HomeMy WebLinkAboutInv# March2025FPL - FPL - 03/17/2025 (3)CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
Intentionally left blank
Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 17071-61087
Download the app
Get instant, secure access to outage and billing info from your mobile device.
Download now ›
When you pay by check, you authorize FPL to process your payment electronically or as a draft. If your payment is processed electronically,
your checking account may be debited on the same day we receive the check and your check will not be returned with your checking account
statement. FPL does not agree to any restrictions, conditions or endorsements placed on any bill statement or payments such as check, money
order or other forms of payment. We will process the payment as if these restrictions or conditions do not exist.
Customer Name: Account Number:FPL.com Page 3
CITY OF DANIA BEACH 17071-61087
Account Number Service Address Meter No.Read Date/
Svc Days
kWh /
Max kWd Amount Due Remarks
00281-29336 100 W DANIA BEACH
BLVD #TRLRS KLL8786 2025-03-11
28
3290 /
0 $455.48
00550-18501 235 SW 1ST CT # OL 2025-03-11
28
88 /
0 $3.83
01992-62544 200 SE 5TH AVE #LS 5 KJ47680 2025-03-10
28
1394 /
0 $201.05
02234-54661 631 NE 2ND ST # LS6 SJ88528 2025-03-10
28
2471 /
8 $416.57
02794-18123 1220 NW 10TH ST # WALL AA15361 2025-03-11
28
33 /
0 $29.02
05703-29326 1905 TIGERTAIL BLVD # LS15 SN88478 2025-03-11
28
660 /
2 $173.58
06011-26295 599 S FEDERAL HWY # IRR ACD8198 2025-03-10
28
0 /
0 $27.21
07471-54557 2901 SW 52ND ST # BALLFIELD KLL4255 2025-03-03
28
1572 /
41 $736.02
07481-52584 2901 SW 52ND ST # BPW KU31193 2025-03-03
28
0 /
0 $27.21
07531-57502 2901 SW 52ND ST #
N BASKETBALL CO KC78811 2025-03-03
28
528 /
0 $84.85
07541-55539 2900 SW 52ND ST # SOCCER KN68310 2025-03-03
28
118 /
1 $55.55
07551-53566 2901 SW 52ND ST # OL 2025-03-11
28
168 /
0 $34.90
09702-57515 495 TAYLOR LN # LS12 SN88486 2025-03-11
28
149 /
3 $105.81
09830-79450 3151 GRIFFIN RD #LIGHTS 0
0 /
0 $0.00 NOT BILLED
09860-17234 434 SE 3RD TER #PUMP KN46905 2025-03-10
28
13 /
0 $33.96
10708-66452 800 NW 2ND ST KCJ4317 2025-03-11
28
4623 /
20 $632.31
18630-57590 116 W DANIA BEACH BLVD AC97190 2025-03-11
28
1536 /
0 $220.10
19577-56503 W DIXIE CRSSVR #CEMETERY AC09306 2025-03-11
28
212 /
0 $42.47
19587-54531 300 W DIXIE HWY KJ37966 2025-03-11
28
476 /
0 $77.87
23433-62451 100 W DANIA BEACH
BLVD #GARAGE KNJ8374 2025-03-11
28
13149 /
38 $1,461.76
27785-15128 5440 RAVENSWOOD RD #IRR KJ62786 2025-03-11
28
26 /
0 $28.62
29082-54531 1700 NE 7TH AVE # LS11 SN88487 2025-03-11
28
4219 /
28 $781.18
29634-25166 300 NE 2ND ST # JR REC CT KJL7051 2025-03-10
28
3457 /
19 $540.21
30507-57602 1151 SE 5TH CT # LS-4 SJ88488 2025-03-10
28
1180 /
7 $284.70
32275-56614 50 SE 2ND AVE # LS 1 ST38232 2025-03-10
28
10200 /
48 $1,482.70
Continue on next page
Customer Name: Account Number:FPL.com Page 4
CITY OF DANIA BEACH 17071-61087
Account Number Service Address Meter No.Read Date/
Svc Days
kWh /
Max kWd Amount Due Remarks
34681-37470 206 SW 1ST AVE # PARK AC09337 2025-03-11
28
3 /
0 $27.36
34854-42168 300 NE 2ND ST # PARK LTS ACD4012 2025-03-10
28
395 /
0 $67.01
36838-26311 279 N BRYAN RD # LS-17 KN52041 2025-03-11
28
68 /
0 $30.96
38600-56542 100 W DANIA BEACH
BLVD #POLICE DEPT KU30441 2025-03-11
28
19020 /
57 $2,129.32
39978-40511 300 N BEACH RD #C
HSE-PIER-PRK LIGHTS KL87259 2025-03-10
28
2058 /
0 $290.14
43965-11000 151 SW 18TH CT # LS 16 SJ88479 2025-03-11
28
2051 /
8 $357.20
44225-67430 102 W DANIA BEACH BLVD # A AC04327 2025-03-11
28
1097 /
0 $161.20
44452-56607 400 SE 2ND AVE # LS 2 ST38233 2025-03-10
28
8460 /
33 $1,148.10
45043-43023 300 N BEACH RD # LS 14 SC88219 2025-03-10
28
140 /
1 $105.90
48600-12451 100 W DANIA BEACH BLVD #B KLL2558 2025-03-11
28
3708 /
0 $511.54
49909-59571 1100 PHIPPEN
WAITERS RD # PUMP KJ71604 2025-03-11
28
597 /
0 $94.11
49929-53523 1200 PHIPPEN WAITERS RD ACD7432 2025-03-11
28
39 /
0 $29.36
53065-79458 1800 GRIFFIN RD #LIGHTS 0
0 /
0 $0.00 NOT BILLED
55113-16357 301 E DANIA BEACH BLVD #ST LT 0
0 /
0 $0.00 NOT BILLED
58069-19410 200 NE 2ND ST #CONCESSION AED7769 2025-03-10
28
397 /
0 $67.29
60629-55627 311 SE 3RD ST # PMP SN88527 2025-03-10
28
97 /
0 $110.55
62074-52647 901 NE 3RD ST #CIVIC CTR KT58793 2025-03-10
28
5160 /
29 $799.36
62624-58257 100 NW 8TH AVE #STAND ACD1416 2025-03-11
28
1431 /
0 $206.04
62762-57638 1200 SE 2ND AVE # LS 3 ST38290 2025-03-10
28
9120 /
22 $1,031.39
62926-58660 951 NW 10 ST #IRR PUMP ACD8555 2025-03-11
28
0 /
0 $27.21
62936-56697 900 NW 10 ST #LIGHTS ACD5956 2025-03-11
28
76 /
0 $31.39
64800-94298 506 NE 3RD ST # OL 2025-03-10
28
29 /
0 $14.19
67543-69459 1901 GRIFFIN RD #LIGHTS 0
0 /
0 $0.00 NOT BILLED
69593-35123 1000 N FEDERAL HWY #SIGN AC58673 2025-03-11
28
427 /
0 $70.10
74042-50974 STREET LIGHTS #DANIA 2025-03-04
28
93767 /
0 $30,838.99
Continue on next page
Customer Name: Account Number:FPL.com Page 5
CITY OF DANIA BEACH 17071-61087
Account Number Service Address Meter No.Read Date/
Svc Days
kWh /
Max kWd Amount Due Remarks
74309-73243 106 N BEACH RD KE82004 2025-03-10
28
4 /
0 $27.43
75296-61378 1201 STIRLING RD #PSAB KU38133 2025-03-11
28
12120 /
30 $1,276.58
75572-89456 4155 GRIFFIN RD #LIGHTS 0
0 /
0 $0.00 NOT BILLED
75615-78464 1200 NW 1ST ST ACD1767 2025-03-11
28
748 /
0 $133.39
77463-97251 2901 SW 52ND ST #POOL MLL7780 2025-03-03
28
27608 /
64 $2,841.61
78869-61130 1201 STIRLING RD #HSPS MV57024 2025-03-11
28
111720 /
204 $10,164.00
82314-31431 803 NW 1ST ST #PKGLTLGTS ACD7830 2025-03-11
28
37 /
0 $29.24
82343-56627 200 NE 2 ST #CTS KEL4829 2025-03-10
28
3027 /
36 $759.74
82363-52681 200 NE 2 ST KLL4681 2025-03-10
28
856 /
0 $341.11
83534-55572 128 NW 10 CT # LS7 ST38676 2025-03-11
28
8880 /
19 $971.68
83594-58521 120 NW 10 CT ACD6938 2025-03-11
28
135 /
0 $34.63
83671-08357 1855 GRIFFIN RD #LS 10 KJJ8920 2025-03-11
28
1002 /
6 $187.28
83822-11186 4540 SW 27TH AVE # OL 2025-03-03
28
77 /
0 $16.86
83875-32461 101 N BEACH RD #MARINA MV58927 2025-03-10
28
52080 /
126 $5,173.77
92733-58607 300 NE 2ND ST # OL 2025-03-10
28
256 /
0 $59.01
95580-98431 2901 SW 52ND ST AC03956 2025-03-03
28
2559 /
0 $357.37
96241-18460 230 SW 12TH AVE KLL3254 2025-03-11
28
1760 /
0 $250.17
97812-54595 2301 STIRLING RD # WELLFLD MN55198 2025-03-04
28
18984 /
29 $1,668.68
TOTAL AMOUNT OF BILL $70,378.22
CURRENT BILL
$455.48
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 504.99
Payments received -504.99
Balance before new charges 0.00
Total new charges 455.48
Total amount you owe $455.48
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 00281-29336
Service Address:
100 W DANIA BEACH BLVD #TRLRS
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
00281-29336 $455.48 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
5,250 kWh
4,200 kWh
3,150 kWh
2,100 kWh
1,050 kWh
0 kWh
A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 00281-29336
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 504.99
Payment received - Thank you −504.99
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$316.18
Fuel:( $0.027180 per kWh)$89.42
Electric service amount 418.47
Gross receipts tax (State tax)10.74
Franchise fee (Reqd local fee)25.88
Taxes and charges 36.62
Regulatory fee (State fee)0.39
Total new charges $455.48
Total amount you owe $455.48
METER SUMMARY
Meter reading - Meter KLL8786. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 31849 28559 3290
ENERGY USAGE COMPARISON
This Month Last Month
Service to Mar 11, 2025 Feb 11, 2025
kWh Used 3290 3659
Service days 28 32
kWh/day 117 114
Amount $455.48 $504.99
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$3.83
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill −20.28
Balance before new charges −20.28
Total new charges 24.11
Total amount you owe $3.83
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 00550-18501
Service Address:
235 SW 1ST CT # OL
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
00550-18501 $3.83 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
110 kWh
88 kWh
66 kWh
44 kWh
22 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Charges and energy usage are based on the facilities contracted. Facility,
energy and fuel costs are available upon request.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 00550-18501
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill −20.28
Balance before new charges −$20.28
New Charges
Rate: OL-1 OUTDOOR LIGHTING
Electric service amount **22.45
Gross receipts tax (State tax)0.27
Franchise fee (Reqd local fee)1.37
Taxes and charges 1.64
Regulatory fee (State fee)0.02
Total new charges $24.11
Total amount you owe $3.83
** Your electric service amount includes the following charges:
Non-fuel energy charge:
$0.091030 per kWh
Fuel charge:$0.026470 per kWh
METER SUMMARY
Next bill date Apr 9, 2025.
Usage Type Usage
Total kWh used 88
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 88 88 88
Service days 28 32 31
kWh/day 3 3 3
Amount $24.11 $24.11 $21.50
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$201.05
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 514.78
Payments received -514.78
Balance before new charges 0.00
Total new charges 201.05
Total amount you owe $201.05
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 01992-62544
Service Address:
200 SE 5TH AVE #LS 5
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
01992-62544 $201.05 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
2,650 kWh
2,120 kWh
1,590 kWh
1,060 kWh
530 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 01992-62544
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 514.78
Payments received - Thank you −514.78
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$133.96
Fuel:( $0.027180 per kWh)$37.89
Electric service amount 184.72
Gross receipts tax (State tax)4.74
Franchise fee (Reqd local fee)11.42
Taxes and charges 16.16
Regulatory fee (State fee)0.17
Total new charges $201.05
Total amount you owe $201.05
METER SUMMARY
Meter reading - Meter KJ47680. Next meter reading Apr 8, 2025.
Usage Type Current - Previous = Usage
kWh used 70249 68855 1394
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 1394 1606 1557
Service days 28 32 29
kWh/day 49 50 53
Amount $201.05 $229.50 $275.90
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$416.57
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 923.29
Payments received -923.29
Balance before new charges 0.00
Total new charges 416.57
Total amount you owe $416.57
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 02234-54661
Service Address:
631 NE 2ND ST # LS6
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
02234-54661 $416.57 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
4,850 kWh
3,880 kWh
2,910 kWh
1,940 kWh
970 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 02234-54661
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 923.29
Payments received - Thank you −923.29
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$237.47
Fuel:( $0.027180 per kWh)$67.16
Electric service amount 317.50
Gross receipts tax (State tax)8.15
Franchise fee (Reqd local fee)19.63
Taxes and charges 27.78
Regulatory fee (State fee)0.29
Total new charges $345.57
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $416.57
METER SUMMARY
Meter reading - Meter SJ88528. Next meter reading Apr 8, 2025.
Usage Type Current - Previous = Usage
kWh used 54531 52060 2471
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 2471 2703 3547
Service days 28 32 29
kWh/day 88 84 122
Amount $345.57 $376.70 $497.63
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$29.02
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 29.36
Payments received -29.36
Balance before new charges 0.00
Total new charges 29.02
Total amount you owe $29.02
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 02794-18123
Service Address:
1220 NW 10TH ST # WALL
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
02794-18123 $29.02 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
50 kWh
40 kWh
30 kWh
20 kWh
10 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 02794-18123
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 29.36
Payment received - Thank you −29.36
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Minimum base bill charge:$9.73
Non-fuel:( $0.096100 per kWh)$3.17
Fuel:( $0.027180 per kWh)$0.90
Electric service amount 26.67
Gross receipts tax (State tax)0.68
Franchise fee (Reqd local fee)1.65
Taxes and charges 2.33
Regulatory fee (State fee)0.02
Total new charges $29.02
Total amount you owe $29.02
METER SUMMARY
Meter reading - Meter AA15361. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 01282 01249 33
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 33 39 12
Service days 28 32 31
kWh/day 1 1 0
Amount $29.02 $29.36 $27.91
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$173.58
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 190.88
Payments received -190.88
Balance before new charges 0.00
Total new charges 173.58
Total amount you owe $173.58
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 05703-29326
Service Address:
1905 TIGERTAIL BLVD # LS15
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
05703-29326 $173.58 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
C/O LIFT STATION # 15
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
950 kWh
760 kWh
570 kWh
380 kWh
190 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 05703-29326
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 190.88
Payment received - Thank you −190.88
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$63.43
Fuel:( $0.027180 per kWh)$17.94
Electric service amount 94.24
Gross receipts tax (State tax)2.42
Franchise fee (Reqd local fee)5.83
Taxes and charges 8.25
Regulatory fee (State fee)0.09
Total new charges $102.58
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $173.58
METER SUMMARY
Meter reading - Meter SN88478. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 21852 21192 660
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 660 789 490
Service days 28 32 31
kWh/day 23 24 15
Amount $102.58 $119.88 $80.74
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$27.21
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 54.42
Payments received -54.42
Balance before new charges 0.00
Total new charges 27.21
Total amount you owe $27.21
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 06011-26295
Service Address:
599 S FEDERAL HWY # IRR
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
06011-26295 $27.21 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
5 kWh
4 kWh
3 kWh
2 kWh
1 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 06011-26295
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 54.42
Payments received - Thank you −54.42
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Minimum base bill charge:$12.13
Non-fuel energy charge:
$0.096100 per kWh
Fuel charge:$0.027180 per kWh
Electric service amount 25.00
Gross receipts tax (State tax)0.64
Franchise fee (Reqd local fee)1.55
Taxes and charges 2.19
Regulatory fee (State fee)0.02
Total new charges $27.21
Total amount you owe $27.21
METER SUMMARY
Meter reading - Meter ACD8198. Next meter reading Apr 8, 2025.
Usage Type Current - Previous = Usage
kWh used 00021 00021 0
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 0 0 0
Service days 28 32 29
kWh/day 0 0 0
Amount $27.21 $27.21 $27.21
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,621.82
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 1,771.66
Payments received -885.86
Balance before new charges 885.80
Total new charges 736.02
Total amount you owe $1,621.82
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 3, 2025 to Mar 3, 2025 (28 days)
Statement Date: Mar 3, 2025
Account Number: 07471-54557
Service Address:
2901 SW 52ND ST # BALLFIELD
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
07471-54557 $1,621.82 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
2,350 kWh
1,880 kWh
1,410 kWh
940 kWh
470 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 07471-54557
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 1,771.66
Payment received - Thank you −885.86
Balance before new charges $885.80
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$53.28
Fuel:( $0.027180 per kWh)$42.73
Demand:($13.41 per KW)$549.81
Electric service amount 676.23
Gross receipts tax (State tax)17.35
Franchise fee (Reqd local fee)41.82
Taxes and charges 59.17
Regulatory fee (State fee)0.62
Total new charges $736.02
Total amount you owe $1,621.82
METER SUMMARY
Meter reading - Meter KLL4255. Next meter reading Apr 1, 2025.
Usage Type Current - Previous = Usage
kWh used 97626 96054 1572
Demand KW 40.62 41
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 3, 2025 Feb 3, 2025 Mar 1, 2024
kWh Used 1572 1410 2036
Service days 28 32 29
kWh/day 56 44 70
Amount $736.02 $885.80 $949.05
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$54.42
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 54.42
Payments received -27.21
Balance before new charges 27.21
Total new charges 27.21
Total amount you owe $54.42
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 3, 2025 to Mar 3, 2025 (28 days)
Statement Date: Mar 3, 2025
Account Number: 07481-52584
Service Address:
2901 SW 52ND ST # BPW
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
07481-52584 $54.42 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
150 kWh
120 kWh
90 kWh
60 kWh
30 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
· We have billed you for the minimum base charge for eight consecutive
months due to your meter registering zero usage. Call us if you wish to
temporarily disconnect your service.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 07481-52584
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 54.42
Payment received - Thank you −27.21
Balance before new charges $27.21
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Minimum base bill charge:$12.13
Non-fuel energy charge:
$0.096100 per kWh
Fuel charge:$0.027180 per kWh
Electric service amount 25.00
Gross receipts tax (State tax)0.64
Franchise fee (Reqd local fee)1.55
Taxes and charges 2.19
Regulatory fee (State fee)0.02
Total new charges $27.21
Total amount you owe $54.42
METER SUMMARY
Meter reading - Meter KU31193. Next meter reading Apr 1, 2025.
Usage Type Current - Previous x Const = Usage
kWh used 00036 00036 60 0
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 3, 2025 Feb 3, 2025 Mar 1, 2024
kWh Used 0 0 0
Service days 28 32 29
kWh/day 0 0 0
Amount $27.21 $27.21 $27.21
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$141.25
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 86.82
Payments received -30.42
Balance before new charges 56.40
Total new charges 84.85
Total amount you owe $141.25
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 3, 2025 to Mar 3, 2025 (28 days)
Statement Date: Mar 3, 2025
Account Number: 07531-57502
Service Address:
2901 SW 52ND ST # N BASKETBALL CO
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
07531-57502 $141.25 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
950 kWh
760 kWh
570 kWh
380 kWh
190 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 07531-57502
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 86.82
Payment received - Thank you −30.42
Balance before new charges $56.40
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$50.74
Fuel:( $0.027180 per kWh)$14.35
Electric service amount 77.96
Gross receipts tax (State tax)2.00
Franchise fee (Reqd local fee)4.82
Taxes and charges 6.82
Regulatory fee (State fee)0.07
Total new charges $84.85
Total amount you owe $141.25
METER SUMMARY
Meter reading - Meter KC78811. Next meter reading Apr 1, 2025.
Usage Type Current - Previous = Usage
kWh used 72765 72237 528
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 3, 2025 Feb 3, 2025 Mar 1, 2024
kWh Used 528 316 736
Service days 28 32 29
kWh/day 18 9 25
Amount $84.85 $56.40 $114.27
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$536.56
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 537.28
Payments received -56.27
Balance before new charges 481.01
Total new charges 55.55
Total amount you owe $536.56
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 3, 2025 to Mar 3, 2025 (28 days)
Statement Date: Mar 3, 2025
Account Number: 07541-55539
Service Address:
2900 SW 52ND ST # SOCCER
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
07541-55539 $536.56 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
200 kWh
160 kWh
120 kWh
80 kWh
40 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 07541-55539
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 537.28
Payment received - Thank you −56.27
Balance before new charges $481.01
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$4.00
Fuel:( $0.027180 per kWh)$3.21
Demand:($13.41 per KW)$13.41
Electric service amount 51.03
Gross receipts tax (State tax)1.31
Franchise fee (Reqd local fee)3.16
Taxes and charges 4.47
Regulatory fee (State fee)0.05
Total new charges $55.55
Total amount you owe $536.56
METER SUMMARY
Meter reading - Meter KN68310. Next meter reading Apr 1, 2025.
Usage Type Current - Previous = Usage
Total kWh used 02414 02296 118
On-Peak kWh used 00000 00000 0
Off-peak kWh used 118
On-peak demand 0.00 0
Maximum demand 1
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 3, 2025 Feb 3, 2025 Mar 1, 2024
kWh Used 118 151 121
Service days 28 32 29
kWh/day 4 4 4
Amount $55.55 $481.01 $56.01
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$34.90
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 34.90
Payments received -34.90
Balance before new charges 0.00
Total new charges 34.90
Total amount you owe $34.90
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 07551-53566
Service Address:
2901 SW 52ND ST # OL
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
07551-53566 $34.90 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
200 kWh
160 kWh
120 kWh
80 kWh
40 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
· Charges and energy usage are based on the facilities contracted. Facility,
energy and fuel costs are available upon request.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 07551-53566
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 34.90
Payment received - Thank you −34.90
Balance before new charges $0.00
New Charges
Rate: OL-1 OUTDOOR LIGHTING
Electric service amount **32.38
Gross receipts tax (State tax)0.51
Franchise fee (Reqd local fee)1.98
Taxes and charges 2.49
Regulatory fee (State fee)0.03
Total new charges $34.90
Total amount you owe $34.90
** Your electric service amount includes the following charges:
Non-fuel energy charge:
$0.091030 per kWh
Fuel charge:$0.026470 per kWh
METER SUMMARY
Next bill date Apr 9, 2025.
Usage Type Usage
Total kWh used 168
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 168 168 168
Service days 28 32 31
kWh/day 6 5 5
Amount $34.90 $34.90 $29.96
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$105.81
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 106.68
Payments received -106.68
Balance before new charges 0.00
Total new charges 105.81
Total amount you owe $105.81
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 09702-57515
Service Address:
495 TAYLOR LN # LS12
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
09702-57515 $105.81 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
600 kWh
480 kWh
360 kWh
240 kWh
120 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 09702-57515
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 106.68
Payment received - Thank you −106.68
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Minimum base bill charge:$1.28
Non-fuel:( $0.096100 per kWh)$14.33
Fuel:( $0.027180 per kWh)$4.05
Electric service amount 32.53
Gross receipts tax (State tax)0.83
Franchise fee (Reqd local fee)1.42
Taxes and charges 2.25
Regulatory fee (State fee)0.03
Total new charges $34.81
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $105.81
METER SUMMARY
Meter reading - Meter SN88486. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 11408 11259 149
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 149 164 331
Service days 28 32 31
kWh/day 5 5 10
Amount $34.81 $35.68 $58.16
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$33.96
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 82.47
Payments received -82.47
Balance before new charges 0.00
Total new charges 33.96
Total amount you owe $33.96
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 09860-17234
Service Address:
434 SE 3RD TER #PUMP
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
09860-17234 $33.96 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
C/O DANIA FL 33004
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
5,800 kWh
4,640 kWh
3,480 kWh
2,320 kWh
1,160 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 09860-17234
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 82.47
Payments received - Thank you −82.47
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$0.44
Fuel:( $0.027180 per kWh)$0.35
Demand charge:$13.41 per KW
Electric service amount 31.20
Gross receipts tax (State tax)0.80
Franchise fee (Reqd local fee)1.93
Taxes and charges 2.73
Regulatory fee (State fee)0.03
Total new charges $33.96
Total amount you owe $33.96
METER SUMMARY
Meter reading - Meter KN46905. Next meter reading Apr 8, 2025.
Usage Type Current - Previous = Usage
kWh used 56072 56059 13
Demand KW .20 0
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 13 15 376
Service days 28 32 29
kWh/day 0 0 12
Amount $33.96 $34.09 $358.33
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$632.31
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 527.35
Payments received -527.35
Balance before new charges 0.00
Total new charges 632.31
Total amount you owe $632.31
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 10708-66452
Service Address:
800 NW 2ND ST
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
10708-66452 $632.31 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
11,150 kWh
8,920 kWh
6,690 kWh
4,460 kWh
2,230 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 10708-66452
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 527.35
Payment received - Thank you −527.35
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$156.68
Fuel:( $0.027180 per kWh)$125.65
Demand:($13.41 per KW)$268.20
Electric service amount 580.94
Gross receipts tax (State tax)14.91
Franchise fee (Reqd local fee)35.92
Taxes and charges 50.83
Regulatory fee (State fee)0.54
Total new charges $632.31
Total amount you owe $632.31
METER SUMMARY
Meter reading - Meter KCJ4317. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 85458 80835 4623
Demand KW 20.16 20
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 4623 4142 6295
Service days 28 32 31
kWh/day 165 129 203
Amount $632.31 $527.35 $811.55
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$220.10
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 223.34
Payments received -223.34
Balance before new charges 0.00
Total new charges 220.10
Total amount you owe $220.10
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 18630-57590
Service Address:
116 W DANIA BEACH BLVD
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
18630-57590 $220.10 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
4,100 kWh
3,280 kWh
2,460 kWh
1,640 kWh
820 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 18630-57590
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 223.34
Payment received - Thank you −223.34
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$147.60
Fuel:( $0.027180 per kWh)$41.75
Electric service amount 202.22
Gross receipts tax (State tax)5.19
Franchise fee (Reqd local fee)12.50
Taxes and charges 17.69
Regulatory fee (State fee)0.19
Total new charges $220.10
Total amount you owe $220.10
METER SUMMARY
Meter reading - Meter AC97190. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 19671 18135 1536
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 1536 1560 1823
Service days 28 32 31
kWh/day 55 49 59
Amount $220.10 $223.34 $262.54
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$42.47
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 46.07
Payments received -46.07
Balance before new charges 0.00
Total new charges 42.47
Total amount you owe $42.47
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 19577-56503
Service Address:
W DIXIE CRSSVR #CEMETERY
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
19577-56503 $42.47 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
1,350 kWh
1,080 kWh
810 kWh
540 kWh
270 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 19577-56503
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 46.07
Payment received - Thank you −46.07
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$20.39
Fuel:( $0.027180 per kWh)$5.76
Electric service amount 39.02
Gross receipts tax (State tax)1.00
Franchise fee (Reqd local fee)2.41
Taxes and charges 3.41
Regulatory fee (State fee)0.04
Total new charges $42.47
Total amount you owe $42.47
METER SUMMARY
Meter reading - Meter AC09306. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 63062 62850 212
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 212 239 104
Service days 28 32 31
kWh/day 8 7 3
Amount $42.47 $46.07 $33.20
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$77.87
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 34.13
Payments received -34.13
Balance before new charges 0.00
Total new charges 77.87
Total amount you owe $77.87
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 19587-54531
Service Address:
300 W DIXIE HWY
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
19587-54531 $77.87 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
1,600 kWh
1,280 kWh
960 kWh
640 kWh
320 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 19587-54531
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 34.13
Payment received - Thank you −34.13
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$45.73
Fuel:( $0.027180 per kWh)$12.94
Electric service amount 71.54
Gross receipts tax (State tax)1.84
Franchise fee (Reqd local fee)4.42
Taxes and charges 6.26
Regulatory fee (State fee)0.07
Total new charges $77.87
Total amount you owe $77.87
METER SUMMARY
Meter reading - Meter KJ37966. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 89169 88693 476
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 476 126 1080
Service days 28 32 31
kWh/day 17 3 34
Amount $77.87 $34.13 $161.18
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,461.76
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 1,783.61
Payments received -1,783.61
Balance before new charges 0.00
Total new charges 1,461.76
Total amount you owe $1,461.76
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 23433-62451
Service Address:
100 W DANIA BEACH BLVD #GARAGE
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
23433-62451 $1,461.76 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
18,850 kWh
15,080 kWh
11,310 kWh
7,540 kWh
3,770 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 23433-62451
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 1,783.61
Payment received - Thank you −1,783.61
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$445.62
Fuel:( $0.027180 per kWh)$357.39
Demand:($13.41 per KW)$509.58
Electric service amount 1,343.00
Gross receipts tax (State tax)34.47
Franchise fee (Reqd local fee)83.05
Taxes and charges 117.52
Regulatory fee (State fee)1.24
Total new charges $1,461.76
Total amount you owe $1,461.76
METER SUMMARY
Meter reading - Meter KNJ8374. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 13740 00591 13149
Demand KW 37.90 38
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 13149 17113 13816
Service days 28 32 31
kWh/day 469 534 445
Amount $1,461.76 $1,783.61 $1,482.78
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$28.62
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 33.76
Payments received -33.76
Balance before new charges 0.00
Total new charges 28.62
Total amount you owe $28.62
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 27785-15128
Service Address:
5440 RAVENSWOOD RD #IRR
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
27785-15128 $28.62 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
300 kWh
240 kWh
180 kWh
120 kWh
60 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 27785-15128
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 33.76
Payment received - Thank you −33.76
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Minimum base bill charge:$10.24
Non-fuel:( $0.096100 per kWh)$2.48
Fuel:( $0.027180 per kWh)$0.71
Electric service amount 26.30
Gross receipts tax (State tax)0.67
Franchise fee (Reqd local fee)1.63
Taxes and charges 2.30
Regulatory fee (State fee)0.02
Total new charges $28.62
Total amount you owe $28.62
METER SUMMARY
Meter reading - Meter KJ62786. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 20673 20647 26
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 26 119 182
Service days 28 32 31
kWh/day 0 3 5
Amount $28.62 $33.76 $38.72
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$781.18
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 805.70
Payments received -805.70
Balance before new charges 0.00
Total new charges 781.18
Total amount you owe $781.18
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 29082-54531
Service Address:
1700 NE 7TH AVE # LS11
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
29082-54531 $781.18 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
7,400 kWh
5,920 kWh
4,440 kWh
2,960 kWh
1,480 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 29082-54531
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 805.70
Payment received - Thank you −805.70
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$142.98
Fuel:( $0.027180 per kWh)$114.67
Demand:($13.41 per KW)$375.48
Electric service amount 663.54
Gross receipts tax (State tax)17.03
Franchise fee (Reqd local fee)29.01
Taxes and charges 46.04
Regulatory fee (State fee)0.60
Total new charges $710.18
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $781.18
METER SUMMARY
Meter reading - Meter SN88487. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 27246 23027 4219
Demand KW 28
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 4219 4792 6714
Service days 28 32 31
kWh/day 150 149 216
Amount $710.18 $734.70 $955.82
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$540.21
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 1,005.12
Payments received -1,005.12
Balance before new charges 0.00
Total new charges 540.21
Total amount you owe $540.21
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 29634-25166
Service Address:
300 NE 2ND ST # JR REC CT
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
29634-25166 $540.21 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
9,450 kWh
7,560 kWh
5,670 kWh
3,780 kWh
1,890 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 29634-25166
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 1,005.12
Payments received - Thank you −1,005.12
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$117.16
Fuel:( $0.027180 per kWh)$93.96
Demand:($13.41 per KW)$254.79
Electric service amount 496.32
Gross receipts tax (State tax)12.74
Franchise fee (Reqd local fee)30.69
Taxes and charges 43.43
Regulatory fee (State fee)0.46
Total new charges $540.21
Total amount you owe $540.21
METER SUMMARY
Meter reading - Meter KJL7051. Next meter reading Apr 8, 2025.
Usage Type Current - Previous = Usage
kWh used 62437 58980 3457
Demand KW 19.01 19
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 3457 3110 3220
Service days 28 32 29
kWh/day 123 97 111
Amount $540.21 $473.34 $512.62
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$284.70
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 1,033.93
Payments received -1,033.93
Balance before new charges 0.00
Total new charges 284.70
Total amount you owe $284.70
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 30507-57602
Service Address:
1151 SE 5TH CT # LS-4
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
30507-57602 $284.70 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
C/O DANIA FL 33004
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
3,550 kWh
2,840 kWh
2,130 kWh
1,420 kWh
710 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 30507-57602
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 1,033.93
Payments received - Thank you −1,033.93
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$39.99
Fuel:( $0.027180 per kWh)$32.07
Demand:($13.41 per KW)$93.87
Electric service amount 196.34
Gross receipts tax (State tax)5.04
Franchise fee (Reqd local fee)12.14
Taxes and charges 17.18
Regulatory fee (State fee)0.18
Total new charges $213.70
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $284.70
METER SUMMARY
Meter reading - Meter SJ88488. Next meter reading Apr 8, 2025.
Usage Type Current - Previous = Usage
kWh used 79770 78590 1180
Demand KW 7
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 1180 2475 2104
Service days 28 32 29
kWh/day 42 77 72
Amount $213.70 $577.11 $288.13
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,482.70
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 3,180.10
Payments received -3,180.10
Balance before new charges 0.00
Total new charges 1,482.70
Total amount you owe $1,482.70
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 32275-56614
Service Address:
50 SE 2ND AVE # LS 1
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
32275-56614 $1,482.70 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
22,400 kWh
17,920 kWh
13,440 kWh
8,960 kWh
4,480 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 32275-56614
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 3,180.10
Payments received - Thank you −3,180.10
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$345.68
Fuel:( $0.027180 per kWh)$277.24
Demand:($13.41 per KW)$643.68
Electric service amount 1,297.01
Gross receipts tax (State tax)33.29
Franchise fee (Reqd local fee)80.20
Taxes and charges 113.49
Regulatory fee (State fee)1.20
Total new charges $1,411.70
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $1,482.70
METER SUMMARY
Meter reading - Meter ST38232. Next meter reading Apr 8, 2025.
Usage Type Current - Previous x Const = Usage
kWh used 07541 07371 60 10200
Demand KW 48
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 10200 11220 12360
Service days 28 32 29
kWh/day 364 350 426
Amount $1,411.70 $1,129.19 $1,700.68
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$27.36
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 27.43
Payments received -27.43
Balance before new charges 0.00
Total new charges 27.36
Total amount you owe $27.36
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 34681-37470
Service Address:
206 SW 1ST AVE # PARK
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
34681-37470 $27.36 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
5 kWh
4 kWh
3 kWh
2 kWh
1 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 34681-37470
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 27.43
Payment received - Thank you −27.43
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Minimum base bill charge:$11.91
Non-fuel:( $0.096100 per kWh)$0.28
Fuel:( $0.027180 per kWh)$0.08
Electric service amount 25.14
Gross receipts tax (State tax)0.65
Franchise fee (Reqd local fee)1.55
Taxes and charges 2.20
Regulatory fee (State fee)0.02
Total new charges $27.36
Total amount you owe $27.36
METER SUMMARY
Meter reading - Meter AC09337. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 00018 00015 3
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 3 4 0
Service days 28 32 31
kWh/day 0 0 0
Amount $27.36 $27.43 $27.21
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$67.01
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 92.04
Payments received -92.04
Balance before new charges 0.00
Total new charges 67.01
Total amount you owe $67.01
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 34854-42168
Service Address:
300 NE 2ND ST # PARK LTS
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
34854-42168 $67.01 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
1,600 kWh
1,280 kWh
960 kWh
640 kWh
320 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 34854-42168
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 92.04
Payments received - Thank you −92.04
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$37.95
Fuel:( $0.027180 per kWh)$10.74
Electric service amount 61.56
Gross receipts tax (State tax)1.58
Franchise fee (Reqd local fee)3.81
Taxes and charges 5.39
Regulatory fee (State fee)0.06
Total new charges $67.01
Total amount you owe $67.01
METER SUMMARY
Meter reading - Meter ACD4012. Next meter reading Apr 8, 2025.
Usage Type Current - Previous = Usage
kWh used 07297 06902 395
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 395 299 457
Service days 28 32 29
kWh/day 14 9 16
Amount $67.01 $54.14 $76.24
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$30.96
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 31.00
Payments received -31.00
Balance before new charges 0.00
Total new charges 30.96
Total amount you owe $30.96
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 36838-26311
Service Address:
279 N BRYAN RD # LS-17
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
36838-26311 $30.96 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
400 kWh
320 kWh
240 kWh
160 kWh
80 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 36838-26311
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 31.00
Payment received - Thank you −31.00
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Minimum base bill charge:$7.18
Non-fuel:( $0.096100 per kWh)$6.54
Fuel:( $0.027180 per kWh)$1.85
Electric service amount 28.44
Gross receipts tax (State tax)0.73
Franchise fee (Reqd local fee)1.76
Taxes and charges 2.49
Regulatory fee (State fee)0.03
Total new charges $30.96
Total amount you owe $30.96
METER SUMMARY
Meter reading - Meter KN52041. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 16802 16734 68
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 68 69 84
Service days 28 32 31
kWh/day 2 2 2
Amount $30.96 $31.00 $32.06
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$2,129.32
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 2,116.08
Payments received -2,116.08
Balance before new charges 0.00
Total new charges 2,129.32
Total amount you owe $2,129.32
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 38600-56542
Service Address:
100 W DANIA BEACH BLVD #POLICE DEPT
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
38600-56542 $2,129.32 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
37,500 kWh
30,000 kWh
22,500 kWh
15,000 kWh
7,500 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 38600-56542
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 2,116.08
Payment received - Thank you −2,116.08
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$644.59
Fuel:( $0.027180 per kWh)$516.96
Demand:($13.41 per KW)$764.37
Electric service amount 1,956.33
Gross receipts tax (State tax)50.21
Franchise fee (Reqd local fee)120.97
Taxes and charges 171.18
Regulatory fee (State fee)1.81
Total new charges $2,129.32
Total amount you owe $2,129.32
METER SUMMARY
Meter reading - Meter KU30441. Next meter reading Apr 9, 2025.
Usage Type Current - Previous x Const = Usage
kWh used 55209 54892 60 19020
Demand KW .95 60.00 57
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 19020 19260 20640
Service days 28 32 31
kWh/day 679 601 665
Amount $2,129.32 $2,116.08 $2,470.74
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$290.14
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 650.41
Payments received -650.41
Balance before new charges 0.00
Total new charges 290.14
Total amount you owe $290.14
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 39978-40511
Service Address:
300 N BEACH RD #C HSE-PIER-PRK LIGHTS
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
39978-40511 $290.14 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA BEACH FL 33004-3699
ENERGY USAGE HISTORY
3,200 kWh
2,560 kWh
1,920 kWh
1,280 kWh
640 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 39978-40511
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 650.41
Payments received - Thank you −650.41
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$197.76
Fuel:( $0.027180 per kWh)$55.94
Electric service amount 266.57
Gross receipts tax (State tax)6.84
Franchise fee (Reqd local fee)16.48
Taxes and charges 23.32
Regulatory fee (State fee)0.25
Total new charges $290.14
Total amount you owe $290.14
METER SUMMARY
Meter reading - Meter KL87259. Next meter reading Apr 8, 2025.
Usage Type Current - Previous = Usage
kWh used 49757 47699 2058
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 2058 2465 1754
Service days 28 32 29
kWh/day 73 77 60
Amount $290.14 $344.77 $253.10
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$357.20
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 393.99
Payments received -393.99
Balance before new charges 0.00
Total new charges 357.20
Total amount you owe $357.20
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 43965-11000
Service Address:
151 SW 18TH CT # LS 16
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
43965-11000 $357.20 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
2,750 kWh
2,200 kWh
1,650 kWh
1,100 kWh
550 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 43965-11000
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 393.99
Payment received - Thank you −393.99
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$69.51
Fuel:( $0.027180 per kWh)$55.75
Demand:($13.41 per KW)$107.28
Electric service amount 262.95
Gross receipts tax (State tax)6.75
Franchise fee (Reqd local fee)16.26
Taxes and charges 23.01
Regulatory fee (State fee)0.24
Total new charges $286.20
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $357.20
METER SUMMARY
Meter reading - Meter SJ88479. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 81302 79251 2051
Demand KW 8
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 2051 2385 2131
Service days 28 32 31
kWh/day 73 74 68
Amount $286.20 $322.99 $290.14
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$161.20
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 129.82
Payments received -129.82
Balance before new charges 0.00
Total new charges 161.20
Total amount you owe $161.20
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 44225-67430
Service Address:
102 W DANIA BEACH BLVD # A
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
44225-67430 $161.20 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
1,250 kWh
1,000 kWh
750 kWh
500 kWh
250 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 44225-67430
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 129.82
Payment received - Thank you −129.82
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$105.41
Fuel:( $0.027180 per kWh)$29.82
Electric service amount 148.10
Gross receipts tax (State tax)3.80
Franchise fee (Reqd local fee)9.16
Taxes and charges 12.96
Regulatory fee (State fee)0.14
Total new charges $161.20
Total amount you owe $161.20
METER SUMMARY
Meter reading - Meter AC04327. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 92681 91584 1097
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 1097 863 641
Service days 28 32 31
kWh/day 39 27 21
Amount $161.20 $129.82 $101.33
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,148.10
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 2,470.14
Payments received -2,470.14
Balance before new charges 0.00
Total new charges 1,148.10
Total amount you owe $1,148.10
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 44452-56607
Service Address:
400 SE 2ND AVE # LS 2
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
44452-56607 $1,148.10 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
17,600 kWh
14,080 kWh
10,560 kWh
7,040 kWh
3,520 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 44452-56607
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 2,470.14
Payments received - Thank you −2,470.14
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$286.72
Fuel:( $0.027180 per kWh)$229.94
Demand:($13.41 per KW)$442.53
Electric service amount 989.60
Gross receipts tax (State tax)25.40
Franchise fee (Reqd local fee)61.19
Taxes and charges 86.59
Regulatory fee (State fee)0.91
Total new charges $1,077.10
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $1,148.10
METER SUMMARY
Meter reading - Meter ST38233. Next meter reading Apr 8, 2025.
Usage Type Current - Previous x Const = Usage
kWh used 05604 05463 60 8460
Demand KW 33
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 8460 9780 7800
Service days 28 32 29
kWh/day 302 305 268
Amount $1,077.10 $1,135.64 $994.04
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$105.90
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 211.66
Payments received -211.66
Balance before new charges 0.00
Total new charges 105.90
Total amount you owe $105.90
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 45043-43023
Service Address:
300 N BEACH RD # LS 14
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
45043-43023 $105.90 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
300 kWh
240 kWh
180 kWh
120 kWh
60 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 45043-43023
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 211.66
Payments received - Thank you −211.66
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Minimum base bill charge:$1.94
Non-fuel:( $0.096100 per kWh)$13.45
Fuel:( $0.027180 per kWh)$3.81
Electric service amount 32.07
Gross receipts tax (State tax)0.82
Franchise fee (Reqd local fee)1.98
Taxes and charges 2.80
Regulatory fee (State fee)0.03
Total new charges $34.90
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $105.90
METER SUMMARY
Meter reading - Meter SC88219. Next meter reading Apr 8, 2025.
Usage Type Current - Previous = Usage
kWh used 06003 05863 140
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 140 126 180
Service days 28 32 29
kWh/day 5 3 6
Amount $34.90 $34.13 $38.47
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$511.54
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 497.60
Payments received -497.60
Balance before new charges 0.00
Total new charges 511.54
Total amount you owe $511.54
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 48600-12451
Service Address:
100 W DANIA BEACH BLVD #B
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
48600-12451 $511.54 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
6,350 kWh
5,080 kWh
3,810 kWh
2,540 kWh
1,270 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 48600-12451
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 497.60
Payment received - Thank you −497.60
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$356.34
Fuel:( $0.027180 per kWh)$100.78
Electric service amount 469.99
Gross receipts tax (State tax)12.06
Franchise fee (Reqd local fee)29.06
Taxes and charges 41.12
Regulatory fee (State fee)0.43
Total new charges $511.54
Total amount you owe $511.54
METER SUMMARY
Meter reading - Meter KLL2558. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 65993 62285 3708
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 3708 3604 3524
Service days 28 32 31
kWh/day 132 112 113
Amount $511.54 $497.60 $494.48
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$94.11
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 107.00
Payments received -107.00
Balance before new charges 0.00
Total new charges 94.11
Total amount you owe $94.11
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 49909-59571
Service Address:
1100 PHIPPEN WAITERS RD # PUMP
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
49909-59571 $94.11 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
C/O CITY HALL
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
800 kWh
640 kWh
480 kWh
320 kWh
160 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 49909-59571
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 107.00
Payment received - Thank you −107.00
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$57.36
Fuel:( $0.027180 per kWh)$16.23
Electric service amount 86.46
Gross receipts tax (State tax)2.22
Franchise fee (Reqd local fee)5.35
Taxes and charges 7.57
Regulatory fee (State fee)0.08
Total new charges $94.11
Total amount you owe $94.11
METER SUMMARY
Meter reading - Meter KJ71604. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 43629 43032 597
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 597 693 0
Service days 28 32 31
kWh/day 21 21 0
Amount $94.11 $107.00 $27.21
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$29.36
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 29.63
Payments received -29.63
Balance before new charges 0.00
Total new charges 29.36
Total amount you owe $29.36
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 49929-53523
Service Address:
1200 PHIPPEN WAITERS RD
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
49929-53523 $29.36 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
CITY HALL
100 W DANIA BLV
DANAIA FL 33004
ENERGY USAGE HISTORY
50 kWh
40 kWh
30 kWh
20 kWh
10 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 49929-53523
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 29.63
Payment received - Thank you −29.63
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Minimum base bill charge:$9.29
Non-fuel:( $0.096100 per kWh)$3.76
Fuel:( $0.027180 per kWh)$1.06
Electric service amount 26.98
Gross receipts tax (State tax)0.69
Franchise fee (Reqd local fee)1.67
Taxes and charges 2.36
Regulatory fee (State fee)0.02
Total new charges $29.36
Total amount you owe $29.36
METER SUMMARY
Meter reading - Meter ACD7432. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 00403 00364 39
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 39 44 16
Service days 28 32 31
kWh/day 1 1 1
Amount $29.36 $29.63 $28.12
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$67.29
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 96.70
Payments received -96.70
Balance before new charges 0.00
Total new charges 67.29
Total amount you owe $67.29
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 58069-19410
Service Address:
200 NE 2ND ST #CONCESSION
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
58069-19410 $67.29 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
950 kWh
760 kWh
570 kWh
380 kWh
190 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 58069-19410
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 96.70
Payments received - Thank you −96.70
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$38.16
Fuel:( $0.027180 per kWh)$10.79
Electric service amount 61.82
Gross receipts tax (State tax)1.59
Franchise fee (Reqd local fee)3.82
Taxes and charges 5.41
Regulatory fee (State fee)0.06
Total new charges $67.29
Total amount you owe $67.29
METER SUMMARY
Meter reading - Meter AED7769. Next meter reading Apr 8, 2025.
Usage Type Current - Previous = Usage
kWh used 26711 26314 397
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 397 281 391
Service days 28 32 29
kWh/day 14 9 13
Amount $67.29 $51.71 $67.24
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$110.55
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 222.48
Payments received -222.48
Balance before new charges 0.00
Total new charges 110.55
Total amount you owe $110.55
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 60629-55627
Service Address:
311 SE 3RD ST # PMP
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
60629-55627 $110.55 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
3,050 kWh
2,440 kWh
1,830 kWh
1,220 kWh
610 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 60629-55627
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 222.48
Payments received - Thank you −222.48
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$3.29
Fuel:( $0.027180 per kWh)$2.64
Demand charge:$13.41 per KW
Electric service amount 36.34
Gross receipts tax (State tax)0.93
Franchise fee (Reqd local fee)2.25
Taxes and charges 3.18
Regulatory fee (State fee)0.03
Total new charges $39.55
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $110.55
METER SUMMARY
Meter reading - Meter SN88527. Next meter reading Apr 8, 2025.
Usage Type Current - Previous = Usage
kWh used 36472 36375 97
Demand KW 0
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 97 111 232
Service days 28 32 29
kWh/day 3 3 8
Amount $39.55 $40.47 $730.22
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$799.36
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 1,563.89
Payments received -1,563.89
Balance before new charges 0.00
Total new charges 799.36
Total amount you owe $799.36
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 62074-52647
Service Address:
901 NE 3RD ST #CIVIC CTR
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
62074-52647 $799.36 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
11,100 kWh
8,880 kWh
6,660 kWh
4,440 kWh
2,220 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 62074-52647
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 1,563.89
Payments received - Thank you −1,563.89
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$174.87
Fuel:( $0.027180 per kWh)$140.25
Demand:($13.41 per KW)$388.89
Electric service amount 734.42
Gross receipts tax (State tax)18.85
Franchise fee (Reqd local fee)45.41
Taxes and charges 64.26
Regulatory fee (State fee)0.68
Total new charges $799.36
Total amount you owe $799.36
METER SUMMARY
Meter reading - Meter KT58793. Next meter reading Apr 8, 2025.
Usage Type Current - Previous x Const = Usage
kWh used 06969 06926 120 5160
Demand KW .24 120.00 29
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 5160 4800 1920
Service days 28 32 29
kWh/day 184 150 66
Amount $799.36 $804.61 $529.54
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$206.04
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 176.37
Payments received -176.37
Balance before new charges 0.00
Total new charges 206.04
Total amount you owe $206.04
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 62624-58257
Service Address:
100 NW 8TH AVE #STAND
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
62624-58257 $206.04 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
3,250 kWh
2,600 kWh
1,950 kWh
1,300 kWh
650 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 62624-58257
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 176.37
Payment received - Thank you −176.37
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$137.54
Fuel:( $0.027180 per kWh)$38.89
Electric service amount 189.30
Gross receipts tax (State tax)4.86
Franchise fee (Reqd local fee)11.71
Taxes and charges 16.57
Regulatory fee (State fee)0.17
Total new charges $206.04
Total amount you owe $206.04
METER SUMMARY
Meter reading - Meter ACD1416. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 41470 40039 1431
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 1431 1210 1075
Service days 28 32 31
kWh/day 51 38 35
Amount $206.04 $176.37 $160.52
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,031.39
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 2,487.47
Payments received -2,487.47
Balance before new charges 0.00
Total new charges 1,031.39
Total amount you owe $1,031.39
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 62762-57638
Service Address:
1200 SE 2ND AVE # LS 3
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
62762-57638 $1,031.39 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
14,350 kWh
11,480 kWh
8,610 kWh
5,740 kWh
2,870 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 62762-57638
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 2,487.47
Payments received - Thank you −2,487.47
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$309.07
Fuel:( $0.027180 per kWh)$247.88
Demand:($13.41 per KW)$295.02
Electric service amount 882.38
Gross receipts tax (State tax)22.64
Franchise fee (Reqd local fee)54.56
Taxes and charges 77.20
Regulatory fee (State fee)0.81
Total new charges $960.39
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $1,031.39
METER SUMMARY
Meter reading - Meter ST38290. Next meter reading Apr 8, 2025.
Usage Type Current - Previous x Const = Usage
kWh used 04564 04412 60 9120
Demand KW 22
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 9120 9960 8880
Service days 28 32 29
kWh/day 325 311 306
Amount $960.39 $1,293.56 $1,045.80
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$27.21
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 27.21
Payments received -27.21
Balance before new charges 0.00
Total new charges 27.21
Total amount you owe $27.21
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 62926-58660
Service Address:
951 NW 10 ST #IRR PUMP
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
62926-58660 $27.21 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
C/O DANIA FL 33004
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
5 kWh
4 kWh
3 kWh
2 kWh
1 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 62926-58660
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 27.21
Payment received - Thank you −27.21
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Minimum base bill charge:$12.13
Non-fuel energy charge:
$0.096100 per kWh
Fuel charge:$0.027180 per kWh
Electric service amount 25.00
Gross receipts tax (State tax)0.64
Franchise fee (Reqd local fee)1.55
Taxes and charges 2.19
Regulatory fee (State fee)0.02
Total new charges $27.21
Total amount you owe $27.21
METER SUMMARY
Meter reading - Meter ACD8555. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 00000 00000 0
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 0 0 0
Service days 28 32 31
kWh/day 0 0 0
Amount $27.21 $27.21 $27.21
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$31.39
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 31.66
Payments received -31.66
Balance before new charges 0.00
Total new charges 31.39
Total amount you owe $31.39
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 62936-56697
Service Address:
900 NW 10 ST #LIGHTS
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
62936-56697 $31.39 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
120 kWh
96 kWh
72 kWh
48 kWh
24 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 62936-56697
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 31.66
Payment received - Thank you −31.66
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Minimum base bill charge:$6.60
Non-fuel:( $0.096100 per kWh)$7.30
Fuel:( $0.027180 per kWh)$2.07
Electric service amount 28.84
Gross receipts tax (State tax)0.74
Franchise fee (Reqd local fee)1.78
Taxes and charges 2.52
Regulatory fee (State fee)0.03
Total new charges $31.39
Total amount you owe $31.39
METER SUMMARY
Meter reading - Meter ACD5956. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 02265 02189 76
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 76 81 19
Service days 28 32 31
kWh/day 3 3 1
Amount $31.39 $31.66 $28.30
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$14.19
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 28.33
Payments received -28.33
Balance before new charges 0.00
Total new charges 14.19
Total amount you owe $14.19
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 64800-94298
Service Address:
506 NE 3RD ST # OL
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
Hello City Of Dania Beach,
Here's what you owe for this billing period.
E001
64800-94298 $14.19 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
30 kWh
24 kWh
18 kWh
12 kWh
6 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payments received after June 05, 2025 are considered late; a late payment
charge, the greater of $0.00 or 1.5% of your past due balance will apply.
Your account may also be billed a deposit adjustment.
· Charges and energy usage are based on the facilities contracted. Facility,
energy and fuel costs are available upon request.
E001Customer Name: Account Number:FPL.com Page 2
City Of Dania Beach 64800-94298
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 28.33
Payments received - Thank you −28.33
Balance before new charges $0.00
New Charges
Rate: OL-1 OUTDOOR LIGHTING
Electric service amount **11.60
Gross receipts tax (State tax)0.09
Franchise fee (Reqd local fee)0.70
Utility tax (Local tax)1.18
Florida sales tax (State tax)0.52
County sales tax (Local tax)0.09
Taxes and charges 2.58
Regulatory fee (State fee)0.01
Total new charges $14.19
Total amount you owe $14.19
** Your electric service amount includes the following charges:
Non-fuel energy charge:
$0.091030 per kWh
Fuel charge:$0.026470 per kWh
METER SUMMARY
Next bill date Apr 8, 2025.
Usage Type Usage
Total kWh used 29
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 29 29 29
Service days 28 32 29
kWh/day 1 1 1
Amount $14.19 $14.19 $13.18
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$70.10
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 109.24
Payments received -109.24
Balance before new charges 0.00
Total new charges 70.10
Total amount you owe $70.10
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 69593-35123
Service Address:
1000 N FEDERAL HWY #SIGN
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
69593-35123 $70.10 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
800 kWh
640 kWh
480 kWh
320 kWh
160 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 69593-35123
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 109.24
Payment received - Thank you −109.24
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$41.02
Fuel:( $0.027180 per kWh)$11.61
Electric service amount 65.50
Gross receipts tax (State tax)1.68
Franchise fee (Reqd local fee)2.86
Taxes and charges 4.54
Regulatory fee (State fee)0.06
Total new charges $70.10
Total amount you owe $70.10
METER SUMMARY
Meter reading - Meter AC58673. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 47232 46805 427
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 427 722 630
Service days 28 32 31
kWh/day 15 23 20
Amount $70.10 $109.24 $98.35
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$30,838.99
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 61,691.87
Payments received -61,691.87
Balance before new charges 0.00
Total new charges 30,838.99
Total amount you owe $30,838.99
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 4, 2025 to Mar 4, 2025 (28 days)
Statement Date: Mar 4, 2025
Account Number: 74042-50974
Service Address:
STREET LIGHTS #DANIA
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
74042-50974 $30,838.99 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
C/O CITY HALL
PO BOX 1708
DANIA FL 33004-1708
ENERGY USAGE HISTORY
103,150 kWh
82,520 kWh
61,890 kWh
41,260 kWh
20,630 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
· Charges and energy usage are based on the facilities contracted. Facility,
energy and fuel costs are available upon request.
· This bill reflects a credit to the fuel charge portion of your bill for each street
light fixture turned off during sea turtle nesting and hatching season. Thank
you for helping us protect sea turtles.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 74042-50974
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 61,691.87
Payments received - Thank you −61,691.87
Balance before new charges $0.00
New Charges
Rate: SL-1 STREET LIGHTING SERVICE
Electric service amount 28,855.28
Gross receipts tax (State tax)205.49
Franchise fee (Reqd local fee)1,752.07
Taxes and charges 1,957.56
Regulatory fee (State fee)26.15
Total new charges $30,838.99
Total amount you owe $30,838.99
METER SUMMARY
Next bill date Apr 2, 2025.
Usage Type Usage
Total kWh used 93767
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 4, 2025 Feb 4, 2025 Mar 4, 2024
kWh Used 93767 93767 93767
Service days 28 32 31
kWh/day 3349 2930 3025
Amount $30,838.99 $30,876.98 $29,916.65
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
Component Code Watts Lumens Owner/
Maint *Quantity Rate/Unit kWh Used Amount
60 KWH E 20 1,200
Energy 2.080000 41.60
88 KWH E 1 88
Energy 3.040000 3.04
168 KWH E 161 27,048
Energy 5.810000 935.41
28 KWH E 4 112
Energy 0.970000 3.88
104 KWH E 8 832
Energy 3.600000 28.80
160 KWH E 11 1,760
Energy 5.530000 60.83
168 KWH E 31 5,208
Energy 5.810000 180.11
C700304 47 5392 F 158 2,528
Energy 0.600000 94.80
Non-energy
Fixtures 6.610000 1,044.38
Maintenance 1.470000 232.26
C700305 76 8653 F 751 19,526
Energy 0.800000 600.80
Non-energy
Fixtures 6.610000 4,964.11
Maintenance 1.470000 1,103.97
C700306 118 15453 F 63 2,583
Energy 1.400000 88.20
For: 02-04-2025 to 03-04-2025 (28 days)
kWh/Day: 3,349
Service Address:
STREET LIGHTS #DANIA
DANIA, FL 33004
FPL.com Page 1Customer Name:
CITY OF DANIA BEACH
Detail of Rate Schedule Charges for Street Lights
CITY OF DANIA BEACH
C/O CITY HALL
PO BOX 1708
DANIA FL 33004-1708
Account Number:
74042-50974
* F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS
H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER
ESLA
Customer Name:
CITY OF DANIA BEACH
Component Code Watts Lumens Owner/
Maint *Quantity Rate/Unit kWh Used Amount
Non-energy
Fixtures 9.610000 605.43
Maintenance 1.470000 92.61
C700307 259 27874 F 25 2,275
Energy 3.200000 80.00
Non-energy
Fixtures 9.610000 240.25
Maintenance 1.470000 36.75
C700602 26 3300 F 409 3,681
Energy 0.400000 163.60
Non-energy
Fixtures 6.610000 2,703.49
Maintenance 1.470000 601.23
C700613 144 2700 F 1 50
Energy 1.800000 1.80
Non-energy
Fixtures 12.610000 12.61
Maintenance 1.470000 1.47
C700627 144 5300 F 12 600
Energy 1.800000 21.60
Non-energy
Fixtures 12.610000 151.32
Maintenance 1.470000 17.64
C863210 38 2500 F 95 1,235
Energy 0.400000 38.00
Non-energy
Fixtures 6.610000 627.95
Maintenance 1.470000 139.65
F600222 59 7500 F 2 40
Account Number:
74042-50974
For: 02-04-2025 to 03-04-2025 (28 days)
kWh/Day: 3,349
Service Address:
STREET LIGHTS #DANIA
DANIA, FL 33004
FPL.com Page 2
* F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS
H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER
ESLA
Customer Name:
CITY OF DANIA BEACH
Component Code Watts Lumens Owner/
Maint *Quantity Rate/Unit kWh Used Amount
Energy 0.600000 1.20
Non-energy
Fixtures 4.500000 9.00
Maintenance 1.470000 2.94
F700305 76 8653 F 94 2,444
Energy 0.800000 75.20
Non-energy
Fixtures 4.500000 423.00
Maintenance 1.470000 138.18
F700307 259 27874 F 4 364
Energy 3.200000 12.80
Non-energy
Fixtures 7.500000 30.00
Maintenance 1.470000 5.88
F700308 268 32329 F 2 188
Energy 3.200000 6.40
Non-energy
Fixtures 10.500000 21.00
Maintenance 1.470000 2.94
HPS0070 70 6300 F 30 870
Energy 1.000000 30.00
Non-energy
Fixtures 5.380000 161.40
Maintenance 2.190000 65.70
HPS0100 100 9500 F 31 1,271
Energy 1.420000 44.02
Non-energy
Fixtures 4.990000 154.69
Maintenance 2.200000 68.20
HPS0150 150 16000 F 51 3,060
Energy 2.080000 106.08
Non-energy
Fixtures 5.140000 262.14
Maintenance 2.230000 113.73
HPS0200 200 22000 F 103 9,064
Energy 3.040000 313.12
Non-energy
Fixtures 7.800000 803.40
Maintenance 2.850000 293.55
Account Number:
74042-50974
For: 02-04-2025 to 03-04-2025 (28 days)
kWh/Day: 3,349
Service Address:
STREET LIGHTS #DANIA
DANIA, FL 33004
FPL.com Page 3
* F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS
H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER
ESLA
Customer Name:
CITY OF DANIA BEACH
Component Code Watts Lumens Owner/
Maint *Quantity Rate/Unit kWh Used Amount
HPS0400 400 50000 F 7 1,176
Energy 5.810000 40.67
Non-energy
Fixtures 7.880000 55.16
Maintenance 2.840000 19.88
HPS0250 250 27500 R 3 348
Energy 4.010000 12.03
Non-energy
Relamp 3.090000 9.27
HPS0400 400 50000 R 37 6,216
Energy 5.810000 214.97
Non-energy
Relamp 2.850000 105.45
PMC0001 308
Non-energy
Fixtures 8.250000 2,541.00
PMW0001 377
Non-energy
Fixtures 6.030000 2,273.31
UCNP 13,456
Non-energy
Maintenance 0.049350 664.05
UCUP 408
Non-energy
Maintenance 0.120540 49.18
Account Number:
74042-50974
For: 02-04-2025 to 03-04-2025 (28 days)
kWh/Day: 3,349
Service Address:
STREET LIGHTS #DANIA
DANIA, FL 33004
FPL.com Page 4
* F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS
H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER
ESLA
Customer Name:
CITY OF DANIA BEACH
Component Code Watts Lumens Owner/
Maint *Quantity Rate/Unit kWh Used Amount
Energy sub total 3,198.96
Non-energy sub total 20,848.17
Sub total 93,767 24,047.13
Energy conservation cost recovery 36.57
Capacity payment recovery charge 6.56
Environmental cost recovery charge 45.95
Storm restoration recovery charge 1,942.85
Transition rider credit −194.10
Storm protection recovery charge 523.22
Fuel charge 2,447.10
Electric service amount 28,855.28
Gross receipts tax (State tax)205.49
Regulatory fee (State fee)26.15
Franchise fee (Reqd local fee)1,752.07
Total 93,767 30,838.99
Account Number:
74042-50974
For: 02-04-2025 to 03-04-2025 (28 days)
kWh/Day: 3,349
Service Address:
STREET LIGHTS #DANIA
DANIA, FL 33004
FPL.com Page 5
* F - FPL OWNS & MAINTAINS E - CUSTOMER OWNS & MAINTAINS R - CUSTOMER OWNS, FPL RELAMPS
H - FPL OWNS & MAINTAINS FIXTURE, CUST OWNS OTHER
ESLA
CURRENT BILL
$27.43
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 55.46
Payments received -55.46
Balance before new charges 0.00
Total new charges 27.43
Total amount you owe $27.43
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 74309-73243
Service Address:
106 N BEACH RD
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
74309-73243 $27.43 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
20 kWh
16 kWh
12 kWh
8 kWh
4 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 74309-73243
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 55.46
Payments received - Thank you −55.46
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Minimum base bill charge:$11.84
Non-fuel:( $0.096100 per kWh)$0.38
Fuel:( $0.027180 per kWh)$0.11
Electric service amount 25.20
Gross receipts tax (State tax)0.65
Franchise fee (Reqd local fee)1.56
Taxes and charges 2.21
Regulatory fee (State fee)0.02
Total new charges $27.43
Total amount you owe $27.43
METER SUMMARY
Meter reading - Meter KE82004. Next meter reading Apr 8, 2025.
Usage Type Current - Previous = Usage
kWh used 02746 02742 4
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 4 4 11
Service days 28 32 29
kWh/day 0 0 0
Amount $27.43 $27.43 $27.83
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,276.58
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 1,313.84
Payments received -1,313.84
Balance before new charges 0.00
Total new charges 1,276.58
Total amount you owe $1,276.58
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 75296-61378
Service Address:
1201 STIRLING RD #PSAB
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
75296-61378 $1,276.58 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
17,100 kWh
13,680 kWh
10,260 kWh
6,840 kWh
3,420 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 75296-61378
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 1,313.84
Payment received - Thank you −1,313.84
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$410.74
Fuel:( $0.027180 per kWh)$329.42
Demand:($13.41 per KW)$402.30
Electric service amount 1,172.87
Gross receipts tax (State tax)30.10
Franchise fee (Reqd local fee)72.53
Taxes and charges 102.63
Regulatory fee (State fee)1.08
Total new charges $1,276.58
Total amount you owe $1,276.58
METER SUMMARY
Meter reading - Meter KU38133. Next meter reading Apr 9, 2025.
Usage Type Current - Previous x Const = Usage
kWh used 30992 30790 60 12120
Demand KW .50 60.00 30
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 12120 12900 10380
Service days 28 32 31
kWh/day 432 403 334
Amount $1,276.58 $1,313.84 $1,242.09
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$133.39
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 122.28
Payments received -122.28
Balance before new charges 0.00
Total new charges 133.39
Total amount you owe $133.39
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 75615-78464
Service Address:
1200 NW 1ST ST
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
DANIA BEACH COMMUNITY REDEVELOPMENT AGENCY,
Here's what you owe for this billing period.
E001
75615-78464 $133.39 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
DANIA BEACH COMMUNITY
REDEVELOPMENT AGENCY
100 W DANIA BEACH BLVD
DANIA BEACH FL 33004-3643
ENERGY USAGE HISTORY
2,350 kWh
1,880 kWh
1,410 kWh
940 kWh
470 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payments received after April 07, 2025 are considered late; a late payment
charge, the greater of $5.00 or 1.5% of your past due balance will apply.
Your account may also be billed a deposit adjustment.
E001Customer Name: Account Number:FPL.com Page 2
DANIA BEACH
COMMUNITY
REDEVELOPMENT
AGENCY
75615-78464
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 122.28
Payment received - Thank you −122.28
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$71.88
Fuel:( $0.027180 per kWh)$20.33
Electric service amount 105.08
Gross receipts tax (State tax)2.70
Franchise fee (Reqd local fee)6.50
Utility tax (Local tax)9.92
Florida sales tax (State tax)7.95
County sales tax (Local tax)1.14
Taxes and charges 28.21
Regulatory fee (State fee)0.10
Total new charges $133.39
Total amount you owe $133.39
METER SUMMARY
Meter reading - Meter ACD1767. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 07813 07065 748
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 748 645 1152
Service days 28 32 31
kWh/day 27 20 37
Amount $133.39 $117.28 $198.19
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$6,599.93
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 7,419.07
Payments received -3,660.75
Balance before new charges 3,758.32
Total new charges 2,841.61
Total amount you owe $6,599.93
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 3, 2025 to Mar 3, 2025 (28 days)
Statement Date: Mar 3, 2025
Account Number: 77463-97251
Service Address:
2901 SW 52ND ST #POOL
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
77463-97251 $6,599.93 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
C/O TANIA STEVENS
100 W DANIA BEACH BLVD
DANIA BEACH FL 33004-3699
ENERGY USAGE HISTORY
51,300 kWh
41,040 kWh
30,780 kWh
20,520 kWh
10,260 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 77463-97251
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 7,419.07
Payment received - Thank you −3,660.75
Balance before new charges $3,758.32
New Charges
Rate: HLFT-1 HIGH LOAD FACTOR DEMAND TIME OF USE
Electric service amount **2,610.76
Gross receipts tax (State tax)67.00
Franchise fee (Reqd local fee)161.44
Taxes and charges 228.44
Regulatory fee (State fee)2.41
Total new charges $2,841.61
Total amount you owe $6,599.93
** Your electric service amount includes the following charges:
Base charge:$30.41
Non-fuel energy charge:
On-peak $0.030330 per kWh
Off-peak $0.022150 per kWh
Fuel charge:
On-peak $0.030740 per kWh
Off-peak $0.025650 per kWh
Demand charge:
On-Peak $15.45 per KW
Maximum $2.80 per KW
METER SUMMARY
Meter reading - Meter MLL7780. Next meter reading Apr 1, 2025.
Usage Type Current - Previous = Usage
Total kWh used 68954 41346 27608
On-Peak kWh used 98265 91280 6985
Off-peak kWh used 20623
On-peak demand 64.25 64
Maximum demand 64
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 3, 2025 Feb 3, 2025 Mar 1, 2024
kWh Used 27608 42785 46625
Service days 28 32 29
kWh/day 986 1337 1607
Amount $2,841.61 $3,758.32 $4,715.32
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$10,164.00
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 10,690.26
Payments received -10,690.26
Balance before new charges 0.00
Total new charges 10,164.00
Total amount you owe $10,164.00
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 78869-61130
Service Address:
1201 STIRLING RD #HSPS
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
78869-61130 $10,164.00 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
134,800 kWh
107,840 kWh
80,880 kWh
53,920 kWh
26,960 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 78869-61130
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 10,690.26
Payment received - Thank you −10,690.26
Balance before new charges $0.00
New Charges
Rate: GSDT-1 GENERAL SERVICE DEMAND TIME OF USE
Electric service amount **9,338.28
Gross receipts tax (State tax)239.65
Franchise fee (Reqd local fee)577.45
Taxes and charges 817.10
Regulatory fee (State fee)8.62
Total new charges $10,164.00
Total amount you owe $10,164.00
** Your electric service amount includes the following charges:
Base charge:$30.41
Non-fuel energy charge:
On-peak $0.062970 per kWh
Off-peak $0.022150 per kWh
Fuel charge:
On-peak $0.030740 per kWh
Off-peak $0.025650 per kWh
Demand charge:$12.69 per KW
Maximum $0.71 per KW
METER SUMMARY
Meter reading - Meter MV57024. Next meter reading Apr 9, 2025.
Usage Type Current - Previous x Const = Usage
Total kWh used 15156 14225 120 111720
On-Peak kWh used 29190 28966 120 26880
Off-peak kWh used 84840
On-peak demand 1.70 120.00 204
Maximum demand 204
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 111720 122520 112560
Service days 28 32 31
kWh/day 3990 3828 3630
Amount $10,164.00 $10,690.26 $10,674.88
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$29.24
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 29.69
Payments received -29.69
Balance before new charges 0.00
Total new charges 29.24
Total amount you owe $29.24
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 82314-31431
Service Address:
803 NW 1ST ST #PKGLTLGTS
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
82314-31431 $29.24 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
PO BOX 1708
DANIA FL 33004-1708
ENERGY USAGE HISTORY
50 kWh
40 kWh
30 kWh
20 kWh
10 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 82314-31431
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 29.69
Payment received - Thank you −29.69
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Minimum base bill charge:$9.44
Non-fuel:( $0.096100 per kWh)$3.55
Fuel:( $0.027180 per kWh)$1.01
Electric service amount 26.87
Gross receipts tax (State tax)0.69
Franchise fee (Reqd local fee)1.66
Taxes and charges 2.35
Regulatory fee (State fee)0.02
Total new charges $29.24
Total amount you owe $29.24
METER SUMMARY
Meter reading - Meter ACD7830. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 06943 06906 37
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 37 45 40
Service days 28 32 31
kWh/day 1 1 1
Amount $29.24 $29.69 $29.52
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$759.74
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 1,507.92
Payments received -1,507.92
Balance before new charges 0.00
Total new charges 759.74
Total amount you owe $759.74
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 82343-56627
Service Address:
200 NE 2 ST #CTS
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
82343-56627 $759.74 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
3,600 kWh
2,880 kWh
2,160 kWh
1,440 kWh
720 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 82343-56627
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 1,507.92
Payments received - Thank you −1,507.92
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$102.59
Fuel:( $0.027180 per kWh)$82.27
Demand:($13.41 per KW)$482.76
Electric service amount 698.03
Gross receipts tax (State tax)17.91
Franchise fee (Reqd local fee)43.16
Taxes and charges 61.07
Regulatory fee (State fee)0.64
Total new charges $759.74
Total amount you owe $759.74
METER SUMMARY
Meter reading - Meter KEL4829. Next meter reading Apr 8, 2025.
Usage Type Current - Previous = Usage
kWh used 22672 19645 3027
Demand KW 35.59 36
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 3027 3265 1757
Service days 28 32 29
kWh/day 108 102 60
Amount $759.74 $775.56 $687.47
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$341.11
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 611.86
Payments received -611.86
Balance before new charges 0.00
Total new charges 341.11
Total amount you owe $341.11
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 82363-52681
Service Address:
200 NE 2 ST
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
82363-52681 $341.11 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
3,450 kWh
2,760 kWh
2,070 kWh
1,380 kWh
690 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
· A secondary metering adjustment of 3% has been added to metered KWH
per Tariff Sheet 10.010.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 82363-52681
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 611.86
Payments received - Thank you −611.86
Balance before new charges $0.00
New Charges
Rate: OS-2 SPORTS FIELD SERVICE
Electric service amount **296.59
Gross receipts tax (State tax)7.61
Franchise fee (Reqd local fee)18.34
Taxes and charges 25.95
Facilities rental 18.28
Regulatory fee (State fee)0.29
Total new charges $341.11
Total amount you owe $341.11
** Your electric service amount includes the following charges:
Base charge:$156.45
Non-fuel energy charge:
$0.136790 per kWh
Fuel charge:$0.026940 per kWh
METER SUMMARY
Meter reading - Meter KLL4681. Next meter reading Apr 8, 2025.
Usage Type Current - Previous = Usage
kWh used 81529 80697 856
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 856 918 928
Service days 28 32 29
kWh/day 29 27 31
Amount $322.81 $333.88 $330.73
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$971.68
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 1,043.45
Payments received -1,043.45
Balance before new charges 0.00
Total new charges 971.68
Total amount you owe $971.68
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 83534-55572
Service Address:
128 NW 10 CT # LS7
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
83534-55572 $971.68 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
16,200 kWh
12,960 kWh
9,720 kWh
6,480 kWh
3,240 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
· Pulse metering conversion factors are available upon request.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 83534-55572
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 1,043.45
Payment received - Thank you −1,043.45
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$300.95
Fuel:( $0.027180 per kWh)$241.36
Demand:($13.41 per KW)$254.79
Electric service amount 827.51
Gross receipts tax (State tax)21.24
Franchise fee (Reqd local fee)51.17
Taxes and charges 72.41
Regulatory fee (State fee)0.76
Total new charges $900.68
FPL Affiliate and Other Programs
Power monitoring-premium plus 71.00
--For ??, please contact your account manager
Total FPL affiliate and other charges $71.00
Total amount you owe $971.68
METER SUMMARY
Meter reading - Meter ST38676. Next meter reading Apr 9, 2025.
Usage Type Current - Previous x Const = Usage
kWh used 05725 05577 60 8880
Demand KW 19
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 8880 9960 8940
Service days 28 32 31
kWh/day 317 311 288
Amount $900.68 $972.45 $1,588.68
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$34.63
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 31.99
Payments received -31.99
Balance before new charges 0.00
Total new charges 34.63
Total amount you owe $34.63
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 83594-58521
Service Address:
120 NW 10 CT
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
83594-58521 $34.63 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
200 kWh
160 kWh
120 kWh
80 kWh
40 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 83594-58521
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 31.99
Payment received - Thank you −31.99
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Minimum base bill charge:$2.30
Non-fuel:( $0.096100 per kWh)$12.97
Fuel:( $0.027180 per kWh)$3.67
Electric service amount 31.81
Gross receipts tax (State tax)0.82
Franchise fee (Reqd local fee)1.97
Taxes and charges 2.79
Regulatory fee (State fee)0.03
Total new charges $34.63
Total amount you owe $34.63
METER SUMMARY
Meter reading - Meter ACD6938. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 07928 07793 135
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 135 87 19
Service days 28 32 31
kWh/day 5 3 1
Amount $34.63 $31.99 $28.30
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$187.28
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 219.86
Payments received -219.86
Balance before new charges 0.00
Total new charges 187.28
Total amount you owe $187.28
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 83671-08357
Service Address:
1855 GRIFFIN RD #LS 10
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
83671-08357 $187.28 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
1855 GRIFFIN RD # LS10
DANIA FL 33004-2436
ENERGY USAGE HISTORY
1,250 kWh
1,000 kWh
750 kWh
500 kWh
250 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 83671-08357
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 219.86
Payment received - Thank you −219.86
Balance before new charges $0.00
New Charges
Rate: GSD-1 GENERAL SERVICE DEMAND
Base charge:$30.41
Non-fuel:( $0.033890 per kWh)$33.96
Fuel:( $0.027180 per kWh)$27.23
Demand:($13.41 per KW)$80.46
Electric service amount 172.06
Gross receipts tax (State tax)4.42
Franchise fee (Reqd local fee)10.64
Taxes and charges 15.06
Regulatory fee (State fee)0.16
Total new charges $187.28
Total amount you owe $187.28
METER SUMMARY
Meter reading - Meter KJJ8920. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 38191 37189 1002
Demand KW 6.41 6
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 1002 1053 942
Service days 28 32 31
kWh/day 35 32 30
Amount $187.28 $219.86 $258.63
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$33.72
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 33.69
Payments received -16.83
Balance before new charges 16.86
Total new charges 16.86
Total amount you owe $33.72
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 3, 2025 to Mar 3, 2025 (28 days)
Statement Date: Mar 3, 2025
Account Number: 83822-11186
Service Address:
4540 SW 27TH AVE # OL
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
Hello City Of Dania Beach,
Here's what you owe for this billing period.
E001
83822-11186 $33.72 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
90 kWh
72 kWh
54 kWh
36 kWh
18 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
· Charges and energy usage are based on the facilities contracted. Facility,
energy and fuel costs are available upon request.
E001Customer Name: Account Number:FPL.com Page 2
City Of Dania Beach 83822-11186
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 33.69
Payment received - Thank you −16.83
Balance before new charges $16.86
New Charges
Rate: OL-1 OUTDOOR LIGHTING
Electric service amount **15.66
Gross receipts tax (State tax)0.23
Franchise fee (Reqd local fee)0.96
Taxes and charges 1.19
Regulatory fee (State fee)0.01
Total new charges $16.86
Total amount you owe $33.72
** Your electric service amount includes the following charges:
Non-fuel energy charge:
$0.091030 per kWh
Fuel charge:$0.026470 per kWh
METER SUMMARY
Next bill date Apr 1, 2025.
Usage Type Usage
Total kWh used 77
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 3, 2025 Feb 3, 2025 Mar 1, 2024
kWh Used 77 77 77
Service days 28 32 29
kWh/day 3 2 3
Amount $16.86 $16.86 $14.59
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$5,173.77
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 9,517.05
Payments received -9,517.05
Balance before new charges 0.00
Total new charges 5,173.77
Total amount you owe $5,173.77
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 83875-32461
Service Address:
101 N BEACH RD #MARINA
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
83875-32461 $5,173.77 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
131,500 kWh
105,200 kWh
78,900 kWh
52,600 kWh
26,300 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 83875-32461
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 9,517.05
Payments received - Thank you −9,517.05
Balance before new charges $0.00
New Charges
Rate: GSDT-1 GENERAL SERVICE DEMAND TIME OF USE
Electric service amount **4,753.45
Gross receipts tax (State tax)121.99
Franchise fee (Reqd local fee)293.94
Taxes and charges 415.93
Regulatory fee (State fee)4.39
Total new charges $5,173.77
Total amount you owe $5,173.77
** Your electric service amount includes the following charges:
Base charge:$30.41
Non-fuel energy charge:
On-peak $0.062970 per kWh
Off-peak $0.022150 per kWh
Fuel charge:
On-peak $0.030740 per kWh
Off-peak $0.025650 per kWh
Demand charge:$12.69 per KW
Maximum $0.71 per KW
METER SUMMARY
Meter reading - Meter MV58927. Next meter reading Apr 8, 2025.
Usage Type Current - Previous x Const = Usage
Total kWh used 41108 40674 120 52080
On-Peak kWh used 11440 11344 120 11520
Off-peak kWh used 40560
On-peak demand 1.05 120.00 126
Maximum demand 149
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 52080 51120 53040
Service days 28 32 29
kWh/day 1860 1597 1828
Amount $5,173.77 $4,775.19 $5,550.79
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$59.01
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 117.88
Payments received -117.88
Balance before new charges 0.00
Total new charges 59.01
Total amount you owe $59.01
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 10, 2025 to Mar 10, 2025 (28 days)
Statement Date: Mar 10, 2025
Account Number: 92733-58607
Service Address:
300 NE 2ND ST # OL
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
92733-58607 $59.01 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
300 kWh
240 kWh
180 kWh
120 kWh
60 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
· Charges and energy usage are based on the facilities contracted. Facility,
energy and fuel costs are available upon request.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 92733-58607
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 117.88
Payments received - Thank you −117.88
Balance before new charges $0.00
New Charges
Rate: OL-1 OUTDOOR LIGHTING
Electric service amount **54.84
Gross receipts tax (State tax)0.77
Franchise fee (Reqd local fee)3.35
Taxes and charges 4.12
Regulatory fee (State fee)0.05
Total new charges $59.01
Total amount you owe $59.01
** Your electric service amount includes the following charges:
Non-fuel energy charge:
$0.091030 per kWh
Fuel charge:$0.026470 per kWh
METER SUMMARY
Next bill date Apr 8, 2025.
Usage Type Usage
Total kWh used 256
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 10, 2025 Feb 10, 2025 Mar 8, 2024
kWh Used 256 256 256
Service days 28 32 29
kWh/day 9 8 9
Amount $59.01 $59.01 $51.46
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$647.51
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 649.84
Payments received -359.70
Balance before new charges 290.14
Total new charges 357.37
Total amount you owe $647.51
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 3, 2025 to Mar 3, 2025 (28 days)
Statement Date: Mar 3, 2025
Account Number: 95580-98431
Service Address:
2901 SW 52ND ST
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
95580-98431 $647.51 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
5,950 kWh
4,760 kWh
3,570 kWh
2,380 kWh
1,190 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 95580-98431
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 649.84
Payment received - Thank you −359.70
Balance before new charges $290.14
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$245.92
Fuel:( $0.027180 per kWh)$69.55
Electric service amount 328.34
Gross receipts tax (State tax)8.43
Franchise fee (Reqd local fee)20.30
Taxes and charges 28.73
Regulatory fee (State fee)0.30
Total new charges $357.37
Total amount you owe $647.51
METER SUMMARY
Meter reading - Meter AC03956. Next meter reading Apr 1, 2025.
Usage Type Current - Previous = Usage
kWh used 02443 99884 2559
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 3, 2025 Feb 3, 2025 Mar 1, 2024
kWh Used 2559 2058 2103
Service days 28 32 29
kWh/day 91 64 73
Amount $357.37 $290.14 $300.70
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$250.17
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 251.89
Payments received -251.89
Balance before new charges 0.00
Total new charges 250.17
Total amount you owe $250.17
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 11, 2025 to Mar 11, 2025 (28 days)
Statement Date: Mar 11, 2025
Account Number: 96241-18460
Service Address:
230 SW 12TH AVE
DANIA, FL 33004
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
96241-18460 $250.17 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W DANIA BEACH BLVD
DANIA FL 33004-3699
ENERGY USAGE HISTORY
6,600 kWh
5,280 kWh
3,960 kWh
2,640 kWh
1,320 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 96241-18460
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 251.89
Payment received - Thank you −251.89
Balance before new charges $0.00
New Charges
Rate: GS-1 GENERAL SVC NON-DEMAND / BUSINESS
Base charge:$12.87
Non-fuel:( $0.096100 per kWh)$169.14
Fuel:( $0.027180 per kWh)$47.84
Electric service amount 229.85
Gross receipts tax (State tax)5.90
Franchise fee (Reqd local fee)14.21
Taxes and charges 20.11
Regulatory fee (State fee)0.21
Total new charges $250.17
Total amount you owe $250.17
METER SUMMARY
Meter reading - Meter KLL3254. Next meter reading Apr 9, 2025.
Usage Type Current - Previous = Usage
kWh used 08292 06532 1760
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 11, 2025 Feb 11, 2025 Mar 11, 2024
kWh Used 1760 1773 2270
Service days 28 32 31
kWh/day 62 55 73
Amount $250.17 $251.89 $323.48
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.
CURRENT BILL
$1,668.68
TOTAL AMOUNT YOU OWE
Apr 7, 2025
NEW CHARGES DUE BY
BILL SUMMARY
Amount of your last bill 3,578.34
Payments received -3,578.34
Balance before new charges 0.00
Total new charges 1,668.68
Total amount you owe $1,668.68
(See page 2 for bill details.)
FPL.com Page 1
Electric Bill Statement
For: Feb 4, 2025 to Mar 4, 2025 (28 days)
Statement Date: Mar 4, 2025
Account Number: 97812-54595
Service Address:
2301 STIRLING RD # WELLFLD
FORT LAUDERDALE, FL 33312
Customer Service:
Outside Florida:
Summary Bill Coordinator
1-800-226-3545
Report Power Outages:
Hearing/Speech Impaired:
1-800-4OUTAGE (468-8243)
711 (Relay Service)
CITY OF DANIA BEACH,
Here's what you owe for this billing period.
E001
97812-54595 $1,668.68 Apr 7, 2025 $SEND MASTER
COUPON
ACCOUNT NUMBER TOTAL AMOUNT YOU OWE NEW CHARGES DUE BY AMOUNT ENCLOSED
/ 3* SEND SUMMARY BILL MASTER COUPON ONLY*
SUMMARY BILL MASTER
17071-61087
CITY OF DANIA BEACH
100 W BCH BLV
DANIA FL 33004
ENERGY USAGE HISTORY
23,850 kWh
19,080 kWh
14,310 kWh
9,540 kWh
4,770 kWh
0 kWh
M A M J J A S O N D J F M2024 2025
KEEP IN MIND
· Payment received after June 05, 2025 is considered LATE; a late payment
charge of 1% will apply.
E001Customer Name: Account Number:FPL.com Page 2
CITY OF DANIA BEACH 97812-54595
Download the app
Get instant, secure access to outage and billing info from your mobile device.
FPL.com/MobileApp
BILL DETAILS
Amount of your last bill 3,578.34
Payments received - Thank you −3,578.34
Balance before new charges $0.00
New Charges
Rate: GSDT-1 GENERAL SERVICE DEMAND TIME OF USE
Electric service amount **1,533.12
Gross receipts tax (State tax)39.34
Franchise fee (Reqd local fee)94.80
Taxes and charges 134.14
Regulatory fee (State fee)1.42
Total new charges $1,668.68
Total amount you owe $1,668.68
** Your electric service amount includes the following charges:
Base charge:$30.41
Non-fuel energy charge:
On-peak $0.062970 per kWh
Off-peak $0.022150 per kWh
Fuel charge:
On-peak $0.030740 per kWh
Off-peak $0.025650 per kWh
Demand charge:$12.69 per KW
Maximum $0.71 per KW
METER SUMMARY
Meter reading - Meter MN55198. Next meter reading Apr 2, 2025.
Usage Type Current - Previous = Usage
Total kWh used 32313 13329 18984
On-Peak kWh used 31887 27385 4502
Off-peak kWh used 14482
On-peak demand 29.32 29
Maximum demand 29
ENERGY USAGE COMPARISON
This Month Last Month Last Year
Service to Mar 4, 2025 Feb 4, 2025 Mar 4, 2024
kWh Used 18984 21666 18
Service days 28 32 31
kWh/day 678 677 0
Amount $1,668.68 $1,832.06 $28.23
KEEP IN MIND
· Taxes, fees, and charges on your bill are determined and required by your
local and state government to be used at their discretion.
· The fuel charge represents the cost of fuel used to generate electricity. It is
a direct pass-through to customers. FPL does not profit from fuel, although
higher costs do result in higher state and local taxes and fees.