Loading...
HomeMy WebLinkAboutInv# 2 FINAL - Bald - 07/05/2022 (4)AIA DOCUMENT G703 PAGE 1 OF 2 PAGESCONTINUATION SHEETAIA DOCUMENT G703PROJECT: Nanofiltration Plant Building PaintingAPPLICATION NO:APPLICATION NO:1201 Stirling RdPERIOD FROM:7/5/2022Dania Beach, FL 33004                  TO:7/15/2022A B C D E F G H IItem Description of Work Number Scheduled Bid Complete Work Completed Mat. Stored Total completed% Balance RetainageNo in Bid Value Previous App. This period This Period this period &stored to date to Finish11 $                   ‐   ‐$              ‐$               ‐$               ‐$                ‐$                ‐$                           21 $       1,500.00 1,500.00$     ‐$               1,500.00$     1,500.00$      ‐$                ‐$                           31 $       5,000.00 5,000.00$     ‐$               ‐$               ‐$                ‐$                ‐$                           41 $       5,000.00 5,000.00$     ‐$               ‐$                ‐$               ‐$                ‐$                           ‐$                ‐$                ‐$               ‐$                           11,500.00$    ‐$               1,500.00$      ‐$               1,500.00$      ‐$                ‐$                           MobilizationNanafiltration plant paintingPermit AllowanceContingency for use by owner if