Loading...
HomeMy WebLinkAboutInv# 2021000023161 - Anastasia Domashova - 07/16/20211 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 Insured:Anastasia Domashova Property:270 SE 7th street Dania Beach, FL 33004 Claim Rep.:Guardian Group Claims Consulting Estimator:Guardian Group Claims Consulting Claim Number:092020024891 Policy Number:Type of Loss:Hurricane Date of Loss:10/9/2020 12:00 PM Date Received: Date Inspected:Date Entered:11/20/2020 12:38 PM Price List:FLFL8X_NOV20 Restoration/Service/Remodel Estimate:DOMASHOVA 2 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 2 All local codes and regulations have been observed while writing this estimate; the time has been taken to call the Florida Building Enforcement to ensure all pertaining permits and local standards are understood and acknowledged upon writing this estimate. Every line item in this estimate can be substantiated and is required to operate within the regulations set forth by the Florida licensing department, Federal labor laws, and safe building practices. All line items are directly related to the project. . Furthermore, all calculations can be backtested; many calculations have been included in the attachments section for transparency. The following publications were utilized while writing this estimate: 1. International Building Code 2. International Existing Building Code 3. International Energy Conservation Code 4. Florida Building Code 5. Roofing Construction and Estimating 6. National Construction Estimator 66th Edition 2018 7. 29 CFR 1926 OSHA 8. NRCA Roofing Manual 9. NRCA Guidelines for Asphalt Shingle Roof Systems 10. ASCE 7-10 11. Manufactures Specifications SIMBILITY/XACTIMATE ACTUALRIAS Symbility licenses its pricing database from the Craftsman book company one of the oldest and most respected construction pricing data providers in North America. Craftsman produces cost data for specific aspects of the construction industry. Craftsman Book Company publishes over 100 construction-related titles and has been publishing construction and reconstruction estimating pricing books since 1951. This predates any vendor of estimating software on the market today. Their customers include contractors, estimators, remodelers, custom builders, architects, engineers, adjusters, and appraisers. Labor productivity is based on a clean job site where tools are put away and secured at the end of each day. Depending on the trade, 20 to 30 minutes per eight hours is allowed for clean-up and putting away tools. Normally skilled workers spend half as much time cleaning up as do unskilled workers. As is typical in new construction, labor includes unpacking materials, in some cases unloading materials from a truck on site, some travel to pick up minor materials (e.g. a forgotten tube of caulk, or a forgotten tool), typical breaks, lay-out, planning, discussion, coordination, mobilization (many companies meet at a central location each morning to receive instructions), recording hours (including specific information needed for job costing),occasional correction of mistakes in installation, and so forth. Prices in the database do not include markup. Insurance repair markup is almost always 20 percent: 10 percent for overhead and 10 percent for profit. Source: Symbility Solutions INC White Paper: Pricing Database Adherence to Adopted Building Code and Local Ordinances Please know that Guardian Group Claims follows the adopted building code of the appropriate authority and OSHA guidelines. Incurred Cost of General Contractor Overhead & Profit The value of the contractor's overhead and profit has been included in this estimate. This is due to the complexity of the reconstruction and the amount of unrelated construction trades requiring the oversight of a General Contractor. General Overhead are expenses incurred by a General Contractor such as office rent, accounting fees, taxes, telephone, and any expenses not directly related to the project. Project Overhead as defined by the NASCLA Contractors Guide to Business, Law and Project Management Are items necessary 3 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 3 to complete the project but are not directly associated with labor and materials. These items are required and are to be paid for by the insurance company to ensure full indemnification is achieved. 4 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 4 2020-11-20-123845 Master Bath LxWxH 11' x 4' 10" x 9' 285.00 SF Walls 338.17 SF Walls & Ceiling 5.91 SY Flooring 31.67 LF Ceil. Perimeter 53.17 SF Ceiling 53.17 SF Floor 31.67 LF Floor Perimeter 43.50 SF Short Wall DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Items removed to perform work: 1. Contents - move out then reset 1.00 EA 0.00 48.87 0.00 9.78 58.65 2. Sink - single - Detach & reset 2.00 EA 0.00 122.53 0.00 49.02 294.08 3. Detach & Reset Sink faucet 2.00 EA 98.63 0.00 0.00 0.00 39.46 236.72 4. Backsplash - solid surface - Coved 8.00 LF 0.00 68.52 8.39 111.32 667.87 (seamless - permanent) 5. Remove Vanity with granite or 4.00 LF 10.61 0.00 0.00 8.48 50.92 marble top 6. Detach & Reset Countertop -14.00 SF 37.89 0.00 0.00 0.00 106.10 636.56 Granite or Marble - High grade 7. Detach & Reset P-trap assembly -2.00 EA 48.98 0.00 0.00 0.00 19.60 117.56 ABS (plastic) 8. Remove Plumbing fixture supply 4.00 EA 5.66 0.00 0.00 4.52 27.16 line 9. Install Plumbing fixture supply line 4.00 EA 0.00 11.12 0.00 8.90 53.38 10. Remove Angle stop valve 4.00 EA 5.66 0.00 0.00 4.52 27.16 11. Angle stop valve 4.00 EA 0.00 29.45 2.01 23.96 143.77 12. Bathroom mirror - Detach & reset 20.00 SF 0.00 8.95 0.00 35.80 214.80 13. Towel bar - Detach & reset 1.00 EA 0.00 16.30 0.00 3.26 19.56 14. Toilet paper dispenser - Detach &1.00 EA 0.00 31.01 0.00 6.20 37.21 reset 15. Detach & Reset Toilet 1.00 EA 201.16 0.00 0.00 0.44 40.32 241.92 16. Detach & Reset Light bar - 4 lights 1.00 EA 44.44 0.00 0.00 0.00 8.88 53.32 Work to walls: 17. Mask and prep for paint - tape only 31.67 LF 0.00 0.58 0.09 3.70 22.16 (per LF) 18. Seal the walls w/oil based/hybrid 285.00 SF 0.00 0.66 1.80 37.98 227.88 stain blocker - one coat 19. Paint the walls - two coats 285.00 SF 0.00 0.95 4.99 55.16 330.90 20. Interior door - Detach & reset -1.00 EA 0.00 24.78 0.00 4.96 29.74 slab only 21. Paint door slab only - 2 coats (per 1.00 EA 0.00 36.51 0.57 7.42 44.50 side) 5 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 5 CONTINUED - Master Bath DESCRIPTION QTY REMOVE REPLACE TOTALTAXO&PRESET 22. R&R Casing - 2 1/4"19.00 LF 0.58 2.12 1.29 10.52 63.11 23. Paint casing - two coats LF 0.00 1.41 0.00 0.00 0.00 24. Paint door/window trim & jamb - 2 1.00 EA 0.00 30.32 0.33 6.12 36.77 coats (per side) Work to floor: 25. Remove Ceramic/porcelain tile -53.17 SF 2.34 0.00 0.00 24.88 149.30 Premium grade 26. Floor leveling cement - Heavy 53.17 SF 0.00 2.58 5.32 28.50 171.00 27. Ceramic/porcelain tile - Premium 53.17 SF 0.00 15.43 37.63 171.60 1,029.64 grade Includes: Tile, grout, thinset or mastic, the use of a ceramic tile saw, and installation labor. 28. R&R Tile base 31.67 LF 2.73 12.59 8.98 98.84 593.01 Includes: Tile base, grout, mastic for tile, the use of a tile saw, and installation labor. 29. Additional labor to remove tile 53.17 SF 1.94 0.00 0.00 20.64 123.79 from concrete slab 30. Tile/stone sealer 53.17 SF 0.00 0.79 1.19 8.64 51.83 31. Clean floor - Heavy 53.17 SF 0.00 0.49 0.04 5.22 31.31 32. Install Vanity with granite or 4.00 LF 0.00 80.91 0.00 64.72 388.36 marble top Totals: Master Bath 73.07 1,029.02 6,173.94 Shower LxWxH 4' 5" x 3' 7" x 9' 144.00 SF Walls 159.83 SF Walls & Ceiling 1.76 SY Flooring 16.00 LF Ceil. Perimeter 15.83 SF Ceiling 15.83 SF Floor 16.00 LF Floor Perimeter 32.25 SF Short Wall DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 33. Detach & Reset Shower faucet -1.00 EA 64.11 0.00 0.00 0.00 12.82 76.93 Standard grade 34. R&R Tile shower - 121 to 150 SF -1.00 EA 304.78 2,619.86 97.03 604.34 3,626.01 High grade 35. R&R 1/2" Cement board 144.00 SF 0.93 3.21 12.90 121.80 730.86 36. Shower pan 1.00 EA 0.00 139.43 3.24 28.52 171.19 37. R&R Mortar bed for tile floors 15.83 SF 1.53 3.85 2.14 17.46 104.77 38. R&R Floor drain - tub/shower -1.00 EA 8.48 36.40 0.68 9.12 54.68 metal/plastic 6 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 6 CONTINUED - Shower DESCRIPTION QTY REMOVE REPLACE TOTALTAXO&PRESET 39. R&R Custom shower door &40.00 SF 2.12 49.15 101.50 430.46 2,582.76 partition - 1/2" glass - frameless 40. Tile shower - regrout 1.00 EA 0.00 127.38 0.81 25.64 153.83 41. Seal grout on tile wall 80.00 SF 0.00 1.02 0.90 16.50 99.00 Totals: Shower 219.20 1,266.66 7,600.03 Master Bedroom LxWxH 15' 5" x 14' 4" x 8' 476.00 SF Walls 696.97 SF Walls & Ceiling 24.55 SY Flooring 59.50 LF Ceil. Perimeter 220.97 SF Ceiling 220.97 SF Floor 59.50 LF Floor Perimeter 114.67 SF Short Wall Subroom 1: entry LxWxH 5' 6" x 3' x 8' 136.00 SF Walls 152.50 SF Walls & Ceiling 1.83 SY Flooring 17.00 LF Ceil. Perimeter 16.50 SF Ceiling 16.50 SF Floor 17.00 LF Floor Perimeter 24.00 SF Short Wall Subroom 2: offset LxWxH 3' 4" x 2' 5" x 8' 92.00 SF Walls 100.06 SF Walls & Ceiling 0.90 SY Flooring 11.50 LF Ceil. Perimeter 8.06 SF Ceiling 8.06 SF Floor 11.50 LF Floor Perimeter 19.33 SF Short Wall DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Items removed to perform work: 42. Content Manipulation charge - per 2.00 HR 0.00 35.83 0.00 14.34 86.00 hour 43. Detach & Reset Window drapery -4.00 EA 33.13 0.00 0.00 0.00 26.50 159.02 hardware - single rod - Small 44. Detach & Reset Window drapery -4.00 EA 33.13 0.00 0.00 0.00 26.50 159.02 hardware - single rod - Large Work to walls: 7 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 7 CONTINUED - Master Bedroom DESCRIPTION QTY REMOVE REPLACE TOTALTAXO&PRESET 45. Remove 1/2" drywall - hung,32.00 SF 0.47 0.00 0.00 3.00 18.04 taped, floated, ready for paint 46. 1/2" drywall - hung, taped, floated,35.20 SF 0.00 2.35 1.16 16.78 100.66 ready for paint 47. R&R Batt insulation - 6" - R19 -32.00 SF 0.33 0.94 1.30 8.40 50.34 unfaced batt 48. Apply plant-based anti-microbial 32.00 SF 0.00 0.24 0.11 1.56 9.35 agent to the surface area 49. Mask and prep for paint - tape only 88.00 LF 0.00 0.58 0.25 10.26 61.55 (per LF) 50. Seal the walls w/oil based/hybrid 704.00 SF 0.00 0.66 4.44 93.80 562.88 stain blocker - one coat 51. Paint the walls - two coats 704.00 SF 0.00 0.95 12.32 136.22 817.34 Work to floor: 52. R&R Snaplock Laminate -245.53 SF 1.33 7.85 83.01 467.40 2,804.37 simulated wood flooring - High grade 53. Vapor barrier - 15# felt 245.53 SF 0.00 0.30 1.03 14.94 89.63 54. Clean floor - Heavy 220.97 SF 0.00 0.49 0.15 21.70 130.13 55. R&R Baseboard - 4 1/4"88.00 LF 0.52 4.10 11.09 83.54 501.19 56. Seal & paint baseboard - two coats 88.00 LF 0.00 1.44 0.68 25.48 152.88 57. Window drapery - hardware -1.00 EA 0.00 33.13 0.00 6.62 39.75 Detach & reset 58. Remove and rehang drapery - per 1.00 HR 0.00 60.46 1.45 12.10 74.01 hour 59. Clean drapes - flat - lined - large -4.00 EA 0.00 37.01 3.55 29.60 181.19 Full service 60. Interior door - Detach & reset -1.00 EA 0.00 24.78 0.00 4.96 29.74 slab only 61. Paint door slab only - 2 coats (per 1.00 EA 0.00 36.51 0.57 7.42 44.50 side) 62. R&R Casing - 2 1/4"19.00 LF 0.58 2.12 1.29 10.52 63.11 63. Paint casing - two coats LF 0.00 1.41 0.00 0.00 0.00 64. Paint door/window trim & jamb - 2 1.00 EA 0.00 30.32 0.33 6.12 36.77 coats (per side) Totals: Master Bedroom 122.73 1,027.76 6,171.47 8 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 8 Linen Closet LxWxH 2' x 2' x 8' 64.00 SF Walls 68.00 SF Walls & Ceiling 0.44 SY Flooring 8.00 LF Ceil. Perimeter 4.00 SF Ceiling 4.00 SF Floor 8.00 LF Floor Perimeter 16.00 SF Short Wall DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Items removed to perform work: 65. Shelving - Detach & reset 12.00 LF 0.00 9.31 0.02 22.34 134.08 Work to walls: 66. Mask and prep for paint - tape only 8.00 LF 0.00 0.58 0.02 0.92 5.58 (per LF) 67. Seal the walls w/oil based/hybrid 64.00 SF 0.00 0.66 0.40 8.52 51.16 stain blocker - one coat 68. Paint the walls - two coats 64.00 SF 0.00 0.95 1.12 12.38 74.30 Work to floor: Work to floor: 69. R&R Snaplock Laminate -4.00 SF 1.33 7.85 1.35 7.62 45.69 simulated wood flooring - High grade 70. Vapor barrier - 15# felt 4.00 SF 0.00 0.30 0.02 0.24 1.46 71. Clean floor - Heavy 4.00 SF 0.00 0.49 0.00 0.40 2.36 72. R&R Baseboard - 4 1/4"8.00 LF 0.52 4.10 1.01 7.60 45.57 73. Seal & paint baseboard - two coats 8.00 LF 0.00 1.44 0.06 2.32 13.90 Totals: Linen Closet 4.00 62.34 374.10 Master closet LxWxH 5' 5" x 5' 1" x 8' 168.00 SF Walls 195.53 SF Walls & Ceiling 3.06 SY Flooring 21.00 LF Ceil. Perimeter 27.53 SF Ceiling 27.53 SF Floor 21.00 LF Floor Perimeter 40.67 SF Short Wall DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Items removed to perform work: 74. Organized closet shelving 80.00 SF 0.00 10.72 17.53 175.02 1,050.15 Work to walls: 9 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 9 CONTINUED - Master closet DESCRIPTION QTY REMOVE REPLACE TOTALTAXO&PRESET 75. Mask and prep for paint - tape only 21.00 LF 0.00 0.58 0.06 2.46 14.70 (per LF) 76. Seal the walls w/oil based/hybrid 168.00 SF 0.00 0.66 1.06 22.40 134.34 stain blocker - one coat 77. Paint the walls - two coats 168.00 SF 0.00 0.95 2.94 32.50 195.04 Work to floor: 78. R&R Snaplock Laminate -27.53 SF 1.33 7.85 9.31 52.40 314.43 simulated wood flooring - High grade 79. Vapor barrier - 15# felt 27.53 SF 0.00 0.30 0.12 1.68 10.06 80. Clean floor - Heavy 27.53 SF 0.00 0.49 0.02 2.70 16.21 81. R&R Baseboard - 4 1/4"21.00 LF 0.52 4.10 2.65 19.94 119.61 82. Seal & paint baseboard - two coats 21.00 LF 0.00 1.44 0.16 6.08 36.48 83. Interior door - Detach & reset -1.00 EA 0.00 24.78 0.00 4.96 29.74 slab only 84. Paint door slab only - 2 coats (per 1.00 EA 0.00 36.51 0.57 7.42 44.50 side) 85. R&R Casing - 2 1/4"19.00 LF 0.58 2.12 1.29 10.52 63.11 86. Paint casing - two coats LF 0.00 1.41 0.00 0.00 0.00 87. Paint door/window trim & jamb - 2 1.00 EA 0.00 30.32 0.33 6.12 36.77 coats (per side) Totals: Master closet 36.04 344.20 2,065.14 Generals DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Delivery and Set-up: The following line items are to address the pre-construction phase of the project to include but not limited to transporting equipment, creating staging areas, meeting with Owner/Management/HOA to coordinate logistics as well as establish safety protocols. This line item requirement is also to ensure a team member is on site as all supporting equipment, materials, and personnel first arrive at the work site. 88. Delivery charge (Bid item)1.00 EA 0.00 450.00 0.00 90.00 540.00 89. Job-site cargo container - pick 1.00 EA 0.00 99.40 6.96 21.28 127.64 up/del. (each way) 16'-40' 90. Job-site cargo/storage container -1.00 MO 0.00 87.83 6.15 18.80 112.78 20' long - per month This will be used to store the contents of the rooms where work is being performed. 91. Provide TV box, packing paper &1.00 EA 0.00 11.98 0.84 2.56 15.38 tape 92. Provide furniture lightweight 5.00 EA 0.00 5.54 1.94 5.92 35.56 blanket/pad 10 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 10 CONTINUED - Generals DESCRIPTION QTY REMOVE REPLACE TOTALTAXO&PRESET 93. Bubble Wrap - Add-on cost for 600.00 LF 0.00 0.18 7.56 23.12 138.68 fragile items 94. Evaluate pack & inventory misc 10.00 EA 0.00 6.92 1.35 14.12 84.67 items - per Sml box 95. Evaluate pack & inventory bric-a-10.00 EA 0.00 9.59 1.99 19.58 117.47 brac - per Med box 96. Evaluate pack & inventory misc 10.00 EA 0.00 11.18 2.57 22.88 137.25 items - per Lg box 97. Evaluate pack & inventory misc 4.00 EA 0.00 14.53 1.27 11.88 71.27 items - per Xlg box 98. Provide wardrobe box, packing 10.00 EA 0.00 10.95 7.67 23.44 140.61 paper & tape - medium size 99. Provide mattress box, packing 1.00 EA 0.00 22.57 1.58 4.84 28.99 paper & tape - queen size 100. Provide picture-frame box,2.00 EA 0.00 5.02 0.70 2.14 12.88 packing paper & tape 101. Provide book box, packing paper 20.00 EA 0.00 2.23 3.12 9.54 57.26 & tape "Dust Control" throughout the restoration period: 102. Dust control barrier - tension post 3.00 DA 3.30 0.00 0.00 1.98 11.88 - per day 103. Dust control barrier per square 300.00 SF 0.47 0.00 1.47 28.50 170.97 foot Mandatory required cleaning of the HVAC system - post/final construction: 104. Clean register - heat / AC 10.00 EA 0.00 3.32 0.04 6.64 39.88 105. Clean ductwork - Interior - Heavy 10.00 EA 0.00 35.25 0.06 70.52 423.08 clean (PER REGISTER) The following is required for the clean / decon of the ac unit: 106. HVAC Technician - per hour 2.00 HR 0.00 80.18 0.00 32.08 192.44 Administative costs: 107. Residential Supervision / Project 24.00 HR 0.00 62.50 0.00 300.00 1,800.00 Management - per hour Team member to meet with crews mobilizing at pre construction and coordinates with Owner/Management/HOA to coordinate and walk though all levels of construction. Establish locations for all equipment and materials to be stored in conjunction with the needs of the civilians that occupy the space. 108. Taxes, insurance, permits & fees 1.00 EA 0.00 0.00 0.00 0.00 0.00 (Bid Item) 109. Per attached invoice from Ericas 1.00 EA 0.00 528.97 0.00 105.80 634.77 Plumbing Totals: Generals 45.27 815.62 4,893.46 Line Item Totals: 2020-11-20-123845 500.31 4,545.60 27,278.14 11 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 11 Grand Total Areas: 1,365.00 SF Walls 346.06 SF Ceiling SF Walls and Ceiling1,711.06 346.06 SF Floor 38.45 SY Flooring 164.67 LF Floor Perimeter 0.00 SF Long Wall 290.42 SF Short Wall 164.67 LF Ceil. Perimeter 0.00 Floor Area 0.00 Total Area 0.00 Interior Wall Area 0.00 Exterior Wall Area 0.00 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length Coverage Item Total %ACV Total % Dwelling 27,022.94 99.06%27,022.94 99.06% Other Structures 0.00 0.00%0.00 0.00% Contents 255.20 0.94%255.20 0.94% Total 27,278.14 100.00%27,278.14 100.00% 12 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 12 Summary for Dwelling Line Item Total 22,023.73 Material Sales Tax 482.20 Storage Rental Tax 13.11 Subtotal 22,519.04 Overhead 2,251.95 Profit 2,251.95 Replacement Cost Value $27,022.94 Net Claim $27,022.94 Guardian Group Claims Consulting 13 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 13 Summary for Contents Line Item Total 208.50 Overhead 20.85 Profit 20.85 Laundering Tax 5.00 Replacement Cost Value $255.20 Net Claim $255.20 Guardian Group Claims Consulting 14 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 14 Recap of Taxes, Overhead and Profit Overhead (10%)Profit (10%)Material Sales Tax Laundering Tax (2%)Manuf. Home Tax Storage Rental Tax (7%)(6%)(7%) Line Items 2,272.80 2,272.80 482.20 5.00 0.00 13.11 Total 2,272.80 2,272.80 482.20 5.00 0.00 13.11 15 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 15 Recap by Room Estimate: 2020-11-20-123845 Master Bath 5,071.85 22.81% Coverage: Dwelling 100.00% =5,071.85 Shower 6,114.17 27.50% Coverage: Dwelling 100.00% =6,114.17 Master Bedroom 5,020.98 22.58% Coverage: Dwelling 95.85% =4,812.48 Coverage: Contents 4.15% =208.50 Linen Closet 307.76 1.38% Coverage: Dwelling 100.00% =307.76 Master closet 1,684.90 7.58% Coverage: Dwelling 100.00% =1,684.90 Generals 4,032.57 18.14% Coverage: Dwelling 100.00% =4,032.57 Subtotal of Areas 100.00%22,232.23 Coverage: Dwelling 99.06% =22,023.73 Coverage: Contents 0.94% =208.50 Total 22,232.23 100.00% 16 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 16 Recap by Category O&P Items Total % CABINETRY 1,402.26 5.14% Coverage: Dwelling @ 100.00% =1,402.26 CONT: GARMENT & SOFT GOODS CLN 208.50 0.76% Coverage: Contents @ 100.00% =208.50 CLEANING 535.48 1.96% Coverage: Dwelling @ 100.00% =535.48 CONTENT MANIPULATION 120.53 0.44% Coverage: Dwelling @ 100.00% =120.53 CONT: PACKING,HANDLNG,STORAGE 856.64 3.14% Coverage: Dwelling @ 100.00% =856.64 GENERAL DEMOLITION 1,596.83 5.85% Coverage: Dwelling @ 100.00% =1,596.83 DOORS 74.34 0.27% Coverage: Dwelling @ 100.00% =74.34 DRYWALL 82.72 0.30% Coverage: Dwelling @ 100.00% =82.72 FLOOR COVERING - CERAMIC TILE 638.86 2.34% Coverage: Dwelling @ 100.00% =638.86 FLOOR COVERING - WOOD 2,258.04 8.28% Coverage: Dwelling @ 100.00% =2,258.04 PERMITS AND FEES 450.00 1.65% Coverage: Dwelling @ 100.00% =450.00 FINISH CARPENTRY / TRIMWORK 1,569.86 5.76% Coverage: Dwelling @ 100.00% =1,569.86 FINISH HARDWARE 16.30 0.06% Coverage: Dwelling @ 100.00% =16.30 HEAT, VENT & AIR CONDITIONING 160.36 0.59% Coverage: Dwelling @ 100.00% =160.36 INSULATION 30.08 0.11% Coverage: Dwelling @ 100.00% =30.08 LABOR ONLY 1,500.00 5.50% Coverage: Dwelling @ 100.00% =1,500.00 LIGHT FIXTURES 44.44 0.16% Coverage: Dwelling @ 100.00% =44.44 MIRRORS & SHOWER DOORS 1,966.00 7.21% Coverage: Dwelling @ 100.00% =1,966.00 PLUMBING 1,672.63 6.13% Coverage: Dwelling @ 100.00% =1,672.63 PAINTING 2,421.01 8.88% Coverage: Dwelling @ 100.00% =2,421.01 TOILET & BATH ACCESSORIES 210.01 0.77% Coverage: Dwelling @ 100.00% =210.01 17 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 17 O&P Items Total % TILE 4,111.49 15.07% Coverage: Dwelling @ 100.00% =4,111.49 WINDOW TREATMENT 298.17 1.09% Coverage: Dwelling @ 100.00% =298.17 WATER EXTRACTION & REMEDIATION 7.68 0.03% Coverage: Dwelling @ 100.00% =7.68 O&P Items Subtotal 22,232.23 81.50% Material Sales Tax 482.20 1.77% Coverage: Dwelling @ 100.00% =482.20 Storage Rental Tax 13.11 0.05% Coverage: Dwelling @ 100.00% =13.11 Overhead 2,272.80 8.33% Coverage: Dwelling @ 99.08% =2,251.95 Coverage: Contents @ 0.92% =20.85 Profit 2,272.80 8.33% Coverage: Dwelling @ 99.08% =2,251.95 Coverage: Contents @ 0.92% =20.85 Laundering Tax 5.00 0.02% Coverage: Contents @ 100.00% =5.00 Total 27,278.14 100.00% Thank you for taking the time to review this estimate. Should you have any questions regarding this estimate, please contact those that have provided you this estimate. This analysis is limited to the information provided and the current conditions at the time of the physical inspection. This estimate does not include allowances for required repairs uncovered during the performance of repairs or emergency/temporary repairs unless noted within the estimate. This estimate does not include allowances for required code upgrades unless noted within the estimate. We did not perform any destructive testing or dismantling of building components during our field inspections. We reserves the right to modify and or amend our analysis in the event additional information becomes available. Unit pricing is subject to market conditions at the time of the loss or at the time of the estimate production and may differ from the actual cost of repair. Given the scope of work and time frame to prepare this estimate any errors in measurement or scope is an unintentional act and every required correction will be honored in a timely manner. 18 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 18 1 Master Bath - 1-Image1 Date Taken: 11/20/2020 Taken By: Patrick Corona 19 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 19 2 Master Bath - 2-Image2 Date Taken: 11/20/2020 Taken By: Patrick Corona 20 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 20 3 Master Bath - 3-Image3 Date Taken: 11/20/2020 Taken By: Patrick Corona 21 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 21 4 Master Bath - 4-Image4 Date Taken: 11/20/2020 Taken By: Patrick Corona 22 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 22 5 Master Bath - 5-Image5 Date Taken: 11/20/2020 Taken By: Patrick Corona 23 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 23 6 Master Bath - 6-Image6 Date Taken: 11/20/2020 Taken By: Patrick Corona 24 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 24 7 Master Bath - 7-Image21 Date Taken: 11/20/2020 Taken By: Patrick Corona 25 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 25 8 shower - 22-Image22 Date Taken: 11/20/2020 Taken By: Patrick Corona 26 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 26 9 shower - 23-Image23 Date Taken: 11/20/2020 Taken By: Patrick Corona 27 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 27 10 shower - 24-Image24 Date Taken: 11/20/2020 Taken By: Patrick Corona 28 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 28 11 shower - 25-Image25 Date Taken: 11/20/2020 Taken By: Patrick Corona 29 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 29 12 shower - 26-Image26 Date Taken: 11/20/2020 Taken By: Patrick Corona 30 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 30 13 Master Bedroom - 8-Image7 Date Taken: 11/20/2020 Taken By: Patrick Corona 31 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 31 14 Master Bedroom - 9-Image8 Date Taken: 11/20/2020 Taken By: Patrick Corona 32 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 32 15 Master Bedroom - 10-Image9 Date Taken: 11/20/2020 Taken By: Patrick Corona 33 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 33 16 Master Bedroom - 11-Image10 Date Taken: 11/20/2020 Taken By: Patrick Corona 34 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 34 17 Master Bedroom - 12-Image11 Date Taken: 11/20/2020 Taken By: Patrick Corona 35 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 35 18 Master Bedroom - 13-Image12 Date Taken: 11/20/2020 Taken By: Patrick Corona 36 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 36 19 Master Bedroom - 14-Image13 Date Taken: 11/20/2020 Taken By: Patrick Corona 37 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 37 20 Master Bedroom - 15-Image14 Date Taken: 11/20/2020 Taken By: Patrick Corona 38 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 38 21 Master Bedroom - 16-Image15 Date Taken: 11/20/2020 Taken By: Patrick Corona 39 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 39 22 Master Bedroom - 17-Image16 Date Taken: 11/20/2020 Taken By: Patrick Corona 40 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 40 23 Master Bedroom - 18-Image17 Date Taken: 11/20/2020 Taken By: Patrick Corona 41 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 41 24 Master Closet - 19-Image18 Date Taken: 11/20/2020 Taken By: Patrick Corona 42 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 42 25 Master Closet - 20-Image19 Date Taken: 11/20/2020 Taken By: Patrick Corona 43 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 43 26 Master Closet - 21-Image20 Date Taken: 11/20/2020 Taken By: Patrick Corona 44 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 44 27 linen closet - 27-Image27 Date Taken: 11/20/2020 Taken By: Patrick Corona 45 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 45 28 linen closet - 28-Image28 Date Taken: 11/20/2020 Taken By: Patrick Corona 46 The Guardian Group 501 East Las Olas Blvd Suite 300 Fort Lauderdale FL 33301 DOMASHOVA 12/10/2020 Page: 46 29 linen closet - 29-Image29 Date Taken: 11/20/2020 Taken By: Patrick Corona