Loading...
HomeMy WebLinkAboutInv# 89821 - CALVIN, GIORDANO & ASSOCIATES, INC. - 09/30/2021CITY OF DANIA BEACH (820)Invoice number 89821 Invoice date 09/30/2021 Page 1 of 10 09/22/2021 1.00 130.00 130.00 09/20/2021 1.00 130.00 130.00 Review and prepare Change Orders for line stops and unforeseen conditions on SE 1st St. Review CO 007 regarding impacted Contractor time for tie-in at SE 1st St / SE 1st Ave. Discuss cost breakdown with Client. 09/16/2021 0.75 130.00 97.50 Prep/Negotiating Chng Orders Discuss potential budget overage with City Engineer and prepare change order summary to date with descriptions and costs of each, as requested. 09/14/2021 1.00 130.00 130.00 Prepare budget reconciliation spreadsheet at City's request to determine potential budget overage and how to mitigate it. 09/13/2021 1.50 130.00 195.00 General Project Supervision Project Manager (IV) Nicholas Kanelidis - project management coordination with Bernnon -- went over status of the project and how we will proceed for the month of October / remaining of the projects; continued downloading photos 09/30/2021 0.75 130.00 97.50 - project management -- 09/23/2021 1.00 130.00 130.00 - meeting onsite with PSD, City Finance Director, and CGA to discuss the reason we need linestops, existing water valve conditions, and how to proceed 09/13/2021 1.00 130.00 130.00 General Project Supervision Project Manager (IV) Subtotal 2.75 357.50 Heidi B. Henderson Date Hours Rate Billed Amount Labor SE 2ND AVE & SE 7TH ST WM (WATER) Billing period through September 30, 2021 CGA PM: Jenna Martinetti RFQ# 2020-005 Email: AP@daniabeachfl.gov CC: Dincer A. Ozaydin <dozaydin@daniabeachfl.gov> CC: AJohnson@daniabeachfl.gov CC: Tstevens@daniabeachfl.gov CITY OF DANIA BEACH (820) ATTN: FINANCE DEPT 100 W. DANIA BEACH BLVD DANIA BEACH, FL 33004 Invoice number 89821 Date 09/30/2021 Project 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2 Date 09/30/2021 Invoice number 89821CITY OF DANIA BEACH (820) 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2Project CITY OF DANIA BEACH (820)Invoice number 89821 Invoice date 09/30/2021 Page 2 of 10 09/14/2021 1.50 130.00 195.00 - Team meeting to discuss the status of the project; cancelled meetings for 16th and the 23rd; site visit -- Contractor has installed about 340 LF of pipe; notified Contractor that soils have been tracked into the parking lot where the trucks were removing and delivering fill adjacent to the marina; Contractor has requested a sweeping truck to be delivered to the site; I advised them to install the turbidity barrier at the south before they begin sweeping since it will drain into the marina; also notified the Contractor that the north turbidity barrier is unhinged at south side 09/09/2021 2.00 130.00 260.00 - project management -- team coordination call in the morning; Contractor installed 60 LF of pipe which is a total of 260 LF to date; densities on the base have not occured yet -- they are still preparing the site in the area; the slab for the OF structure will not be completed until October; turbidity barrier is in place at OF and is being checked to make sure it stays fastened to the seawall; Contractor is aiming to open up parking in phases so they do not wait until the end 09/02/2021 2.50 130.00 325.00 General Project Supervision Project Manager (IV) Heidi B. Henderson Updating PM tracking spreadsheet 09/27/2021 1.00 75.00 75.00 Administration Administrative Assistant/Clerical Amanda LaFevers Date Hours Rate Billed Amount Labor OCEAN PARK DRAINAGE (STORMWATER) Respond to FDEP regarding certification request documents. Review approval letter from FDEP and distribute to Contractor. 09/07/2021 0.50 130.00 65.00 Record Drawings/Certifications Review and provide comments on FO 011 and 012 regarding repair clamps and hot connections. 09/30/2021 1.00 130.00 130.00 09/28/2021 1.00 130.00 130.00 Phone conference with Client and Contractor regarding line-stops and coming up with a pay item for unforeseen hot connections where City cannot shut down WM. Continue reviewing and preparing the change order for the line-stops. 09/27/2021 1.50 130.00 195.00 Meet with Client and CEI to review line-stop change order and to plan for City Commission. Begin preparing change order form. 09/24/2021 1.50 130.00 195.00 Phone conference with Client and Contractor to review remaining budget against line stop change order. Game plan for Commission Agenda. Prep/Negotiating Chng Orders Project Manager (IV) Subtotal 10.75 1,397.50 Nicholas Kanelidis Date Hours Rate Billed Amount Labor SE 2ND AVE & SE 7TH ST WM (WATER) subtotal 1,755.00 SE 2ND AVE & SE 7TH ST WM (WATER) Date 09/30/2021 Invoice number 89821CITY OF DANIA BEACH (820) 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2Project CITY OF DANIA BEACH (820)Invoice number 89821 Invoice date 09/30/2021 Page 3 of 10 09/15/2021 Bernnon Artola CEI Project Administrator 3.00 130.00 390.00 09/20/2021 Bernnon Artola CEI Project Administrator Contractor continued transfer 2.00 130.00 260.00 09/21/2021 Bernnon Artola CEI Project Administrator 2.00 130.00 260.00 09/22/2021 Bernnon Artola CEI Project Administrator 2.00 130.00 260.00 09/27/2021 Bernnon Artola CEI Project Administrator Contractor completed the last two transfer 09/17/2021 Bernnon Artola CEI Project Administrator Contractor commenced transfer 1.50 130.00 195.00 Subconsultant Services 4.00 130.00 520.00 09/30/2021 ALLY ENGINEERING SERVICES, INC. Units Rate Billed Amount Consultant - project management -- downloading photos for our files; coordination with Bernnon on the status of the project 09/29/2021 0.50 130.00 65.00 - project management -- Contractor has installed the pipe leading to CB-2, installed CB-1; mudding in the existing pipe from the west into CB-2; they will begin pavement restoration once pipe installation has been completed; project tracking and saving photos 09/28/2021 2.00 130.00 260.00 09/27/2021 0.25 130.00 32.50 - coordination with Bernnon concerning Contractor's schedule for this week; reviewed revised as-built; correspondence with Contractor - received a complaint from the City; contacted resident with a complaint; contacted Contractor and had a conference call and asked the Contractor to go onsite to rectify the situation 09/24/2021 0.50 130.00 65.00 - project management -- met Contractor (Julio, Albert, and Ricky) onsite; contractor was checking the cross slope to CB-4 to investigate the slope to the inlet in case adjustments may need to be made; CB-3 was installed this week and they are proceeding north; sweeper is still not onsite but reminded them again the the dirt north of marina office needs to be removed but make sure the turbidity barrier is in place beforehand to avoid a plume in the bay 09/16/2021 1.00 130.00 130.00 - project management -- Contractor has installed 375 LF to date; today that are installing the 20LF prior to CB- 3, CB-3, and proceeding north; both turbidity barriers are installed; Contractor will have the sweeper onsite tomorrow PM; Contractor is having barricades delievered in order to begin the restoration of the parking spaces General Project Supervision Project Manager (IV) Subtotal 10.25 1,332.50 Heidi B. Henderson Date Hours Rate Billed Amount Labor OCEAN PARK DRAINAGE (STORMWATER) Date 09/30/2021 Invoice number 89821CITY OF DANIA BEACH (820) 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2Project CITY OF DANIA BEACH (820)Invoice number 89821 Invoice date 09/30/2021 Page 4 of 10 09/21/2021 Bernnon Artola CEI Project Administrator Contractor installed 60 LF of Pipe towards CB-2. Marina Crossing is re-opened 1.00 130.00 130.00 09/22/2021 Bernnon Artola CEI Project Administrator Contractor installed 40 LF of pipe towards CB-2. 3.00 130.00 390.00 09/23/2021 Bernnon Artola CEI Project Administrator Contractor installed 40 LF of Pipe; CEI Coordinated with Dania Beach removal of Palm in conflict with CB-2. 4.00 130.00 520.00 09/20/2021 Bernnon Artola CEI Project Administrator Contractor installed 60 LF of Pipe towards CB-2 2.00 130.00 260.00 09/17/2021 Bernnon Artola CEI Project Administrator Contractor installed 40LF from CB-4 to the north. Closed access to Marina. Subconsultant Services 1.00 130.00 130.00 09/01/2021 Bernnon Artola CEI Project Administrator Visit site; Contractor installed 20' LF of stormwater pipe. 3.00 130.00 390.00 2.00 130.00 260.00 3.00 130.00 390.00 09/07/2021 Bernnon Artola CEI Project Administrator Contractor removed and reset 20' of pipe placed on Friday and installed an additional 20' of pipe. 3.00 130.00 390.00 09/03/2021 Bernnon Artola CEI Project Administrator Contractor installed 40' LF of Watermain; swept and jobsite and secured site for holiday weekend. 2.00 130.00 260.00 09/10/2021 Bernnon Artola CEI Project Administrator Contractor reset turbidity curtain at both locations. Excavator stopped working due to hydraulic Oil line break. 1.00 130.00 130.00 09/13/2021 Bernnon Artola CEI Project Administrator Contractor received equipment and clean roadway. However, due weather no work items were performed. 2.00 130.00 260.00 09/15/2021 Bernnon Artola CEI Project Administrator Contractor installed 40 LF of Pipe and set new Structure CB-4 2.00 130.00 260.00 09/08/2021 Bernnon Artola CEI Project Administrator Contractor received 9 loads of embankment and hauled 9 loads of muck. Installed 20 LF of pipe. 09/30/2021 ALLY ENGINEERING SERVICES, INC. Units Rate Billed Amount Consultant OCEAN PARK DRAINAGE (STORMWATER) Date 09/30/2021 Invoice number 89821CITY OF DANIA BEACH (820) 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2Project CITY OF DANIA BEACH (820)Invoice number 89821 Invoice date 09/30/2021 Page 5 of 10 09/09/2021 1.00 130.00 130.00 09/02/2021 2.50 130.00 325.00 - project management -- Contractor performed three core drills in the road to confirm that the base is 8 inches thick; sidewalk was being formed; header curb will be sawcut tomorrow and sidewalk forming will be complete with wire mesh and ready for inspection in the morning; 20 loads of fill was removed from the site this week and one remains to finalize the site General Project Supervision Project Manager (IV) Heidi B. Henderson Updating PM tracking spreadsheet 09/30/2021 1.00 75.00 75.00 Updating PM tracking spreadsheet 09/29/2021 1.50 75.00 112.50 Updating PM tracking spreadsheet 09/28/2021 1.00 75.00 75.00 09/28/2021 1.00 75.00 75.00 Meeting with Heidi to go over PM logs. Starting working on logs. Administration Administrative Assistant/Clerical Subtotal 4.50 337.50 Amanda LaFevers Date Hours Rate Billed Amount Labor DANIA COVE DRAINAGE (STORMWATER) 09/24/2021 Bernnon Artola CEI Project Administrator Contractor installed 40 LF of Pipe and CB 2. Coordinate with Restaurant Management closure of Traffic Circle. Subconsultant Services 3.00 130.00 390.00 09/27/2021 Bernnon Artola CEI Project Administrator Contractor installed 16 LF of Pipe from CB2 to CB1 and set new Structure CB-1. Coordinated Closure with Broward Sherriff Office (BSO) 3.00 130.00 390.00 09/30/2021 Bernnon Artola CEI Project Administrator Contractor to complete Restoration of Pavement and begin Clean up. Open Roadway. Attend Pre-Con meeting on behalf of Dania Beach (10 AM) South Federal HWY and SE 6th Street 4.00 130.00 520.00 09/29/2021 Bernnon Artola CEI Project Administrator Contractor installed Crossing from CB-2 to CB-5 (50 LF Pipe) and set CB-5; City and BSO; Closed two sections of the road. Closure to end on 9/30 at 1 pm. 09/30/2021 Subtotal 53.50 6,955.00 ALLY ENGINEERING SERVICES, INC. Units Rate Billed Amount Consultant OCEAN PARK DRAINAGE (STORMWATER) subtotal 8,362.50 OCEAN PARK DRAINAGE (STORMWATER) Date 09/30/2021 Invoice number 89821CITY OF DANIA BEACH (820) 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2Project CITY OF DANIA BEACH (820)Invoice number 89821 Invoice date 09/30/2021 Page 6 of 10 - project management coordination with Bernnon -- went over status of the project and how we will proceed for the month of October / remaining of the projects; continued downloading photos 09/30/2021 0.75 130.00 97.50 - project management coordination with Bernnon -- went over status of the project and how we will proceed for the month of October / remaining of the projects; continued downloading photos 09/30/2021 0.75 130.00 97.50 - project management -- downloading photos for our files; coordination with Bernnon on the status of the project 09/29/2021 0.50 130.00 65.00 - project management -- Contractor is regrading the site (onsite); milling the cul-de-sac; paving is scheduled for tomorrow; sodding will be after the pavement has been completed -- end of week; confirmation of Bahia sod to Contractor; followed up with tree placement approval with Ryan St. George with City CD; project tracking and saving photos 09/28/2021 2.00 130.00 260.00 - project management -- Contractor is installing storm pipe up to the end of the parking around 320 LF 09/23/2021 1.00 130.00 130.00 09/23/2021 3.50 130.00 455.00 - project management -- Contractor is cleaning up the site; base has been corrected sinceTuesdays's base inspection (except in the middle where cars are backing out); reviewed the updated as-built; sent comments to the team and requested revision and status of water meter box; sent the new tree locations to the City for approval - project management -- 09/21/2021 3.00 130.00 390.00 - project management -- base inspection -- majority looked good but a few areas need to be completed 09/21/2021 2.00 130.00 260.00 - coordination with Bernnon on base inspection scheduled; Contractor not ready; correspondence and coordination with BC Utilities concerning the adjustment of the meter box in the residential property -- City can adjust it as long as it is no more than 9-inches 09/17/2021 1.00 130.00 130.00 - project management -- onsite meeting with CGA; reviewed drainage as-builts; correspondence with team on pending items and revisions needed to be made to as-built; correspondence on BC on raising the water meter box at 4437 SW 25th Terrace due to the fill places on their lawn 09/16/2021 3.00 130.00 390.00 - coordination with Bernnon 09/15/2021 0.25 130.00 32.50 09/14/2021 2.00 130.00 260.00 - project management -- Contractor is continuing to regrade the site and clean up the site; call with the Owner and Superintendent to discuss when the project will be completed -- they said this Friday; discussed with Bernnon and we will need to do further inspections of the base prior to the paving and completion of the project - review of as-builts and team coordination and correspondence 09/13/2021 1.00 130.00 130.00 - onsite meeting with Contractor, CGA, and PSD 09/10/2021 2.00 130.00 260.00 - coordination for the onsite meeting tomorrow 09/09/2021 0.25 130.00 32.50 - Contractor installed the sidewalk at the entrance of the park and around the drainage structure collars; cut off the edge of the sidewalk near the parking area because it cracked and sawcut the remaining header curb and reinstalled the portion that had to be removed General Project Supervision Project Manager (IV) Heidi B. Henderson Date Hours Rate Billed Amount Labor DANIA COVE DRAINAGE (STORMWATER) Date 09/30/2021 Invoice number 89821CITY OF DANIA BEACH (820) 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2Project CITY OF DANIA BEACH (820)Invoice number 89821 Invoice date 09/30/2021 Page 7 of 10 09/13/2021 Bernnon Artola CEI Project Administrator Contractor continued limerock grading; suspended operations due to weather. 09/15/2021 Bernnon Artola CEI Project Administrator Contractor continued limerock grading; and grading retention areas in side park 3.00 130.00 390.00 09/17/2021 Bernnon Artola CEI Project Administrator Contractor removed broken sections of sidewalk in park and Continued Grading limerock 2.00 130.00 260.00 09/20/2021 Bernnon Artola CEI Project Administrator Contractor Continued final Preparation of Lime rock Base. Inspection on 9/20/21 2.00 130.00 260.00 2.00 130.00 260.00 1.00 130.00 130.00 3.00 130.00 390.00 09/08/2021 Bernnon Artola CEI Project Administrator Contractor completed grading of sidewalk and thickened edge. Ready for Concrete on Thursday. 2.00 130.00 260.00 09/07/2021 Bernnon Artola CEI Project Administrator CEI notified Contractor of Cracks on curb and marked areas to be sawcut and reconstructed. Contractor continued grading for sidewalk. 2.00 130.00 260.00 09/03/2021 Bernnon Artola CEI Project Administrator CEI verified sidewalk thickness at inside park. Photos sent to the City. Contractor placed 50' of reinforced sidewalk. 3.00 130.00 390.00 09/01/2021 Bernnon Artola CEI Project Administrator Contractor continued to spread and compact limerock. Subconsultant Services 2.00 130.00 260.00 09/10/2021 Bernnon Artola CEI Project Administrator Contractor replaced broken section of curb and continued grading limerock. 09/30/2021 ALLY ENGINEERING SERVICES, INC. Units Rate Billed Amount Consultant Meeting to review contractor progress and claims. 09/27/2021 1.00 130.00 130.00 General Project Supervision Project Manager (IV) Jenna Martinetti Subtotal 26.50 3,445.00 Date Hours Rate Billed Amount Labor DANIA COVE DRAINAGE (STORMWATER) Date 09/30/2021 Invoice number 89821CITY OF DANIA BEACH (820) 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2Project CITY OF DANIA BEACH (820)Invoice number 89821 Invoice date 09/30/2021 Page 8 of 10 09/01/2021 Bernnon Artola CEI Project Administrator Prepared cost analysis of Speed Hump modifications for Dania Beach and revised speed hump locations. Subconsultant Services 3.00 130.00 390.00 09/30/2021 ALLY ENGINEERING SERVICES, INC. Units Rate Billed Amount Consultant SPEED HUMP IMPROVEMENTS (ROADWAY) subtotal 390.00 SPEED HUMP IMPROVEMENTS (ROADWAY) 09/13/2021 Bernnon Artola CEI Project Administrator Contractor installed door hangers 1.00 130.00 130.00 09/08/2021 Bernnon Artola CEI Project Administrator Provided Final Changes/Quantities to city and Contractor. 1.00 130.00 130.00 3.00 130.00 390.00 09/07/2021 Bernnon Artola CEI Project Administrator Field Meeting with Contractor Foreman (RB) to review sites and discuss all changes 2.00 130.00 260.00 09/21/2021 Bernnon Artola CEI Project Administrator Performed Base inspection with Heidi/straightedge and Cross Slopes. Three repairs pending Subconsultant Services 2.00 130.00 260.00 09/30/2021 Bernnon Artola CEI Project Administrator Striping of Parking Lot (Anticipated) 09/22/2021 Bernnon Artola CEI Project Administrator Verified lime rock base repairs. Base is Accepted for Paving. Completed Sidewalk Concrete. 09/28/2021 Bernnon Artola CEI Project Administrator Milling of turn around (additional work) and Final Grading of retential areas and clean up of Base. Prepare for Paving set for 9/29/201 5.00 130.00 650.00 09/29/2021 Bernnon Artola CEI Project Administrator Contractor paved 104 Tns of Asphalt (2 lifts of 1") 2.00 130.00 260.00 09/30/2021 Subtotal 38.00 4,940.00 ALLY ENGINEERING SERVICES, INC. Units Rate Billed Amount Consultant DANIA COVE DRAINAGE (STORMWATER) subtotal 8,852.50 DANIA COVE DRAINAGE (STORMWATER) Date 09/30/2021 Invoice number 89821CITY OF DANIA BEACH (820) 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2Project CITY OF DANIA BEACH (820)Invoice number 89821 Invoice date 09/30/2021 Page 9 of 10 Invoice total 19,360.00 Date 09/30/2021 Invoice number 89821CITY OF DANIA BEACH (820) 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2Project CITY OF DANIA BEACH (820)Invoice number 89821 Invoice date 09/30/2021 Page 10 of 10 88129 08/01/2021 36,530.00 36,530.00 88560 08/31/2021 21,450.00 21,450.00 89821 09/30/2021 19,360.00 19,360.00 Total 77,340.00 19,360.00 21,450.00 36,530.00 0.00 0.00 Aging Summary Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120 99-100 REIMBURSABLES 0.00 0.00 0.00 0.00 0.00 SPEED HUMP IMPROVEMENTS (ROADWAY)5,980.00 5,525.00 390.00 5,915.00 65.00 DANIA COVE DRAINAGE (STORMWATER)30,290.00 13,877.50 8,852.50 22,730.00 7,560.00 OCEAN PARK DRAINAGE (STORMWATER)30,290.00 15,372.50 8,362.50 23,735.00 6,555.00 SE 2ND AVE & SE 7TH ST WM (WATER)24,960.00 23,205.00 1,755.00 24,960.00 0.00 Total 91,520.00 57,980.00 19,360.00 77,340.00 14,180.00 Invoice Summary Description Contract Amount Prior Billed Current Billed Total Billed Remaining