HomeMy WebLinkAboutInv# Apr2024FPL - FPL - 04/16/2024 (2)FPL.com Page 1
Summary Bill Statement
Statement Date: Apr 16, 2024
Master Account #: 17071-61087
Total Number of Subordinates: 66
CURRENT BILL
$218,694.02
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
CITY OF DANIA BEACH
SUMMARY BILL
Total kWh 444,064
Total accounts billed 64
Total accounts not billed 2
For Summary Billing inquiries, please email
SUMB@FPL.com
Please return the coupon below with payment for the Total Amount You Owe.
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
17071-61087 $218,694.02 May 7, 2024 $
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
Make check payable to FPL
in U.S. funds and mail along with
this coupon to:
FPL Summary Bill
P.O. BOX 524013
MIAMI, FL 33152-4013
/ 27 9011170716108742049681200
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
Total Amount due
$71,692.81
Intentionally left blank
Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 17071-61087
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
Download now ›
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
Find resources ›
When you pay by check, you authorize FPL to process your payment electronically or as a draft. If your payment is processed electronically,
your checking account may be debited on the same day we receive the check and your check will not be returned with your checking account
statement. FPL does not agree to any restrictions, conditions or endorsements placed on any bill statement or payments such as check, money
order or other forms of payment. We will process the payment as if these restrictions or conditions do not exist.
Customer Name:Account Number:FPL.com Page 3
CITY OF DANIA BEACH 17071-61087
Account Number Service Address Meter No.Read Date/
Svc Days
kWh /
Max kWd Amount Due Remarks
00550-18501 235 SW 1ST CT # OL 2024-04-10
30
88 /
0 $62.87
01992-62544 200 SE 5TH AVE #LS 5 KJ47680 2024-04-09
32
1646 /
7 $780.39
02234-54661 631 NE 2ND ST # LS6 SJ88528 2024-04-09
32
3773 /
12 $1,757.43
02794-18123 1220 NW 10TH ST # WALL AA15361 2024-04-10
30
11 /
0 $83.59
05703-29326 1905 TIGERTAIL BLVD # LS15 SN88478 2024-04-10
30
472 /
2 $445.28
06011-26295 599 S FEDERAL HWY # IRR ACD8198 2024-04-09
32
0 /
0 $81.60
07471-54557 2901 SW 52ND ST # BALLFIELD KLL4255 2024-04-01
31
1875 /
54 $1,880.65
07481-52584 2901 SW 52ND ST # BPW KU31193 2024-04-01
31
0 /
0 $54.42
07531-57502 2901 SW 52ND ST #
N BASKETBALL CO KC78811 2024-04-01
31
770 /
0 $228.27
07541-55539 2900 SW 52ND ST # SOCCER KN68310 2024-04-01
31
131 /
1 $112.39
07551-53566 2901 SW 52ND ST # OL 2024-04-10
30
168 /
0 $86.79
09702-57515 495 TAYLOR LN # LS12 SN88486 2024-04-10
30
195 /
3 $355.78
09860-17234 434 SE 3RD TER #PUMP KN46905 2024-04-09
32
527 /
15 $761.67
10708-66452 800 NW 2ND ST KCJ4317 2024-04-10
30
6871 /
19 $2,474.62
18630-57590 116 W DANIA BEACH BLVD AC97190 2024-04-10
30
1846 /
0 $711.05
19577-56503 W DIXIE CRSSVR #CEMETERY AC09306 2024-04-10
30
117 /
0 $98.01
19587-54531 300 W DIXIE HWY KJ37966 2024-04-10
30
1243 /
0 $523.69
23433-62451 100 W DANIA BEACH
BLVD #GARAGE KNJ8374 2024-04-10
30
13333 /
30 $4,400.01
27785-15128 5440 RAVENSWOOD RD #IRR KJ62786 2024-04-10
30
179 /
0 $128.08
29082-54531 1700 NE 7TH AVE # LS11 SN88487 2024-04-10
30
435 /
18 $2,495.43
29634-25166 300 NE 2ND ST # JR REC CT 0
0 /
0 $1,059.05 NOT BILLED
30507-57602 1151 SE 5TH CT # LS-4 SJ88488 2024-04-09
32
2185 /
6 $1,051.25
32275-56614 50 SE 2ND AVE # LS 1 ST38232 2024-04-09
32
13920 /
37 $4,613.02
34681-37470 206 SW 1ST AVE # PARK AC09337 2024-04-10
30
0 /
0 $81.60
34854-42168 300 NE 2ND ST # PARK LTS ACD4012 2024-04-09
32
563 /
0 $206.93
Continue on next page
Customer Name:Account Number:FPL.com Page 4
CITY OF DANIA BEACH 17071-61087
Account Number Service Address Meter No.Read Date/
Svc Days
kWh /
Max kWd Amount Due Remarks
36838-26311 279 N BRYAN RD # LS-17 KN52041 2024-04-10
30
71 /
0 $96.01
38600-56542 100 W DANIA BEACH
BLVD #POLICE DEPT KU30441 2024-04-10
30
22380 /
68 $7,512.95
39978-40511 300 N BEACH RD #C
HSE-PIER-PRK LIGHTS KL87259 2024-04-09
32
2860 /
0 $869.23
43965-11000 151 SW 18TH CT # LS 16 SJ88479 2024-04-10
30
2120 /
7 $1,054.57
44225-67430 102 W DANIA BEACH BLVD # A AC04327 2024-04-10
30
703 /
0 $288.90
44452-56607 400 SE 2ND AVE # LS 2 ST38233 2024-04-09
32
8460 /
25 $3,211.74
45043-43023 300 N BEACH RD # LS 14 SC88219 2024-04-09
32
217 /
1 $330.33
48600-12451 100 W DANIA BEACH BLVD #B KLL2558 2024-04-10
30
3924 /
0 $1,460.09
49909-59571 1100 PHIPPEN
WAITERS RD # PUMP KJ71604 2024-04-10
30
320 /
0 $109.90
49929-53523 1200 PHIPPEN WAITERS RD ACD7432 2024-04-10
30
18 /
0 $84.29
55113-16357 301 E DANIA BEACH BLVD #ST LT KI90174 2024-04-09
32
32 /
0 $250.28
58069-19410 200 NE 2ND ST #CONCESSION AED7769 2024-04-09
32
542 /
0 $217.82
60629-55627 311 SE 3RD ST # PMP SN88527 2024-04-09
32
246 /
46 $1,686.28
62074-52647 901 NE 3RD ST #CIVIC CTR KT58793 2024-04-09
32
3600 /
10 $1,413.39
62624-58257 100 NW 8TH AVE #STAND ACD1416 2024-04-10
30
1166 /
0 $472.18
62762-57638 1200 SE 2ND AVE # LS 3 ST38290 2024-04-09
32
5040 /
21 $2,934.59
62926-58660 951 NW 10 ST #IRR PUMP ACD8555 2024-04-10
30
0 /
0 $81.60
62936-56697 900 NW 10 ST #LIGHTS ACD5956 2024-04-10
30
40 /
0 $86.11
64800-94298 506 NE 3RD ST # OL 2024-04-09
32
29 /
0 $38.93
67178-60578 100 NW 8TH AVE #STAND OL 2024-04-10
30
352 /
0 $251.39
69593-35123 1000 N FEDERAL HWY #SIGN AC58673 2024-04-10
30
555 /
0 $284.17
74042-50974 STREET LIGHTS #DANIA 2024-04-02
29
93767 /
0 $95,898.67
74309-73243 106 N BEACH RD KE82004 2024-04-09
32
16 /
0 $83.49
75296-61378 1201 STIRLING RD #PSAB KU38133 2024-04-10
30
10980 /
28 $3,674.03
75615-78464 1200 NW 1ST ST ACD1767 2024-04-10
30
1826 /
0 $674.89
Continue on next page
Customer Name:Account Number:FPL.com Page 5
CITY OF DANIA BEACH 17071-61087
Account Number Service Address Meter No.Read Date/
Svc Days
kWh /
Max kWd Amount Due Remarks
77463-97251 2901 SW 52ND ST #POOL MLL7780 2024-04-01
31
32301 /
82 $8,287.17
78869-61130 1201 STIRLING RD #HSPS MV57024 2024-04-10
30
110520 /
192 $32,146.33
81308-34206 100 N BEACH RD #REST 0
0 /
0 $0.00 NOT BILLED
82314-31431 803 NW 1ST ST #PKGLTLGTS ACD7830 2024-04-10
30
36 /
0 $90.61
82343-56627 200 NE 2 ST #CTS KEL4829 2024-04-09
32
1243 /
37 $2,014.14
82363-52681 200 NE 2 ST KLL4681 2024-04-09
32
1469 /
0 $1,057.48
83534-55572 128 NW 10 CT # LS7 ST38676 2024-04-10
30
5760 /
40 $3,816.23
83594-58521 120 NW 10 CT ACD6938 2024-04-10
30
11 /
0 $85.46
83671-08357 1855 GRIFFIN RD #LS 10 KJJ8920 2024-04-10
30
777 /
9 $674.19
83822-11186 4540 SW 27TH AVE # OL 2024-04-01
31
77 /
0 $27.78
83824-57524 120 NW 10 CT KJL1753 2024-04-10
30
2562 /
0 $2,358.97
83875-32461 101 N BEACH RD #MARINA MV58927 2024-04-09
32
73440 /
162 $18,600.97
92733-58607 300 NE 2ND ST # OL 2024-04-09
32
256 /
0 $149.67
95580-98431 2901 SW 52ND ST AC03956 2024-04-01
31
3197 /
0 $730.11
96241-18460 230 SW 12TH AVE KLL3254 2024-04-10
30
2744 /
0 $970.32
97812-54595 2301 STIRLING RD # WELLFLD MN55198 2024-04-02
60
34 /
0 $84.89
97812-54595 2301 STIRLING RD # WELLFLD MN55198 2024-02-02
30
25 /
0
TOTAL AMOUNT OF BILL $218,694.02
CURRENT BILL
$62.87
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 42.98
Balance before new charges 42.98
Total new charges 19.89
Total amount you owe $62.87
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 00550-18501
Service Address:
235 SW 1ST CT # OL
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
00550-18501 $62.87 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
110 kWh
88 kWh
66 kWh
44 kWh
22 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $42.98 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Charges and energy usage are based on the facilities contracted. Facility,
energy and fuel costs are available upon request.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 00550-18501
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 42.98
Balance before new charges $42.98
New Charges
Rate: OL-1 OUTDOOR LIGHTING
Electric service amount **18.57
Gross receipts tax (State tax)0.17
Franchise fee (Reqd local fee)1.13
Taxes and charges 1.30
Regulatory fee (State fee)0.02
Total new charges $19.89
Total amount you owe $62.87
** Your electric service amount includes the following charges:
Non-fuel energy charge:
$0.037780 per kWh
Fuel charge:$0.036500 per kWh
METER SUMMARY
Next bill date May 10, 2024.
Usage Type Usage
Total kWh used 88
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 88 88 88
Service days 30 31 32
kWh/day 3 3 3
Amount $19.89 $21.50 $24.17
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$780.39
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 531.14
Balance before new charges 531.14
Total new charges 249.25
Total amount you owe $780.39
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 01992-62544
Service Address:
200 SE 5TH AVE #LS 5
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
01992-62544 $780.39 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
2,850 kWh
2,280 kWh
1,710 kWh
1,140 kWh
570 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $531.14 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 01992-62544
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 531.14
Balance before new charges $531.14
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$46.29
Fuel:( $0.037280 per kWh)$61.36
Demand:($13.02 per KW)$91.14
Electric service amount 229.00
Gross receipts tax (State tax)5.88
Franchise fee (Reqd local fee)14.16
Taxes and charges 20.04
Regulatory fee (State fee)0.21
Total new charges $249.25
Total amount you owe $780.39
METER SUMMARY
Meter reading - Meter KJ47680. Next meter reading May 9, 2024.
Usage Type Current -Previous =Usage
kWh used 52023 50377 1646
Demand KW 6.81 7
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 1646 1557 1307
Service days 32 29 32
kWh/day 51 53 40
Amount $249.25 $275.90 $204.52
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,757.43
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 1,182.14
Balance before new charges 1,182.14
Total new charges 575.29
Total amount you owe $1,757.43
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 02234-54661
Service Address:
631 NE 2ND ST # LS6
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
02234-54661 $1,757.43 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
14,350 kWh
11,480 kWh
8,610 kWh
5,740 kWh
2,870 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $1,182.14 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 02234-54661
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 1,182.14
Balance before new charges $1,182.14
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$309.88
Fuel:( $0.037280 per kWh)$140.66
Electric service amount 463.32
Gross receipts tax (State tax)11.89
Franchise fee (Reqd local fee)28.65
Taxes and charges 40.54
Regulatory fee (State fee)0.43
Total new charges $504.29
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $1,757.43
METER SUMMARY
Meter reading - Meter SJ88528. Next meter reading May 9, 2024.
Usage Type Current -Previous =Usage
kWh used 18358 14585 3773
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 3773 3547 3061
Service days 32 29 32
kWh/day 117 122 95
Amount $504.29 $497.63 $389.32
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$83.59
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 55.83
Balance before new charges 55.83
Total new charges 27.76
Total amount you owe $83.59
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 02794-18123
Service Address:
1220 NW 10TH ST # WALL
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
02794-18123 $83.59 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
20 kWh
16 kWh
12 kWh
8 kWh
4 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $55.83 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 02794-18123
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 55.83
Balance before new charges $55.83
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Minimum base bill charge:$11.42
Non-fuel:( $0.082130 per kWh)$0.90
Fuel:( $0.037280 per kWh)$0.41
Electric service amount 25.51
Gross receipts tax (State tax)0.65
Franchise fee (Reqd local fee)1.58
Taxes and charges 2.23
Regulatory fee (State fee)0.02
Total new charges $27.76
Total amount you owe $83.59
METER SUMMARY
Meter reading - Meter AA15361. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 00870 00859 11
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 11 12 13
Service days 30 31 32
kWh/day 0 0 0
Amount $27.76 $27.91 $28.01
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$445.28
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 299.03
Balance before new charges 299.03
Total new charges 146.25
Total amount you owe $445.28
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 05703-29326
Service Address:
1905 TIGERTAIL BLVD # LS15
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
05703-29326 $445.28 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
C/O LIFT STATION # 15
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
1,050 kWh
840 kWh
630 kWh
420 kWh
210 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $299.03 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 05703-29326
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 299.03
Balance before new charges $299.03
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$38.76
Fuel:( $0.037280 per kWh)$17.60
Electric service amount 69.14
Gross receipts tax (State tax)1.77
Franchise fee (Reqd local fee)4.28
Taxes and charges 6.05
Regulatory fee (State fee)0.06
Total new charges $75.25
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $445.28
METER SUMMARY
Meter reading - Meter SN88478. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 14756 14284 472
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 472 490 699
Service days 30 31 32
kWh/day 15 15 21
Amount $75.25 $80.74 $115.79
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$81.60
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 54.39
Balance before new charges 54.39
Total new charges 27.21
Total amount you owe $81.60
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 06011-26295
Service Address:
599 S FEDERAL HWY # IRR
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
06011-26295 $81.60 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
5 kWh
4 kWh
3 kWh
2 kWh
1 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $54.39 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 06011-26295
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 54.39
Balance before new charges $54.39
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Minimum base bill charge:$12.22
Non-fuel energy charge:
$0.082130 per kWh
Fuel charge:$0.037280 per kWh
Electric service amount 25.00
Gross receipts tax (State tax)0.64
Franchise fee (Reqd local fee)1.55
Taxes and charges 2.19
Regulatory fee (State fee)0.02
Total new charges $27.21
Total amount you owe $81.60
METER SUMMARY
Meter reading - Meter ACD8198. Next meter reading May 9, 2024.
Usage Type Current -Previous =Usage
kWh used 00021 00021 0
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 0 0 0
Service days 32 29 32
kWh/day 0 0 0
Amount $27.21 $27.21 $27.13
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,880.65
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 949.05
Balance before new charges 949.05
Total new charges 931.60
Total amount you owe $1,880.65
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 1, 2024 to Apr 1, 2024 (31 days)
Statement Date: Apr 1, 2024
Account Number: 07471-54557
Service Address:
2901 SW 52ND ST # BALLFIELD
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
07471-54557 $1,880.65 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
2,500 kWh
2,000 kWh
1,500 kWh
1,000 kWh
500 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 07471-54557
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 949.05
Balance before new charges $949.05
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$52.73
Fuel:( $0.037280 per kWh)$69.90
Demand:($13.02 per KW)$703.08
Electric service amount 855.92
Gross receipts tax (State tax)21.96
Franchise fee (Reqd local fee)52.93
Taxes and charges 74.89
Regulatory fee (State fee)0.79
Total new charges $931.60
Total amount you owe $1,880.65
METER SUMMARY
Meter reading - Meter KLL4255. Next meter reading May 1, 2024.
Usage Type Current -Previous =Usage
kWh used 80576 78701 1875
Demand KW 53.53 54
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 1, 2024 Mar 1, 2024 Apr 3, 2023
kWh Used 1875 2036 2264
Service days 31 29 32
kWh/day 60 70 70
Amount $931.60 $949.05 $929.02
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$54.42
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 27.21
Balance before new charges 27.21
Total new charges 27.21
Total amount you owe $54.42
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 1, 2024 to Apr 1, 2024 (31 days)
Statement Date: Apr 1, 2024
Account Number: 07481-52584
Service Address:
2901 SW 52ND ST # BPW
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
07481-52584 $54.42 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
150 kWh
120 kWh
90 kWh
60 kWh
30 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 07481-52584
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 27.21
Balance before new charges $27.21
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Minimum base bill charge:$12.22
Non-fuel energy charge:
$0.082130 per kWh
Fuel charge:$0.037280 per kWh
Electric service amount 25.00
Gross receipts tax (State tax)0.64
Franchise fee (Reqd local fee)1.55
Taxes and charges 2.19
Regulatory fee (State fee)0.02
Total new charges $27.21
Total amount you owe $54.42
METER SUMMARY
Meter reading - Meter KU31193. Next meter reading May 1, 2024.
Usage Type Current -Previous x Const =Usage
kWh used 00034 00034 60 0
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 1, 2024 Mar 1, 2024 Apr 3, 2023
kWh Used 0 0 0
Service days 31 29 32
kWh/day 0 0 0
Amount $27.21 $27.21 $27.13
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$228.27
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 114.27
Balance before new charges 114.27
Total new charges 114.00
Total amount you owe $228.27
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 1, 2024 to Apr 1, 2024 (31 days)
Statement Date: Apr 1, 2024
Account Number: 07531-57502
Service Address:
2901 SW 52ND ST # N BASKETBALL CO
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
07531-57502 $228.27 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
1,000 kWh
800 kWh
600 kWh
400 kWh
200 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 07531-57502
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 114.27
Balance before new charges $114.27
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$63.24
Fuel:( $0.037280 per kWh)$28.71
Electric service amount 104.73
Gross receipts tax (State tax)2.69
Franchise fee (Reqd local fee)6.48
Taxes and charges 9.17
Regulatory fee (State fee)0.10
Total new charges $114.00
Total amount you owe $228.27
METER SUMMARY
Meter reading - Meter KC78811. Next meter reading May 1, 2024.
Usage Type Current -Previous =Usage
kWh used 67846 67076 770
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 1, 2024 Mar 1, 2024 Apr 3, 2023
kWh Used 770 736 833
Service days 31 29 32
kWh/day 24 25 26
Amount $114.00 $114.27 $135.33
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$112.39
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 56.01
Balance before new charges 56.01
Total new charges 56.38
Total amount you owe $112.39
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 1, 2024 to Apr 1, 2024 (31 days)
Statement Date: Apr 1, 2024
Account Number: 07541-55539
Service Address:
2900 SW 52ND ST # SOCCER
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
07541-55539 $112.39 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
550 kWh
440 kWh
330 kWh
220 kWh
110 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 07541-55539
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 56.01
Balance before new charges $56.01
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$3.69
Fuel:( $0.037280 per kWh)$4.88
Demand:($13.02 per KW)$13.02
Electric service amount 51.80
Gross receipts tax (State tax)1.33
Franchise fee (Reqd local fee)3.20
Taxes and charges 4.53
Regulatory fee (State fee)0.05
Total new charges $56.38
Total amount you owe $112.39
METER SUMMARY
Meter reading - Meter KN68310. Next meter reading May 1, 2024.
Usage Type Current -Previous =Usage
Total kWh used 00979 00848 131
On-Peak kWh used 00000 00000 0
Off-peak kWh used 131
On-peak demand 0.00 0
Maximum demand 1
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 1, 2024 Mar 1, 2024 Apr 3, 2023
kWh Used 131 121 285
Service days 31 29 32
kWh/day 4 4 8
Amount $56.38 $56.01 $604.63
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$86.79
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 59.89
Balance before new charges 59.89
Total new charges 26.90
Total amount you owe $86.79
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 07551-53566
Service Address:
2901 SW 52ND ST # OL
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
07551-53566 $86.79 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
200 kWh
160 kWh
120 kWh
80 kWh
40 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $59.89 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Charges and energy usage are based on the facilities contracted. Facility,
energy and fuel costs are available upon request.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 07551-53566
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 59.89
Balance before new charges $59.89
New Charges
Rate: OL-1 OUTDOOR LIGHTING
Electric service amount **25.03
Gross receipts tax (State tax)0.32
Franchise fee (Reqd local fee)1.53
Taxes and charges 1.85
Regulatory fee (State fee)0.02
Total new charges $26.90
Total amount you owe $86.79
** Your electric service amount includes the following charges:
Non-fuel energy charge:
$0.037780 per kWh
Fuel charge:$0.036500 per kWh
METER SUMMARY
Next bill date May 10, 2024.
Usage Type Usage
Total kWh used 168
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 168 168 168
Service days 30 31 32
kWh/day 6 5 5
Amount $26.90 $29.96 $35.20
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$355.78
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 246.11
Balance before new charges 246.11
Total new charges 109.67
Total amount you owe $355.78
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 09702-57515
Service Address:
495 TAYLOR LN # LS12
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
09702-57515 $355.78 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
750 kWh
600 kWh
450 kWh
300 kWh
150 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $246.11 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 09702-57515
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 246.11
Balance before new charges $246.11
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$16.01
Fuel:( $0.037280 per kWh)$7.27
Electric service amount 36.06
Gross receipts tax (State tax)0.93
Franchise fee (Reqd local fee)1.65
Taxes and charges 2.58
Regulatory fee (State fee)0.03
Total new charges $38.67
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $355.78
METER SUMMARY
Meter reading - Meter SN88486. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 08725 08530 195
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 195 331 244
Service days 30 31 32
kWh/day 6 10 7
Amount $38.67 $58.16 $48.79
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$761.67
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 478.70
Balance before new charges 478.70
Total new charges 282.97
Total amount you owe $761.67
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 09860-17234
Service Address:
434 SE 3RD TER #PUMP
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
09860-17234 $761.67 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
C/O DANIA FL 33004
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
2,800 kWh
2,240 kWh
1,680 kWh
1,120 kWh
560 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $478.70 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 09860-17234
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 478.70
Balance before new charges $478.70
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$14.82
Fuel:( $0.037280 per kWh)$19.65
Demand:($13.02 per KW)$195.30
Electric service amount 259.98
Gross receipts tax (State tax)6.67
Franchise fee (Reqd local fee)16.08
Taxes and charges 22.75
Regulatory fee (State fee)0.24
Total new charges $282.97
Total amount you owe $761.67
METER SUMMARY
Meter reading - Meter KN46905. Next meter reading May 9, 2024.
Usage Type Current -Previous =Usage
kWh used 40327 39800 527
Demand KW 14.89 15
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 527 376 399
Service days 32 29 32
kWh/day 16 12 12
Amount $282.97 $358.33 $394.17
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$2,474.62
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 1,683.40
Balance before new charges 1,683.40
Total new charges 791.22
Total amount you owe $2,474.62
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 10708-66452
Service Address:
800 NW 2ND ST
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
10708-66452 $2,474.62 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
12,400 kWh
9,920 kWh
7,440 kWh
4,960 kWh
2,480 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $1,683.40 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 10708-66452
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 1,683.40
Balance before new charges $1,683.40
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$193.21
Fuel:( $0.037280 per kWh)$256.15
Demand:($13.02 per KW)$247.38
Electric service amount 726.95
Gross receipts tax (State tax)18.65
Franchise fee (Reqd local fee)44.95
Taxes and charges 63.60
Regulatory fee (State fee)0.67
Total new charges $791.22
Total amount you owe $2,474.62
METER SUMMARY
Meter reading - Meter KCJ4317. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 04550 97679 6871
Demand KW 19.05 19
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 6871 6295 7776
Service days 30 31 32
kWh/day 229 203 243
Amount $791.22 $811.55 $1,071.73
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$711.05
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 457.23
Balance before new charges 457.23
Total new charges 253.82
Total amount you owe $711.05
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 18630-57590
Service Address:
116 W DANIA BEACH BLVD
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
18630-57590 $711.05 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
3,300 kWh
2,640 kWh
1,980 kWh
1,320 kWh
660 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $457.23 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 18630-57590
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 457.23
Balance before new charges $457.23
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$151.60
Fuel:( $0.037280 per kWh)$68.82
Electric service amount 233.20
Gross receipts tax (State tax)5.98
Franchise fee (Reqd local fee)14.42
Taxes and charges 20.40
Regulatory fee (State fee)0.22
Total new charges $253.82
Total amount you owe $711.05
METER SUMMARY
Meter reading - Meter AC97190. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 93483 91637 1846
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 1846 1823 977
Service days 30 31 32
kWh/day 62 59 31
Amount $253.82 $262.54 $156.36
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$98.01
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 64.81
Balance before new charges 64.81
Total new charges 33.20
Total amount you owe $98.01
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 19577-56503
Service Address:
W DIXIE CRSSVR #CEMETERY
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
19577-56503 $98.01 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
1,050 kWh
840 kWh
630 kWh
420 kWh
210 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $64.81 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 19577-56503
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 64.81
Balance before new charges $64.81
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Minimum base bill charge:$3.76
Non-fuel:( $0.082130 per kWh)$9.60
Fuel:( $0.037280 per kWh)$4.36
Electric service amount 30.50
Gross receipts tax (State tax)0.78
Franchise fee (Reqd local fee)1.89
Taxes and charges 2.67
Regulatory fee (State fee)0.03
Total new charges $33.20
Total amount you owe $98.01
METER SUMMARY
Meter reading - Meter AC09306. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 56715 56598 117
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 117 104 529
Service days 30 31 32
kWh/day 4 3 17
Amount $33.20 $33.20 $90.96
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$523.69
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 348.22
Balance before new charges 348.22
Total new charges 175.47
Total amount you owe $523.69
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 19587-54531
Service Address:
300 W DIXIE HWY
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
19587-54531 $523.69 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
1,900 kWh
1,520 kWh
1,140 kWh
760 kWh
380 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $348.22 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 19587-54531
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 348.22
Balance before new charges $348.22
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$102.09
Fuel:( $0.037280 per kWh)$46.34
Electric service amount 161.21
Gross receipts tax (State tax)4.14
Franchise fee (Reqd local fee)9.97
Taxes and charges 14.11
Regulatory fee (State fee)0.15
Total new charges $175.47
Total amount you owe $523.69
METER SUMMARY
Meter reading - Meter KJ37966. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 82482 81239 1243
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 1243 1080 856
Service days 30 31 32
kWh/day 41 34 26
Amount $175.47 $161.18 $138.68
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$4,400.01
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 2,992.93
Balance before new charges 2,992.93
Total new charges 1,407.08
Total amount you owe $4,400.01
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 23433-62451
Service Address:
100 W DANIA BEACH BLVD #GARAGE
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
23433-62451 $4,400.01 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
16,850 kWh
13,480 kWh
10,110 kWh
6,740 kWh
3,370 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $2,992.93 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 23433-62451
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 2,992.93
Balance before new charges $2,992.93
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$374.92
Fuel:( $0.037280 per kWh)$497.05
Demand:($13.02 per KW)$390.60
Electric service amount 1,292.78
Gross receipts tax (State tax)33.17
Franchise fee (Reqd local fee)79.94
Taxes and charges 113.11
Regulatory fee (State fee)1.19
Total new charges $1,407.08
Total amount you owe $4,400.01
METER SUMMARY
Meter reading - Meter KNJ8374. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 56393 43060 13333
Demand KW 30.38 30
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 13333 13816 14730
Service days 30 31 32
kWh/day 444 445 460
Amount $1,407.08 $1,482.78 $1,605.35
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$128.08
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 90.91
Balance before new charges 90.91
Total new charges 37.17
Total amount you owe $128.08
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 27785-15128
Service Address:
5440 RAVENSWOOD RD #IRR
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
27785-15128 $128.08 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
350 kWh
280 kWh
210 kWh
140 kWh
70 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $90.91 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 27785-15128
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 90.91
Balance before new charges $90.91
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$14.70
Fuel:( $0.037280 per kWh)$6.67
Electric service amount 34.15
Gross receipts tax (State tax)0.88
Franchise fee (Reqd local fee)2.11
Taxes and charges 2.99
Regulatory fee (State fee)0.03
Total new charges $37.17
Total amount you owe $128.08
METER SUMMARY
Meter reading - Meter KJ62786. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 18723 18544 179
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 179 182 264
Service days 30 31 32
kWh/day 5 5 8
Amount $37.17 $38.72 $52.30
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$2,495.43
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 2,110.21
Balance before new charges 2,110.21
Total new charges 385.22
Total amount you owe $2,495.43
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 12, 2024
Account Number: 29082-54531
Service Address:
1700 NE 7TH AVE # LS11
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
29082-54531 $2,495.43 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
8,250 kWh
6,600 kWh
4,950 kWh
3,300 kWh
1,650 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $2,110.21 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 29082-54531
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 2,110.21
Balance before new charges $2,110.21
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$12.23
Fuel:( $0.037280 per kWh)$16.22
Demand:($13.02 per KW)$234.36
Electric service amount 293.02
Gross receipts tax (State tax)7.52
Franchise fee (Reqd local fee)13.41
Taxes and charges 20.93
Regulatory fee (State fee)0.27
Total new charges $314.22
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $2,495.43
METER SUMMARY
Meter reading - Meter SN88487. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 85039 84604 435
Demand KW 18
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 435 6714 2979
Service days 30 31 32
kWh/day 14 216 93
Amount $314.22 $955.82 $418.82
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,051.25
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 706.80
Balance before new charges 706.80
Total new charges 344.45
Total amount you owe $1,051.25
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 30507-57602
Service Address:
1151 SE 5TH CT # LS-4
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
30507-57602 $1,051.25 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
C/O DANIA FL 33004
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
3,400 kWh
2,720 kWh
2,040 kWh
1,360 kWh
680 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $706.80 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 30507-57602
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 706.80
Balance before new charges $706.80
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$61.44
Fuel:( $0.037280 per kWh)$81.46
Demand:($13.02 per KW)$78.12
Electric service amount 251.23
Gross receipts tax (State tax)6.45
Franchise fee (Reqd local fee)15.54
Taxes and charges 21.99
Regulatory fee (State fee)0.23
Total new charges $273.45
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $1,051.25
METER SUMMARY
Meter reading - Meter SJ88488. Next meter reading May 9, 2024.
Usage Type Current -Previous =Usage
kWh used 57590 55405 2185
Demand KW 6
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 2185 2104 2271
Service days 32 29 32
kWh/day 68 72 70
Amount $273.45 $288.13 $476.58
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$4,613.02
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 2,993.94
Balance before new charges 2,993.94
Total new charges 1,619.08
Total amount you owe $4,613.02
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 32275-56614
Service Address:
50 SE 2ND AVE # LS 1
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
32275-56614 $4,613.02 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
17,400 kWh
13,920 kWh
10,440 kWh
6,960 kWh
3,480 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $2,993.94 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 32275-56614
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 2,993.94
Balance before new charges $2,993.94
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$391.43
Fuel:( $0.037280 per kWh)$518.94
Demand:($13.02 per KW)$481.74
Electric service amount 1,422.32
Gross receipts tax (State tax)36.50
Franchise fee (Reqd local fee)87.95
Taxes and charges 124.45
Regulatory fee (State fee)1.31
Total new charges $1,548.08
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $4,613.02
METER SUMMARY
Meter reading - Meter ST38232. Next meter reading May 9, 2024.
Usage Type Current -Previous x Const =Usage
kWh used 05279 05047 60 13920
Demand KW 37
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 13920 12360 9180
Service days 32 29 32
kWh/day 435 426 286
Amount $1,548.08 $1,700.68 $1,061.46
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$81.60
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 54.39
Balance before new charges 54.39
Total new charges 27.21
Total amount you owe $81.60
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 34681-37470
Service Address:
206 SW 1ST AVE # PARK
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
34681-37470 $81.60 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
5 kWh
4 kWh
3 kWh
2 kWh
1 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $54.39 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 34681-37470
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 54.39
Balance before new charges $54.39
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Minimum base bill charge:$12.22
Non-fuel energy charge:
$0.082130 per kWh
Fuel charge:$0.037280 per kWh
Electric service amount 25.00
Gross receipts tax (State tax)0.64
Franchise fee (Reqd local fee)1.55
Taxes and charges 2.19
Regulatory fee (State fee)0.02
Total new charges $27.21
Total amount you owe $81.60
METER SUMMARY
Meter reading - Meter AC09337. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 00009 00009 0
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 0 0 0
Service days 30 31 32
kWh/day 0 0 0
Amount $27.21 $27.21 $27.13
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$206.93
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 119.85
Balance before new charges 119.85
Total new charges 87.08
Total amount you owe $206.93
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 34854-42168
Service Address:
300 NE 2ND ST # PARK LTS
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
34854-42168 $206.93 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
1,850 kWh
1,480 kWh
1,110 kWh
740 kWh
370 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $119.85 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 34854-42168
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 119.85
Balance before new charges $119.85
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$46.24
Fuel:( $0.037280 per kWh)$20.99
Electric service amount 80.01
Gross receipts tax (State tax)2.05
Franchise fee (Reqd local fee)4.95
Taxes and charges 7.00
Regulatory fee (State fee)0.07
Total new charges $87.08
Total amount you owe $206.93
METER SUMMARY
Meter reading - Meter ACD4012. Next meter reading May 9, 2024.
Usage Type Current -Previous =Usage
kWh used 02866 02303 563
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 563 457 1649
Service days 32 29 32
kWh/day 18 16 52
Amount $87.08 $76.24 $254.45
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$96.01
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 65.16
Balance before new charges 65.16
Total new charges 30.85
Total amount you owe $96.01
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 36838-26311
Service Address:
279 N BRYAN RD # LS-17
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
36838-26311 $96.01 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
300 kWh
240 kWh
180 kWh
120 kWh
60 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $65.16 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 36838-26311
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 65.16
Balance before new charges $65.16
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Minimum base bill charge:$7.08
Non-fuel:( $0.082130 per kWh)$5.83
Fuel:( $0.037280 per kWh)$2.65
Electric service amount 28.34
Gross receipts tax (State tax)0.73
Franchise fee (Reqd local fee)1.75
Taxes and charges 2.48
Regulatory fee (State fee)0.03
Total new charges $30.85
Total amount you owe $96.01
METER SUMMARY
Meter reading - Meter KN52041. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 15483 15412 71
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 71 84 62
Service days 30 31 32
kWh/day 2 2 1
Amount $30.85 $32.06 $31.35
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$7,512.95
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 4,923.36
Balance before new charges 4,923.36
Total new charges 2,589.59
Total amount you owe $7,512.95
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 38600-56542
Service Address:
100 W DANIA BEACH BLVD #POLICE DEPT
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
38600-56542 $7,512.95 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
32,750 kWh
26,200 kWh
19,650 kWh
13,100 kWh
6,550 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $4,923.36 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 38600-56542
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 4,923.36
Balance before new charges $4,923.36
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$629.32
Fuel:( $0.037280 per kWh)$834.33
Demand:($13.02 per KW)$885.36
Electric service amount 2,379.22
Gross receipts tax (State tax)61.05
Franchise fee (Reqd local fee)147.12
Taxes and charges 208.17
Regulatory fee (State fee)2.20
Total new charges $2,589.59
Total amount you owe $7,512.95
METER SUMMARY
Meter reading - Meter KU30441. Next meter reading May 10, 2024.
Usage Type Current -Previous x Const =Usage
kWh used 50412 50039 60 22380
Demand KW 1.14 60.00 68
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 22380 20640 21960
Service days 30 31 32
kWh/day 746 665 686
Amount $2,589.59 $2,470.74 $2,682.84
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$869.23
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 483.62
Balance before new charges 483.62
Total new charges 385.61
Total amount you owe $869.23
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 39978-40511
Service Address:
300 N BEACH RD #C HSE-PIER-PRK LIGHTS
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
39978-40511 $869.23 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA BEACH FL 33004-3699
ENERGY USAGE HISTORY
3,250 kWh
2,600 kWh
1,950 kWh
1,300 kWh
650 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $483.62 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 39978-40511
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 483.62
Balance before new charges $483.62
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$234.88
Fuel:( $0.037280 per kWh)$106.62
Electric service amount 354.28
Gross receipts tax (State tax)9.09
Franchise fee (Reqd local fee)21.91
Taxes and charges 31.00
Regulatory fee (State fee)0.33
Total new charges $385.61
Total amount you owe $869.23
METER SUMMARY
Meter reading - Meter KL87259. Next meter reading May 9, 2024.
Usage Type Current -Previous =Usage
kWh used 24323 21463 2860
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 2860 1754 2415
Service days 32 29 32
kWh/day 89 60 75
Amount $385.61 $253.10 $366.25
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,054.57
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 700.58
Balance before new charges 700.58
Total new charges 353.99
Total amount you owe $1,054.57
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 43965-11000
Service Address:
151 SW 18TH CT # LS 16
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
43965-11000 $1,054.57 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
2,800 kWh
2,240 kWh
1,680 kWh
1,120 kWh
560 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $700.58 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 43965-11000
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 700.58
Balance before new charges $700.58
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$59.62
Fuel:( $0.037280 per kWh)$79.03
Demand:($13.02 per KW)$91.14
Electric service amount 260.00
Gross receipts tax (State tax)6.67
Franchise fee (Reqd local fee)16.08
Taxes and charges 22.75
Regulatory fee (State fee)0.24
Total new charges $282.99
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $1,054.57
METER SUMMARY
Meter reading - Meter SJ88479. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 56468 54348 2120
Demand KW 7
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 2120 2131 2325
Service days 30 31 32
kWh/day 70 68 72
Amount $282.99 $290.14 $302.49
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$288.90
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 183.61
Balance before new charges 183.61
Total new charges 105.29
Total amount you owe $288.90
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 44225-67430
Service Address:
102 W DANIA BEACH BLVD # A
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
44225-67430 $288.90 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
5,150 kWh
4,120 kWh
3,090 kWh
2,060 kWh
1,030 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $183.61 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 44225-67430
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 183.61
Balance before new charges $183.61
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$57.75
Fuel:( $0.037280 per kWh)$26.21
Electric service amount 96.74
Gross receipts tax (State tax)2.48
Franchise fee (Reqd local fee)5.98
Taxes and charges 8.46
Regulatory fee (State fee)0.09
Total new charges $105.29
Total amount you owe $288.90
METER SUMMARY
Meter reading - Meter AC04327. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 87339 86636 703
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 703 641 1150
Service days 30 31 32
kWh/day 23 21 36
Amount $105.29 $101.33 $181.60
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$3,211.74
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 2,151.37
Balance before new charges 2,151.37
Total new charges 1,060.37
Total amount you owe $3,211.74
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 44452-56607
Service Address:
400 SE 2ND AVE # LS 2
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
44452-56607 $3,211.74 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
14,300 kWh
11,440 kWh
8,580 kWh
5,720 kWh
2,860 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $2,151.37 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 44452-56607
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 2,151.37
Balance before new charges $2,151.37
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$237.90
Fuel:( $0.037280 per kWh)$315.39
Demand:($13.02 per KW)$325.50
Electric service amount 909.00
Gross receipts tax (State tax)23.32
Franchise fee (Reqd local fee)56.21
Taxes and charges 79.53
Regulatory fee (State fee)0.84
Total new charges $989.37
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $3,211.74
METER SUMMARY
Meter reading - Meter ST38233. Next meter reading May 9, 2024.
Usage Type Current -Previous x Const =Usage
kWh used 03842 03701 60 8460
Demand KW 25
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 8460 7800 8220
Service days 32 29 32
kWh/day 264 268 256
Amount $989.37 $994.04 $970.28
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$330.33
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 217.21
Balance before new charges 217.21
Total new charges 113.12
Total amount you owe $330.33
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 45043-43023
Service Address:
300 N BEACH RD # LS 14
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
45043-43023 $330.33 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
550 kWh
440 kWh
330 kWh
220 kWh
110 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $217.21 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 45043-43023
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 217.21
Balance before new charges $217.21
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$17.83
Fuel:( $0.037280 per kWh)$8.09
Electric service amount 38.70
Gross receipts tax (State tax)0.99
Franchise fee (Reqd local fee)2.39
Taxes and charges 3.38
Regulatory fee (State fee)0.04
Total new charges $42.12
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $330.33
METER SUMMARY
Meter reading - Meter SC88219. Next meter reading May 9, 2024.
Usage Type Current -Previous =Usage
kWh used 04231 04014 217
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 217 180 45
Service days 32 29 32
kWh/day 6 6 1
Amount $42.12 $38.47 $30.20
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,460.09
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 936.20
Balance before new charges 936.20
Total new charges 523.89
Total amount you owe $1,460.09
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 48600-12451
Service Address:
100 W DANIA BEACH BLVD #B
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
48600-12451 $1,460.09 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
6,150 kWh
4,920 kWh
3,690 kWh
2,460 kWh
1,230 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $936.20 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 48600-12451
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 936.20
Balance before new charges $936.20
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$322.27
Fuel:( $0.037280 per kWh)$146.29
Electric service amount 481.34
Gross receipts tax (State tax)12.35
Franchise fee (Reqd local fee)29.76
Taxes and charges 42.11
Regulatory fee (State fee)0.44
Total new charges $523.89
Total amount you owe $1,460.09
METER SUMMARY
Meter reading - Meter KLL2558. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 15560 11636 3924
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 3924 3524 3918
Service days 30 31 32
kWh/day 130 113 122
Amount $523.89 $494.48 $585.62
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$109.90
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 54.39
Balance before new charges 54.39
Total new charges 55.51
Total amount you owe $109.90
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 49909-59571
Service Address:
1100 PHIPPEN WAITERS RD # PUMP
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
49909-59571 $109.90 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
C/O CITY HALL
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
750 kWh
600 kWh
450 kWh
300 kWh
150 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $54.39 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 49909-59571
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 54.39
Balance before new charges $54.39
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$26.29
Fuel:( $0.037280 per kWh)$11.93
Electric service amount 51.00
Gross receipts tax (State tax)1.31
Franchise fee (Reqd local fee)3.15
Taxes and charges 4.46
Regulatory fee (State fee)0.05
Total new charges $55.51
Total amount you owe $109.90
METER SUMMARY
Meter reading - Meter KJ71604. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 36995 36675 320
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 320 0 649
Service days 30 31 32
kWh/day 10 0 20
Amount $55.51 $27.21 $108.50
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$84.29
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 56.17
Balance before new charges 56.17
Total new charges 28.12
Total amount you owe $84.29
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 49929-53523
Service Address:
1200 PHIPPEN WAITERS RD
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
49929-53523 $84.29 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
CITY HALL
100 W DANIA BLV
DANAIA FL 33004
ENERGY USAGE HISTORY
30 kWh
24 kWh
18 kWh
12 kWh
6 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $56.17 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 49929-53523
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 56.17
Balance before new charges $56.17
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Minimum base bill charge:$10.92
Non-fuel:( $0.082130 per kWh)$1.47
Fuel:( $0.037280 per kWh)$0.67
Electric service amount 25.84
Gross receipts tax (State tax)0.66
Franchise fee (Reqd local fee)1.60
Taxes and charges 2.26
Regulatory fee (State fee)0.02
Total new charges $28.12
Total amount you owe $84.29
METER SUMMARY
Meter reading - Meter ACD7432. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 00125 00107 18
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 18 16 0
Service days 30 31 32
kWh/day 1 1 0
Amount $28.12 $28.12 $27.13
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$250.28
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 221.43
Balance before new charges 221.43
Total new charges 28.85
Total amount you owe $250.28
*ESTIMATED BILL*
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
*ESTIMATED BILL*
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 55113-16357
Service Address:
301 E DANIA BEACH BLVD #ST LT
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
55113-16357 $250.28 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
1,050 kWh
840 kWh
630 kWh
420 kWh
210 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $221.43 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 55113-16357
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 221.43
Balance before new charges $221.43
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Minimum base bill charge:$9.91
Non-fuel:( $0.082130 per kWh)$2.63
Fuel:( $0.037280 per kWh)$1.19
Electric service amount 26.51
Gross receipts tax (State tax)0.68
Franchise fee (Reqd local fee)1.64
Taxes and charges 2.32
Regulatory fee (State fee)0.02
Total new charges $28.85
Total amount you owe $250.28
*ESTIMATED BILL*
METER SUMMARY
Meter reading - Meter KI90174. Next meter reading May 9, 2024.
Usage Type Estimated -Previous =Usage
kWh used 02066 02034 32
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 32 0 0
Service days 32 29 32
kWh/day 1 0 0
Amount $28.85 $27.21 $27.13
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
· Your current month’s bill is an estimate based on prior consumption. This
is because we were unable to obtain an actual meter reading on your
scheduled read date. Rest assured, no action is required from you. For more
information, visit FPL.com/Meters.
CURRENT BILL
$217.82
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 133.47
Balance before new charges 133.47
Total new charges 84.35
Total amount you owe $217.82
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 58069-19410
Service Address:
200 NE 2ND ST #CONCESSION
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
58069-19410 $217.82 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
950 kWh
760 kWh
570 kWh
380 kWh
190 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $133.47 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 58069-19410
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 133.47
Balance before new charges $133.47
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$44.51
Fuel:( $0.037280 per kWh)$20.21
Electric service amount 77.50
Gross receipts tax (State tax)1.99
Franchise fee (Reqd local fee)4.79
Taxes and charges 6.78
Regulatory fee (State fee)0.07
Total new charges $84.35
Total amount you owe $217.82
METER SUMMARY
Meter reading - Meter AED7769. Next meter reading May 9, 2024.
Usage Type Current -Previous =Usage
kWh used 21297 20755 542
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 542 391 629
Service days 32 29 32
kWh/day 17 13 20
Amount $84.35 $67.24 $105.57
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,686.28
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 913.00
Balance before new charges 913.00
Total new charges 773.28
Total amount you owe $1,686.28
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 60629-55627
Service Address:
311 SE 3RD ST # PMP
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
60629-55627 $1,686.28 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
3,700 kWh
2,960 kWh
2,220 kWh
1,480 kWh
740 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $913.00 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 60629-55627
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 913.00
Balance before new charges $913.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$6.92
Fuel:( $0.037280 per kWh)$9.17
Demand:($13.02 per KW)$598.92
Electric service amount 645.22
Gross receipts tax (State tax)16.56
Franchise fee (Reqd local fee)39.90
Taxes and charges 56.46
Regulatory fee (State fee)0.60
Total new charges $702.28
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $1,686.28
METER SUMMARY
Meter reading - Meter SN88527. Next meter reading May 9, 2024.
Usage Type Current -Previous =Usage
kWh used 27529 27283 246
Demand KW 46
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 246 232 152
Service days 32 29 32
kWh/day 7 8 4
Amount $702.28 $730.22 $676.25
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,413.39
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 982.53
Balance before new charges 982.53
Total new charges 430.86
Total amount you owe $1,413.39
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 62074-52647
Service Address:
901 NE 3RD ST #CIVIC CTR
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
62074-52647 $1,413.39 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
7,800 kWh
6,240 kWh
4,680 kWh
3,120 kWh
1,560 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $982.53 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 62074-52647
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 982.53
Balance before new charges $982.53
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$101.23
Fuel:( $0.037280 per kWh)$134.21
Demand:($13.02 per KW)$130.20
Electric service amount 395.85
Gross receipts tax (State tax)10.16
Franchise fee (Reqd local fee)24.48
Taxes and charges 34.64
Regulatory fee (State fee)0.37
Total new charges $430.86
Total amount you owe $1,413.39
METER SUMMARY
Meter reading - Meter KT58793. Next meter reading May 9, 2024.
Usage Type Current -Previous x Const =Usage
kWh used 06351 06321 120 3600
Demand KW .08 120.00 10
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 3600 1920 3720
Service days 32 29 32
kWh/day 112 66 116
Amount $430.86 $529.54 $675.85
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$472.18
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 306.73
Balance before new charges 306.73
Total new charges 165.45
Total amount you owe $472.18
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 62624-58257
Service Address:
100 NW 8TH AVE #STAND
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
62624-58257 $472.18 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
1,550 kWh
1,240 kWh
930 kWh
620 kWh
310 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $306.73 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 62624-58257
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 306.73
Balance before new charges $306.73
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$95.76
Fuel:( $0.037280 per kWh)$43.47
Electric service amount 152.01
Gross receipts tax (State tax)3.90
Franchise fee (Reqd local fee)9.40
Taxes and charges 13.30
Regulatory fee (State fee)0.14
Total new charges $165.45
Total amount you owe $472.18
METER SUMMARY
Meter reading - Meter ACD1416. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 21498 20332 1166
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 1166 1075 1296
Service days 30 31 32
kWh/day 39 35 41
Amount $165.45 $160.52 $202.93
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$2,934.59
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 2,174.36
Balance before new charges 2,174.36
Total new charges 760.23
Total amount you owe $2,934.59
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 62762-57638
Service Address:
1200 SE 2ND AVE # LS 3
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
62762-57638 $2,934.59 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
11,600 kWh
9,280 kWh
6,960 kWh
4,640 kWh
2,320 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $2,174.36 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 62762-57638
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 2,174.36
Balance before new charges $2,174.36
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$141.72
Fuel:( $0.037280 per kWh)$187.89
Demand:($13.02 per KW)$273.42
Electric service amount 633.24
Gross receipts tax (State tax)16.25
Franchise fee (Reqd local fee)39.16
Taxes and charges 55.41
Regulatory fee (State fee)0.58
Total new charges $689.23
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $2,934.59
METER SUMMARY
Meter reading - Meter ST38290. Next meter reading May 9, 2024.
Usage Type Current -Previous x Const =Usage
kWh used 03362 03278 60 5040
Demand KW 21
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 5040 8880 1740
Service days 32 29 32
kWh/day 157 306 54
Amount $689.23 $1,045.80 $433.74
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$81.60
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 54.39
Balance before new charges 54.39
Total new charges 27.21
Total amount you owe $81.60
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 62926-58660
Service Address:
951 NW 10 ST #IRR PUMP
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
62926-58660 $81.60 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
C/O DANIA FL 33004
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
5 kWh
4 kWh
3 kWh
2 kWh
1 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $54.39 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 62926-58660
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 54.39
Balance before new charges $54.39
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Minimum base bill charge:$12.22
Non-fuel energy charge:
$0.082130 per kWh
Fuel charge:$0.037280 per kWh
Electric service amount 25.00
Gross receipts tax (State tax)0.64
Franchise fee (Reqd local fee)1.55
Taxes and charges 2.19
Regulatory fee (State fee)0.02
Total new charges $27.21
Total amount you owe $81.60
METER SUMMARY
Meter reading - Meter ACD8555. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 00000 00000 0
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 0 0 0
Service days 30 31 32
kWh/day 0 0 0
Amount $27.21 $27.21 $27.13
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$86.11
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 56.86
Balance before new charges 56.86
Total new charges 29.25
Total amount you owe $86.11
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 62936-56697
Service Address:
900 NW 10 ST #LIGHTS
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
62936-56697 $86.11 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
100 kWh
80 kWh
60 kWh
40 kWh
20 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $56.86 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 62936-56697
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 56.86
Balance before new charges $56.86
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Minimum base bill charge:$9.33
Non-fuel:( $0.082130 per kWh)$3.28
Fuel:( $0.037280 per kWh)$1.49
Electric service amount 26.88
Gross receipts tax (State tax)0.69
Franchise fee (Reqd local fee)1.66
Taxes and charges 2.35
Regulatory fee (State fee)0.02
Total new charges $29.25
Total amount you owe $86.11
METER SUMMARY
Meter reading - Meter ACD5956. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 01515 01475 40
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 40 19 67
Service days 30 31 32
kWh/day 1 1 2
Amount $29.25 $28.30 $31.70
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$38.93
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 26.34
Balance before new charges 26.34
Total new charges 12.59
Total amount you owe $38.93
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 64800-94298
Service Address:
506 NE 3RD ST # OL
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
Hello City Of Dania Beach,
Here's what you owe for this billing period.
E001
64800-94298 $38.93 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
30 kWh
24 kWh
18 kWh
12 kWh
6 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $26.34 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payments received after July 05, 2024 are considered late; a late payment
charge, the greater of $0.00 or 1.5% of your past due balance will apply.
Your account may also be billed a deposit adjustment.
· Charges and energy usage are based on the facilities contracted. Facility,
energy and fuel costs are available upon request.
E001Customer Name:Account Number:FPL.com Page 2
City Of Dania Beach 64800-94298
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Cash in on a new A/C
Improve comfort and see savings over time with a new, energy-efficient
A/C unit. Install today to save up to $2,150!
FPL.com/AC
BILL DETAILS
Amount of your last bill 26.34
Balance before new charges $26.34
New Charges
Rate: OL-1 OUTDOOR LIGHTING
Electric service amount **10.29
Gross receipts tax (State tax)0.05
Franchise fee (Reqd local fee)0.62
Utility tax (Local tax)1.01
Florida sales tax (State tax)0.52
County sales tax (Local tax)0.09
Taxes and charges 2.29
Regulatory fee (State fee)0.01
Total new charges $12.59
Total amount you owe $38.93
** Your electric service amount includes the following charges:
Non-fuel energy charge:
$0.037780 per kWh
Fuel charge:$0.036500 per kWh
METER SUMMARY
Next bill date May 9, 2024.
Usage Type Usage
Total kWh used 29
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 29 29 29
Service days 32 29 32
kWh/day 1 1 1
Amount $12.59 $13.18 $14.08
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$251.39
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 171.84
Balance before new charges 171.84
Total new charges 79.55
Total amount you owe $251.39
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 67178-60578
Service Address:
100 NW 8TH AVE #STAND OL
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
67178-60578 $251.39 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
400 kWh
320 kWh
240 kWh
160 kWh
80 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $171.84 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Charges and energy usage are based on the facilities contracted. Facility,
energy and fuel costs are available upon request.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 67178-60578
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 171.84
Balance before new charges $171.84
New Charges
Rate: OL-1 OUTDOOR LIGHTING
Electric service amount **74.29
Gross receipts tax (State tax)0.67
Franchise fee (Reqd local fee)4.52
Taxes and charges 5.19
Regulatory fee (State fee)0.07
Total new charges $79.55
Total amount you owe $251.39
** Your electric service amount includes the following charges:
Non-fuel energy charge:
$0.037780 per kWh
Fuel charge:$0.036500 per kWh
METER SUMMARY
Next bill date May 10, 2024.
Usage Type Usage
Total kWh used 352
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 352 352 352
Service days 30 31 32
kWh/day 12 11 11
Amount $79.55 $85.96 $96.69
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$284.17
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 199.39
Balance before new charges 199.39
Total new charges 84.78
Total amount you owe $284.17
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 69593-35123
Service Address:
1000 N FEDERAL HWY #SIGN
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
69593-35123 $284.17 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
750 kWh
600 kWh
450 kWh
300 kWh
150 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $199.39 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 69593-35123
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 199.39
Balance before new charges $199.39
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$45.59
Fuel:( $0.037280 per kWh)$20.69
Electric service amount 79.06
Gross receipts tax (State tax)2.03
Franchise fee (Reqd local fee)3.62
Taxes and charges 5.65
Regulatory fee (State fee)0.07
Total new charges $84.78
Total amount you owe $284.17
METER SUMMARY
Meter reading - Meter AC58673. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 41447 40892 555
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 555 630 533
Service days 30 31 32
kWh/day 19 20 17
Amount $84.78 $98.35 $90.46
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$95,898.67
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 66,536.46
Balance before new charges 66,536.46
Total new charges 29,362.21
Total amount you owe $95,898.67
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 4, 2024 to Apr 2, 2024 (29 days)
Statement Date: Apr 2, 2024
Account Number: 74042-50974
Service Address:
STREET LIGHTS #DANIA
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
74042-50974 $95,898.67 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
C/O CITY HALL
PO BOX 1708
DANIA FL 33004-1708
ENERGY USAGE HISTORY
103,150 kWh
82,520 kWh
61,890 kWh
41,260 kWh
20,630 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $6,679.03 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Charges and energy usage are based on the facilities contracted. Facility,
energy and fuel costs are available upon request.
· This bill reflects a credit to the fuel charge portion of your bill for each street
light fixture turned off during sea turtle nesting and hatching season. Thank
you for helping us protect sea turtles.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 74042-50974
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 66,536.46
Balance before new charges $66,536.46
New Charges
Rate: SL-1 STREET LIGHTING SERVICE
Electric service amount 27,496.50
Gross receipts tax (State tax)172.64
Franchise fee (Reqd local fee)1,668.17
Taxes and charges 1,840.81
Regulatory fee (State fee)24.90
Total new charges $29,362.21
Total amount you owe $95,898.67
METER SUMMARY
Next bill date May 2, 2024.
Usage Type Usage
Total kWh used 93767
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 2, 2024 Mar 4, 2024 Apr 4, 2023
kWh Used 93767 93767 93727
Service days 29 31 32
kWh/day 3233 3025 2929
Amount $29,362.21 $29,916.65 $30,534.74
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
Component Code Watts Lumens Owner/
Maint *Quantity Rate/Unit kWh Used Amount
60 KWH E 20 1,200
Energy 2.060000 41.20
88 KWH E 1 88
Energy 3.020000 3.02
168 KWH E 161 27,048
Energy 5.770000 928.97
28 KWH E 4 112
Energy 0.960000 3.84
104 KWH E 8 832
Energy 3.570000 28.56
160 KWH E 11 1,760
Energy 5.500000 60.50
168 KWH E 31 5,208
Energy 5.770000 178.87
C700304 47 5392 F 158 2,528
Energy 0.600000 94.80
Non-energy
Fixtures 6.600000 1,042.80
Maintenance 1.460000 230.68
C700305 76 8653 F 751 19,526
Energy 0.800000 600.80
Non-energy
Fixtures 6.600000 4,956.60
Maintenance 1.460000 1,096.46
C700306 118 15453 F 63 2,583
Energy 1.400000 88.20
For: 03-04-2024 to 04-02-2024 (29 days)
kWh/Day: 3,233
Service Address:
STREET LIGHTS #DANIA
DANIA, FL 33004
FPL.com Page 1Customer Name:
CITY OF DANIA BEACH
Detail of Rate Schedule Charges for Street Lights
CITY OF DANIA BEACH
C/O CITY HALL
PO BOX 1708
DANIA FL 33004-1708
Account Number:
74042-50974
* F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS
H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER
ESLA
Customer Name:
CITY OF DANIA BEACH
Component Code Watts Lumens Owner/
Maint *Quantity Rate/Unit kWh Used Amount
Non-energy
Fixtures 9.600000 604.80
Maintenance 1.460000 91.98
C700307 259 27874 F 25 2,275
Energy 3.200000 80.00
Non-energy
Fixtures 9.600000 240.00
Maintenance 1.460000 36.50
C700602 26 3300 F 409 3,681
Energy 0.400000 163.60
Non-energy
Fixtures 6.600000 2,699.40
Maintenance 1.460000 597.14
C700613 144 2700 F 1 50
Energy 1.800000 1.80
Non-energy
Fixtures 12.600000 12.60
Maintenance 1.460000 1.46
C700627 144 5300 F 12 600
Energy 1.800000 21.60
Non-energy
Fixtures 12.600000 151.20
Maintenance 1.460000 17.52
C863210 38 2500 F 95 1,235
Energy 0.400000 38.00
Non-energy
Fixtures 6.600000 627.00
Maintenance 1.460000 138.70
F600222 59 7500 F 2 40
Account Number:
74042-50974
For: 03-04-2024 to 04-02-2024 (29 days)
kWh/Day: 3,233
Service Address:
STREET LIGHTS #DANIA
DANIA, FL 33004
FPL.com Page 2
* F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS
H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER
ESLA
Customer Name:
CITY OF DANIA BEACH
Component Code Watts Lumens Owner/
Maint *Quantity Rate/Unit kWh Used Amount
Energy 0.600000 1.20
Non-energy
Fixtures 4.500000 9.00
Maintenance 1.460000 2.92
F700305 76 8653 F 94 2,444
Energy 0.800000 75.20
Non-energy
Fixtures 4.500000 423.00
Maintenance 1.460000 137.24
F700307 259 27874 F 4 364
Energy 3.200000 12.80
Non-energy
Fixtures 7.500000 30.00
Maintenance 1.460000 5.84
F700308 268 32329 F 2 188
Energy 3.200000 6.40
Non-energy
Fixtures 10.500000 21.00
Maintenance 1.460000 2.92
HPS0070 70 6300 F 30 870
Energy 1.000000 30.00
Non-energy
Fixtures 5.340000 160.20
Maintenance 2.180000 65.40
HPS0100 100 9500 F 31 1,271
Energy 1.410000 43.71
Non-energy
Fixtures 4.960000 153.76
Maintenance 2.190000 67.89
HPS0150 150 16000 F 51 3,060
Energy 2.060000 105.06
Non-energy
Fixtures 5.110000 260.61
Maintenance 2.220000 113.22
HPS0200 200 22000 F 103 9,064
Energy 3.020000 311.06
Non-energy
Fixtures 7.750000 798.25
Maintenance 2.830000 291.49
Account Number:
74042-50974
For: 03-04-2024 to 04-02-2024 (29 days)
kWh/Day: 3,233
Service Address:
STREET LIGHTS #DANIA
DANIA, FL 33004
FPL.com Page 3
* F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS
H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER
ESLA
Customer Name:
CITY OF DANIA BEACH
Component Code Watts Lumens Owner/
Maint *Quantity Rate/Unit kWh Used Amount
HPS0400 400 50000 F 7 1,176
Energy 5.770000 40.39
Non-energy
Fixtures 7.830000 54.81
Maintenance 2.820000 19.74
HPS0250 250 27500 R 3 348
Energy 3.990000 11.97
Non-energy
Relamp 3.070000 9.21
HPS0400 400 50000 R 37 6,216
Energy 5.770000 213.49
Non-energy
Relamp 2.830000 104.71
PMC0001 308
Non-energy
Fixtures 8.200000 2,525.60
PMW0001 377
Non-energy
Fixtures 5.990000 2,258.23
UCNP 13,456
Non-energy
Maintenance 0.049020 659.61
UCUP 408
Non-energy
Maintenance 0.119740 48.85
Account Number:
74042-50974
For: 03-04-2024 to 04-02-2024 (29 days)
kWh/Day: 3,233
Service Address:
STREET LIGHTS #DANIA
DANIA, FL 33004
FPL.com Page 4
* F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS
H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER
ESLA
Customer Name:
CITY OF DANIA BEACH
Component Code Watts Lumens Owner/
Maint *Quantity Rate/Unit kWh Used Amount
Energy sub total 3,185.04
Non-energy sub total 20,768.34
Sub total 93,767 23,953.38
Energy conservation cost recovery 35.63
Capacity payment recovery charge 12.19
Environmental cost recovery charge 43.13
Transition rider credit −291.62
Storm protection recovery charge 369.44
Fuel charge 3,374.35
Electric service amount 27,496.50
Gross receipts tax (State tax)172.64
Regulatory fee (State fee)24.90
Franchise fee (Reqd local fee)1,668.17
Total 93,767 29,362.21
Account Number:
74042-50974
For: 03-04-2024 to 04-02-2024 (29 days)
kWh/Day: 3,233
Service Address:
STREET LIGHTS #DANIA
DANIA, FL 33004
FPL.com Page 5
* F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS
H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER
ESLA
CURRENT BILL
$83.49
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 55.47
Balance before new charges 55.47
Total new charges 28.02
Total amount you owe $83.49
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 74309-73243
Service Address:
106 N BEACH RD
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
74309-73243 $83.49 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
20 kWh
16 kWh
12 kWh
8 kWh
4 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $55.47 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 74309-73243
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 55.47
Balance before new charges $55.47
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Minimum base bill charge:$11.06
Non-fuel:( $0.082130 per kWh)$1.31
Fuel:( $0.037280 per kWh)$0.60
Electric service amount 25.75
Gross receipts tax (State tax)0.66
Franchise fee (Reqd local fee)1.59
Taxes and charges 2.25
Regulatory fee (State fee)0.02
Total new charges $28.02
Total amount you owe $83.49
METER SUMMARY
Meter reading - Meter KE82004. Next meter reading May 9, 2024.
Usage Type Current -Previous =Usage
kWh used 02672 02656 16
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 16 11 2
Service days 32 29 32
kWh/day 0 0 0
Amount $28.02 $27.83 $27.27
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$3,674.03
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 2,462.77
Balance before new charges 2,462.77
Total new charges 1,211.26
Total amount you owe $3,674.03
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 75296-61378
Service Address:
1201 STIRLING RD #PSAB
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
75296-61378 $3,674.03 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
20,100 kWh
16,080 kWh
12,060 kWh
8,040 kWh
4,020 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $2,462.77 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 75296-61378
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 2,462.77
Balance before new charges $2,462.77
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$308.75
Fuel:( $0.037280 per kWh)$409.33
Demand:($13.02 per KW)$364.56
Electric service amount 1,112.85
Gross receipts tax (State tax)28.56
Franchise fee (Reqd local fee)68.82
Taxes and charges 97.38
Regulatory fee (State fee)1.03
Total new charges $1,211.26
Total amount you owe $3,674.03
METER SUMMARY
Meter reading - Meter KU38133. Next meter reading May 10, 2024.
Usage Type Current -Previous x Const =Usage
kWh used 28549 28366 60 10980
Demand KW .46 60.00 28
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 10980 10380 14580
Service days 30 31 32
kWh/day 366 334 455
Amount $1,211.26 $1,242.09 $1,648.15
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$674.89
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 378.51
Balance before new charges 378.51*
Total new charges 296.38
Total amount you owe $674.89
*This $378.51 is PAST DUE -- PLEASE PAY IMMEDIATELY
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 75615-78464
Service Address:
1200 NW 1ST ST
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
DANIA BEACH COMMUNITY REDEVELOPMENT AGENCY,
Here's what you owe for this billing period.
E001
75615-78464 $674.89 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
DANIA BEACH COMMUNITY
REDEVELOPMENT AGENCY
100 W DANIA BEACH BLVD
DANIA BEACH FL 33004-3643
ENERGY USAGE HISTORY
2,600 kWh
2,080 kWh
1,560 kWh
1,040 kWh
520 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Payments received after May 07, 2024 are considered late; a late payment
charge, the greater of $5.00 or 1.5% of your past due balance will apply.
Your account may also be billed a deposit adjustment.
E001Customer Name:Account Number:FPL.com Page 2
DANIA BEACH
COMMUNITY
REDEVELOPMENT
AGENCY
75615-78464
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 378.51
Balance before new charges $378.51 *
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$149.96
Fuel:( $0.037280 per kWh)$68.07
Electric service amount 230.81
Gross receipts tax (State tax)5.92
Franchise fee (Reqd local fee)14.27
Utility tax (Local tax)19.52
Florida sales tax (State tax)17.46
County sales tax (Local tax)2.51
Taxes and charges 59.68
Late payment charge 5.68
Regulatory fee (State fee)0.21
Total new charges $296.38
Total amount you owe $674.89
*This $378.51 is PAST DUE -- PLEASE PAY IMMEDIATELY
METER SUMMARY
Meter reading - Meter ACD1767. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 92680 90854 1826
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 1826 1152 1526
Service days 30 31 32
kWh/day 61 37 48
Amount $290.70 $198.19 $273.89
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$8,287.17
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 4,715.32
Balance before new charges 4,715.32
Total new charges 3,571.85
Total amount you owe $8,287.17
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 1, 2024 to Apr 1, 2024 (31 days)
Statement Date: Apr 1, 2024
Account Number: 77463-97251
Service Address:
2901 SW 52ND ST #POOL
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
77463-97251 $8,287.17 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
C/O TANIA STEVENS
100 W DANIA BEACH BLVD
DANIA BEACH FL 33004-3699
ENERGY USAGE HISTORY
53,250 kWh
42,600 kWh
31,950 kWh
21,300 kWh
10,650 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Effective April 1 through October 31, Time-of-Use On-Peak hours are Noon
to 9 PM, Monday through Friday; holidays are Off-Peak.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 77463-97251
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 4,715.32
Balance before new charges $4,715.32
New Charges
Rate: HLFT-1 HIGH LOAD FACTOR DEMAND TIME OF USE
Electric service amount **3,281.68
Gross receipts tax (State tax)84.21
Franchise fee (Reqd local fee)202.93
Taxes and charges 287.14
Regulatory fee (State fee)3.03
Total new charges $3,571.85
Total amount you owe $8,287.17
** Your electric service amount includes the following charges:
Base charge:$30.21
Non-fuel energy charge:
On-peak $0.024580 per kWh
Off-peak $0.016460 per kWh
Fuel charge:
On-peak $0.041230 per kWh
Off-peak $0.035590 per kWh
Demand charge:
On-Peak $15.05 per KW
Maximum $2.78 per KW
METER SUMMARY
Meter reading - Meter MLL7780. Next meter reading May 1, 2024.
Usage Type Current -Previous =Usage
Total kWh used 00283 67982 32301
On-Peak kWh used 32929 25473 7456
Off-peak kWh used 24845
On-peak demand 82.46 82
Maximum demand 84
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 1, 2024 Mar 1, 2024 Apr 3, 2023
kWh Used 32301 46625 28853
Service days 31 29 32
kWh/day 1041 1607 901
Amount $3,571.85 $4,715.32 $3,582.40
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$32,146.33
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 21,701.57
Balance before new charges 21,701.57
Total new charges 10,444.76
Total amount you owe $32,146.33
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 78869-61130
Service Address:
1201 STIRLING RD #HSPS
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
78869-61130 $32,146.33 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
131,250 kWh
105,000 kWh
78,750 kWh
52,500 kWh
26,250 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $21,701.57 of this bill is past due. If payment has been
made, we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Effective April 1 through October 31, Time-of-Use On-Peak hours are Noon
to 9 PM, Monday through Friday; holidays are Off-Peak.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 78869-61130
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 21,701.57
Balance before new charges $21,701.57
New Charges
Rate: GSDT-1 GENERAL SERVICE DEMAND TIME OF USE
Electric service amount **9,596.26
Gross receipts tax (State tax)246.24
Franchise fee (Reqd local fee)593.40
Taxes and charges 839.64
Regulatory fee (State fee)8.86
Total new charges $10,444.76
Total amount you owe $32,146.33
** Your electric service amount includes the following charges:
Base charge:$30.21
Non-fuel energy charge:
On-peak $0.057010 per kWh
Off-peak $0.016460 per kWh
Fuel charge:
On-peak $0.041230 per kWh
Off-peak $0.035590 per kWh
Demand charge:$12.31 per KW
Maximum $0.71 per KW
METER SUMMARY
Meter reading - Meter MV57024. Next meter reading May 10, 2024.
Usage Type Current -Previous x Const =Usage
Total kWh used 04648 03727 120 110520
On-Peak kWh used 26533 26296 120 28440
Off-peak kWh used 82080
On-peak demand 1.60 120.00 192
Maximum demand 192
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 110520 112560 119280
Service days 30 31 32
kWh/day 3684 3630 3727
Amount $10,444.76 $10,674.88 $12,051.11
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$90.61
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 61.55
Balance before new charges 61.55
Total new charges 29.06
Total amount you owe $90.61
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 82314-31431
Service Address:
803 NW 1ST ST #PKGLTLGTS
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
82314-31431 $90.61 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
PO BOX 1708
DANIA FL 33004-1708
ENERGY USAGE HISTORY
300 kWh
240 kWh
180 kWh
120 kWh
60 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $61.55 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 82314-31431
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 61.55
Balance before new charges $61.55
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Minimum base bill charge:$9.62
Non-fuel:( $0.082130 per kWh)$2.96
Fuel:( $0.037280 per kWh)$1.34
Electric service amount 26.70
Gross receipts tax (State tax)0.69
Franchise fee (Reqd local fee)1.65
Taxes and charges 2.34
Regulatory fee (State fee)0.02
Total new charges $29.06
Total amount you owe $90.61
METER SUMMARY
Meter reading - Meter ACD7830. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 06520 06484 36
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 36 40 247
Service days 30 31 32
kWh/day 1 1 8
Amount $29.06 $29.52 $49.80
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$2,014.14
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 1,368.45
Balance before new charges 1,368.45
Total new charges 645.69
Total amount you owe $2,014.14
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 82343-56627
Service Address:
200 NE 2 ST #CTS
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
82343-56627 $2,014.14 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
2,050 kWh
1,640 kWh
1,230 kWh
820 kWh
410 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $1,368.45 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 82343-56627
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 1,368.45
Balance before new charges $1,368.45
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$34.95
Fuel:( $0.037280 per kWh)$46.34
Demand:($13.02 per KW)$481.74
Electric service amount 593.24
Gross receipts tax (State tax)15.22
Franchise fee (Reqd local fee)36.68
Taxes and charges 51.90
Regulatory fee (State fee)0.55
Total new charges $645.69
Total amount you owe $2,014.14
METER SUMMARY
Meter reading - Meter KEL4829. Next meter reading May 9, 2024.
Usage Type Current -Previous =Usage
kWh used 03886 02643 1243
Demand KW 36.71 37
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 1243 1757 1283
Service days 32 29 32
kWh/day 38 60 40
Amount $645.69 $687.47 $534.13
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,057.48
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 627.43
Balance before new charges 627.43
Total new charges 430.05
Total amount you owe $1,057.48
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 82363-52681
Service Address:
200 NE 2 ST
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
82363-52681 $1,057.48 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
3,400 kWh
2,720 kWh
2,040 kWh
1,360 kWh
680 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $627.43 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· A secondary metering adjustment of 3% has been added to metered KWH
per Tariff Sheet 10.010.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 82363-52681
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 627.43
Balance before new charges $627.43
New Charges
Rate: OS-2 SPORTS FIELD SERVICE
Electric service amount **378.30
Gross receipts tax (State tax)9.71
Franchise fee (Reqd local fee)23.39
Taxes and charges 33.10
Facilities rental 18.28
Regulatory fee (State fee)0.37
Total new charges $430.05
Total amount you owe $1,057.48
** Your electric service amount includes the following charges:
Base charge:$155.41
Non-fuel energy charge:
$0.114740 per kWh
Fuel charge:$0.036990 per kWh
METER SUMMARY
Meter reading - Meter KLL4681. Next meter reading May 9, 2024.
Usage Type Current -Previous =Usage
kWh used 72284 70857 1469
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 1469 928 3082
Service days 32 29 32
kWh/day 44 31 96
Amount $411.75 $330.73 $738.18
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$3,816.23
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 2,735.48
Balance before new charges 2,735.48
Total new charges 1,080.75
Total amount you owe $3,816.23
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 83534-55572
Service Address:
128 NW 10 CT # LS7
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
83534-55572 $3,816.23 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
16,250 kWh
13,000 kWh
9,750 kWh
6,500 kWh
3,250 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $2,735.48 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 83534-55572
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 2,735.48
Balance before new charges $2,735.48
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$161.97
Fuel:( $0.037280 per kWh)$214.73
Demand:($13.02 per KW)$520.80
Electric service amount 927.71
Gross receipts tax (State tax)23.81
Franchise fee (Reqd local fee)57.37
Taxes and charges 81.18
Regulatory fee (State fee)0.86
Total new charges $1,009.75
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $3,816.23
METER SUMMARY
Meter reading - Meter ST38676. Next meter reading May 10, 2024.
Usage Type Current -Previous x Const =Usage
kWh used 03936 03840 60 5760
Demand KW 40
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 5760 8940 8040
Service days 30 31 32
kWh/day 192 288 251
Amount $1,009.75 $1,588.68 $996.95
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$85.46
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 57.70
Balance before new charges 57.70
Total new charges 27.76
Total amount you owe $85.46
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 83594-58521
Service Address:
120 NW 10 CT
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
83594-58521 $85.46 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
150 kWh
120 kWh
90 kWh
60 kWh
30 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $57.70 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 83594-58521
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 57.70
Balance before new charges $57.70
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Minimum base bill charge:$11.42
Non-fuel:( $0.082130 per kWh)$0.90
Fuel:( $0.037280 per kWh)$0.41
Electric service amount 25.51
Gross receipts tax (State tax)0.65
Franchise fee (Reqd local fee)1.58
Taxes and charges 2.23
Regulatory fee (State fee)0.02
Total new charges $27.76
Total amount you owe $85.46
METER SUMMARY
Meter reading - Meter ACD6938. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 07387 07376 11
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 11 19 103
Service days 30 31 32
kWh/day 0 1 3
Amount $27.76 $28.30 $34.15
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$674.19
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 458.45
Balance before new charges 458.45
Total new charges 215.74
Total amount you owe $674.19
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 83671-08357
Service Address:
1855 GRIFFIN RD #LS 10
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
83671-08357 $674.19 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
1855 GRIFFIN RD # LS10
DANIA FL 33004-2200
ENERGY USAGE HISTORY
1,100 kWh
880 kWh
660 kWh
440 kWh
220 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $458.45 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 83671-08357
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 458.45
Balance before new charges $458.45
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.21
Non-fuel:( $0.028120 per kWh)$21.85
Fuel:( $0.037280 per kWh)$28.97
Demand:($13.02 per KW)$117.18
Electric service amount 198.21
Gross receipts tax (State tax)5.09
Franchise fee (Reqd local fee)12.26
Taxes and charges 17.35
Regulatory fee (State fee)0.18
Total new charges $215.74
Total amount you owe $674.19
METER SUMMARY
Meter reading - Meter KJJ8920. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 27963 27186 777
Demand KW 8.88 9
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 777 942 894
Service days 30 31 32
kWh/day 25 30 27
Amount $215.74 $258.63 $173.29
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$27.78
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 14.59
Balance before new charges 14.59
Total new charges 13.19
Total amount you owe $27.78
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 1, 2024 to Apr 1, 2024 (31 days)
Statement Date: Apr 1, 2024
Account Number: 83822-11186
Service Address:
4540 SW 27TH AVE # OL
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
Hello City Of Dania Beach,
Here's what you owe for this billing period.
E001
83822-11186 $27.78 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
90 kWh
72 kWh
54 kWh
36 kWh
18 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Charges and energy usage are based on the facilities contracted. Facility,
energy and fuel costs are available upon request.
E001Customer Name:Account Number:FPL.com Page 2
City Of Dania Beach 83822-11186
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Cash in on a new A/C
Improve comfort and see savings over time with a new, energy-efficient
A/C unit. Install today to save up to $2,150!
FPL.com/AC
BILL DETAILS
Amount of your last bill 14.59
Balance before new charges $14.59
New Charges
Rate: OL-1 OUTDOOR LIGHTING
Electric service amount **12.28
Gross receipts tax (State tax)0.15
Franchise fee (Reqd local fee)0.75
Taxes and charges 0.90
Regulatory fee (State fee)0.01
Total new charges $13.19
Total amount you owe $27.78
** Your electric service amount includes the following charges:
Non-fuel energy charge:
$0.037780 per kWh
Fuel charge:$0.036500 per kWh
METER SUMMARY
Next bill date May 1, 2024.
Usage Type Usage
Total kWh used 77
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 1, 2024 Mar 1, 2024 Apr 3, 2023
kWh Used 77 77 77
Service days 31 29 32
kWh/day 2 3 2
Amount $13.19 $14.59 $16.98
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$2,358.97
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 1,752.74
Balance before new charges 1,752.74
Total new charges 606.23
Total amount you owe $2,358.97
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 83824-57524
Service Address:
120 NW 10 CT
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA,
Here's what you owe for this billing period.
E001
83824-57524 $2,358.97 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA
CITY HALL
DANIA FL 33004
ENERGY USAGE HISTORY
4,450 kWh
3,560 kWh
2,670 kWh
1,780 kWh
890 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $1,752.74 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· A secondary metering adjustment of 3% has been added to metered KWH
per Tariff Sheet 10.010.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA 83824-57524
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 1,752.74
Balance before new charges $1,752.74
New Charges
Rate: OS-2 SPORTS FIELD SERVICE
Electric service amount **544.14
Gross receipts tax (State tax)13.96
Franchise fee (Reqd local fee)33.65
Taxes and charges 47.61
Facilities rental 13.97
Regulatory fee (State fee)0.51
Total new charges $606.23
Total amount you owe $2,358.97
** Your electric service amount includes the following charges:
Base charge:$155.41
Non-fuel energy charge:
$0.114740 per kWh
Fuel charge:$0.036990 per kWh
METER SUMMARY
Meter reading - Meter KJL1753. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 91602 89114 2562
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 2562 3996 3003
Service days 30 31 32
kWh/day 82 125 91
Amount $592.25 $864.89 $723.53
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$18,600.97
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 11,210.45
Balance before new charges 11,210.45
Total new charges 7,390.52
Total amount you owe $18,600.97
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 83875-32461
Service Address:
101 N BEACH RD #MARINA
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
83875-32461 $18,600.97 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
130,450 kWh
104,360 kWh
78,270 kWh
52,180 kWh
26,090 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $11,210.45 of this bill is past due. If payment has been
made, we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Effective April 1 through October 31, Time-of-Use On-Peak hours are Noon
to 9 PM, Monday through Friday; holidays are Off-Peak.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 83875-32461
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 11,210.45
Balance before new charges $11,210.45
New Charges
Rate: GSDT-1 GENERAL SERVICE DEMAND TIME OF USE
Electric service amount **6,790.14
Gross receipts tax (State tax)174.23
Franchise fee (Reqd local fee)419.88
Taxes and charges 594.11
Regulatory fee (State fee)6.27
Total new charges $7,390.52
Total amount you owe $18,600.97
** Your electric service amount includes the following charges:
Base charge:$30.21
Non-fuel energy charge:
On-peak $0.057010 per kWh
Off-peak $0.016460 per kWh
Fuel charge:
On-peak $0.041230 per kWh
Off-peak $0.035590 per kWh
Demand charge:$12.31 per KW
Maximum $0.71 per KW
METER SUMMARY
Meter reading - Meter MV58927. Next meter reading May 9, 2024.
Usage Type Current -Previous x Const =Usage
Total kWh used 33419 32807 120 73440
On-Peak kWh used 09279 09131 120 17760
Off-peak kWh used 55680
On-peak demand 1.35 120.00 162
Maximum demand 173
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 73440 53040 92040
Service days 32 29 32
kWh/day 2295 1828 2876
Amount $7,390.52 $5,550.79 $10,185.60
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$149.67
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 102.88
Balance before new charges 102.88
Total new charges 46.79
Total amount you owe $149.67
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 8, 2024 to Apr 9, 2024 (32 days)
Statement Date: Apr 9, 2024
Account Number: 92733-58607
Service Address:
300 NE 2ND ST # OL
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
92733-58607 $149.67 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
300 kWh
240 kWh
180 kWh
120 kWh
60 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $102.88 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· Charges and energy usage are based on the facilities contracted. Facility,
energy and fuel costs are available upon request.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 92733-58607
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 102.88
Balance before new charges $102.88
New Charges
Rate: OL-1 OUTDOOR LIGHTING
Electric service amount **43.60
Gross receipts tax (State tax)0.49
Franchise fee (Reqd local fee)2.66
Taxes and charges 3.15
Regulatory fee (State fee)0.04
Total new charges $46.79
Total amount you owe $149.67
** Your electric service amount includes the following charges:
Non-fuel energy charge:
$0.037780 per kWh
Fuel charge:$0.036500 per kWh
METER SUMMARY
Next bill date May 9, 2024.
Usage Type Usage
Total kWh used 256
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 9, 2024 Mar 8, 2024 Apr 10, 2023
kWh Used 256 256 256
Service days 32 29 32
kWh/day 8 9 8
Amount $46.79 $51.46 $59.38
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$730.11
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 300.70
Balance before new charges 300.70
Total new charges 429.41
Total amount you owe $730.11
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 1, 2024 to Apr 1, 2024 (31 days)
Statement Date: Apr 1, 2024
Account Number: 95580-98431
Service Address:
2901 SW 52ND ST
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
95580-98431 $730.11 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
4,700 kWh
3,760 kWh
2,820 kWh
1,880 kWh
940 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 95580-98431
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 300.70
Balance before new charges $300.70
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$262.57
Fuel:( $0.037280 per kWh)$119.18
Electric service amount 394.53
Gross receipts tax (State tax)10.12
Franchise fee (Reqd local fee)24.40
Taxes and charges 34.52
Regulatory fee (State fee)0.36
Total new charges $429.41
Total amount you owe $730.11
METER SUMMARY
Meter reading - Meter AC03956. Next meter reading May 1, 2024.
Usage Type Current -Previous =Usage
kWh used 59630 56433 3197
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 1, 2024 Mar 1, 2024 Apr 3, 2023
kWh Used 3197 2103 3222
Service days 31 29 32
kWh/day 103 73 101
Amount $429.41 $300.70 $484.04
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$970.32
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 599.78
Balance before new charges 599.78
Total new charges 370.54
Total amount you owe $970.32
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Mar 11, 2024 to Apr 10, 2024 (30 days)
Statement Date: Apr 10, 2024
Account Number: 96241-18460
Service Address:
230 SW 12TH AVE
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
96241-18460 $970.32 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
5,550 kWh
4,440 kWh
3,330 kWh
2,220 kWh
1,110 kWh
0 kWh
A M J J A S O N D J F M A2023 2024
KEEP IN MIND
· Did you forget? $599.78 of this bill is past due. If payment has been made,
we thank you and apologize for this reminder.
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 96241-18460
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 599.78
Balance before new charges $599.78
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.78
Non-fuel:( $0.082130 per kWh)$225.36
Fuel:( $0.037280 per kWh)$102.30
Electric service amount 340.44
Gross receipts tax (State tax)8.74
Franchise fee (Reqd local fee)21.05
Taxes and charges 29.79
Regulatory fee (State fee)0.31
Total new charges $370.54
Total amount you owe $970.32
METER SUMMARY
Meter reading - Meter KLL3254. Next meter reading May 10, 2024.
Usage Type Current -Previous =Usage
kWh used 73179 70435 2744
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Apr 10, 2024 Mar 11, 2024 Apr 11, 2023
kWh Used 2744 2270 2617
Service days 30 31 32
kWh/day 91 73 81
Amount $370.54 $323.48 $395.70
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$57.02
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 28.37
Balance before new charges 28.37
Total new charges 28.65
Total amount you owe $57.02
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Jan 3, 2024 to Feb 2, 2024 (30 days)
Statement Date: Feb 2, 2024
Account Number: 97812-54595
Service Address:
2301 STIRLING RD # WELLFLD
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
97812-54595 $57.02 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W BCH BLV
DANIA FL 33004
ENERGY USAGE HISTORY
30 kWh
24 kWh
18 kWh
12 kWh
6 kWh
0 kWh
A S S O O N N D D J J F F2023 2024
KEEP IN MIND
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 97812-54595
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 28.37
Balance before new charges $28.37
New Charges
Rate: GST-1 GENERAL SVC NON-DEMAND TOU / BUSINESS
Electric service amount **26.35
Gross receipts tax (State tax)0.68
Franchise fee (Reqd local fee)1.60
Taxes and charges 2.28
Regulatory fee (State fee)0.02
Total new charges $28.65
Total amount you owe $57.02
** Your electric service amount includes the following charges:
Base charge:$12.78
Minimum base bill charge:$10.11
Non-fuel energy charge:
On-peak $0.149590 per kWh
Off-peak $0.061450 per kWh
Fuel charge:
On-peak $0.041230 per kWh
Off-peak $0.035600 per kWh
METER SUMMARY
Meter reading - Meter MN55198. Next meter reading Mar 4, 2024.
Usage Type Current -Previous =Usage
Total kWh used 00438 00413 25
On-Peak kWh used 00113 00102 11
Off-peak kWh used 14
ENERGY USAGE COMPARISON
This Month Last Month
Service to Feb 2, 2024 Jan 3, 2024
kWh Used 25 21
Service days 30 32
kWh/day 0 0
Amount $28.65 $28.37
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$84.89
TOTAL AMOUNT YOU OWE
May 7, 2024
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 57.02
Payments received -28.37
Balance before new charges 28.65
Total new charges 56.24
Total amount you owe $84.89
(See page 2 for bill details.)
An approved rate decrease is in effect. Rates will decrease again in May.
Learn more at FPL.com/Rates.
FPL.com Page 1
Electric Bill Statement
For: Feb 2, 2024 to Apr 2, 2024
Statement Date: Apr 11, 2024
Account Number: 97812-54595
Service Address:
2301 STIRLING RD # WELLFLD
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
97812-54595 $84.89 May 7, 2024 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W BCH BLV
DANIA FL 33004
ENERGY USAGE HISTORY
30 kWh
24 kWh
18 kWh
12 kWh
6 kWh
0 kWh
O N N D D J J F F M M A A2023 2024
KEEP IN MIND
· Payment received after July 05, 2024 is considered LATE; a late payment
charge of 1% will apply.
· This bill is for multiple (2) billing periods.
E001Customer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 97812-54595
Download the app
Get instant, secure access to outage and billing info from your mobile
device.
FPL.com/MobileApp
Programs for your business
Discover rebates, tips and tools to save on your bill - plus, business
solutions.
FPL.com/BizPrograms
BILL DETAILS
Amount of your last bill 57.02
Payment received - Thank you −28.37
Balance before new charges $28.65
New Charges
Rate: GST-1 GENERAL SVC NON-DEMAND TOU / BUSINESS
Electric service amount 51.68
Gross receipts tax (State tax)1.33
Franchise fee (Reqd local fee)3.19
Taxes and charges 4.52
Regulatory fee (State fee)0.04
Total new charges $56.24
Total amount you owe $84.89
METER SUMMARY
Multiple-month usage
Meter no. MN55198 Next meter reading May 2, 2024
Total kWh 34
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
ECOMCustomer Name:Account Number:FPL.com Page 1
CITY OF DANIA BEACH 97812-54595
BILLING STATEMENT - MULTIPLE BILLING PERIODS
BILLING STATEMENT
For: Feb 02 2024 to Mar 04 2024 (31 days)
Rate Schedule GST-1
Meter Number MN55198
Current kWh Reading 00456
Previous kWh Reading 00438
Curr On-peak kWh Rdg 00117
Prev On-peak kWh Rdg 00113
kWh Constant 00001
Average kWh per Day 1
Storm Charge 0.00
Total kWh Used 18
On-peak kWh Used 4
Off-peak kWh Used 14
Demand Reading 000.00
On-peak Demand Rdg 000.02
KW Constant 1
Demand Used 0
Max Demand 0
Max Month Demand 0
On-peak Demand 0
Contract Demand 0
Service Amount 25.94
FPL SolarTogethr Chg 0.00
FPL SolarTogethr Cr 0.00
Transformer Credit 0.00
Curtailment/CDR Cr 0.00
Non-Std Mtr Enroll 0.00
Non-Std Mtr Surchg 0.00
Fixed Rate differential 0.00
Gross receipts tax 0.67
Regulatory Assessment Fee 0.02
Franchise Charge 1.60
Utility Tax 0.00
Florida Sales Tax 0.00
Disc FL Sales Surtax 0.00
VSP Solar Charge 0.00
Facility Rental 0.00
Fac Rental Sales Tax 0.00
Fac Rental Disc Tax 0.00
Late Payment Charge 0.00
Care To Share donation 0.00
Contracted Service Charge 0.00
Total New Charges 28.23
BILLING STATEMENT
For: Mar 04 2024 to Apr 02 2024 (29 days)
Rate Schedule GST-1
Meter Number MN55198
Current kWh Reading 00472
Previous kWh Reading 00456
Curr On-peak kWh Rdg 00121
Prev On-peak kWh Rdg 00117
kWh Constant 00001
Average kWh per Day 1
Storm Charge 0.00
Total kWh Used 16
On-peak kWh Used 4
Off-peak kWh Used 12
Demand Reading 000.00
On-peak Demand Rdg 000.02
KW Constant 1
Demand Used 0
Max Demand 0
Max Month Demand 0
On-peak Demand 0
Contract Demand 0
Service Amount 25.74
FPL SolarTogethr Chg 0.00
FPL SolarTogethr Cr 0.00
Transformer Credit 0.00
Curtailment/CDR Cr 0.00
Non-Std Mtr Enroll 0.00
Non-Std Mtr Surchg 0.00
Fixed Rate differential 0.00
Gross receipts tax 0.66
Regulatory Assessment Fee 0.02
Franchise Charge 1.59
Utility Tax 0.00
Florida Sales Tax 0.00
Disc FL Sales Surtax 0.00
VSP Solar Charge 0.00
Facility Rental 0.00
Fac Rental Sales Tax 0.00
Fac Rental Disc Tax 0.00
Late Payment Charge 0.00
Care To Share donation 0.00
Contracted Service Charge 0.00
Total New Charges 28.01
ECOMCustomer Name:Account Number:FPL.com Page 2
CITY OF DANIA BEACH 97812-54595