HomeMy WebLinkAboutInv# S Jones Deposit - USA ROOFING AND CONSTRUCTION - 03/16/2024INVOICE / WORK ORDER
USA ROOFING AND CONSTRUCTION INC
1118 N 46th Terrace
Hollywood, FL 33021, USA
(954) 893-2550
usaroofingworkiz@gmail.com
Invoice #321
Date Mon Mar 11 2024
Balance 2966.17
Due On Mon Mar 11 2024
Bill To:
DANIA BEACH STORM PROTECTION PROGRAM
Shirley Jones (130 SW 5th Ct , Dania Beach, Fl
33004)
130 SW 5th Ct
Dania Beach, Florida 33004
(954) 924-6800#3674
spp@daniabeachfl.gov
Service Location: 130 SW 5th Ct
Dania Beach, Florida 33004
Description QTY Price Amount
INITIAL DOWN PAYMENT
Initial down payment for shingles roof replacement,
approved by the Storm Protection Program. (City of Dania
Beach).
Balance remaining of $5,932.33
1 2966.17 2966.17
Sub total 2966.17
Tax 0.00
Tax Rate 0.00%
Page 1 of 7
Total 2966.17
Balance 2966.17
TERMS AND CONDITIONS
Contractor and Owner, in consideration of the mutual covenants and conditions contained herein and other good and valuable
consideration, the receipt and sufficiency of which are hereby conclusively acknowledged, hereby agree as follows on the date
set forth below:
CONTRACT DOCUMENTS: Contractor is USA ROOFING AND CONSTRUCTION, INC. and has license numbers CBC1266379 and
CCC1334537. The Contract Documents consist of this Contract and the documents set forth above and those documents
referenced including the Florida Construction Disclosures and the Right of Rescission. The Contract Documents also include any
modifications of this Contract subsequent to its execution. These documents form the Contract, and are as fully a part of the
Contract as if attached to this Contract. The Contract represents the entire agreement between the parties and supersedes prior
negotiations, representations or agreements, either written or oral. If anything in the other Contract Documents is inconsistent
with this Contract, this Contract shall govern. The Contractor shall be furnished, free of charge, such copies of any and all
drawings, plans, and specifications as are reasonably necessary for execution of the Work.
WORK: The term “Work” means the materials and services expressly set forth in the Contract Documents. The Work may
constitute the whole or a part of the Project. The scope of Work may be increased, decreased, changed or modified by
agreement of the parties. All listed limitations and exclusions are specifically excluded from this Contract, the Work and the
Contract Price. All allowances are an estimate and costs and fees in excess of an allowance item shall be billed and paid as a
Change Order.
CONTRACT PRICE: Subject to exclusions and allowances, Change Orders, claims and other additions and deductions as set forth
herein, Owner shall pay to Contractor the Contract Price. Punch list or warranty items or issues do not constitute a basis for
withholding payment to the Contractor. All payment shall be made in good U.S. funds. Unpaid amounts shall bear interest from
the date payment is due at 1.5% per month.
PROGRESS PAYMENTS: Owner shall pay to Contractor any deposit no later than (5) days of the last party executing this
Agreement. Payment shall be made to Contractor as otherwise set forth in this agreement or within seven (7) days after
receiving an invoice or payment application, whichever is earlier. Time is of the essence with respect to all progress payments
by Owner.
FINAL PAYMENT: A final payment, consisting of the unpaid balance of the Contract Price shall be made as set forth in this
agreement or within seven (7) days after substantial completion of the Work by Contractor, whichever is earlier. Time is of the
essence with respect to final payment by Owner.
OWNER REPRESENTATIVE: If multiple Owners sign this agreement, any Owner has full authority to direct the Contractor to do
extra work or make changes to the scope of Work. Any and all instructions (written or oral), acts, or omissions of the any Owner
shall bind the Owner as if made by all Owners.
COOPERATION WITH LENDER: Owner shall cooperate with any lending entity or entities providing financing for the Project and
shall supply such information and certifications as may reasonably be required, from time to time, in order that Owner can satisfy
conditions for lender to make payments to Contractor. Owner shall not hinder or delay the approval of the work to delay or
prevent payment to Contractor.
ACCEPTANCE: Owner shall immediately inspect the Work when it has been completed and any aspect of the Work not acceptable
to the Owner must be specifically noticed in writing to the Contractor within five calendar days following completion of that
aspect of the Work or the Work whole. Owner’s failure to provide written notice to Contractor of any issues, claims or defects
within 14 days of Owner’s beneficial use of the Project and Work, or the issuance of a certificate of completion or certificate of
occupancy, whichever is sooner. Contractor shall be given a reasonable opportunity to address the issue (as set forth herein and
pursuant to Florida law).
TIME: Contractor shall achieve substantial completion and final completion of the entire Work in a reasonable amount of time
subject to the conditions and circumstances surrounding the Work and Project. The Owner shall make the Project available and
take all steps necessary to allow the Contractor to perform the Work on the Project not less than fifty hours per week, Monday
through Saturday, 7AM to 5PM. Any and all substantial completion and final completion dates provided are merely estimates.
CHANGE ORDERS: Owner and Contractor may agree to changes, additions, or deletions in the scope of work without invalidating
this Contract (“Change Order”). Contractor and Owner shall agree on said change order work and costs in writing and Contractor
shall thereupon perform the changed Work in accordance with the terms of this Contract, Contract Documents and the Change
Order. Contractor shall not be obligated to perform any changed work prior to mutual agreement of the parties. However,
Contractor may rely on an Owner’s oral directive to perform changed work and the Owner remains obligated to pay for same.
The Owner shall reimburse Contractor for all costs and fees incurred in connection with permits, permit processing, permit
expediting, testing, inspections, fines, and code violation payments related to the Work and said costs shall be in excess of the
contract price. In the event of increases in the cost of materials to the Contractor after the date of this Contract, the Contractor
Page 2 of 7
shall pass on such increases as extra costs which the Owner agrees to pay as an additive change. If material or equipment,
which the Contractor is required to furnish under this Contract, become unavailable, either temporarily or permanently,
subsequent to the execution of the Contract, through causes beyond its direct control, then in the case of temporary
unavailability, the contract time shall be extended for such period of time as the Contractor shall be delayed by such
unavailability; and in the case of permanent unavailability, the Contractor shall be excused from the requirement of furnishing
such materials or equipment. The Owner agrees to pay the Contractor any increase in cost between the cost of the material or
equipment or furnishing (as an additive change) which has become permanently unavailable and the cost of the closest
substitute which is then reasonably available.
WARRANTY: The Contractor warrants to the Owner only that all materials furnished by it will be of standard quality, type and
condition, free from defects, and will be installed or applied in a good workmanlike manner, in reasonable compliance with
manufacturer’s published application instructions. Should any defect occur within the warranty period, due to defective
materials or workmanship supplied by the Contractor, the Contractor hereby agrees to repair same without
charge, upon receipt of proper notice in writing, by certified mail, providing that the Contractor has been paid
in full and the Owner was not in breach or terminated this Contract. There is no warranty and same shall be
void if the total contract price, as amended, is not paid in full or if the Work or work or materials supplied by
the Contractor are abused, not maintained or modified in any way. All warranty work shall be performed
during normal business hours and within a reasonable time following written notice to the Contractor. Contractor
shall provide no warranty whatsoever on Owner’s supplied materials and/or on the work and/or materials of the Owner’s
alternate contractor(s) and/or specialty contractor(s).
Contractor’s sole obligation is to perform the Work actually depicted and described in the Contract Documents and/or plans and
specifications or the Work directed by Owner. The Contractor is not responsible for missing or conflicting information or
components from the Contract Documents, plans and/or specifications or for the constructability, performance, or use of the
Contract Documents, plans, specifications, or the Project. The Contractor has not and shall not interpret the Contract
Documents, plans, specifications, or Project design in order to fill in missing information or confirm compliance with the
applicable building code, life safety systems, or the Americans with Disabilities Act (ADA) which the Owner agrees are its
obligations.
DEFAULT: Unless permitted by Florida law, this Contract is not cancelable by Owner. If Owner (or those under its direct or
indirect control) through active or passive acts, omissions, or negligence prevents, slows, or delays, the Contractor’s progress of
the Work (for any reason whatsoever) or causes Work to be done out of sequence, or if the Owner fails to make timely payment
to the Contractor, the Owner shall be in default of this Contract. Upon default of this Contract by Owner, Contractor shall have
no further obligations under this Contract and the Owner shall immediately pay to the Contractor the portion of the Contract
Price due and outstanding at the time of default plus Contractor’s lost profit on the uncompleted portion of the Work. Contractor
may cancel this Contract at any time and for no reason, subject to returning to Owner the unused portion of any payments
made.
DISPUTES: If a dispute should arise between Owner and Contractor under or relating to the Work or the Contract, or the breach
thereof, then either party may seek redress of its grievances as to such disputes at law or in equity in a court of competent
jurisdiction located in Broward County, Florida. This Contract shall be governed and construed under the laws of the State of
Florida. Each of the parties hereto consents to the jurisdiction and the venue of any such action in Broward County for all
purposes in connection with this Contract. THE CONTRACTOR AND OWNER WAIVE THEIR RIGHT TO A JURY TRIAL IN ANY AND ALL
ACTIONS AND PROCEEDINGS. The prevailing party in any such suit or defense shall be entitled to recover from the other party
any and all costs and expenses, including but not limited to reasonable attorney's fees and costs, incurred in having to enforce
its rights hereunder, with or without suit.
SITE CONDITIONS: The Contractor employees shall not be required to Work in hazardous conditions and the Owner agrees to
mitigate such conditions prior to commencement of the Work. Contractor is not responsible or liable for vandalism, theft, or
damage to the Work or surrounding areas no matter how caused, including, without limitation, wind, rain, hail, hurricanes, or
acts of God or third parties. The Contractor is not responsible for and shall be entitled to an additive Change Order for any and
all non-visible or unforeseen site conditions, be they underground, under-floor, behind-wall, under roof, above ceiling, or the like,
or any and all other site conditions that are not disclosed to Contractor in writing prior to construction. Contractor is not
responsible to reinstall any alarm system it may have removed. Owner shall, at its expense, contact their alarm company to
reinstall same. Owner shall secure and safeguard all personal property, jewelry, valuables, and pets during work hours.
Contractor is not responsible for damage or theft to personal property that was left in the work area or the well-being of pets.
Contractor shall be given, at no cost, access to water, electric and lighting, and access to the service panel. The trash receptacle
used during the Project is solely for the purpose of collecting construction-related refuse and is not to be used by Owner. Owner
agrees to pay all costs arising from unforeseen issues such as unsafe or illegal conditions, rot or mold, inspector requirements,
overlooked conditions, identifying and removing hazardous materials (lead paint, solvents, asbestos, etc.) before or after the
Project has begun, all as a Change Order. Contractor is not responsible for warping of material, natural grain and texture in
variations of wood and stone, defects in materials, equipment or appliances covered by the manufacturer, driveway cracks
formed after concrete/asphalt has set or standing water, damage due to heat, sunlight or water, rust, mold, termites or wood rot,
any defects arising from work done after inspection by Owner, Refarding fencing and concrete work, underground digging,
damage to sprinkler systems, main water lines, AC lines, drain lines or cable/internet/phone lines.
LIMITATION OF LIABILITY AND INDEMNIFICATION: The Contractor’ liability in any action related to this Contract or the Work
performed hereunder, shall in no event exceed the amount of the Contract Price and such liability may be fully discharged by a
reimbursement of any payments received by the Contractor under this Contract. This limitation of liability is expressly intended
to apply to all types of claims, including but not limited to claims for the Contractor’s own negligence.
Page 3 of 7
EXCEPT AS SPECIFICALLY PROVIDED HEREIN, IF ANY, THERE ARE NO WARRANTIES, EXPRESS OR IMPLIED,
INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A
PARTICULAR PURPOSE. THE CONTRACTOR WILL NOT BE RESPONSIBLE FOR ANY SPECIAL, INCIDENTAL OR
CONSEQUENTIAL DAMAGES AND ANY CLAIM AGAINST THE CONTRACTOR OR ITS AGENTS, OFFICERS, AND
EMPLOYEES SHALL BE LIMITED TO THE REPLACEMENT VALUE OF ITS WORK AND ONLY IF SUCH WORK OR
MATERIAL IS FOUND TO BE DEFECTIVE.
Notwithstanding anything else to the contrary, the Contractor shall have no liability or responsibility for any damages and/or
delays caused by others or for damages or delays either before commencement of, or during said Work, or after said Work,
caused by structural faults, temperature changes and differentials, sun and weather exposure, strikes, material shortages, labor
shortages, war, Acts of God, rain, wind, wind storms, fire, floods, theft, vandalism, hurricanes or any event beyond its direct and
immediate control. Contractor shall not be responsible for any damage which has or may have occurred prior to the
commencement of Contractor’s Work, including, without limitation, drywall, wood, furniture, fixtures, insulation, and paint. Any
interruption in the Work which results in lost time and/or material and is not the sole and direct fault of the Contractor, shall be
paid by the Owner as an extra cost according to time and material lost as an additive Change.
If any claim is made for damage or injury including death, the Owner agrees to indemnify and hold the Contractor harmless from
and against such claim and all loss, damage, injury and expense (including reasonable attorney's fees and costs) that the
Contractor may sustain when such claim is directly or indirectly based or related to the Owner's or its agents', contractors', or
employees' negligent, intentional or wrongful acts or omissions.
OWNER SUPPLIED MATERIALS AND LABOR: If the Owner, before or during the course of the Work, purchases it’s own materials
and/or supplies and/or directly retains the labor and/or services of an alternate contractor(s) and/or specialty contractor(s)
(herein collectively “Owner Supplied Materials and Labor”), then Owner shall (1) be solely responsible for the timely delivery,
coordination, insurance, protection, and security of and for the Owner Supplied Materials and Labor and (2) take all steps
necessary to not adversely affect the Contractor’s construction schedule or the sequence of the Contractor’s Work. At Owner’s
sole cost and expense, Owner shall fully abide by and comply with all of Contractor’s requests that any or all Owner Supplied
Materials and Labor be furnished or held (and stored and not delivered/commenced) at the dates, times, and locations
designated by Contractor at its sole and absolute discretion. Contractor shall have sole discretion to allow or refuse to allow any
trade from working under its permit.
Additionally, all such labor and/or services of an alternate contractor(s) and/or specialty contractor(s) shall be performed under
permits, licenses, and insurance completely separate and apart from the permits, license, and insurance covering the Work of
the Contractor under this Agreement. The Owner hereby agrees to defend, indemnify and hold Contractor harmless from any
and all costs, fees, expenses, damages, losses, impacts, and injuries (including death) caused by the Owner’s alternate
contractor(s) and/or specialty contractor(s) for any reason whatsoever. Notwithstanding the foregoing, the Owner shall, within
five calendar days of retaining said alternate contractor(s) and/or specialty contractor(s), take all steps necessary to cause said
alternate contractor(s) and/or specialty contractor(s) to furnish to Contractor valid, effective, and enforceable certificates of
insurance naming Contractor as an additional insured on said alternate contractor(s) and/or specialty contractor(s) policy. Said
certificate and policy shall specifically prohibit said alternate contractor(s) and/or specialty contractor(s) from amending or
canceling said policy without 30 days prior written notice to Contractor and shall be issued in amounts no less than $1,000,000
by an A+ or better AM Best rated company licensed in Florida. Contractor, at its sole and absolute discretion, may slow or stop
all Work until such time as said insurance certificates are provided. The Owner shall be responsible for any and all incurred
demobilization and/or remobilization costs, fees, and/or impacts suffered by Contractor as an additive Change Order.
SUBCONTRACTS: Those portions of the Work that the Contractor does not customarily perform with the Contractor's own
personnel shall be performed under subcontracts or by other appropriate agreements with the Contractor. Contractor has the
absolute and sole discretion to select and hire the subcontractors and suppliers of its choice. Owner shall not interfere with or
direct the work of said subcontractors.
MATCHING: Contractor will use reasonable efforts to match the color, finish, hue, texture, size, shape, dimension, make, model
and the look and feel of materials, but there will be differences and said differences shall not be a basis to reject Work or refuse
to make payment. Owner is given notice now that a full replacement is needed to avoid variations in the foregoing and if Owner
does not elect a full replacement it assumes the risk and of said variations.
STORAGE: If materials for the Project are ready to install and Owner is not ready, a grace period of 15 days will be given. After 15
days, a delay fee of $100 per week will apply. After 30 days, a delay fee of $250 per week will apply. These fees shall be paid
monthly and shall be paid in advance of the Work continuing.
HOA’s AND CONDOS: Owner is responsible to provide Contractor with the proper contact information for the person in charge of
coordinating and approving construction. Contractor shall not begin its work or order materials until the necessary HOA or CA
approvals are received unless Owner instructs Contractor in writing to commence without said approval, and if so, Owner bears
all of the risk if the approval is delayed or never arrives. Owner is responsible to read and understand the bylaws and rules of
allowed upgrades, colors, styles and Contractor, by to agreeing to sell and install a product, does not warrant or represent that it
will be approved by the HOA or CA. Owner bears all of the risk of its selection of any product, color and style.
RELATIONSHIP OF THE PARTIES: The Owner agrees to furnish and approve, in a timely manner, information requested by the
Contractor and to make payments to the Contractor in accordance with the requirements of the Contract Documents. The
Owner shall, at the request of the Contractor, furnish to the Contractor reasonable evidence that financial arrangements have
been made to fulfill the Owner’s obligations under the Contract. Furnishing of such evidence shall be a continuing condition
precedent to the Contractor’s further obligation under this Contract.
Page 4 of 7
MISCELLANEOUS: In the event that any term, provision, or part of the Contract is held to be illegal, invalid or unenforceable, such
term, provision, or part shall be deemed severed from the Contract and the remaining terms, provisions and parts shall remain
unaffected thereby. Where the context requires, neutral terms used herein shall include the masculine and feminine, and
singular terms shall include the plural, and vice versa. This Contract, including the documents incorporated herein by reference,
embodies the entire agreement of the parties and supersedes all prior negotiations, agreements and understandings relating to
the subject matter hereof. No requirement of this Contract may be waived or modified except by a written document signed by
at least one authorized representative of each party. The captions of the articles in this Contract are inserted only as a matter of
convenience and for reference and in no way define, limit or describe the scope of any article or paragraph herein. All reference
to days shall mean calendar days unless otherwise specified. All notices called for in this Agreement shall be in writing and
addressed to one or more of the authorized representatives set forth in this Agreement. The person signing this Contract
represents and warrants that he/she is the lawful fee simple owner of the property where the Work is being performed or is an
expressly authorized agent for the owner of the property. Notwithstanding, the party signing this Contract agrees to be
individually and personally bound by the terms and conditions contained herein and shall timely pay the Contractor for the Work
and materials furnished as set forth herein.
PRICE ADJUSTMENTS. Because USA Roofing and Construction cannot determine the full condition of the roof system until
tearoff is completed, the final price of this contract is subject to adjustment according to the prices listed in this contract for
extra labor and materials. After tearoff is completed, USA Roofing and Construction will assess whether additional labor and
materials will be required to complete the contract, and if so, how much this will cost. The owner agrees to pay this extra
amount to the extent it does not exceed 10% of the unadjusted price of the contract. If the extra amount is to exceed 10% of the
unadjusted price of the contract, USA Roofing and Construction will notify the Owner or Owner’s representative and provide a
written statement listing the extra labor and materials required and the additional cost. USA Roofing and Construction will require
the Owner or Owner’s representative to sign off on a change order or this statement approving the additional costs prior to the
continuation of work.
TERMINATION. If the Owner or Owner’s representative refuses to sign the change order or written statement, and an
alternative agreement cannot be reached immediately, USA Roofing and Construction may, in its sole discretion, terminate
performance. The parties agree that if USA Roofing and Construction invokes the termination procedure described
herein, USA Roofing and Construction will install a temporary protective covering (such as a tarp) over the exposed roof and that
the Owner and Owner’s representative shall not interfere with the installation of the temporary protective covering. USA Roofing
and Construction shall have no further obligations to perform under this contract.
IF USA ROOFING AND CONSTRUCTION TERMINATES ITS PERFORMANCE UNDER THIS PROVISION, THE OWNER AGREES TO
RELEASE AND TO HOLD HARMLESS USA ROOFING AND CONSTRUCTION OF ANY LIABILITY ARISING FROM OR RELATING TO THE
TERMINATION AND NON-COMPLETION OF THIS CONTRACT, INCLUDING FINES OR PENALTIES ASSESSED AGAINST THE OWNER,
AND DAMAGE OF ANY KIND CAUSED BY WATER INFILTRATION, PESTS, OR OTHER DAMAGE RESULTING FROM THE LACK OF A
PERMANENT ROOFING SYSTEM. A TEMPORARY PROTECTIVE COVERING IS NOT A PERMANENT ROOFING SOLUTION. THE OWNER
MUST EXPEDITIOUSLY OBTAIN SUBSTITUTE PERFORMANCE TO AVOID THE RISK OF SERIOUS PROPERTY DAMAGE.
PAYMENT DUE UPON TERMINATION . If USA Roofing and Construction invokes the above termination clause, the Owner shall
become immediately obligated to pay the following amounts to USA Roofing:
Tearoff: $5.00 per square foot
Permits: Actual amount paid to the city
HOA work: $250
Tarp: $1250
Materials Actual amount paid to suppliers
Any deposits or progress payments made by the Owner may be allocated towards these amounts. Owner further acknowledges
that USA Roofing and Construction may assert a claim of lien against the property for the above-described amounts to the extent
the same are lienable.
THE OWNER'S OBLIGATION IS NOT CONTINGENT ON FINANCING . The parties hereby agree that their performance under
this Contract is not conditioned on the Owner's ability to secure financing. The owner agrees that the Owner's failure or inability
to secure financing, regardless of reason, will not excuse the Owner's obligation to pay USA Roofing and Construction.
NO LIABILITY FOR WEATHER-RELATED DAMAGE DURING PERFORMANCE . The parties hereby agree that USA Roofing and
Construction shall not be held liable for damage caused by the weather, including but not limited to water ingress, during the
performance of this contract.
IN WITNESS WHEREOF, the parties have duly executed this Contract as of the date first above written.
OWNER OR AGENT CONTRACTOR / AGENT
Sign: ______________________________ Sign: _________________________
Page 5 of 7
Print:
FLORIDA RESIDENTIAL CONSTRUCTION DISCLOSURES
FLORIDA’S CONSTRUCTION LIEN LAW
NOTICE: ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW (SECTIONS
713.001-713.37, FLORIDA STATUTES), THOSE WHO WORK ON YOUR
PROPERTY OR PROVIDE MATERIALS AND ARE NOT PAID IN FULL HAVE A
RIGHT TO ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR
PROPERTY. IF YOUR CONTRACTOR OR A SUBCONTRACTOR FAILS TO PAY
SUBCONTRACTORS, SUB-SUBCONTRACTORS, OR MATERIAL SUPPLIERS,
THE PEOPLE WHO ARE OWED MONEY MAY LOOK TO YOUR PROPERTY FOR
PAYMENT, EVEN IF YOU HAVE ALREADY PAID YOUR CONTRACTOR IN FULL.
IF YOU FAIL TO PAY YOUR CONTRACTOR, YOUR CONTRACTOR MAY ALSO
HAVE A LIEN ON YOUR PROPERTY. THIS MEANS IF A LIEN IS FILED YOUR
PROPERTY COULD BE SOLD AGAINST YOUR WILL TO PAY FOR LABOR,
MATERIALS, OR OTHER SERVICES THAT YOUR CONTRACTOR OR A
SUBCONTRACTOR MAY HAVE FAILED TO PAY. TO PROTECT YOURSELF, YOU
SHOULD STIPULATE IN THIS CONTRACT THAT BEFORE ANY PAYMENT IS
MADE, YOUR CONTRACTOR IS REQUIRED TO PROVIDE YOU WITH A
WRITTEN RELEASE OF LIEN FROM ANY PERSON OR COMPANY THAT HAS
PROVIDED TO YOU A "NOTICE TO OWNER." FLORIDA'S CONSTRUCTION
LIEN LAW IS COMPLEX, AND IT IS RECOMMENDED THAT YOU CONSULT AN
ATTORNEY.
FLORIDA’S HOMEOWNER’S CONSTRUCTION RECOVERY FUND
PAYMENT, UP TO A LIMITED AMOUNT, MAY BE AVAILABLE FROM THE FLORIDA HOMEOWNERS’
CONSTRUCTION RECOVERY FUND IF YOU LOSE MONEY ON A PROJECT PERFORMED UNDER CONTRACT,
WHERE THE LOSS RESULTS FROM SPECIFIED VIOLATIONS OF FLORIDA LAW BY A LICENSED CONTRACTOR.
FOR INFORMATION ABOUT THE RECOVERY FUND AND FILING A CLAIM, CONTACT THE FLORIDA
CONSTRUCTION INDUSTRY LICENSING BOARD AT THE FOLLOWING TELEPHONE NUMBER AND ADDRESS:
Construction Industry Licensing Board, 2601 Blair Stone Road, Tallahassee, FL 32399: phone (850) 487-1395.
CONSTRUCTION DEFECTS NOTICE
NOTICE: ANY CLAIMS FOR CONSTRUCTION DEFECTS ARE SUBJECT TO THE NOTICE AND CURE PROVISIONS OF
CHAPTER 558, FLORIDA STATUTES.
OWNER OR AGENT
Sign: ___________________________
FLORIDA'S RIGHT TO CANCEL DISCLOSURE
BUYER’S RIGHT TO CANCEL
THIS IS A HOME SOLICITATION SALE, AND IF YOU DO NOT WANT THE GOODS OR SERVICES, YOU MAY CANCEL
THIS AGREEMENT BY PROVIDING WRITTEN NOTICE TO THE SELLER IN PERSON, BY TELEGRAM, OR BY MAIL.
THIS NOTICE MUST INDICATE THAT YOU DO NOT WANT THE GOODS OR SERVICES AND MUST BE DELIVERED
OR POSTMARKED BEFORE MIDNIGHT OF THE THIRD BUSINESS DAY AFTER YOU SIGN THIS AGREEMENT. IF
Page 6 of 7
YOU CANCEL THIS AGREEMENT, THE SELLER MAY NOT KEEP ALL OR PART OF ANY CASH DOWN PAYMENT.
OWNER OR AGENT
Sign: ___________________________
Notes:
Thank You For Your Business!
Page 7 of 7