Loading...
HomeMy WebLinkAboutInv# 0000025702 - EMPOWER GENERATORS INC - 05/13/2021 Effective 7/31/2014 Water Use Permits Individual Permit, except Mining/Dewatering • Max Month Allocation <= 3 MGM ........................................................................................ $ 350 • Max Month Allocation > 3 MGM <= 15 MGM ..................................................................... $ 1,000 Individual Irrigation < 20 years • Max Month Allocation > 15 MGM ....................................................................................... $ 1,000 Individual Irrigation >= 20 years • Max Month Allocation > 15 MGM <= 30 MGM .................................................................... $ 1,600 • Max Month Allocation > 30 MGM <= 300 MGM .................................................................. $ 3,400 • Max Month Allocation > 300 MGM ...................................................................................... $ 5,600 Individual Public Water Supply < 20 years • Max Month Allocation > 15 MGM <= 30 MGM .................................................................... $ 2,700 • Max Month Allocation > 30 MGM <= 300 MGM .................................................................. $ 5,500 • Max Month Allocation > 300 MGM ...................................................................................... $ 7,000 Individual Public Water Supply >= 20 years • Max Month Allocation > 15 MGM <= 30 MGM .................................................................... $ 4,200 • Max Month Allocation > 30 MGM <= 300 MGM .................................................................. $ 8,500 • Max Month Allocation > 300 MGM ..................................................................................... $11,500 Individual Mining/Dewatering • Standard Individual Permit <= 1 year ..................................................................................... $ 500 • Standard Individual Permit > 1 year ...................................................................................... $ 1,800 • Master Individual Permit ...................................................................................................... $ 4,000 Individual Industrial < 20 years • Max Month Allocation > 15 MGM <= 30 MGM .................................................................... $ 1,400 • Max Month Allocation > 30 MGM <= 300 MGM .................................................................. $ 2,750 • Max Month Allocation > 300 MGM ...................................................................................... $ 3,500 Individual Industrial >= 20 years • Max Month Allocation > 15 MGM <= 30 MGM .................................................................... $ 2,000 • Max Month Allocation > 30 MGM <= 300 MGM .................................................................. $ 3,650 • Max Month Allocation > 300 MGM ...................................................................................... $ 5,600 Individual Diversion/Impoundment < 20 years • Max Month Allocation > 15 MGM <= 30 MGM .................................................................... $ 1,400 • Max Month Allocation > 30 MGM <= 300 MGM .................................................................. $ 2,750 • Max Month Allocation > 300 MGM ...................................................................................... $ 3,500 Individual Diversion/Impoundment >= 20 years • Max Month Allocation > 15 MGM <= 30 MGM .................................................................... $ 2,000 Effective 7/31/2014 • Max Month Allocation > 30 MGM <= 300 MGM .................................................................. $ 3,950 • Max Month Allocation > 300 MGM ...................................................................................... $ 6,200 Independent Secondary User Diversion/Impoundment • Max Month Allocation > 15 MGM <= 30 MGM .................................................................... $ 1,000 • Max Month Allocation > 30 MGM <= 300 MGM .................................................................. $ 2,000 • Max Month Allocation > 300 MGM ...................................................................................... $ 3,200 Noticed General Water Use Permit • Application filed electronically via ePermitting (www.sfwmd.gov/ePermitting) ................... $ 100 • Application filed by other means ............................................................................................ $ 350 Permit Transfer of Ownership ............................................................................................................ $ 300 General Permit by Rule ...................................................................................................................... No Fee Letter Modification ............................................................................................................................ No Fee Aquifer Storage and Recovery (cost added to applicable use type listed above) ............................. $ 1,000 Water Well Construction ................................................................................................................... $ 100 Water Well Abandonment ................................................................................................................. No Fee Page 1 of 10 Incorporated by reference in rule 40E-2.101 (F.A.C.) Form 1379 (2014-07) WATER USE PERMIT # (if application is for renewal or modification): ____________________________ If necessary, attach additional sheets if there are multiple applicants, owners, agents, etc. 1. APPLICANT (Complete legal name in which permit should be issued) NAME:__________________________________________________________________________ If applicant is a business, provide a contact person:____________________________________ ADDRESS: ______________________________________________________________________ CITY, STATE, ZIP: ________________________________________________________________ PHONE: (________) __________________ CELL PHONE: (________) ____________________ EMAIL ADDRESS: __________________________________________________ Applicant is:  Owner  Lessee*  Other (explain)______________________________ *Attach copy of current lease, or written authorization from property owner 2. OWNER (If different than applicant) NAME:__________________________________________________________________________ ADDRESS: ______________________________________________________________________ CITY, STATE, ZIP: ________________________________________________________________ PHONE: (________) __________________ CELL PHONE: (________) ____________________ EMAIL ADDRESS: _______________________________________________________________ 3. AGENT OR CONSULTANT NAME:_________________________COMPANY NAME (if applicable): ______________________ ADDRESS: ______________________________________________________________________ CITY, STATE, ZIP: ________________________________________________________________ PHONE: (________) __________________ CELL PHONE: (________) ____________________ EMAIL ADDRESS: _______________________________________________________________ 4. COMPLIANCE CONTACT (Person responsible for sending compliance reports to the District) NAME:__________________________________________________________________________ ADDRESS: ______________________________________________________________________ CITY, STATE, ZIP: ________________________________________________________________ PHONE: (________) __________________ CELL PHONE: (________) ____________________ EMAIL ADDRESS: _______________________________________________________________ SECTION I – CONTACT INFORMATION WATER USE PERMIT APPLICATION South Florida Water Management District P.O. Box 24680, West Palm Beach, Florida 33416-4680 (561) 686-8800 www.sfwmd.gov/ePermitting Page 2 of 10 Incorporated by reference in rule 40E-2.101 (F.A.C.) Form 1379 (2014-07) SECTION II – APPLICATION INFORMATION Refer to the Applicant’s Handbook for permit application guidance, located online at www.sfwmd.gov. If any fields are not applicable for the proposed use, write N/A in the field. 1. TYPE OF APPLICATION:  New  Modification  Renewal If this application is for a modification, please describe the modification request and the reason the modification is necessary. _____________________________________________________________ ___________________________________________________________________________________ __________________________________________________________________________________ 2. REQUESTED PERMIT DURATION:  20 years  ____ years (up to 20 years)  I qualify for a duration greater than 20 years, per Florida Statute 373.236 3. PROJECT NAME: __________________________ COUNTY: _________________________ PHYSICAL ADDRESS: _____________________________________________________________ 4. RELATED PERMITS (for projects other than Public Supply)  ENVIRONMENTAL RESOURCE PERMIT (ERP) PERMIT/APPLICATION NO(S):______________________________  RIGHT OF W AY (ROW ) Permit/Application No(s): _______________________________________________  DIVERSION AND IMPOUNDMENT (D&I) Permit/Application No(s): ____________________________________ SECTION III – USE CATEGORY Please check all applicable water use categories associated with this permit application and complete the associated supplemental form(s) indicated. Refer to District rules 40E-21.651for water use type definitions. Water Use Category Supplemental Form  Agricultural (e.g., crops, livestock, nursery, aquaculture, pasture) Form A  Commercial / Industrial (e.g., service business, food and beverage production, cooling and heating, commercial attraction, manufacturing, chemical processing, power generation, aquifer remediation, mining) Form B  Landscape / Recreation (e.g., irrigation of parks, cemeteries, landscaped areas, golf courses, athletic fields, playgrounds) Form C  Dewatering (e.g., water use or removal associated with construction or excavation) Form D  Public Supply (e.g., public or privately owned water utility) Form E  Diversion and Impoundment (diversion or extraction of water). Independent Secondary users should use the applicable supplemental form based on type of water use. Form F Page 3 of 10 Incorporated by reference in rule 40E-2.101 (F.A.C.) Form 1379 (2014-07) SECTION IV – SOURCES OF WATER SUMMARY OF GROUNDWATER (WELL) FACILITIES Well Name or Number Map Designation Existing or Proposed Date of Proposed Construction Date Installed if Existing Diameter (in) Total Depth (ft) Cased Depth (ft) Screened Interval (ft) Pumped or Flowing Pump Type (see Instructions) Pump Intake Depth (ft bls) Pump or Flow Capacity (GPM) Working Valve if Artesian (yes, no or not applicable) Status (see Instructions) Purpose (see Instructions) Elevation of the Wellhead (ft NGVD - see Instructions) Water Use Accounting Method (see Instructions) Date Last Calibrated (ATTACH calibration report) Planar Coordinates (if known - see instructions) Section / Township / Range Page 4 of 10 Incorporated by reference in rule 40E-2.101 (F.A.C.) Form 1379 (2014-07) Instruction for Completing Groundwater (Wells) Section Well Name or Number: The Applicant’s designation of the well. How do you refer to it? Map Designation: This is how the well is labeled on the map submitted with the application. This may be the same as Well Name or Number, but does not necessarily have to be. Existing or Proposed: If the well is proposed, enter the date of expected operation. If it is an existing well, enter the date it was installed if you know it. Diameter: Outside diameter of the well casing. Total Depth: Total length in feet between the land surface and the bottom of the well. Cased Depth: The length in feet from the land surface to the bottom of the well casing. Screened Interval: The distance in feet below land surface to the top and bottom of the well screen, if the well is so equipped. Pumped or Flowing: Does the well produce water as a result of natural artesian flow, or is it pumped? Pump Type: This is the type of pump that has been installed for the well (typical choices are as follows): Centrifugal Diesel turbine Axial flow Windmill Submersible Jet Suction Other (specify) Electric turbine Hydraulic Portable Pump Intake Depth: Location of the pump depth in feet below land surface. The pump may be on the surface or down inside the well. Pump or Flow Capacity: The amount of water the pump can produce in gallons per minute (GPM). Working Valve: If the well is artesian, does it have a working valve to control the flow? Status: Primary Secondary (i.e. a production well that is rotated) Standby (i.e. used for freeze protection or emergency) Monitor Injection (i.e. A/C, pool heat exchange, etc.; sometimes used only periodically) Recharge (i.e. same as above) Purpose: What will the water be used for (typical choices are as follows): Dairy Irrigation Air Conditioning Swimming Pool Heating Monitor Aquaculture Freeze Protection Irrigation/Lake Recharge Livestock Bottled Water Mining/Dewatering Aquifer Storage and Recovery Industrial Other (specify) Public Water Supply Aquifer Remediation and Recovery Elevation of the Wellhead: This is the elevation of the top of the finished well at the ground surface. Planar coordinates: The Florida State Plane System (Planar Coordinates) should be submitted if you have a land survey which identifies the location of the well in terms of those measurements. If you do not know what these are, it is not necessary to include them. Section / Township / Range: The section, township and range in which the pump is located. Page 5 of 10 Incorporated by reference in rule 40E-2.101 (F.A.C.) Form 1379 (2014-07) SUMMARY OF SURFACE WATER (PUMP) FACILITIES Pump Name or Number Map Designation Surface Water Source Local Drainage District (if applicable) Existing or Proposed Date of Proposed Installation Date Installed if Existing Pump type (for list see Instructions) Pump Capacity (GPM) Pump Horsepower Pump Diameter (inches) Pump Intake Elevation (feet NGVD) Status (see Instructions) Purpose (see Instructions) Two way pump? (yes / no) Water Use Accounting Method (see Instructions) Date Last Calibrated (ATTACH calibration report) Planar Coordinates (if known - see instructions) Section / Township / Range ProposedProposed 2020 2020 DaniaBeach DaniaBeach GroundWater GroundWater 1200 1200 Dewatering Dewatering Primary Standby No No Gauge Gauge 10 10 70 70 Disel Disel -10 -10 36/50/41 36/50/41 Page 6 of 10 Incorporated by reference in rule 40E-2.101 (F.A.C.) Form 1379 (2014-07) Instructions for Completing Surface Water (Pumps) Section Pump Name or Number: The Applicant’s designation of the pump. How do you would refer to it? Map Designation: This is how the pump is labeled on the map submitted with the application. This may be the same as Pump Name or Number, but does not necessarily have to be. Surface Water Source: This is the name of the water body from which the pump withdraws water (e.g. SFWMD C-51, Lake Worth Drainage District Canal E-3, Un-named canal, onsite lake). Local Drainage District: If the project is located in a local drainage or “298” district, such as Lake Worth Drainage District, Indian Trails Water Control District, etc., please identify it. Existing or Proposed: If the pump is proposed enter the date of expected operation. If it is an existing pump, enter the date it was installed if you know it. Pump Type: Typical choices are: Centrifugal Diesel Turbine Axial Flow Submersible Suction Electric turbine Hydraulic Other (specify) Pump Capacity: The amount of water the pump can produce in gallons per minute (GPM). Pump Horsepower: Horsepower rating of the pump. Pump Diameter: Size of the intake opening of the pump, in inches. Pump Intake Elevation: The elevation from which the pump can produce water without cavitating. Status: Primary Secondary (i.e. a production pump that is rotated) Standby (i.e. used for freeze protection or emergency) Purpose: What will the water be used for (typical choices are as follows): Dairy Irrigation Air Conditioning Swimming Pool Heating Aquaculture Freeze Protection Irrigation/Lake Recharge Mining/Dewatering Livestock Industrial Aquifer Storage and Recovery Aquifer Remediation and Recovery Other (specify) Two way pump: Can the pump be used for both intake of irrigation water and discharge of storm water? Flow Measurement Method: Describe how the amount of water produced by the pump will be measured as per Section 4.1.1. of the Applicant’s Handbook. Date Last Calibrated: When was the flow measurement method last calibrated? ATTACH the calibration report. Planar coordinates: The Florida State Plane System (Planar Coordinates) should be submitted if you have a land survey which identifies the location of the pump in terms of those measurements. If you do not know what these are, it is not necessary to include them. Section / Township / Range: The section, township and range in which the pump is located. Page 7 of 10 Incorporated by reference in rule 40E-2.101 (F.A.C.) Form 1379 (2014-07) SUMMARY OF SURFACE WATER (CULVERT) FACILITIES Culvert Name or Number Map Designation Surface Water Source Local Drainage District (if applicable) Existing or Proposed Date of Proposed Construction Date installed if Existing Culvert type (for list see Instructions) Culvert length (Feet) Culvert Cross-section Culvert Diameter (inches) Culvert Height (inches) Culvert Width (inches) Invert Elevation (Feet NGVD) Type of Control Device (for list see Instructions) Status (see Instructions) Purpose (see Instructions) Two way culvert? (yes / no) Water Use Accounting Method (see Instructions) Date Last Calibrated (if known) Planar Coordinates (if known - see instructions) Section / Township / Range Page 8 of 10 Incorporated by reference in rule 40E-2.101 (F.A.C.) Form 1379 (2014-07) Instructions for Completing Surface Water (Culverts) Section Culvert Name or Number: The Applicant’s designation of the culvert. How do you refer to it? Map Designation: This is how the culvert is labeled on the map submitted with the application. This may be the same as Culvert Name or Number, but does not necessarily have to be. Surface Water Source: This is the name of the water body from which the culvert withdraws water (e.g. SFWMD C-51, Lake Worth Drainage District Canal E-3, Un-named canal, onsite lake). Local Drainage District: If the project is located in a local drainage or “298” district, such as Lake Worth Drainage District, Indian Trails Water Control District, etc., please identify it. Existing or Proposed: If the culvert is proposed enter the date of expected operation. If existing, enter the date it was installed (if known). Culvert Type: Corrugated; Metal pipe; Reinforced concrete pipe; Steel pipe Culvert Length: Distance between the ends of the culvert in feet. Culvert Cross-section: Is the culvert round, elliptical, rectangular, or other? Culvert Diameter: If the culvert is round, the inside diameter of the culvert, in inches. Culvert Height: If the culvert is not round, the inside height of the culvert, in inches. Culvert Width: If the culvert is not round, the inside width of the culvert, in inches. Invert Elevation: The lowest elevation, referenced to NGVD, at which water will flow through the culvert. Type of Control Device: What controls the flow of water through the culvert (typical choices are): Control gate; Flap gate; Flashboard riser; Gated riser; Screw gate; Slide gate; Valve; Other (specify) Status: Primary; Secondary (i.e. a production pump that is rotated); Standby (i.e. used for freeze protection/ emergency) Purpose: What will the water be used for (typical choices are as follows): Dairy Irrigation Aquaculture Freeze Protection Mining/Dewatering Livestock Industrial Irrigation/Lake Recharge Other (specify) Two way culvert: Can the culvert be used for both intake of irrigation water and discharge of storm water? Flow Measurement Method: Describe how the amount of water produced by the pump will be measured as per Section 4.1.1. of the Applicant’s Handbook. Date Last Calibrated: When was the flow measurement method last calibrated? ATTACH the calibration report. Planar coordinates: The Florida State Plane System (Planar Coordinates) should be submitted if you have a land survey which identifies the location of the culvert in terms of those measurements. If you do not know what these are, it is not necessary to include them. Section / Township / Range: The section, township and range in which the culvert is located. Page 9 of 10 Incorporated by reference in rule 40E-2.101 (F.A.C.) Form 1379 (2014-07) SECTION V – EVALUATION OF RECLAIMED WATER FEASIBILITY The applicant is required to evaluate the feasibility of utilizing reclaimed water. The feasibility analysis must be completed as outlined in the Applicant’s Handbook, subsection 2.2.4.  Feasibility analysis attached  Not applicable (i.e. no lines in area, crop type restriction, already using reclaimed) Explanation:_____________________________________________________________________ SECTION VI – SUMMARY OF REQUESTED WATER USE Total the requested water use from each supplemental form (Agricultural, Irrigation, Commercial / Industrial, Public Water Supply, etc.) in the table below. If the multiple sources add up to more than 100%, please attach an operating plan with a detailed explanation. Requested Amounts and Source(s) of Water Source 1 Name1 ________________ (MGY2/MGM3) Source 2 Name ________________ (MGY2/MGM3) Source 3 Name ________________ (MGY2/MGM3) Source 4 Name ________________ (MGY2/MGM3) Total Requested Water Use (MGY2/MGM3) / / / / / 1 Provide the name of the water source. Examples include the Upper Floridan aquifer and the Biscayne aquifer. 2 MGY = Million gallons per year of water to be withdrawn over a 12-month time period under a 1-in-10 year drought condition (i.e. 1,500,000 gallons each day/1,000,000 = 1.5 x 365 = 547.5). 3 MGM = Maximum million gallons per month of water to be withdrawn in any single month under the 1 -in-10 year drought condition. SECTION VII – AQUIFER STORAGE AND RECOVERY (complete if applicable) 1 Aquifer Name, surface water body, water treatment plant name. Please describe any projected increases or decreases (from historical average) in the amounts stored or recovered. ___________________________________________________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________ ASR Facility Name Source of Stored Water1 Storage Aquifer Name Recovery Water Destination Estimated Demand Average/Maximum (MGD) Estimated Injected Average/Maximum (MGD) / / / / / / / / Page 10 of 10 Incorporated by reference in rule 40E-2.101 (F.A.C.) Form 1379 (2014-07) When determining whether the permit applicant has provided reasonable assurances that the conditions for issuance are met, the District will consider the projected impact of the proposed withdrawal, along with impacts from any existing legal uses and other pending applications for a water use permit. To provide these assurances, studies and/or impact evaluations may be required. Please refer to the Applicant’s Handbook (subsection 3.3) for criteria regarding impact evaluations and attach your analysis, if applicable. Impact evaluation attached Not applicable SECTION IX – APPLICANT CERTIFICATION I certify that to the best of my knowledge and belief that all of the information provided on this form and in any attachment to it is correct. I understand that any permit issued shall be subject to review and modification, enforcement action, or revocation, in whole or in part, for any material false statement in an application to continue, initiate, or modify a use, or for any material false statement in any report or statement of fact required of the permittee [Section 373.243(1), Florida Statutes]. With advance notice, I agree to provide District staff with proper identification entry to the project site for the purpose of performing analyses of the site for determining whether the conditions for issuance will be met. Further, if a permit is granted, I agree that, with advance notice, District staff with proper identification shall have permission to enter, inspect, observe, collect samples, and take measurements of permitted facilities to determine compliance with the permit conditions and permitted plans and specifications. If applicable) I authorize _____________________________________________ to act as my agent for permit application coordination. __________________________ ______________________________ ______________ APPLICANT’S NAME APPLICANT’S SIGNATURE DATE (print or type) __________________________ _______________________________ ______________ AUTHORIZED AGENT’S NAME AUTHORIZED AGENT’S SIGNATURE DATE (print or type) Please make sure to include the following with the permit application submittal: Proof of Property Control (i.e. Deed, Lease) as per the Applicant’s Handbook, subsection 2.1.1 (may be obtained via the applicable county Property Appraiser’s website) Application Fee (www.sfwmd.gov) Location/Site Map (refer to supplemental application forms for specific requirements) Supplemental Form(s) and associated supporting information (i.e. maps, calculations) Water Conservation Plan (if applicable) Diversion and Impoundment (D&I) Independent Secondary User – Letter from the D&I that demonstrates legal access, and that the use will not cause the D&I to exceed its permit allocation. SECTION VIII – IMPACT EVALUATION SECTION X – APPLICANT CHECKLIST Please wait... If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document. You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download. For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader. Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.