Loading...
HomeMy WebLinkAboutInv# PAY APP 4 - TECHGROUPONE, INC - 01/28/2025 (2)TECHGROUPONE, INC – 8504 NW 66th St Miami, FL 33166 email:contractor@techgroupone.com Ph (305) 517- 3040 CHANGE ORDER #: 6 SUBMITTED TO: DATE: 12/04/2024 Jhon Quintero – Project Manager PROJECT: City Hall Restroom Renovation SUBMITTED BY: PROJECT #: ITB-23-002 Techgroupone, Inc CPR DESCRIPTION CITY HALL RESTROOM RENOVATION – -Rough Electrical Work $ 2,500.00 -Rough Plumbing Work $ 850.00 Total Change Order: $ 3,350.00 Below we describe the work carried out The air conditioning drain lines were previously connected to one of the bathroom’s sewer pipes. This connection was removed, and the drain lines for both air conditioning units were redirected to the vent stack of the water fountains, as instructed by the Building Department. The connection was routed beneath the water fountains, and a P-trap was installed. Additionally, an access panel will be installed for future maintenance. All piping along this route was insulated. Approximately 15 conduits ranging from 1/2 inch to 1 1/4 inches were secured between the two bathrooms. Additionally, two boxes were installed for hand dryers, and the MC cable feeding them was strapped. Several electrical boxes were also installed. Two boxes for emergency lights were set up, and four greenfield conduits feeding disconnect switches were strapped. Lastly, unused empty conduits were removed. SUBJECT:DISCIPLINE:CATEGORY: ATTACHMENTS:DRAWING REFERENCE: RESPONSE TO CPR RESPONSE BY:DATE: CHANGE OF PROPOSAL REQUEST (CPR)