Loading...
HomeMy WebLinkAboutInv# Pay App 009 - S3S Construction, Inc. - 03/17/2025 (2)Change Proposal Request (CPR) Page 1 of 2 Project Information Change Proposal Request Project #230129 Contract #001 Title Building Department Renovation CPR #006 Address 100 West Dania Beach Boulevard Issue Date 11-Nov-2024 Subject City, State, Zip Dania Beach, FL 33004 Country Light Fixture Package Upgrade Prime Contract Company Owner Contact Kevin Maragh Contact John Quintero Company S3S Construction, Inc.Company City of Dania Beach Address 7320 Griffin Rd Address 100 West Dania Beach Boulevard Suite 222 City, State, Zip Davie, FL 33314 City, State, Zip Dania Beach, FL 33004 Country United States Country Phone Phone 954-924-6800 Fax Fax Description of the proposed change: This change proposal request (CPR) is for the difference in price between the upgraded light fixtures shown on the revised RCP received on October 7, 2024, and the fixtures shown on the original bid plans. This CPR also includes the cost of adding (1) duplex receptacle in the closet next to the women's restroom and modifying the ceiling grid and tiles to accommodate the new linear light fixtures. We request your approval to deduct the amount of $32,217.14 from the remaining Owner's Contingency. The construction budget shall be increased by $20,138.96 to satisfy the total cost of this CPR. Net Amount of this Proposed Change:$20,138.96 The Contract time due to this Change Proposal Request has increased by 15 Working Days. This document, when fully executed as accepted, shall constitute authorization to proceed with the work described herein. Submitted By Response:￿ Accept ￿ Do Not Accept S3S Construction, Inc. City of Dania Beach Company Company __________________________________________________________________________________________________________________ By Date By Date 11/11/24 Change Proposal Request (CPR) Page 2 of 2 Proposed Items Item #Item Description Quantity Unit Unit Price Subtotal 1 Custom Order Cross T's and Tiles to accommodate linear light fixtures 1 LS 1,500.00 1,500.00 2 Upgraded Lighting Package 1 LS 39,308.00 39,308.00 3 Field General Conditions 1 LS 3,264.64 3,264.64 4 Overhead & Profit 1 LS 6,610.90 6,610.90 5 Payment & Performance Bond Fee (3% of 110% of the total amount)1 LS 1,672.56 1,672.56 6 Owner's Contingency 1 LS -32,217.14 -32,217.14 Subtotal = $20,138.96 Tax = $0.00 Total = $20,138.96 Project: Job ID: CO: 24-1151 DANIA BEACH BUILDING DEPT RFCO 001: NEW LIGHTING PACKAGE 18 Oct 2024 16:01:03 Change Order Summary Tax Rate status: Default Bid Name: BASE BID Bid Template: BASIC AND CHANGE ORDER Phase Quote $Material $Equip $SubCon $Labor HrsDrawing FIXTURES 31,749.41 0.00 0.00 0.00 0.00 31,749.41 0.00 0.00 0.00 0.00Sheet Totals: 2,222.46 0.00 0.00 0.00 31,749.41 2,222.46 33,971.87 33,971.87 Sub Total (Quo/Mat/Equip/Sub): Sales Tax: Sub Total: 0.00 0.00 0.00 0.00 Direct Labor $: Indirect Labor $: Labor Escalation: Labor Tax: 0.00Direct Job Costs (0.00%): 33,971.87 3,397.19 37,369.06 1,868.45 0.00 0.00 39,237.51 Prime Cost: Net Cost: Job Tax: Selling Price: Overhead (Avg. 10.00%): Profit (Avg. 5.00%): Bond (0.0000%): 7.0000% 0.0000% 7.0000% 0.0000% 0.0000% Material: Labor: Equipment: Subcontract: Job: TAX RATES MISCELLANEOUS Avg. Lbr. Rate (Cost): Labor Hrs Per Sq. Ft.: Quantity of Units: Cost Per Unit: Labor $ Per Sq. Ft.: Cost Per Sq. Ft.: Total Square Feet: Avg. Lbr. Rate (Bid): Calc. Adjustment: 0.00 0.00 1.00 39,237.51 0.00 0.00 1.00 39,237.51 0.00% Tax: Quote: 7.0000% Bid Notes: Lump Sum: 0.00 6151 Pembroke Rd. Hollywood, FL 33023 Tirone Electric & Data Phone: (954) 989-7162 Web: www.tirone-electric.com Page 1 of 1ConEst Software Systems ESTA BL ISHED IN 1978 6151 PEMBROKE RD • HOLLYWOOD, FL 33023 PHONE: (954) 989 -7162 FAX: (954) 894 -0334 WWW.TIRONE -ELECTRIC.COM REQUEST FOR CHANGE ORDER To: S3S CONSTRUCTION INC. 7320 GRIFFIN ROAD, SUITE 222 DAVIE, FL 33314 Date: 11/4/2024 Project: DANIA BCH BLDG DEPARTMENT Scope of change to be performed under the same conditions as specified in the original contract unless otherwise stipulated. Tirone Electric, Inc. reserves the right to claim for additional direct and indirect costs and time extension due to impact and/or delay of execution of work. RFC No: 001 Scope of work: Difference in price of new revised lighting package and bid lighting package. Install (1) duplex receptacle in closet next to womens restroom. Upon approval the sum of $39,308.00 will be added to the contract price. Original Contract $246,600.00 Other Approved Change Orders $0.00 Total Contract to Date $246,600.00 This Request $39,308.00 Other Pending Requests $0.00 Total Contract plus Pending RFCs $285,908.00 Authorized Signature: ______________________________________ Date: _________ TIRONE ELECTRIC & DATA Authorized Signature: ______________________________________ Date: _________ S3S CONSTRUCTION INC. 11/4/24 Project: Job ID: CO: 24-1151 DANIA BEACH BUILDING DEPT RFCO 001: NEW LIGHTING PACKAGE 4 Nov 2024 9:49:02 Change Order Summary Tax Rate status: Default Bid Name: BASE BID Bid Template: BASIC AND CHANGE ORDER Phase Quote $Material $Equip $SubCon $Labor HrsDrawing FIXTURES 0.00 31,749.41 0.00 0.00 0.00 DEVICES 0.00 56.69 0.00 0.00 6.48 0.00 31,806.10 0.00 0.00 6.48Sheet Totals: 0.00 2,226.43 0.00 0.00 31,806.10 2,226.43 34,032.53 34,032.53 Sub Total (Quo/Mat/Equip/Sub): Sales Tax: Sub Total: 0.00 0.00 0.00 0.00 Direct Labor $: Indirect Labor $: Labor Escalation: Labor Tax: 0.00Direct Job Costs (0.00%): 34,032.53 3,403.25 37,435.78 1,871.79 0.00 0.00 39,307.57 Prime Cost: Net Cost: Job Tax: Selling Price: Overhead (Avg. 10.00%): Profit (Avg. 5.00%): Bond (0.0000%): 7.0000% 0.0000% 7.0000% 0.0000% 0.0000% Material: Labor: Equipment: Subcontract: Job: TAX RATES MISCELLANEOUS Avg. Lbr. Rate (Cost): Labor Hrs Per Sq. Ft.: Quantity of Units: Cost Per Unit: Labor $ Per Sq. Ft.: Cost Per Sq. Ft.: Total Square Feet: Avg. Lbr. Rate (Bid): Calc. Adjustment: 0.00 0.00 1.00 39,307.57 6.48 0.00 1.00 39,307.57 0.00% Tax: Quote: 7.0000% Bid Notes: Lump Sum: 0.00 6151 Pembroke Rd. Hollywood, FL 33023 Tirone Electric & Data Phone: (954) 989-7162 Web: www.tirone-electric.com Page 1 of 1ConEst Software Systems Project: Job ID: CO: Takeoff 24-1151 DANIA BEACH BUILDING DEPT RFCO 001: NEW LIGHTING PACKAGE 4 Nov 2024 9:51:48 Phase: FIXTURES Qty Size DescriptionItem #U/M Q/M Material Unit Material Result Labor Unit Labor Result 0.00 OLD LIGHTING PACKAGE -1.00 EA OLD LIGHTING PACKAGE2M -64,073.03 0.00 64,073.0300 0.0000 0.00 NEW LIGHTING PACKAGE 1.00 EA NEW LIGHTING PACKAGE3M 95,822.44 0.00 95,822.4400 0.0000 31,749.41 0.00Phase Totals: Phase: DEVICES Qty Size DescriptionItem #U/M Q/M Material Unit Material Result Labor Unit Labor Result 0.00 NEW OUTLET IN CLOSET NEXT TO WOMENS RESTROOM 20.00 3/4FT EMT10047M 14.21 1.50 0.7105 0.0750 3.00 3/4EA EMT STEEL-COMP COUPLING30304M 1.26 0.63 0.4195 0.2100 2.00 3/4EA EMT STEEL COMP CONNECTOR30384M 0.70 0.90 0.3505 0.4500 2.00 1-1/2"D 21.0-CIEA 4"SQ 3/4- KO NO BRKT150005M 2.20 0.80 1.1008 0.4000 1.00 5/8"RISE 4.8-CIEA 1G 4"SQ PLASTER-RING150061M 0.53 0.25 0.5302 0.2500 1.00 EA 4"SQ BLANK CVR150091M 0.42 0.10 0.4202 0.1000 1.00 18"EA ADJ OUTLET BOX BRACKET161159M 5.73 0.05 5.7292 0.0540 1.00 20AEA DX RECEPT SPECIFICATION GRADE140016M 8.99 0.45 8.9900 0.4500 1.00 1-DUPLEXEA 1G PLASTIC PLATE140415M 1.50 0.15 1.5000 0.1500 3.00 3/4EA EMT 1-HOLE STEEL STRAP161262M 0.20 0.18 0.0667 0.0600 7.00 #10 x 1 1/4"EA TEK SCREW160955M 0.37 0.25 0.0530 0.0360 90.00 12FT THHN/THWN CU (STR)70033 M 14.14 0.81 0.1571 0.0090 10.00 12/2M MC CABLE - ALUM JKT W/G70307M 6.44 0.41 0.6441 0.0406 56.69 6.48Phase Totals: 31,806.10 6.48Job Totals: 6151 Pembroke Rd. Hollywood, FL 33023 Tirone Electric & Data Phone: (954) 989-7162 Web: www.tirone-electric.com Page 1 of 1