HomeMy WebLinkAboutInv# 91306 - CALVIN, GIORDANO & ASSOCIATES, INC. - 11/30/2021CITY OF DANIA BEACH (820)Invoice number 91306 Invoice date 11/30/2021 Page 1 of 5 Prepare for and attend Commission Meeting for change order approval. Update budget spreadsheet with progress to date for budget management. 11/09/2021 2.00 130.00 260.00 Prep/Negotiating Chng Orders Update connection chart and budget spreadsheet based on today's two connections completed. 11/23/2021 0.50 130.00 65.00 Review daily inspection report and update connection table and budget spreadsheet. Provide direction on alleyway connection north of 4th St due to differing sizes in pipes to be connected. 11/17/2021 1.00 130.00 130.00 Review daily inspection reports and update connection chart and budget spreadsheet. 11/15/2021 0.50 130.00 65.00 General Project Supervision Project Manager (IV) Subtotal 4.00 520.00 Nicholas Kanelidis 11/18/2021 0.50 130.00 65.00 - project management -- 3 connections north and south of SE 2nd Terrace for the hydrant (SE corner of the apartment building), 2.5-inch domestic, and 4-inch fire line in front / adjacent to the school; the 8-inch fire line was not able to be completed because the old 6-inch line was in the way -- they will cut and cap the main then connect the 8-inch next week; tomorrow they will connect the Alley North of SE 1st Street - Contractor made two connections -- 1 at SE 4th Terrace using 6 LF of 6-inch PVC, 2 90 degree bends, 1 cap; SE 4th Street using 9LF of 6-inch PVC and 2 90 degree bends 11/16/2021 0.50 130.00 65.00 General Project Supervision Project Manager (IV) Subtotal 1.00 130.00 Heidi B. Henderson Date Hours Rate Billed Amount Labor SE 2ND AVE & SE 7TH ST WM (WATER) Billing period through November 30, 2021 CGA PM: Jenna Martinetti RFQ# 2020-005 PO# 2022-045 Email: AP@daniabeachfl.gov CC: Dincer A. Ozaydin <dozaydin@daniabeachfl.gov> CC: AJohnson@daniabeachfl.gov CC: Tstevens@daniabeachfl.gov CITY OF DANIA BEACH (820) ATTN: FINANCE DEPT 100 W. DANIA BEACH BLVD DANIA BEACH, FL 33004 Invoice number 91306 Date 11/30/2021 Project 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2 Date 11/30/2021 Invoice number 91306CITY OF DANIA BEACH (820) 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2Project CITY OF DANIA BEACH (820)Invoice number 91306 Invoice date 11/30/2021 Page 2 of 5 General Project Supervision Project Manager (IV) Heidi B. Henderson Date Hours Rate Billed Amount Labor OCEAN PARK DRAINAGE (STORMWATER) 11/29/2021 Bernnon Artola CEI Project Administrator Watermain tie-in at Sta. 49+05: 9' of 6" C-900, 2 - 90deg fittings, 1 6" Cap, 1 LineStop. Tie-in at 57+02; 8" Fire Suppression. 10' of 8" DIP, two 6" Caps. 11/23/2021 Bernnon Artola CEI Project Administrator 6" Watermain tie-ins at 55+20. Alley Between SE 2nd Terrace and SE 3rd St. 7' of 6" C-900, 2-90 Deg Fittings, 1- 6" Cap, 1 Line Stop. 6" Watermain Tie-in at 58+93. Alley between SE 3rd St and SE 2nd St. 7' of 6" C-900, 2- 90 Deg Fittings, 1 Cap, 1 Line Stop. 5.00 91.00 455.00 11/19/2021 Bernnon Artola CEI Project Administrator 6" Watermain tie-ins at Alley Between SE 1st Street and SE Park Street. 6' of 6" C-900, 2-90 Deg Fittings, 1- 6" Cap. Patch and repair limerock for paving on Wednesday (next week). Subconsultant Services 5.00 91.00 455.00 11/08/2021 Bernnon Artola CEI Project Administrator Installation of two line stops at SE 7th ST and SE 3Ave. Watermain tie-in of two connects 12"x6" cross. Tie north watermain and south watermain. 5.00 91.00 455.00 5.00 91.00 455.00 3.00 91.00 273.00 11/15/2021 Bernnon Artola CEI Project Administrator 6" Watermain tie-in across Alley between NE 5 st and NE 4 Terrace, 1 line Stop, 6' of 6" C-900m 2- 90 deg Fittings, 1 6" Cap. 6" Watermain tie-in between NE 6st and NE 5 St at. 37+80, 1 line Stop. 2 - 90deg Fittings, 1- 6" CAP. City of Dania Beach Abandoned 2 -2" Watermains. 11/10/2021 Bernnon Artola CEI Project Administrator Watermain tie-in at SE 5th St. Watermain tie-in at se 4 terrace. Double connection (hot connection) 11/17/2021 Bernnon Artola CEI Project Administrator 6" Watermain Tie in at alley between Se 4 St and SE 3 Place. 9' of 6" C-900, 2-90 Deg Fittings, 6x4 reducer, 1 4" CAP. 6" Watermain transfer at SE 3 Place (west); 10' - 6" C-900, 2 - 90 deg Fittings, 1 6" Cap. 5.00 91.00 455.00 5.00 91.00 455.00 11/30/2021 Subtotal 33.00 3,003.00 ALLY ENGINEERING SERVICES, INC. Units Rate Billed Amount Consultant SE 2ND AVE & SE 7TH ST WM (WATER) subtotal 3,653.00 SE 2ND AVE & SE 7TH ST WM (WATER) Date 11/30/2021 Invoice number 91306CITY OF DANIA BEACH (820) 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2Project CITY OF DANIA BEACH (820)Invoice number 91306 Invoice date 11/30/2021 Page 3 of 5 11/15/2021 Bernnon Artola CEI Project Administrator Densities at Ocean Park, Continue Lime rock. 11/12/2021 Bernnon Artola CEI Project Administrator 2.00 91.00 182.00 11/10/2021 Bernnon Artola CEI Project Administrator Contractor resumed grading. Density inspection on Thursday. Subconsultant Services 3.00 91.00 273.00 1.00 91.00 91.00 3.00 91.00 273.00 11/24/2021 Bernnon Artola CEI Project Administrator Paving Patches 3.00 91.00 273.00 11/01/2021 Bernnon Artola CEI Project Administrator Contractor placement of second lift of base 3.00 91.00 273.00 11/22/2021 Bernnon Artola CEI Project Administrator Patch and repair limerock for paving on Wednesday 1.00 91.00 91.00 11/03/2021 Bernnon Artola CEI Project Administrator Contractor commenced grading of subgrade on second section of parking lot. Heavy rains cancelled operations. 11/05/2021 Bernnon Artola CEI Project Administrator 1.00 91.00 91.00 11/30/2021 Subtotal 17.00 1,547.00 ALLY ENGINEERING SERVICES, INC. Units Rate Billed Amount Consultant - project management -- king tides flooded the subgrade areas; Contractor is pumping water out of the second run of trench to dry out the area in hopes for densities tomorrow 11/09/2021 0.50 130.00 65.00 General Project Supervision Project Manager (IV) Heidi B. Henderson Date Hours Rate Billed Amount Labor OCEAN PARK DRAINAGE (STORMWATER) subtotal 1,612.00 OCEAN PARK DRAINAGE (STORMWATER) Date 11/30/2021 Invoice number 91306CITY OF DANIA BEACH (820) 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2Project CITY OF DANIA BEACH (820)Invoice number 91306 Invoice date 11/30/2021 Page 4 of 5 1.00 91.00 91.00 11/12/2021 Bernnon Artola CEI Project Administrator Densities 3.00 91.00 273.00 11/05/2021 Bernnon Artola CEI Project Administrator Subconsultant Services 4.00 91.00 364.00 11/01/2021 Bernnon Artola CEI Project Administrator Confirmed punchlist completion. 11/30/2021 Subtotal 8.00 728.00 ALLY ENGINEERING SERVICES, INC. Units Rate Billed Amount Consultant Review daily inspection report and update budget spreadsheet. Discuss with Inspector. 11/10/2021 0.50 130.00 65.00 General Project Supervision Project Manager (IV) Nicholas Kanelidis - project management for construction 11/09/2021 2.50 130.00 325.00 - project management -- project status coordination on remaining items; addition of sod in ROW; permit status in CD; closing out of permits; submitted the certificatioin to BC SWM to close out the permit 11/01/2021 2.00 130.00 260.00 General Project Supervision Project Manager (IV) Subtotal 4.50 585.00 Heidi B. Henderson Date Hours Rate Billed Amount Labor DANIA COVE DRAINAGE (STORMWATER) subtotal 1,378.00 DANIA COVE DRAINAGE (STORMWATER) Invoice total 6,643.00 Date 11/30/2021 Invoice number 91306CITY OF DANIA BEACH (820) 19277712 DANIA BEACH PROJECT MANAGEMENT ASSISTANCE - WORK ORDER #2Project CITY OF DANIA BEACH (820)Invoice number 91306 Invoice date 11/30/2021 Page 5 of 5 91306 11/30/2021 6,643.00 6,643.00 Total 6,643.00 6,643.00 0.00 0.00 0.00 0.00 Aging Summary Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120 99-100 REIMBURSABLES 0.00 0.00 0.00 0.00 0.00 SPEED HUMP IMPROVEMENTS (ROADWAY)9,230.00 6,734.00 0.00 6,734.00 2,496.00 DANIA COVE DRAINAGE (STORMWATER)32,890.00 24,361.50 1,378.00 25,739.50 7,150.50 OCEAN PARK DRAINAGE (STORMWATER)37,440.00 26,055.50 1,612.00 27,667.50 9,772.50 SE 2ND AVE & SE 7TH ST WM (WATER)33,800.00 29,893.50 3,653.00 33,546.50 253.50 Total 113,360.00 87,044.50 6,643.00 93,687.50 19,672.50 Invoice Summary Description Contract Amount Prior Billed Current Billed Total Billed Remaining