Loading...
HomeMy WebLinkAboutInv# 110169 - CALVIN, GIORDANO & ASSOCIATES, INC. - 10/31/2022CITY OF DANIA BEACH (820)Invoice number 110169 Invoice date 10/31/2022 Page 1 of 11 10/06/2022 0.25 150.00 37.50 - SW 40th Ave FDOT Project -- BC Sanitary sewer lateral damaged -- CEI called because there was a SS lateral hit during the removal of some roots; could not contact BC WWW so I gave them a call and notified them to please send someone out asap; correspondence with CEI concerning the address and provided info to BC; BC confirmed they are sending someone out now; notified CEI 10/06/2022 0.50 150.00 75.00 - FPID: 446370-1 - SR-848 Stirling Rd from west of North 58th Ave to SR-5/US-1 -- correspondence with FDOT consultant confirming there are areas that only have drainage since our utilties do not extend west of I-95 10/06/2022 0.25 150.00 37.50 10/05/2022 0.50 150.00 75.00 - inspection coordination for Lakeshore Drive Improvements Final Inspection (Public Works Permit No. 20- 1410) -- inspector provided photos of the pending deficiencies; confirmed with construction team to fail the inspection; notified EOR 10/05/2022 0.25 150.00 37.50 10/05/2022 0.25 150.00 37.50 - Lakeshore Drive Improvements Final Inspection (Public Works Permit No. 20-1410) -- further coordination with Contractor concerning sidewalk cracks; say that the city did this; I will look into this - inspection coordination for water line Inspec Atlantica - coordination with construction team on results from PSD - 446370-1 - SR-848 Stirling Rd from west of North 58th Ave to SR-5US-1 -- sent overlay from PSD to PM coordinator 10/04/2022 0.50 150.00 75.00 - ERC -- 446997-1 | ERC 45 follow up -- correspondence with Reviewer to confirm I accept his response; updated in the ERC system 10/04/2022 0.50 150.00 75.00 General Project Supervision Project Manager (IV) Heidi B. Henderson Date Hours Rate Billed Amount Labor 10-107 ENGINEERING PROGRAM MANAGEMENT Billing period through October 31, 2022 CGA PM: Jenna Martinetti PO# 2022-00000047 PO# 2023-00000067 - $150,000.00 Email: AP@daniabeachfl.gov CC: Dincer A. Ozaydin <dozaydin@daniabeachfl.gov> CC: AJohnson@daniabeachfl.gov CC: Tstevens@daniabeachfl.gov CITY OF DANIA BEACH (820) ATTN: FINANCE DEPT 100 W. DANIA BEACH BLVD DANIA BEACH, FL 33004 Invoice number 110169 Date 10/31/2022 Project 192777 DANIA BEACH MISCELLANEOUS ENGINEERING SERVICES APPROVED BY DEPUTY DIRECTOR 11/28/2022 Date 10/31/2022 Invoice number 110169CITY OF DANIA BEACH (820) 192777 DANIA BEACH MISCELLANEOUS ENGINEERING SERVICESProject CITY OF DANIA BEACH (820)Invoice number 110169 Invoice date 10/31/2022 Page 2 of 11 10/13/2022 0.75 150.00 112.50 - 10/22/2022 9am to 4pm - Detour/Road Closure - FPL WR#10288803 - Broward County r/w Permit# 2021-376- EP - Anglers Ave/Ravenswood Rd - FPL Pole Installation - Concurrent -- followed up with the request for MOT and the request on their letterhead for review prior to approval 10/13/2022 0.25 150.00 37.50 10/12/2022 0.25 150.00 37.50 - Masri Estates - New ROW permit --provided the information that is required for the ROW permit submittal - Lakeshore Drive Improvements Final Inspection (Public Works Permit No. 20-1410) -- notified contractor to provide proof that the city damaged the sidewalk or they will need to repair it and to confirm the sod is underway 10/11/2022 0.25 150.00 37.50 - Lakeshore Drive Improvements Final Inspection (Public Works Permit No. 20-1410) -- contacted PSD to confirm if they know how the sidewalk was cracked to determine if we can close out the permit 10/10/2022 0.25 150.00 37.50 - Lakeshore Drive Improvements Final Inspection (Public Works Permit No. 20-1410) -- coordination with construction team to look into the possiblity that the sidewalk was cracked by the city as they say; reviewed previous inspection requests and information 10/07/2022 0.25 150.00 37.50 - 445625-1-52-01 (D4) -- SYSTEMATIC INTERSECTION LIGHTING IMPROVEMENTS- BROWARD COUNTY -- confirmed that this site is not within city limits via correspondence with FDOT PM 10/07/2022 0.25 150.00 37.50 - UPLOAD BY FRI ERC 447679-1-52-01 SR-810HILLSBORO BLVD FROM SR-7US-441 TO SR- 845POWERLINE ROAD -- logged into ERC system to confirm this request has been removed - (UTILITY ATLAS) New Development Dania Beach - Engineering Details -- Imeca Dev. 501 Stirling Road -- received atlas from PSD and sent to EOR; notified him that the water and sewer letter will be forthcoming next week; confirmed they resubmitted yesterday for DRC 10/07/2022 0.25 150.00 37.50 - Masri Estates -- reviewed the plans and BC application to be signed by PSD; provided comments to the EOR for them to respond and requested drainage calculations for review; revised application 10/07/2022 1.00 150.00 150.00 - 46 SW 1ST. AVE (101 DANIA BEACH 2ND PHASE) -- reviewed request from EOR concerning confirmation of required infrastructure improvements; correspondence with EOR 10/07/2022 0.50 150.00 75.00 - 101 Dania Beach Apartments -- reviewed the FDEP water, FDEP sewer, and BC sewer applications for PSD signature; reviewed prior correspondence of the project, DRC comments and conditions, water capacity confirmation letter, approved plans; correspondence with the City to confirm water extension limits and ownership of FM in ROW; redlines applications 10/07/2022 2.00 150.00 300.00 10/07/2022 0.25 150.00 37.50 - Imeca Dev -- request for capacity letter; requested the info required to complete the request; and sent the form to be filled out; requested updated atlas and as-builts from PSD to aid in their design 10/06/2022 0.50 150.00 75.00 10/06/2022 0.50 150.00 75.00 - 4201 SW 53rd Street Storm Drain -- BC WWW called and there is a broken SW pipe that has caused BC SS lateral to burst; checked atlas and we do have drainage; contacted PSD Ops to send someone out - dropped off ROW permits at PSD General Project Supervision Project Manager (IV) Heidi B. Henderson Date Hours Rate Billed Amount Labor 10-107 ENGINEERING PROGRAM MANAGEMENT Date 10/31/2022 Invoice number 110169CITY OF DANIA BEACH (820) 192777 DANIA BEACH MISCELLANEOUS ENGINEERING SERVICESProject CITY OF DANIA BEACH (820)Invoice number 110169 Invoice date 10/31/2022 Page 3 of 11 - Permit 22-1237 Pre-Con Request -- correspondence with Contractor; checked PSD calendars; confirmed locaiton and requested plans; sent invitation to team 10/24/2022 0.25 150.00 37.50 - Permit #: 2021-C-491-00010 Pending Permit Expiration -- coordination with electrical engineer for as-builts and certificaiton needed to close out the project 10/24/2022 0.25 150.00 37.50 - City Place Apts. - Test Well -- Applicant requested that the well be placed in the ROW; reached out to EOR to confirm the reason in ROW, depth of the test well, and the area needed including the equipment 10/24/2022 0.25 150.00 37.50 10/24/2022 0.50 150.00 75.00 - 10/29/2022 9am to 4pm - Detour/Road Closure - FPL WR#10288803 - Broward County r/w Permit# 2021-376- EP - Anglers Ave/Ravenswood Rd - FPL Pole Installation - Concurrent -- received approval from PSD; coordination with PSD to post the information on the city's website; notified FPL of the approval - 10/29/2022 9am to 4pm - Detour/Road Closure - FPL WR#10288803 - Broward County r/w Permit# 2021-376- EP - Anglers Ave/Ravenswood Rd - FPL Pole -- received revised letter; saved files; made revisions; sent to PSD for approval 10/21/2022 0.50 150.00 75.00 - CW Thomas Park - 800 MW 2nd St. -- correspondence with Applicant to on the water and sewer availability letter requirements 10/21/2022 0.25 150.00 37.50 - 10/29/2022 9am to 4pm - Detour/Road Closure - FPL WR#10288803 - Broward County r/w Permit# 2021-376- EP - Anglers Ave/Ravenswood Rd - FPL Pole Installation - Concurrent -- reviewed MOT letter and requested revisions 10/21/2022 0.25 150.00 37.50 10/21/2022 0.25 150.00 37.50 - 101 Dania Beach Apts - call with Engineering firm to discuss W&S availability request; further correspondence confirming documents sent for review since it appears that already have one in place 10/20/2022 0.25 150.00 37.50 - E4V55 Dania Bridge Cutoff Pre-Construction Field Meeting -- pre-construction meeting 10/20/2022 1.50 150.00 225.00 - 46 SW 1ST. AVE (101 DANIA BEACH 2ND PHASE) -- confirmed with PSD that they will need a separate LS for this phase since it is across the street 10/20/2022 0.25 150.00 37.50 - 46 SW 1ST. AVE (101 DANIA BEACH 2ND PHASE) -- call with the EOR to discuss the possiblity of using Phase 1's LS for Phase 2; however, it is across the street so reached out to PSD to confirm if at all possible 10/18/2022 0.25 150.00 37.50 - 0630.2200047.0000 Tiki Restaurant and Bar -- W, S, SW ATLAS -- received the water atlases from COH; inquired with PSD Ops if we received the SS atlas; requested PSD GIS to update our GIS to indicate that the WM is owned by COH 10/17/2022 0.25 150.00 37.50 - 101 Dania Beach - Water and Sewer Applications -- reviewed the revised applications indicating that the City will O&M the FM in the ROW from the project to the connection on Dania Beach Blvd and sent to PSD for review; received PSD approval and sent to EOR 10/13/2022 0.50 150.00 75.00 - Masri Estates - forms to be signed by the City -- reviewed the information requested (calculations, resolution, hydraulic conductivity report); forward the BC SWM application to PSD to confirm approval of O&M and confirmation for the EOR to submit for the BC SWM license General Project Supervision Project Manager (IV) Heidi B. Henderson Date Hours Rate Billed Amount Labor 10-107 ENGINEERING PROGRAM MANAGEMENT Date 10/31/2022 Invoice number 110169CITY OF DANIA BEACH (820) 192777 DANIA BEACH MISCELLANEOUS ENGINEERING SERVICESProject CITY OF DANIA BEACH (820)Invoice number 110169 Invoice date 10/31/2022 Page 4 of 11 10/27/2022 0.50 150.00 75.00 - City Place permit applications -- call from Applicant to discuss timing; went over things I will be looking for during my review 10/26/2022 0.25 150.00 37.50 - 2020-284-EP - EXTENSION NEEDED-Old Griffin Rd Bryan Rd to US 1-Dania Beach -- reviewed FPL's request for road closure; requested revisions; correspondence with FPL 10/26/2022 0.50 150.00 75.00 10/24/2022 0.25 150.00 37.50 - 2020 - 284 - EP Tonight 10/24 --correspondence with FPL permitting and provided requirements of road closure request, timing, and provided a sample of the letter for them 10/24/2022 0.25 150.00 37.50 - 2020 - 284 - EP Tonight 10/24 -- received a call from FPL to confirm they can have the road closure tonight; advised them the city needs 2 weeks advance per our previous conversations and to send me a plan, permit, MOT, etc. to see the soonest PSD will approve them 10/24/2022 0.25 150.00 37.50 10/24/2022 0.25 150.00 37.50 - - Permit 22-1237 Pre-Con Request -- received address and scope of work; updated invitation; provided PSD the permit and scope 10/24/2022 0.25 150.00 37.50 - 10/29/2022 9am to 4pm - Detour/Road Closure - FPL WR#10288803 - Broward County r/w Permit# 2021-376- EP - Anglers Ave/Ravenswood Rd - FPL Pole Installation -- reviewed the post online from PSD; confimed the information was correct 10/24/2022 0.25 150.00 37.50 - City Place Apts. - ROW Permit 2022-1550 -- Applicant requested approval of the traffic study for the ROW permit; requested approval from Traffic to prepare the confirmation for the Applicant - 500 E. Dania Beach Blvd - SP-035-22 Site Plan KingHead DRC Comments -- EOR called to go over gauge coordination; water model; and FDOT coorddination; email PSD Ops to confirm guage location; emailed PSD PM to provide model; emailed FDOT so he can coordinate the timing of the projects - City Place Apts. - Test Well -- received additional information from the EOR to confirm the test well will be 160 feet deep and that it is not within the ROW but that the work will extend into the ROW thus the need for the ROW permit; EOR confirmed MOT will be submitted 10/24/2022 0.25 150.00 37.50 10/24/2022 0.25 150.00 37.50 10/24/2022 0.25 150.00 37.50 - 500 E. Dania Beach Blvd - SP-035-22 Site Plan KingHead DRC Comments -- EOR requested FM pressure; advised him that his team would need to install a pressure gauge 10/24/2022 0.25 150.00 37.50 - inspection coordination for ROW number: 2021-0861; ROW number: 2019-1930 10/24/2022 0.25 150.00 37.50 - FPID: 446370-1 - SR-848 Stirling Rd from west of North 58th Ave to SR-5/US-1 -- checked ERC for submittals due; confirming with designer if I need to submit the overlay on FDOT ERC since I had emailed the overlay directly to him per his request - 2020 - 284 - EP Tonight 10/24 -- received can email from FPL saying that they will be working tongiht; requested plans, confirmation of scope, MOT, permit, road closure, etc. information - 446198-1 - SR-A1A/DANIA BEACH BLVD FROM SR-5/US-1 TO GULFSTREAM ROAD: Memorandum of Understanding - Street Lighting Services -- FDOT is asking for concurrence to proceed; requested clarity if they need an approval of the MOU and if so to resend what the approval is exactly for; received MOU; requested confirmation this is only for lighting General Project Supervision Project Manager (IV) Heidi B. Henderson Date Hours Rate Billed Amount Labor 10-107 ENGINEERING PROGRAM MANAGEMENT Date 10/31/2022 Invoice number 110169CITY OF DANIA BEACH (820) 192777 DANIA BEACH MISCELLANEOUS ENGINEERING SERVICESProject CITY OF DANIA BEACH (820)Invoice number 110169 Invoice date 10/31/2022 Page 5 of 11 10/05/2022 0.50 150.00 75.00 10/04/2022 0.25 150.00 37.50 - provided response to CGA team concerning pending comment on the bid recommendation letter 10/04/2022 0.50 150.00 75.00 - reviewed email concerning materials from Canseco Electric; contacted Canseco Electric to discuss 10/04/2022 0.25 150.00 37.50 - finalized bid recommendation letter and sent to the city - revised bid recommendation letter for submission to the City 10/04/2022 0.25 150.00 37.50 - followed up with CGA team on internal review for bid recommendation letter 10/03/2022 0.25 150.00 37.50 - went over locations and proposed structures with PSD; confirming 4 structures and lights / garland are underway 10/03/2022 0.50 150.00 75.00 General Project Supervision Project Manager (IV) Heidi B. Henderson Date Hours Rate Billed Amount Labor 10-124 FDOT UTILITY PERMIT FOR HOLIDAY LIGHTS PHASE 3 - MEDIANS - 21-1984 Request for Pre-Con -- correspondence with CGA construction team and PSD; called Mastec to discuss the pre-con; email to Mastec to request plans and information to schedule the pre-con with PSD 10/31/2022 0.50 150.00 75.00 - City Place -- Water and Sewer Applications review 10/31/2022 1.00 150.00 150.00 - 101 DB Apt Phase 2 -- called the EOR to go over the water and sewer availability request; printed documents for review 10/31/2022 0.50 150.00 75.00 - 6FB1513C Utility Location Request -- correspondence with requestor and PSD GIS to complete the request for atlases 10/28/2022 0.25 150.00 37.50 - inspection coordination for 2021 0861 & 2019 1930 with CGA construction team to see if the inspections occurred; contacted the contractor to confirm if she needs anything further from the city at this time 10/27/2022 0.25 150.00 37.50 - OSP - Permit #: 2021-C-491-00010 Pending Permit Expiration -- coordination with PSD and Electrical Engineer to go onsite and verify that the equipment has been installed properly 10/27/2022 0.25 150.00 37.50 - 600 East Dania Beach Residence -- called the EOR back concerning an inspection request; discussed the status of the project and if there had been a pre-construction meeting yet; he thought so a year or so back; notified the EOR that it is recommended to have a meeting before they complete the pavement restoration; emailed EOR so he has my contact information and confirmed with PSD Ops that they will be at the water tap tomorrow General Project Supervision Project Manager (IV) Subtotal 22.50 3,375.00 Heidi B. Henderson Date Hours Rate Billed Amount Labor Phase subtotal 3,375.00 10-107 ENGINEERING PROGRAM MANAGEMENT Date 10/31/2022 Invoice number 110169CITY OF DANIA BEACH (820) 192777 DANIA BEACH MISCELLANEOUS ENGINEERING SERVICESProject CITY OF DANIA BEACH (820)Invoice number 110169 Invoice date 10/31/2022 Page 6 of 11 Modified section 16.31 in the Contract Addendum per Heidi's instrcution 10/20/2022 0.25 100.00 25.00 Engineering Design Jr. Engineer (I) Tavares Jackson Follow up on all emails. Coordinate field visit with electrician date and time. 10/31/2022 0.50 150.00 75.00 Engineering Design Project Manager (IV) Jorge R. Cervantes - reviewed the revised agreement; correspondence with legal; and sent to contractor for signature 10/21/2022 0.75 150.00 112.50 - received initialed agreement and reviewed correspondence that was forwarded; the correspondence did not indicate the delay of materials as he noted; advised to please make sure to send the actual correspondence so that we are aware of the reason as to why there are delays in materials 10/21/2022 0.25 150.00 37.50 - call with legal to go over the revisions needed for the agreement; redlined revisions necessary to be completed 10/20/2022 0.25 150.00 37.50 - looked over revisions from legal; responded to PSD 10/19/2022 0.25 150.00 37.50 - reviewed the revised addendum; correspondence with the contractor and correspondence with DB Legal 10/18/2022 1.00 150.00 150.00 - called contractor to confirm he understands we cannot modify the bid cost and he agreed; requested legal to finalize the agreement to proceed 10/17/2022 0.25 150.00 37.50 - correspondence with legal department and the contractor to confirm that the city cannot increase the cost of the project 10/14/2022 0.50 150.00 75.00 - City of Dania Beach Agreement-Canseco Electrical Contractors, Inc.-addendum -- received redlines from Contractor; confirmed with PSD that procurement is completing these and if they need anything further 10/13/2022 0.25 150.00 37.50 - call with the Contractor to provide redlines needed for the agreement and to get going on all items to begin construction ASAP 10/06/2022 0.50 150.00 75.00 - correspondence to confirm the status of the material availability General Project Supervision Project Manager (IV) Subtotal 6.50 975.00 Heidi B. Henderson Date Hours Rate Billed Amount Labor Phase subtotal 1,075.00 10-124 FDOT UTILITY PERMIT FOR HOLIDAY LIGHTS PHASE 3 - MEDIANS Date 10/31/2022 Invoice number 110169CITY OF DANIA BEACH (820) 192777 DANIA BEACH MISCELLANEOUS ENGINEERING SERVICESProject CITY OF DANIA BEACH (820)Invoice number 110169 Invoice date 10/31/2022 Page 7 of 11 10/20/2022 0.50 150.00 75.00 - call with City legal to go over comments from FDOT; redlined revisions necessary to be completed 10/20/2022 0.25 150.00 37.50 - further coordination with FDOT concerning comments; correspondence with DB legal to assist on revisions needed - correspondence with FDOT to confirm the requested revisions for the CA 10/20/2022 0.50 150.00 75.00 10/13/2022 0.25 150.00 37.50 - followed up with FDOT to check on the legal review for the construction agreement - heard back from FDOT; added the previous MOA number to the info sheet and resubmitted via OSP 10/06/2022 0.50 150.00 75.00 - reuploaded Exhibits to the OSP website; followed up with FDOT to confirm receipt and when we should anticipate the next steps 10/06/2022 0.50 150.00 75.00 - correspondence with FDOT; uploaded Exhibits A and C per their direction to OSP 10/03/2022 0.50 150.00 75.00 General Project Supervision Project Manager (IV) Subtotal 3.00 450.00 Heidi B. Henderson Date Hours Rate Billed Amount Labor 10-188 ADDITIONAL HOLIDAY LIGHTS ON US-1 PHASE 4 - correspondence with FDOT to confirm no penalty for an extension request; coordination with Electrical Engineer when the extension should be until; sent request via FDOT OSP system 10/31/2022 0.50 150.00 75.00 - coordination with Contractor and Electrical Engineer on the onsite meeting; updated the calendar invite 10/31/2022 0.25 150.00 37.50 - further coordination of onsite verification of equipment installation; sent invite for the Electrical Engineer and contractor to meet onsite 10/29/2022 0.25 150.00 37.50 - coordination with Electrical Engineering and the Contractor to schedule a time to do the equipment installation verification for the as-builts and certification 10/28/2022 0.25 150.00 37.50 10/28/2022 0.25 150.00 37.50 - checked the FDOT OSP system to see when the permit expires; emailed FDOT to see if I should go ahead and extend the permit - coordination of permit closeout with Electrical Engineer and PSD; PSD to provide as-builts and times to go to each location to verify work has been completed 10/25/2022 0.50 150.00 75.00 General Project Supervision Project Manager (IV) Subtotal 2.00 300.00 Heidi B. Henderson Date Hours Rate Billed Amount Labor Phase subtotal 300.00 10-185 FDOT UTILITY PERMIT FOR HOLIDAY LIGHTS PHASE 2 - ADDITIONAL POLES ON GRIFFIN Date 10/31/2022 Invoice number 110169CITY OF DANIA BEACH (820) 192777 DANIA BEACH MISCELLANEOUS ENGINEERING SERVICESProject CITY OF DANIA BEACH (820)Invoice number 110169 Invoice date 10/31/2022 Page 8 of 11 10/31/2022 1.00 75.00 75.00 Coordinated and scheduled a pre-con inspection for 21-1984; updated log to reflect 10/28/2022 1.50 75.00 112.50 -Updated logged and New World with inspection status -Filed and logged Closed permit -Coordinated inspections with Ian -Assisted DB Ladies with questions -Coordinated and confirmed type of inspection and scheduled inspections with the contractor/CGA Inspector/DB PW Dept 10/27/2022 2.00 75.00 150.00 -Filed and logged Closed permit 10/26/2022 0.50 75.00 37.50 -Assisted Inspector with questions regarding pending/failed inspection -Filed and logged Closed permit 10/21/2022 1.25 75.00 93.75 10/14/2022 0.25 75.00 18.75 -Assisted Inspector with questions regarding pending/failed inspection 10/11/2022 2.00 75.00 150.00 -Filed and logged Closed permit -Updated log with Darren's inspection notes -Updating DB inspection log -Called Chloe and requested a form inspection be added to a permit -Closed out and updated new world with passing inspection information -Requested permits to be closed in New World - 10/10/2022 2.00 75.00 150.00 10/07/2022 1.00 75.00 75.00 Research permit #20-1410 for any information pertaining to failed inspection for Heidi (Cracked Sidewalks Questions) -Updating DB inspection log -Coordinating new inspection requests with Inspector -Confirming detail on inspections with Heidi before failing an inspection - 10/05/2022 2.50 75.00 187.50 Administration Administrative Assistant/Clerical Subtotal 14.00 1,050.00 Amanda LaFevers Date Hours Rate Billed Amount Labor 50-100 CONSTRUCTION OBSERVATON Modified exhibit A per Heidi's instruction. 10/20/2022 0.25 100.00 25.00 Engineering Design Jr. Engineer (I) Tavares Jackson Date Hours Rate Billed Amount Labor Phase subtotal 475.00 10-188 ADDITIONAL HOLIDAY LIGHTS ON US-1 PHASE 4 Date 10/31/2022 Invoice number 110169CITY OF DANIA BEACH (820) 192777 DANIA BEACH MISCELLANEOUS ENGINEERING SERVICESProject CITY OF DANIA BEACH (820)Invoice number 110169 Invoice date 10/31/2022 Page 9 of 11 10/27/2022 2.00 90.00 180.00 coordination on new incoming inspections 10/26/2022 3.00 90.00 270.00 Permit #22-1079, contractor did not know how to restore to correct standards. I educated him on the subject 10/25/2022 2.00 90.00 180.00 job instruction for permit #22-1079 10/24/2022 6.00 90.00 540.00 site visits to permit #'s 22-1079, 22-1295, 21-0689 & 21-1175. Field Inspection & Observation Inspector Subtotal 13.00 1,170.00 Ian Davaiu Date Hours Rate Billed Amount Labor Phase subtotal 2,220.00 50-100 CONSTRUCTION OBSERVATON Invoice total 7,445.00 Date 10/31/2022 Invoice number 110169CITY OF DANIA BEACH (820) 192777 DANIA BEACH MISCELLANEOUS ENGINEERING SERVICESProject CITY OF DANIA BEACH (820)Invoice number 110169 Invoice date 10/31/2022 Page 10 of 11 50-100 CONSTRUCTION OBSERVATON 0.00 56,230.00 2,220.00 58,450.00 -58,450.00 31-100 SOFTWARE 0.00 0.00 0.00 0.00 0.00 30-100 DATA TECH & DEV 0.00 0.00 0.00 0.00 0.00 15-100 CEI 0.00 0.00 0.00 0.00 0.00 10-188 ADDITIONAL HOLIDAY LIGHTS ON US-1 PHASE 4 0.00 3,417.50 475.00 3,892.50 -3,892.50 10-187 SLUDGE WALL FOR PSD/WATER PLANT 0.00 337.50 0.00 337.50 -337.50 10-186 PERMITTING FOR GRIFFIN BRIDGE MURAL 0.00 5,207.50 0.00 5,207.50 -5,207.50 10-185 FDOT UTILITY PERMIT FOR HOLIDAY LIGHTS PHASE 2 - ADDITIONAL POLES ON GRIFFIN 0.00 1,087.50 300.00 1,387.50 -1,387.50 10-124 FDOT UTILITY PERMIT FOR HOLIDAY LIGHTS PHASE 3 - MEDIANS 0.00 40,442.50 1,075.00 41,517.50 -41,517.50 20-101 FPL EASEMENT-DANIA BEACH MARINA 0.00 1,435.00 0.00 1,435.00 -1,435.00 20-108 SURVEY - MISC ASSISTANCE 0.00 1,592.50 0.00 1,592.50 -1,592.50 20-102 SE 2ND AVE WM EMERGENCY SURVEY & DATUM CONVERSION - SURVEY 0.00 7,997.50 0.00 7,997.50 -7,997.50 10-167 CITY FDOT UTILITY PERMIT FOR HOLIDAY LIGHTS 0.00 40,591.25 0.00 40,591.25 -40,591.25 10-122 SE 2ND AVE WM EMERGENCY SURVEY & DATUM CONVERSION - ENG 0.00 8,281.25 0.00 8,281.25 -8,281.25 10-121 LS 7 REHABILITATION 0.00 3,600.00 0.00 3,600.00 -3,600.00 10-120 ELECTRICAL ENGINEERING 0.00 0.00 0.00 0.00 0.00 10-119 FDOT CRA MULTIMODAL PEDESTRIAN SAFETY IMPROVEMENTS 0.00 650.00 0.00 650.00 -650.00 10-118 BRIDGE MAINTENANCE SUPPORT 0.00 1,235.00 0.00 1,235.00 -1,235.00 10-117 43RD TERRACE DRAINAGE 0.00 675.00 0.00 675.00 -675.00 10-116 BEACHFRONT RESTROOM RENOVATIONS 0.00 650.00 0.00 650.00 -650.00 10-115 QUARTERDECK ELEVATOR 0.00 0.00 0.00 0.00 0.00 10-114 UNDERGROUNDING OF UTILITIES AT THE BEACH 0.00 3,635.00 0.00 3,635.00 -3,635.00 10-113 BEACH PARKING LOT DRAINAGE 0.00 775.00 0.00 775.00 -775.00 10-112 SE DRAINAGE IMPROVEMENTS 0.00 1,645.00 0.00 1,645.00 -1,645.00 10-111 US1 TRANSIT IMPROVEMENTS 0.00 700.00 0.00 700.00 -700.00 10-110 LS 10 REHABILITATION 0.00 800.00 0.00 800.00 -800.00 10-109 LS 5 REHABILITATION 0.00 1,175.00 0.00 1,175.00 -1,175.00 10-108 SW 40TH AVE - FDOT 0.00 5,652.50 0.00 5,652.50 -5,652.50 20-100 SW 40TH AVE ROW DEDICATION 0.00 1,042.50 0.00 1,042.50 -1,042.50 10-107 ENGINEERING PROGRAM MANAGEMENT 0.00 182,186.25 3,375.00 185,561.25 -185,561.25 10-106 ENGINEERING-MISC.0.00 5,100.00 0.00 5,100.00 -5,100.00 10-104 ENGINEERING-WATER 22,000.00 27,816.25 0.00 27,816.25 -5,816.25 10-103 ENGINEERING-STORM SEWER 21,075.00 25,612.50 0.00 25,612.50 -4,537.50 10-102 ENGINEERING-SANITARY SEWER 28,537.00 31,640.00 0.00 31,640.00 -3,103.00 10-101 ENGINEERING-ROADWAY 44,013.50 73,321.25 0.00 73,321.25 -29,307.75 DANIA COVE DRAINAGE 0.00 3,047.50 0.00 3,047.50 -3,047.50 ENGINEERING-DEVELOPMENT REVIEW 0.00 74,522.50 0.00 74,522.50 -74,522.50 Description Contract Amount Prior Billed Current Billed Total Billed Remaining Invoice Summary Date 10/31/2022 Invoice number 110169CITY OF DANIA BEACH (820) 192777 DANIA BEACH MISCELLANEOUS ENGINEERING SERVICESProject CITY OF DANIA BEACH (820)Invoice number 110169 Invoice date 10/31/2022 Page 11 of 11 110169 10/31/2022 7,445.00 7,445.00 Total 7,445.00 7,445.00 0.00 0.00 0.00 0.00 Aging Summary Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120 99-100 REIMBURSABLES 0.00 0.00 0.00 0.00 0.00 70-101 ENVIRONMENTAL 0.00 0.00 0.00 0.00 0.00 70-100 LANDSCAPE ARCHITECTURE 0.00 0.00 0.00 0.00 0.00 66-100 GOVERNMENTAL SERVICES 0.00 0.00 0.00 0.00 0.00 60-100 PLANNING ASSISTANCE 0.00 450.00 0.00 450.00 -450.00 Total 115,625.50 612,551.25 7,445.00 619,996.25 -504,370.75 Invoice Summary Description Contract Amount Prior Billed Current Billed Total Billed Remaining