HomeMy WebLinkAboutInv# 480rev2 - Ally Engineering Services, Inc - 10/31/2024.�, ALLY
E N G IN E E R ING S E R V I C E S, I N C.
14750 NW 77th COURT • SUITE 308 •MIAMI LAKES, FL 33016 • 786-401-6647
City of Dania Beach
Invoice number
480rev2
100 West Dania Beach Blvd
Date
10/31/2024
Dania Beach, FL 33004
Project
DAN-2024-01
DANIA BEACH - CEI
SERVICES FOR SOUTHEAST DRAINAGE
PROJECT
Billing period through October 31, 2024
RFQ No. 23-020
City PM: John Quintero; jquintero@daniabeachfl.gov
Invoice Summary
Contract
Percent
Total
Prior
Current
Description
Amount
Complete
Billed
Billed
Remaining
Billed
CONSTRUCTION
677,319.75
4.85
32,873.00
3,936.00
644,446.75
28,937.00
CONSTRUCTION - CGA
121,305.00
0.00
0.00
0.00
121,305.00
0.00
Total
798,624.75
4.12
32,873.00
3,936.00
765,751.75
28,937.00
City of Dania Beach Invoice number 480rev2 Invoice date 10131/2024
Page 1 of 5
City of Dania Beach
Project DAN-2024-01 DANIA BEACH - CEI SERVICES FOR SOUTHEAST DRAINAGE PROJECT
100 CONSTRUCTION
Labor
CEI Project Administrator
Mohamed Mabrouk
Project Management
Project Start groundbreaking on site
Invoice number 480rev2
Date 10/31/2024
Billed
Date Units Rate Amount
10/02/2024 2.00 161.00
10/04/2024 3.00 161.00
Attend two meetings with the EOR/City and with the Contractor/City to discuss issues raised by the project
team
10/07/2024 3.00 161.00
Field Visit and walk through with contractor - SE 3rd St between SE 5th Ave and SE 4th Ave
10/08/2024 3.00 161.00
Field meeting with super and field visit to lamp the existing drainage on SE 3rd street and SE 5th Avenue
10/09/2024 2.00 161.00
Walk through the project limits to check storm prep with inspection staff
10/10/2024 2.00 161.00
Walk through after the storm to determine issues and damages
10/11/2024 4.00 161.00
Review schedule submitted by contractor, coordinate meter handover meeting, coordinate shop drawings and
RFI submittals, discuss potential change order with the City and contractor
10/14/2024 4.00 161.00
meet on site to verify field conditions with the contractor and to meet with city representatives to obtain the
meter. Review dailies and shop drawings log
10/15/2024 4.00 161.00
review the RFI log, coordinate RFI responses with the deisgn EOR, visit the project site to review dirt
driveways, contact the design team and city staff to address the driveway issue.
10/16/2024 5.00 161.00
attend internal meeting with the deisgn team to discuss issues with the plans including M&R limits, driveway
replacement, drainage pipe sizes and others, meet on site with the contractor to lamb se 3rd between 4th eve
and 3rd eve
10/17/2024 5.00 161.00
field visit to lamb se 3rd street; review potential changing site condition with drainage at SE 3rd avenue; review
RFI's and Shop drawings, discuss change order with the City and prepare change order.
10/18/2024 5.00 161.00
attend progress meeting; attend internal meeting with design team to discuss field changing drainage conditions
on SE 3rd, meet on site with contractor to review drainage issues at SE 3rd St and SE 4th Ave.
10/21 /2024 5.00 161.00
prepare change order, discuss change order with city, field visit to review drainage changing conditions on SE
3rd st and SE 3rd avenue
10/22/2024 5.00 161.00
attend daily design meeting, phone calls with city and project team regarding change order, phone calls with the
contractor regarding change order, review submitted RFI, review materials testing requierments, review daily
reports
10/23/2024 5.00 161.00
attend daily meeting with design team; review drainage changing conditions on site with the contractor on SE
3rd Street between 4th and 3rd eve, attend internal meeting to discuss the change order, emails.
10/24/2024 5.00 161.00
attend daily meeting with design team; review drainage changing conditions on site with the contractor on SE
3rd Street between 4th and 3rd eve, attend internal meeting to discuss the change order, emails and review
RFI's with the inspection staff, review dailies.
322.00
483.00
483.00
483.00
322.00
322.00
644.00
644.00
644.00
805.00
805.00
805.00
805.00
805.00
805.00
805.00
City of Dania Beach Invoice number 480rev2 Invoice date 10/31/2024
Page 2 of 5
City of Dania Beach Invoice number 480rev2
Project DAN-2024-01 DANIA BEACH - CEI SERVICES FOR SOUTHEAST DRAINAGE PROJECT Date 10/31/2024
100 CONSTRUCTION
Labor
Billed
Date Units Rate Amount
CEI Project Administrator
Mohamed Mabrouk
Project Management
10/25/2024 5.00 161.00
attend daily meeting with design team; review drainage changing conditions on site with the contractor on SE
3rd Street between 4th and 3rd ave, emails.
10/28/2024 5.00 161.00
attend daily meeting with design team, attend meeting with the contractor to discuss change order, review the
contractor's submitted schedule
10/29/2024 5.00 161.00
attend daily meeting with design team, prepare and attend the progress meeting, review the contractor's
schedule; review dailies by incpstion staff, review RFI and shop drawings submittals.
10/30/2024 4.00 161.00
attend meeting to discuss change orde changes, prepare for change order meeting, field visit to review SE 3rd
street west of 4th avenue new work area, review dailies, emails
10/31/2024 4.00 161.00
attend daily design meeting, visit field to lamb and inspect existing drainage along SE 3rd street west of 4th
avenue, review the MOT and pedestrian access with the contractor; emails and RFl review
attend meeting on site
emails
review submittals and RFI's
Subtotal
Subtotal
CEI Inspector
Alejandro J. Arrieta
Field Supervision
10/01 /2024
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
Field Inspection
10/03/2024
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/04/2024
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/07/2024
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/08/2024
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/11 /2024
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/14/2024
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/15/2024
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/16/2024
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/17/2024
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
85.00
85.00
805.00
805.00
805.00
644.00
644.00
13,685.00
13,685.00
8.00
82.00
656.00
8.00
82.00
656.00
8.00
82.00
656.00
8.00
82.00
656.00
8.00
82.00
656.00
8.00
82.00
656.00
8.00
82.00
656.00
8.00
82.00
656.00
8.00
82.00
656.00
8.00
82.00
656.00
City of Dania Beach Invoice number 480rev2 Invoice date 10/31/2024
Page 3 of 5
City of Dania Beach Invoice number 480rev2
Project DAN-2024-01 DANIA BEACH - CEI SERVICES FOR SOUTHEAST DRAINAGE PROJECT Date 10/31/2024
100 CONSTRUCTION
Labor
Billed
Date Units Rate Amount
CEllnspector
Alejandro J. Arrieta
Field Inspection
10/18/2024
8.00
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/21 /2024
8.00
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/22/2024
8.00
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/23/2024
8.00
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/24/2024
8.00
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/25/2024
8.00
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/28/2024
8.00
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/29/2024
8.00
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/30/2024
8.00
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
10/31/2024
8.00
Performing on -site field inspection on the contractor's drainage operation (3rd Street)
Subtotal
152.00
Subtotal
160.00
82.00
656.00
82.00
656.00
82.00
656.00
82.00
656.00
82.00
656.00
82.00
656.00
82.00
656.00
82.00
656.00
82.00
656.00
82.00
656.00
Alicia Serpa
Meetings
10/02/2024
2.00
82.00
RFI log update, shop drawings log update, filing, processing RFIs and shop drawings
10/04/2024
3.00
82.00
Progress meeting, internal meeting, RFl log update, shop drawings log update, filing, processing RFIs and shop
drawings
10/14/2024
4.00
82.00
RFI log update, shop drawings log update, filing, processing RFIs and shop drawings
10/15/2024
4.00
82.00
RFI log update, shop drawings log update, filing, processing RFIs and shop drawings
10/16/2024
3.00
82.00
RFI log update, shop drawings log update, filing, processing RFIs and shop drawings
10/18/2024
4.00
82.00
Progress meeting, RFI log update, shop drawings log update, filing, processing RFIs and shop drawings
10/21/2024
1.00
82.00
RFI log update, shop drawings log update, filing, processing RFIs and shop drawings
10/28/2024
1.00
82.00
RFI log update, shop drawings log update, filing, processing RFIs and shop drawings
10/29/2024
2.00
82.00
13,120.00
164.00
246.00
328.00
328.00
246.00
328.00
82.00
82.00
164.00
City of Dania Beach Invoice number 480rev2 Invoice date 10/31/2024
Page 4 of 5
City of Dania Beach
Project DAN-2024-01 DANIA BEACH - CEI SERVICES FOR SOUTHEAST DRAINAGE PROJECT
100 CONSTRUCTION
Labor
Date
CEI Inspector
Alicia Serpa
Meetings
RFl log update, shop drawings log update, filing, processing RFIs and shop drawings
10/30/2024
RFI log update, shop drawings log update, filing, processing RFIs and shop drawings
Subtotal
Subtotal
Phase subtotal
Invoice number 480rev2
Date 10/31/2024
Billed
Units Rate Amount
2.00
82.00 164.00
26.00
2,132.00
26.00
2,132.00
Invoice total 28. 337,00
Dincer Akin Ozaydin, P.E��
Depuly Public Services Director/City Engineer
City of Dania Beach Invoice number480rev2 Invoice date 10/31/2024
Page 5 of 5