HomeMy WebLinkAboutInv# APPLICATION #2 - A.D.A. Engineering, Inc. - 08/07/2021TO OWNER : PROJECT:OCEAN PARK INTERIM DRAINAGE IMPROVEMENTS
CONTRACTOR :A/E :ADA PROJECT NO: CM04-0121-1
CONTRACTOR'S APPLICATION FOR PAYMENT
Application is made for Payment, as shown below, in connection with the Contracts
CHANGE Continuation Sheet, AIA Document G703, is attached.
ADDITION DEDUCTION 1. ORIGINAL CONTRACT SUM $253,748.44
2. NET CHANGE BY CHANGE ORDERS
3. CONTRACT SUM TO DATE (Line 1 + 2) $253,748.44
$ - $ - 4. TOTAL COMPLETED & STORED TO DATE (Column G on G703)$147,978.12
$ - $ -
5. RETAINAGE:
A. 5% COMPLETED WORK (Column D + E on G703)$7,398.91
B. 0% STORED MAT'L (Column F on G703)
Total Retainage (Line 5a + Line 5b or Total Column I of G703)
$140,579.21
BY:DATE:
$82,898.56
$57,680.65
that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance
with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED.$113,169.23
SUBSCRIBED AND SWORN TO BEFORE ME THIS
NOTARY PUBLIC:
MY COMMISSION EXPIRES:
AMMOUNT CERTIFIED:$57,680.65
(Attach explanation of amount certifed differs from the amount applied for)
ENGINEER :
By:Date:
APPLICATION #: 2
7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior
certificates)
has been completed in accordance with the Contract Documents, that all amounts have been paid by the contractor for work which previous Certificates for
In accordance with the Contract Documents, based on on-site observations and the data comprising the above application, the Architect certifies to the Owner
STATE OF: FLORIDA COUNTY OF: MIAMI-DADE
AIA DOCUMENT G702
NUMBER DATE APPROVED
CHANGE ORDERS APPROVED IN
APPROVED THIS MONTH
TOTALS
APPLICATION AND CERTIFICATE FOR PAYMENT
PERIOD TO: 8/7/21 to 9/6/21
City of Dania Beach Public Services Department
1201 Stirling Road
Dania Beach, FL 33004
Attn: Fernando Rodriguez
CRAVEN THOMPSON & ASSOCIATES, INCA.D.A. Engineering Inc.
8550 NW 33 ST, Suite 202,
Doral, FL 33122
This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor
named herein, payment and acceptance of payment are without prejudic to any rights of the Owner
or Contractor under this contract.
CRAVEN THOMPSON & ASSOCIATED, INC.
ARCHITECT/ENGINEER
9/19/2021
8. CURRENT PAYMENT DUE
DISTRIBUTION TO:
NET CHANGE BY CHANGE ORDERS
The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the work covered by this Application for Payment
CONTRACTOR: A.D.A. ENGINEERING, INC
9. BALANCE TO FINISH (Line 3 - Line 6)
6. TOTAL EARNED LESS RETAINAGE (Line 4 - Line 6)
Payment were issued and payments received from the Owner, and that current payment shown herein is now due.
CONTINUATION SHEET AIA DOCUMENT G703
APPLICATION NO:
PERIOD TO:
ADA PROJECT NO
A E G H I
QUANTITY UOM UNIT
PRICE TOTAL QUANTITY TOTAL
1 1.00 LS $18,762.86 $18,762.86 0.15 $2,814.43 $15,010.29 80% $ 750.51
2 1.00 LS $2,000.00 $2,000.00 $236.60 12% $ 11.83
2.1 $ -
3 1.00 LS $8,702.90 $8,702.90 0.333 $2,900.97 $5,801.93 67% $ 290.10
4 1.00 LS $9,693.06 $9,693.06 0.650 $6,300.49 $7,851.38 81% $ 392.57
5 1.00 LS $42,680.68 $42,680.68 0.370 $15,791.85 $33,803.10 79% $ 1,690.15
5.1 $ -
5.1 $7,751.85 $ 387.59
6 2.00 EA $7,751.85 $15,503.70 $1,192.04 8% $ 59.60
7.1 68.00 LF $17.53 $1,192.04 $ -
7.2 68.00 LF $40.29 $2,739.97 - $22,105.62 807% $ 1,105.28
8.1 762.00 LF $29.01 $22,105.62 $5,372.40 24% $ 268.62
8.2 762.00 LF $44.77 $34,114.74 395.000 $17,684.15 $28,484.15 83% $ 1,424.21
9.1 5.00 EA $2,160.00 $10,800.00 $3,064.21 28% $ 153.21
9.2 5.00 EA $3,064.21 $15,321.04 1.000 $3,064.21 $3,064.21 20% $ 153.21
10 296.00 SY $37.24 $11,023.04 - $ -
11 1,176.00 SY $3.33 $3,916.08 470.400 $1,566.43 $1,566.43 40% $ 78.32
WORK COMPLETED THIS PERIOD
ALLOWANCE FOR UTILITY AND DRAINAGE
CONFLICTS, ADDITIONAL PAVEMENT
RESTORATION, ADDITIONAL WALK
RESTORATION, ADDITIONAL DRAINAGE PIPE,
AND ADDITIONAL CURB RESTORATION (item
increased by $17,680.68 due to inline valve credit)
$ 3,752.57
FURNISH 4'-6' DIAMETER DRAINAGE STRUCTURE
INSTALL 4'-6' DIAMETER DRAINAGE STRUCTURE
FURNISH AND INSTALL 4" THICK 3000 PSI
CONCRETE WALK INCLUDING COMPACTED
SUBGRADE BENEATH
$ 7,735.79
Contractor's signed Certification attached.
In tabulations below, amounts are stated to the nearest dollar.
AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, Containing
FURNISH AND INSTALL 12”
STABILIZED SUBGRADE LBR 40 (FOR PAVEMENT
RESTORATION
$3,064.21
$ 11,023.04
FURNISH 24" HP STORM DRAINAGE PIPE 0'-6'
DEPTH (INCLUDE DEWATERING)$5,372.40
INSTALL 18" HP STORM DRAINAGE PIPE 0'-6'
DEPTH (INCLUDE DEWATERING)
APPLICATION DATE:9/19/2021
8/7/21 - 9/6/21
CM04-0121-01
BALANCE TO
FINISH
(C - G)
RETAINAGE
5.00%
$ -
$ 14,311.66
$ (19,365.65)
$ 5,630.59
$ 12,256.83
$ 2,349.65
$ 1,763.40
$1,550.89
$ 2,900.97
$ 8,877.58
$ -
$12,195.86
ITEM NO.DESCRIPTION OF WORK
$1,192.04
$22,105.62
TOTAL
COMPLETED
AND STORED TO
DATE
(D + E + F)
%
(G + C)FROM PREVIOUS
APPLICATION (D&E)
$10,800.00
B
$236.60
$2,900.97
PERMIT FEE ALLOWANCE FOR BUILDING, PLAN
REVIEW, NPDES, DEWATERING
MAINTENANCE OF TRAFFIC
MOBILIZATION AND BONDING
PCO # 1 Additional Scope: $25,000.00 Removal and
Disposal of approx. 59 lf of 30" RCP, roadway restoration
as well as restoration of the exist. planter, and curb Type-
D. In lieu of replacing the existing 30" RCP with 30" HP
Storm Pipe, 24" HP Storm Pipe will be used. The proposed
24" inline valves in the SOV will remain. The 24" inline
valve in the North Control Structure will be installed on the
East side.
D
FURNISH 18" HP STORM DRAINAGE PIPE 0'-6'
DEPTH (INCLUDE DEWATERING)
$ 16,733.22
$ 1,192.04
PCO # 2 Unforeseen Soil Condition: $17,680.68 level of
effort to remove the unsuitable material and import suitable
material.
$7,751.85 $ (7,751.85)
INSTALL 24" DIAMETER INLINE STORMWATER
CHECK VALVE AT OUTFALL IN
SEAWALL
INSTALL 24" HP STORM DRAINAGE PIPE 0'-6'
DEPTH (INCLUDE DEWATERING)
$18,011.25
ALL DEMOLITION, GRUBBING, PAVEMENT
REMOVAL, & DISPOSAL OF ALL ITEMS
REQUIRED TO CONSTRUCT PROJECT.
Use column 1 on Contracts where variable retainage for line items may apply
CODB Building Permit $236.60 confirmation Number
022444 dated July 22,2021
$ 1,841.68
C
2
SCHEDULE OF VALUES
CONTINUATION SHEET AIA DOCUMENT G703
APPLICATION NO:
PERIOD TO:
ADA PROJECT NO
A E G H I
QUANTITY UOM UNIT
PRICE TOTAL QUANTITY TOTAL
WORK COMPLETED THIS PERIOD
Contractor's signed Certification attached.
In tabulations below, amounts are stated to the nearest dollar.
AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, Containing
APPLICATION DATE:9/19/2021
8/7/21 - 9/6/21
CM04-0121-01
BALANCE TO
FINISH
(C - G)
RETAINAGE
5.00%
ITEM NO.DESCRIPTION OF WORK TOTAL
COMPLETED
AND STORED TO
DATE
(D + E + F)
%
(G + C)FROM PREVIOUS
APPLICATION (D&E)
B D
Use column 1 on Contracts where variable retainage for line items may apply
C
2
SCHEDULE OF VALUES
12 1,176.00 SY $14.99 $17,628.24 352.800 $5,288.47 $5,288.47 30% $ 264.42
13 1,176.00 SY $16.11 $18,945.36 - $ -
14 1.00 LS $4,663.75 $4,663.75 - $908.34 19% $ 45.42
15 1.00 LS $3,633.36 $3,633.36 0.2202 $800.00 $1,971.63 54% $ 98.58
16 1.00 LS $4,686.50 $4,686.50 0.300 $1,405.95 $1,405.95 30% $ 70.30
17 1.00 LS $5,635.50 $5,635.50 0.550 $3,099.53 $3,099.53 55% $ 154.98
$ -
$253,748.44 $60,716.47 $147,978.12 58% $ 7,398.91
STRIPING AND SIGNAGE RESTORATION TO
CURRENT CODE REQUIREMENTS $908.34
$ 12,339.77
PREPARE AND PROVIDE ALL STAKE OUT AND
REQUIRED ASBUILTS PER AGENCIES
NPDES IMPLEMENTATION AND MONITORING
PER GOVERNING AGENCIES
FURNISH AND INSTALL 1-1/2" TYPE S-III ASPHALT
IN TWO 3/4" LIFTS PER LATEST FDOT
REQUIREMENTS FOR TYPE S-III ASPHALT (FOR
PAVEMENT RESTORATION)
REQUIRED TESTING PER CONTRACT
DOCUMENTS AND GOVERNING AGENCIES $1,171.63
$ 2,535.98
$ 18,945.36
$ 3,755.41
$ 1,661.74
$ 3,280.55
FURNISH AND INSTALL 8”
LIMEROCK BASE LBR 100 (FOR PAVEMENT
RESTORATION)
TOTAL CONTRACT AMOUNT $87,261.65 $ 105,770.32