Loading...
HomeMy WebLinkAboutFolio 504235160010 - 901 NE 3 St Assessment 2019 - 5/5/2022City of Dania Beach I T Parker Community Center (Property 10) Final DRAFT Report City Purchase Order No. 2019-00000258 Submitted By: C.A.P. Government, Inc. Project No. 19 GOVT 022.0 August 22, 2019 Properties Building Systems and Code Compliance Evaluation August 22, 2019 Via Email and Hand Delivery Ms. Ana M. Garcia City Manager City of Dania Beach 100 W Dania Beach Boulevard Dania Beach, Florida 33004 Re: I T Parker Community Center Building Systems and Code Compliance Evaluation. Dear Ms. Garcia: In accordance with our agreement (Exhibit A), attached you will find the final report for the above- captioned City buildings and site. The Report assesses the general condition of these properties and brings to light our evaluations of the building systems as well as our recommended course of action. This document presents to the best of our knowledge, an accurate and unbiased appraisal of the facilities at the time of inspections. The I T Parker Community Center building is structurally sound. Addressing the noted deficiencies, deferred maintenance and capitalizing recommended improvements should insure the facilities and operating equipment will have an extended useful life with adherence to a periodic maintenance schedule, if recommended future and similar assessment are made in the upcoming 3 to 5 years period. The Report lists key facts, findings and issues that we believe should be addressed by the City of Dania Beach in order to achieve consensus on how to proceed with future required and recommended remediations and upgrades. We thank you for your continued confidence in C.A.P. Government, Inc. and for the opportunity to be of service to the City of Dania Beach. We gratefully acknowledge your cooperation and contribution to this important project; we are ready to assist on future related undertakings and in the continuation of this project. If you have any questions or wish to discuss further, please contact me at (305) 305-6906 at your earliest convenience. Very truly yours, C.A.P. Government, Inc. Ricardo J. Fernandez, RA Registered Architect Cc: Marc C. LaFerrier, Community Development Director Fernando J. Rodriguez, Public Services Director Eric Brown, Parks and Recreation Director Curt Keyser, City Engineer Enclosures I T Parker Community Center (Property 10) _____________________________________________________________________________________ TABLE OF CONTENTS Transmittal Letter ................................................................................................................. i Table of Contents ................................................................................................................ ii Project Narrative Description and Scope of Work........................................................ Tab 1 Executive Summary ..................................................................................................... Tab 2 Technical Report .......................................................................................................... Tab 3 • ADA / Accessibility ........................................................................................... Page 1 • General Building and Structural ....................................................................... Page 2 • Mechanical ....................................................................................................... Page 5 • Plumbing .......................................................................................................... Page 6 • Fire Protection .................................................................................................. Page 6 • Electrical........................................................................................................... Page 7 Summary Schedules of Findings & Probable Construction Costs ............................... Tab 4 Statement of Probable Construction Costs .................................................................. Tab 5 City of Dania Properties Data ...................................................................................... Tab 6 Certification and Extent of Responsibility..................................................................... Tab 7 Building Inspection Representative Photographs ........................................................ Tab 8 o ADA, Architectural and Structural .............................................................................. Tab a o Mechanical ............................................................................................................ Tab b o Electrical ............................................................................................................... Tab c o Plumbing .............................................................................................................. Tab d o Fire Protection ....................................................................................................... Tab e I T Parker Community Center (Property 10) _____________________________________________________________________________________ EXHIBITS EXHIBIT A: City of Dania Agreement and Purchase Order ........................................ Tab 9 SUPPORTING DOCUMENTS .............................................................................. (*) Florida Building Code, 2017, Sixth Edition, Latest Revisions ....................................................... (*) Florida Accessibility Code, 2012 (FL Statutes Section 553.503) .................................................. (*) Life Safety Code (NFPA 101), 2015 Edition ................................................................................. (*) Electrical Code (NFPA 70), 2014 Edition...................................................................................... (*) CW Thomas Existing Drawings and Previous ADA Report (As Provided).................................... (*) (*) The above Supporting Documents are incorporated herein by reference as noted. I T Parker Community Center (Property 10) _____________________________________________________________________________________ PROJECT NARRATIVE DESCRIPTION AND SCOPE OF WORK I T Parker Community Center (built 2000 - 9354 sq. ft.) is located at 901 NE 3rd Street, Dania Beach. Site inspections took place on June 11, 2019. Florida. CAP’s Professional Team assigned to this project consisted of Ricardo J. Fernandez, R.A.; (Architecture, ADA and Primary Structure); Andres Gonzales, P.E. (Electrical Systems) and Oscar Alvarez (Mechanical, Plumbing and Fire Protection). Folio Numbers and other Property data was provided by The City of Dania and is summarized under TAB 6. Our scope of work, as noted briefly in the Background and Authorization section of this report is to undertake a Building Systems and Code Compliance Evaluation and provide an assessment report noting the conditions of the building structure, building envelope, electrical and mechanical systems, ADA compliance updates from previous (as Provided) reports and new required and recommended improvements in operating systems. Certain existing building operating systems and components at the I T Parker Facility have now become outdated, insufficient or non-compliant. This is due to requirements of new codes and ordinances, exhaustion of the useful life beyond any reasonable upgrade or economic repair, with no residual or salvageable value. Repairs and improvements will renew and extend the useful life of these buildings with modern and efficient operating systems are necessary. Our undertaking (where possible) has been itemized according to the Construction Specifications Institute’s (CSI) 16 divisions of work. This format is the construction and building products I T Parker Community Center (Property 10) _____________________________________________________________________________________ industries nationally adopted categories and divisions of work for uniformity in specifications; cost estimates and allocation of resources and trades of construction. The Construction Specification Institute Divisions are as follows: 1. General Requirements 2. Site Construction 3. Concrete 4. Masonry 5. Metals 6. Wood & Plastics 7. Thermal & Moisture Protection 8. Doors & Windows 9. Finishes 10. Specialties 11. Equipment 12. Furnishings 13. Special Construction 14. Conveying Systems 15. Mechanical 16. Electrical Of the above Divisions, all are utilized in documenting our Report except Divisions 4, 5, 6, 12, 13 and 14. C.A.P Government, Inc., wishes to thank the City of Dania designated staff for their valuable assistance and teamwork in coordinating this undertaking. I T Parker Community Center (Property 10) __________________________________________________________ 1 EXECUTIVE SUMMARY C.A.P. Government, Inc. was authorized to undertake Building Systems and Code Compliance Assessments of 28 City of Dania Beach properties under an agreement cited elsewhere in this report and to document our professional efforts and findings. The extent of the scope of work and procedures is also documented elsewhere in this report. The Table of Contents provides a quick reference to the specific contents of our Report. Properties condition were ranked in three objective categories: Life Safety / Code Compliance, items requiring immediate attention; Deferred Maintenance, items that could be addressed within a one or two-year time window and Recommended Improvements items that could be capitalized for future implementation. Urgency of needed repairs and/or upgrades were ranked 1, 2 and 3 as follows: (1) Most Urgent needing immediate attention. (2) Repairs that could be deferred up to 12 months and (3) Repairs that could be deferred up to 24 months. Costs of repairs were ranked as follows: Amounts up $99,000.00 were ranked (3); amounts from $100,000.00 up to $250,000.00 were ranked (2; amounts greater than $250,000.00 were ranked (1). The Properties completed under this report include the Following : I T Parker Community Center (No.10). Property Data is listed under Tab 6 in this Report. I T Parker Community Center (Property 10) _____________________________________________________________________________________ 1 TECHNICAL REPORT The following report represents the results of our efforts carried out at I T Parker Property site visits; physical non-destructive inspections and observations are noted. The information presented herein reflects the present condition at the facility at the time of inspection s and observations. No record drawings or previous reports were made available prior to inspections. We begin this section with our ADA Compliance review and General Building Evaluations. Americans with Disabilities Act (A.D.A.) Evaluation Parking: Four accessible parking spaces are provided in the front of the Community Center out of a total of nine (9) parking spaces belonging to the Community Center. According to staff, the Community Center has the right to use the Marina parking area contiguous to the Center with more than eighty (80} parking spaces not counting approximately fifty (50) boat trailer spaces. One space shall be converted to be Van- Accessible. Ramps: There are no ramps as the sidewalk fronting the parking area is flush with the pavement and cross- slopes are in compliance. Steps / Stairs: Only steps are located to access a stage in the large conference or event / performance area which requires a ramp or lift to be provided. As per ADA 206.2.4. Elevators: Not applicable to these properties Doors: All doors with closers exceeded the maximum push-pull pressure of five (5) pounds after initial inertia pressure was overcome. I T Parker Community Center (Property 10) _____________________________________________________________________________________ 2 Drinking Fountains: Minimum of two drinking fountains are required; need additional one to comply with ADA height, knee and toe clearance. Restrooms: Restrooms need ADA compliant stall. Fixture count might not comply with assembly area requirements, Signage: No ADA signs deficiencies were observed except in the Restrooms. We recommend that a City- wide directional and informational signs and graphics program be considered both for identity branding and uniformity. Countertops: Certain countertops must be modified to meet ADA range of 28” to 34” AFF in seating areas and pass-thru windows in food preparation/ serving area. Clearances: All accessible areas meet minimum headroom of 80 ”; all hallways and corridors meet or exceed minimum required widths. Access and Egress Travel distances to any exit on each floor do not exceed maximum code allowed of 75 feet for assembly occupancies. Building occupancy load signs are posted; a building map showing emergency egress routes be posted at appropriate locations. General Building and Structural Observations and Recommendations Overall Condition The I T Parker Community Center building is structurally sound. Addressing the noted deficiencies, deferred maintenance and capitalizing recommended improvements listed under Tab 4 should insure the facilities and operating equipment will have an extended useful life with adherence to a periodic maintenance schedule. I T Parker Community Center (Property 10) _____________________________________________________________________________________ 3 Sidewalks Sidewalks are in good condition with no majo r cracks or other defect that would present an immediate risk to pedestrians. Parking Parking areas are in excellent condition. Parking surface is in good conditions with no pot holes, cracks, depressions or corrugations. Approved sealcoating and res triping should be capitalized and scheduled in approximately five years. (see ADA parking comments) Building Envelope - Roofs Community Center Roofs is in excellent condition; clean, with no visible stress or defects in hips, valleys or flashing. It appears to have been reroofed in recent years. It consists of mostly hip roofs with two small gables over the main assembly hall. Roof material is light colored raised -profile asphalt shingles. Edge flashing and soffits are also in excellent conditions. Building Envelope - Walls Walls are in good condition with a rough stucco finish. No hairline cracks were observed. Building Envelope - Fenestrations Windows and shutters are in good condition. Doors are also in good condition except for door push-pull pressure as noted in ADA section. General Buildings Interior: Except as noted elsewhere, buildings interiors are in good condition. (see ADA and Electrical and Mechanical Sections). Medical emergencies: I T Parker Community Center (Property 10) _____________________________________________________________________________________ 4 Medical emergencies are to be addressed by the building management emergency response plan in coordination with proper authorities. We recommend the building be provided with a portable heart defibrillator at a visible location and property staff be trained in its use . Fire Hazards Fire hazards are a possibility in any facility. However, in addition to addressing code compliance issues, we recommend that the building management review its emergency response plan and rehearse evacuation as a preventative measure that will minimize the impact of any potential fire event. Severe Weather Conditions: South Florida is geographically situated in the principal Eastern and Western Caribbean route for tropical depressions, storms, and hurricanes. The consequences of such extreme events could include wind damage and flooding, as well as disruption of power and other utilities infrastructure. While this is addressed by the City/County Hurricane Preparedness Plan, we recommend the building management’s emergency response plan be reviewed as to inclusion of procedural planning. Terrorism, Civil or Other Disturbances: We recommend that a “Threat Assessment Report” be prepared for this and other City of Dania properties. The report should include a summary of significant strengths, vulnerabilities, and recommendations. It should also define a refuge or lock-down area where possible. Review and upgrades to security cameras or CCTV systems should be considered. Hazardous Materials Incidents Hazardous materials exist anywhere there is human occupancy. Hazardous Materials should have proper storage area, identified as a risk prevention and compliance measures: a. Identify and list hazardous chemicals in their workplaces (Material Safety Data Sheets: MSDS). b. Obtain a MSDS and label for each hazardous chemical. I T Parker Community Center (Property 10) _____________________________________________________________________________________ 5 c. Develop and implement a written hazard communication program, including labels, MSDS, and employee training on the list of chemicals, MSDS and label information. d. Communicate hazard information to their employees throu gh labels, MSDS, and formal training programs. e. Mechanical Observations and Recommendations Mechanical room; Electrical equipment and appliances shall be relocated from the mechanical room used as a return air plenum. Refer to pictures –M18 and M19. Mechanical room; Duct detectors shall be provided in supply air ducts. The installation and type of detector shall be in accordance with section 606 of the Florida Building Code – Mechanical. Refer to pictures – M20 and M21. RECOMMENDATIONS General in all areas; Cleaning the supply and return air duct installed in the ceiling space in main building and the outlets, ceiling diffusers and return air grilles. Refer to Pictures – M20 and M21. Site and mechanical room; The existing HVAC system consists of four split system units. Two units are past their useful life and are in fair condition. Building openings and support may be reused for new systems. The insulation of refrigerant piping needs replacement – Damaged. Refer to Pictures – M18, M19, M22, M23, and M24. Site; A service outlet needs to be provided within 25 feet from condensing units in accordance with NFPA 70 and chapter 3 of the Florida Building Code – Mechanical. Refer to Pictures – M22, M23 and M24. I T Parker Community Center (Property 10) _____________________________________________________________________________________ 6 Plumbing Observations and Recommendations Site; A backflow preventer needs to be installed in the building water service pipe. The installation, and type of backflow preventer shall be in accordance with section 608 of the Florida Building Code – Plumbing. Refer to pictures – P13 and P14. Restrooms; Accessible fixtures and signs shall be provided in both restrooms including lavatories in accessible toilet compartments. Refer to picture – P11. RECOMMENDATIONS Mechanical room; Hot water lines shall be insulated, and a hot water re-circulation system provided in accordance with the Florida Building Code – Energy Conservation. Refer to picture – P12. Fire Protection System Observations and Recommendations Main Building; Building address shall be provided. The installation and height of the signs shall be in accordance with NFPA 1 - Florida Fire Prevention Code – Fire Code. Refer to pictures – F16 and F17. Main Building – Mechanical room; Covers shall be provided in electrical outlets. Refer to picture –F20. Main Building - General; Fire alarm automatic initiating devices shall be provided in the building. Only manual pull stations have been provided. Fire alarm system shall be upgraded, and several notification appliances replaced. The installation, location and type of devices shall be in accordance with the standard NFPA 72- Fire Alarm Code. Refer to picture – F19. Main Building - General; A fire sprinkler system shall be provided based on the use and occupant load of the building and occupancy classification (Assembly). The installation and type of I T Parker Community Center (Property 10) _____________________________________________________________________________________ 7 system shall be in accordance with the standard NFPA 13 - Fire Sprinkler system. Refer to pictures – F18 and F19. Main Building – General in all areas; Exit signs and emergency lighting shall be repaired or replaced (Battery replacement needed). All means of egress components shall be illuminated in accordance with section NFPA 101.7 of the Florida Fire Prevention Code – Life Safety Code. Refer to picture – F9. RECOMMENDATIONS None Electrical Observations and Recommendations Electrical Service This building has an electrical service (see picture # 1) of 250 Amps, 120 / 240 Volts, 3 phase, 4 wires. The electrical service has: Meter: 800 Amps, 120 / 240 volts, 3 phases, 4 wires, Main “1 of 3”: Panel board of 400 Amps, 120 / 240 volts, 3 phase, 4 wires with a main circuit breaker of 400 Amps. (see picture # 2) Main “2 of 3”: Fused disconnect of 400 amps, 120 / 240 volts, 1 phase, 3 wires with 300 Amps. (see picture # 3) Main “3 of 3”: Panel board of 200 Amps, 120 / 240 volts, 1 phase, 3 wires with a main circuit breaker of 125 Amps (see picture # 4) We observed that the grounding wire is connected to the metal water pipe and grounding rods (see pictures # 5). I T Parker Community Center (Property 10) _____________________________________________________________________________________ 8 The electrical panel was observed in acceptable conditions, and code violations were not observed. Electrical conditions of the other area in the building are acceptable, GFIC receptacles are installed in the kitchen and bathroom according with the requirement of the NEC -2014 art. 210.8. (see picture # 6) The general lighting is acceptable but there are several lighting fixtures that need the diffuser to be cleaned. The building has emergency lighting system with battery back -up incorporated. There are outdoor lighting fixtures attached to the building. Deficiencies: 1. There are several emergency lighting fixtures no t operable, because the batteries are in bad conditions. Those fixtures need to be replaced to comply with the Life Safety Code (NFPA-101) 2015 art.7.9 (see picture # 7) 2. Mechanical room will shall be cleaned and cleared; it cannot used as storage. 3. There are open electrical boxes that need to be closed (see picture # 8) 4. Fused disconnect of the Condensing Units do not have the required clearance in front of the disconnects as required by NEC-2014 art. 110.26 (see picture # 9) END OF REPORT I T Parker Community Center (Property 10) _____________________________________________________________________________________ PRELIMINARY STATEMENT OF PROBABLE CONSTRUCTION COST This order-of-magnitude preliminary statement of probable construction cost is based on current market costs conditions. It is also based on C.A.P. Government, Inc. (CAP) experience as licensed construction industry and design professionals extensively involved in similar undertakings. It is recognized, however, that neither CAP nor the City of Dania Beach (CITY), has control over the cost of labor materials and equipment, over the Contractor’s methods of determining bid prices, or over competitive bidding, market or negotiations. Accordingly, CAP cannot and does not warrant or represent that bids or negotiated prices will not vary from the preliminary statements prepared and/or compiled by CAP. CAP will prepare a detailed quantity take-off as an additional service if requested and required at a future date. Assumptions a) This cost estimate assumes current costs as of date of this submittal. b) This cost estimate assumes that no major catastrophe, natural or man-made, such as hurricanes or terrorist acts, will exist or impact the marketplace from now thru completion of the construction period. Factors Impacting Estimate Our Order-od-Magnitude Preliminary Statement of Probable Construction Cost is impacted by several important factors as follows: 1. Execution of work might require multiple interruptions to occupied facilities during certain construction events. 2. Costs are expected to increase in line with current inflationary pressure at an annual rate of approximately 2.0%. 3. This project might necessitate multiple trades and bid packages that may include allowances for additional overhead and contingencies that will impact bids with higher than normal costs. 4. The upgrades and repairs will necessitate multiple inspections / field observation, and coordination with City of Dania Beach personnel and other agencies during repairs and construction. We hereby state that the above Order-of-Magnitude Preliminary Statement of Probable Construction Cost is correct to the best of our knowledge at the time of its preparation and within the scope of services for this undertaking. By: C.A.P. Government, Inc. OBSERVED CONDITIONS / DEFICIENCY LIFE SAFETY CODE COMPLIANCE DEFERRED MAINTENANCE RECOMMENDED IMPROVEMENTS PRIORITY NEED COST IMPACT 1. 1.1 Multiple Trades Mobilization, mobilization, Project Signs, Equipment Rental, etc. as required $0.00 $0.00 $5,000.00 n/a 3 1.2 Project Supervision and Miscellaneous Labor $0.00 $0.00 $5,000.00 n/a 3 1.3 Insurance $0.00 $0.00 $0.00 n/a 0 1.4 Testing Services; Misc. Fees $0.00 $0.00 $5,000.00 n/a 3 1.5 Permit, Impact Fees $0.00 $0.00 $0.00 n/a 0 1.6 Shop Drawings, Other Miscellaneous $0.00 $0.00 $2,000.00 n/a 3 1.7 Overhead & Profit (Included in Summary Sheet)$0.00 $0.00 $0.00 n/a 0 Totals: General Requirements $0.00 $0.00 $17,000.00 2. 2.1 Reseal and restripe parking area (in front of building only) every five years $0.00 $3,000.00 $0.00 3 3 Totals: Site Construction $0.00 $3,000.00 $0.00 3. 3.1 Not Applicable to this building $0.00 $0.00 $0.00 0 0 Totals: Concrete $0.00 $0.00 $0.00 I T Parker Community Center (Property 10) DETAIL SCHEDULE OF FINDINGS Concrete (CSI Division No. 3) General Requirements (CSI Division No. 1) Site Construction (CSI Division No. 2) I T Parker Community Center (Property 10) DETAIL SCHEDULE OF FINDINGS OBSERVED CONDITIONS / DEFICIENCY LIFE SAFETY CODE COMPLIANCE DEFERRED MAINTENANCE RECOMMENDED IMPROVEMENTS PRIORITY NEED COST IMPACT 4. 4.1 Not Applicable to this building $0.00 $0.00 $0.00 0 0 Totals: Masonry $0.00 $0.00 $0.00 5 5.1 Not Applicable to this building $0.00 $0.00 $0.00 0 0 Totals: Metals $0.00 $0.00 $0.00 6 6.1 Not Applicable to this building $0.00 $0.00 $0.00 0 0 Totals: Wood & Plastics $0.00 $0.00 $0.00 7 7.1 Check roof condition biannually (early May and November) for distress and debris $0.00 $0.00 $1,000.00 2 3 Totals: Thermal & Moisture Protection $0.00 $0.00 $1,000.00 8 8.1 Correct door closers pressure in all doors with closers to 5 pounds push/pull as per ADA $1,000.00 $0.00 $0.00 1 3 8.2 Check all windows biannually (early May and November) for broken glass, hardened, cracked or separated sealants $0.00 $0.00 $1,000.00 2 3 Totals: Doors & Windows $1,000.00 $0.00 $1,000.00 Masonry (CSI Division No. 4) Metals (CSI Division No. 5) Wood & Plastics (CSI Division No. 6) Thermal & Moisture Protection (CSI Division No. 7) Doors & Windows (CSI Division No. 8) I T Parker Community Center (Property 10) DETAIL SCHEDULE OF FINDINGS OBSERVED CONDITIONS / DEFICIENCY LIFE SAFETY CODE COMPLIANCE DEFERRED MAINTENANCE RECOMMENDED IMPROVEMENTS PRIORITY NEED COST IMPACT 9 9.1 Schedule exterior pressure wash and repaint Community center every seven years $0.00 $0.00 $25,000.00 3 3 9.2 Schedule interior repainting of Community Center every fifteen years or as needed.$0.00 $0.00 $15,000.00 3 3 Totals: Finishes $0.00 $40,000.00 10 10.1 Rework Restrooms areas and accessories to comply with ADA and fixture count to FBC $25,000.00 $0.00 $0.00 0 0 Totals: Specialties $25,000.00 $0.00 $0.00 11 11.1 Procure install and train Site staff in the use of an AED Defribulator $0.00 $0.00 $2,500.00 1 3 11.2 Consideration of directional and informational sign program upgrade, including occupancy and emergency egress map. $0.00 $0.00 $5,000.00 1 3 11.3 Upgrade Community Center kitchen equipment layout and cabinetry for proper code compliant operation if Food Preparation is contemplated. $0.00 $0.00 $15,000.00 2 3 11.4 Provide ramp or lift to access stage in the large conference or event / performance area as per ADA 206.2.4. $5,000.00 $0.00 $15,000.00 1 3 Totals: Equipment $5,000.00 $0.00 $37,500.00 Finishes (CSI Division No. 9) Specialties (CSI Division No. 10) Equipment (CSI Division No. 11) I T Parker Community Center (Property 10) DETAIL SCHEDULE OF FINDINGS OBSERVED CONDITIONS / DEFICIENCY LIFE SAFETY CODE COMPLIANCE DEFERRED MAINTENANCE RECOMMENDED IMPROVEMENTS PRIORITY NEED COST IMPACT 12 12.1 Not Applicable to this building $0.00 $0.00 $0.00 0 0 Totals: Furnishing $0.00 $0.00 $0.00 13 13.1 Not Applicable to this building $0.00 $0.00 $0.00 0 0 Totals: Special Construction $0.00 $0.00 $0.00 14 14.1 Not Applicable to this building $0.00 $0.00 $0.00 0 0 Totals: Conveying Systems $0.00 $0.00 $0.00 15 15.1 Clean the supply and return air ducts installed in the ceiling space as well as the outlets, ceiling diffusers and return air grilles. $0.00 $1,000.00 $0.00 2 3 15.2 An automatic fire alarm initiating devices shall be provided in the building.Only manual pull stations have been provided. Fire alarm system shall be upgraded,and several notification appliances replaced.The installation,location and type of devices shall be in accordance with the standard NFPA 72- Fire Alarm Code. $2,500.00 $0.00 $0.00 1 3 15.3 The existing HVAC system consists of four split system units. Two units are past their useful life and are in fair condition. Building openings and support may be reused for new systems. The insulation of refrigerant piping needs replacement – Damaged $0.00 $500.00 $15,000.00 2 3 15.4 A service outlet needs to be provided within 25 feet from condensing units in accordance with NFPA 70 and chapter 3 of the Florida Building Code $250.00 $0.00 $0.00 1 3 15.5 Electrical equipment and appliances shall be relocated from the mechanical room used as a return air plenum. $250.00 $0.00 $0.00 1 3 Mechanical (CSI Division No. 15) Furnishings (CSI Division No. 12) Special Construction (CSI Division No. 13) Conveying Systems (CSI Division No. 14) I T Parker Community Center (Property 10) DETAIL SCHEDULE OF FINDINGS OBSERVED CONDITIONS / DEFICIENCY LIFE SAFETY CODE COMPLIANCE DEFERRED MAINTENANCE RECOMMENDED IMPROVEMENTS PRIORITY NEED COST IMPACT 15.6 Duct detectors shall be provided in supply air ducts. The installation and type of detector shall be in accordance with section 606 of the Florida Building Code – Mechanical $1,000.00 $0.00 $0.00 1 3 .15.7 Install new ADA compliant drinking fountain at entry $1,600.00 $0.00 $0.00 1 3 15.8 Replace all plumbing fixtures at reworked restrooms $40,000.00 $0.00 $0.00 1 3 15.9 A fire sprinkler system shall be provided based on the use and occupant load of the building and occupancy classification (Assembly). The installation and type of system shall be in accordance with the standard NFPA 13- Fire Sprinkler system. $70,000.00 $10,000.00 $0.00 1 3 15.10 Occupant load signs(provided) shall be according to section NFPA 101.7 of the FFPC (see 11.2)$500.00 $0.00 $0.00 1 3 15.11 Exit signs and emergency lighting shall be repaired or replaced. All means of egress components shall be illuminated in accordance with section NFPA 101.7 of the FFPC $1,500.00 $0.00 $0.00 1 3 15.12 Building number needs to be relocated. The installation and height of the signs shall be in accordance with NFPA 1- FFPC $300.00 $0.00 $0.00 1 3 Totals: Mechanical $117,900.00 $11,500.00 $15,000.00 16 16.1 Close open electrical boxes $0.00 $250.00 $0.00 2 3 16.2 There are several inoperable emergency lighting fixtures due to dead or defective batteries.Batteries need to be replaced to comply with the Life Safety Code $1,500.00 $0.00 $0.00 1 3 16.3 Fused disconnect of the condensing do not have the required clearance in front of the disconnects as required NEC-2014 art. 110.26 $1,000.00 $0.00 $0.00 1 3 Totals: Electrical $2,500.00 $250.00 $0.00 Electrical (CSI Division No. 16) I T Parker Community Center (Property 10) DETAIL SCHEDULE OF FINDINGS BUILDING INFORMATION No.Name Location Folio No.Building Use Building Age Building Area/Stories Year Built Type of Construction Building Plans on File 40 Year Inspection Report Electrical Mechanical Plumbing Structural Fire ADA Other 1 CITY HALL 100 W. DANIA BEACH BLVD. 5042 34 62 0020 42 31,010 / 2 1977 111 - MNC YES NO ***** 2 CITY HALL PARKING GARAGE 100 W DANIA BEACH BLVD. (BCPA -49 PARK AVE EAST)5042 34 01 3080 9 117,117/4 2010 131 - FR YES NO ***** 3 FIRE STATION #1 116 W DANIA BEACH BLVD. 5042 34 62 0010 54 9,524 / 1 1965 111 - MNC NO ***** 4 TRAINING TOWER 116 W DANIA BEACH BLVD. 5042 34 62 0010 29 200/3 1990 111 - MNC NO ***** 5 ADMIN BLDG 116 W DANIA BEACH BLVD. 5042 34 62 0010 39 1719/1 1980 119 - JM NO ***** 6 NYBERG SWANSON COMMERCE 102 W DANIA BEACH BLVD. (BCPA - 116 W DANIA BEACH BLVD.) 5042 34 62 0010 108 2739/2 1911 119 - JM NO ***** 7 DANIA WOMEN'S CLUB 100 NW 1 AVE (BCPA - 116 W DANIA BEACH BLVD)5042 34 62 0010 79 1585/1 1940 101 - FRAME NO ***** 8 FROST PARK - RECREATION BUILDING 300 NE 2 STREET 5042 34 29 0010 15 6,000 / 1 2004 119 - JM NO ***** 9 FROST PARK - OPTIMIST CONCESSION 300 NE 2 STREET 5042 34 29 0010 59 200/1 1960 131 - FR NO ***** 10 IT PARKER COMMUNITY CENTER 901 NE 3 STREET 5042 35 16 0010 19 9354/1 2000 119 - JM NO ***** 11 DANIA BEACH BAR & GRILL 100 N BEACH RD. (BCPA - 65 N BEACH RD)5042 36 00 0050 39 1832/1 1980 111 - MNC YES NO ***** 12 DOCK MASTER BLDG 151 N BEACH RD 5042 36 00 0031 5 3535/1 2014 119 - JM NO ***** 13 FAU BUILDING 91 N BEACH RD.5142 01 02 8250 19 29156/2 2000 111 - MNC YES NO ***** 14 MARINA / LIFEGUARD OFFICES AND RESTROOM 101 N BEACH RD. (BCPA - 110 N BEACH RD)5042 36 00 0031 12 1550/1 2007 119 - JM NO ***** City of Dania Beach : Building Inventory No.Name Location Folio No.Building Use Building Age Building Area/Stories Year Built Type of Construction Building Plans on File 40 Year Inspection Report Electrical Mechanical Plumbing Structural Fire ADA Other 15 NORTH RESTROOM 150 N BEACH RD (BCPA - 45 N BEACH RD)5042 36 00 0030 39 200/1 1980 131 - FR NO ***** 16 PIER / RESTAURANTS 300 N BEACH RD (BCPA -45 N BEACH RD)5042 36 00 0030 15 4717/1 2005 257 - WATERFRONT STRUCTURE YES NO ***** 17 BAIT SHOP 300 N BEACH RD. (BCPA - 45 N BEACH RD)5042 36 00 0030 15 444/1 2005 111 - MNC YES NO ***** 18 FISHING PIER 300 N BEACH RD (BCPA -45 N BEACH RD)5042 36 00 0030 15 7344/0 2005 257 - WATERFRONT STRUCTURE YES NO ***** 19 DUPLEX - VACANT 509 NW 3 TERRACE 5042 34 06 0230 37 2512/1 1982 20 C W THOMAS - RECREATION CENTER, RESTROOM AND PUMP HOUSE 800 NW 2 ST. (BCPA - 100 NW 8 AVE)5042 34 00 0260 12 5542/1 2007 119 -JM NO ***** 21 C W THOMAS - BASEBALL RESTROOM 100 NW 8 AVENUE 5042 33 10 0020 25 200/1 1994 131 - FR NO ***** 22 C W THOMAS - CONCESSION STAND 100 NW 8 AVENUE 5042 34 00 0260 27 200/1 1992 199 - JM YES NO ***** 23 COMMUNITY CENTER - VACANT 1399 STIRLING RD.5142 04 00 0090 51 3036/1 1968 111 - MNC NO ***** 24 SW COMMUNITY CENTER 1201 STIRLING RD. 5142 04 00 0010 9 2550/1 2010 119 - JM NO ***** 25 PUBLIC SERVICES BUILLDING/ (GARAGE, MAINT., UTLITY, STORAGE) 1201 STIRLING RD. 5142 04 00 0010 9 14850/1 2010 111 - MNC YES NO ***** 26 FIRE STATION 93 4601 SW 30 AVENUE 5042 29 52 0010 54 12000/1 1965 119 - JM YES NO ***** 27 BSO SUBSTATION 803 NW 1 STREET 5042 34 23 0010 18 4485/1 2001 119 - JM NO ***** 28 PJ MELI PARK - RECREATION CENTER 2901 SW 52 ST (BCPA 2900 SW 52 ST)5042 32 01 0541 33 3210/1 1986 119 - JM NO ***** City of Dania Beach : Building Inventory Building omitted from scope as per meeting of June 28, 2019 I T Parker Community Center (Property 10) _____________________________________________________________________________________ CERTIFICATION AND EXTENT OF RESPONSIBILITY The items addressed in this report reflect our professional research, documentation, and order- of-magnitude cost statement at the time of facility evaluation, based on observed conditions. These items are not to be considered all-inclusive but represent C.A.P. Government, Inc. (CAP) professional services based, to the extent reasonably possible within the agreed -upon scope of work. CAP shall not be responsible for this opinion to anyone other than those to whom it is addressed. The building systems and code compliance evaluation is a building assessment task; it is not meant to represent, or take the place of, a detailed professional design and construction effort to achieve required repairs and/or upgrades. Accordingly, no testing or analysis of any kind were performed. CAP does not assume liability for the outcome of decisions, contracts, commitments or obligations made based on this information, and for which CAP has no direct or indirect contractual obligation. CAP does not assume any liability for any existing facility at the I T Parker Community Center. The contents of this report are not, under any circumstances, represented to be applicable to similar subjects, properties or locations. The liability of CAP Service Corporation to the Client, for any cause of combination of causes shall be, in total amount, limited to applicable terms and conditions of CAP insurance as provided under our Master Agreement and scope of work for this project. C.A.P. Government, Inc. I T Parker Community Center (Property 10) Building Systems & Code Compliance Architectural Conditions I T Parker Community Center (Property 10) Building Systems & Code Compliance Architectural Conditions I T Parker Community Center (Property 10) Building Systems & Code Compliance Architectural Conditions I T Parker Community Center (Property 10) Building Systems & Code Compliance Architectural Conditions I T Parker Community Center (Property 10) Building Systems & Code Compliance Architectural Conditions I T Parker Community Center (Property 10) Building Systems & Code Compliance Architectural Conditions Picture # 1 Picture # 2 Picture # 3 Picture # 4 I T Parker Community Center (Property 10) Building Systems & Code Compliance Electrical Conditions Picture # 5 Picture # 6 Picture # 7 Picture # 8 I T Parker Community Center (Property 10) Building Systems & Code Compliance Electrical Conditions Picture # 9 I T Parker Community Center (Property 10) Building Systems & Code Compliance Electrical Conditions I T Parker Community Center (Property 10) Building Systems & Code Compliance Mechanical Conditions Picture #2 Picture #3 Picture #4 Picture #1 I T Parker Community Center (Property 10) Building Systems & Code Compliance Mechanical Conditions Picture #6 Picture #7 Picture #5 I T Parker Community Center (Property 10) Building Systems & Code Compliance Plumbing Conditions Picture #1 Picture #2 I T Parker Community Center (Property 10) Building Systems & Code Compliance Fire Protection Conditions Picture #1 Picture #2 Picture #3 Picture #4