRestoration
CLO-1000 Closeout - Restoration - Final Concrete Restoration 2 2 0%02-Dec-25 04-Dec-25 51 DANIA 5D HW
CLO-1010 Closeout - Restoration - Final Sod Restoration 5 5 0%05-Dec-25 11-Dec-25 51 DANIA 5D HW
CLO-1020 Closeout - Restoration - Pavement Markings/ Signage 5 5 0%12-Dec-25 19-Dec-25 51 DANIA 5D HW
CLO-1030 Closeout - Restoration - Final Mill & Overlay 5 5 0%22-Dec-25 29-Dec-25 51 DANIA 5D HW
CloseoutCloseoutCloseoutCloseoutCloseoutCloseoutCloseoutCloseoutCloseout
CLO-2000 Closeout - Closeout - Final Inspection & Acceptance 1 1 0%19-May-26 19-May-26 -44 DANIA 5D H
CLO-2010 Closeout - Closeout - Generate Punchlist 2 2 0%19-May-26 20-May-26 -45 DANIA 5D H
CLO-2020 Closeout - Closeout - Final As-Built Submittal 15 15 0%21-May-26 04-Jun-26 -63 DANIA 7D
CLO-2030 Closeout - Closeout - Submit Final O&M Closeout Documents 30 30 0%21-May-26 19-Jun-26 -63 DANIA 7D
CLO-2040 Closeout - Closeout - Complete Punchlist 30 30 0%21-May-26 19-Jun-26 -63 DANIA 7D
CLO-2050 Closeout - Closeout - Final Contract Closeout 30 30 0%21-May-26 19-Jun-26 -63 DANIA 7D
CLO-2060 Closeout - Closeout - As-Built Review 15 15 0%05-Jun-26 19-Jun-26 -63 DANIA 7D
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2025 2026
South East Drainage Retrofit - Update 06 - March 31, 2025
TASK filter: All Activities
South East Drainage Retrofit - Update 06 - March 31, 2025
ALL ACTIVITIES
Run Date: 15-Apr-25
Data Date: 01-Apr-25
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Page 8 of 8