Loading...
HomeMy WebLinkAboutInv# PayApp 1 - Burkhardt Construction - 05/31/2024Document G702,APPLICATION AND CERTIFICATE FOR PAYMENT,containing APPLICATION NUMBER:1 Contractor's signed Certification is attached.APPLICATION DATE:05/31/2024 Use Column I on Contracts where variable retainage for line items apply.PERIOD:05/01/24 05/31/24 ARCHITECTS/ENGINEERS PROJECT NO: Contract Lines A B C D E F G H I ITEM NO. COST CODE DESCRIPTION OF WORK SCHEDULED VALUE WORK COMPLETED MATERIALS PRESENTLY STORED NOT IN D OR E) TOTAL COMPLETED AND STORED TO DATE D+E+F) G C) BALANCE TO FINISH C G) RETAINAGEFROM PREVIOUS APPLICATION D E) THIS PERIOD 1 2-00204 Mainten ance of Traffic MAINTENANCE OF TRAFFIC $307,600.00 $0.00 $9,228.00 $0.00 $9,228.00 3.00%$298,372.00 $461.40 2 20- 21300 Clearing Grubbin g DEMOLITION/CLEARING GRUBBING $303,576.70 $0.00 $97,823.84 $0.00 $97,823.84 32.22%$205,752.86 $4,891.19 3 20- 21400 Grading EARTHWORK AND GRADING $683,845.00 $0.00 $0.00 $0.00 $0.00 0.00%$683,845.00 $0.00 4 20- 22000 Subgrad e/Base SUBGRADE,BASE,AND ASPHALT CONSTRUCTION $ 859,603.10 $0.00 $0.00 $0.00 $0.00 0.00%$859,603.10 $0.00 5 12- 01200 Furnishi ngs PLAYGROUND AREA $294,920.36 $0.00 $0.00 $0.00 $0.00 0.00%$294,920.36 $0.00 6 13- 01305 Swimmi ng Pool SWIMMING POOL $690,858.00 $0.00 $0.00 $0.00 $0.00 0.00%$690,858.00 $0.00 7 12- 01200 Furnishi ngs FURNISHINGS AND MISCELLANEOUS $1,220,819.40 $0.00 $0.00 $0.00 $0.00 0.00%$1,220,819.40 $0.00 8 10- 01015 Signage PAVEMENT MARKINGS AND SIGNAGE $5,663.20 $0.00 $0.00 $0.00 $0.00 0.00%$5,663.20 $0.00 9 3-00300 Concret e SIDEWALK/CONCRETE CURB CONSTRUCTION $527,239.50 $0.00 $0.00 $0.00 $0.00 0.00%$527,239.50 $0.00 10 20- 28000 Water Distributi on WATER SUPPLY $155,439.00 $0.00 $0.00 $0.00 $0.00 0.00%$155,439.00 $0.00 CONTINUATION SHEET DOCUMENT G703 Page 2 of 4 A B C D E F G H I ITEM NO. COST CODE DESCRIPTION OF WORK SCHEDULED VALUE WORK COMPLETED MATERIALS PRESENTLY STORED NOT IN D OR E) TOTAL COMPLETED AND STORED TO DATE D+E+F) G C) BALANCE TO FINISH C G) RETAINAGEFROM PREVIOUS APPLICATION D E) THIS PERIOD 11 2-00250 Storm Drainag e STORM DRAINAGE $707,520.76 $0.00 $18,500.00 $0.00 $18,500.00 2.61%$689,020.76 $925.00 12 2-00281 Sewer Service SANITARY SEWER $53,704.00 $0.00 $0.00 $0.00 $0.00 0.00%$53,704.00 $0.00 13 16- 01600 Electrica l ELECTRICAL/STREETLIGHTING $1,543,924.02 $0.00 $4,800.00 $0.00 $4,800.00 0.31%$1,539,124.02 $240.00 14 2-00274 Utilities FRANCHISE UTILITIES $28,400.00 $0.00 $0.00 $0.00 $0.00 0.00%$28,400.00 $0.00 15 13- 01300 Special Construc tion VERTICAL CONSTRUCTION ELEMENTS $9,037,541.76 $0.00 $34,277.00 $0.00 $34,277.00 0.38%$9,003,264.76 $1,713.85 16 2-00270 Landsca ping LANDSCAPING $613,926.90 $0.00 $29,000.00 $0.00 $29,000.00 4.72%$584,926.90 $1,450.00 17 2-00265 Irrigation IRRIGATION $173,500.00 $0.00 $0.00 $0.00 $0.00 0.00%$173,500.00 $0.00 18 17- 01701 Continge ncy CONSTRUCTION CONTINGENCY $360,000.00 $0.00 $0.00 $0.00 $0.00 0.00%$360,000.00 $0.00 19 20- 21000 General Conditio ns GENERAL CONDITIONS $1,093,840.65 $0.00 $32,815.22 $0.00 $32,815.22 3.00%$1,061,025.43 $1,640.76 20 20- 21050 Construc tion phase fee CONSTRUCTION MANAGEMENT FEE $1,342,400.00 $0.00 $40,272.00 $0.00 $40,272.00 3.00%$1,302,128.00 $2,013.60 21 20- 21000 General Conditio ns PROFIT $1,350,000.00 $0.00 $40,500.00 $0.00 $40,500.00 3.00%$1,309,500.00 $2,025.00 TOTALS:$21,354,322.35 $0.00 $307,216.06 $0.00 $307,216.06 1.44%$21,047,106.29 $15,360.80 CONTINUATION SHEET DOCUMENT G703 Page 3 of 4 Grand Totals A B C D E F G H I ITEM NO. DESCRIPTION OF WORK SCHEDULED VALUE WORK COMPLETED MATERIALS PRESENTLY STORED NOT IN D OR E) TOTAL COMPLETED AND STORED TO DATE D+E+F) G C) BALANCE TO FINISH C G) RETAINAGEFROMPREVIOUS APPLICATION D E) THIS PERIOD GRAND TOTALS:21,354,322.35 $0.00 $307,216.06 $0.00 $307,216.06 1.44%$21,047,106.29 $15,360.80 DOCUMENT G703 APPLICATION AND CERTIFICATE FOR PAYMENT CONTINUATION SHEET DOCUMENT G703 Page 4 of 4